Loading...
HomeMy WebLinkAbout2001-09-18; City Council; 16331; 2000-2001 Pavement Overlay ProjectCITY OF CARLSBAD -AGENDA BILL \B# II,,331 TITLE: AWARD OF CONTRACT FOR THE CONSTRUCTION OF ATG. 9/I l/O1 2000/01 PAVEMENT OVERLAY PROJECT IEPT. ENG PROJECT NO. 3667-4 m CITY MGR. RECOMMENDED ACTION: Adopt Resolution No. 900 I-akj accepting bids and awarding the contract to Nicholas Grant Corp. for the construction of the 2000/01 Pavement Overlay Project, Project No. 3667-4. ITEM EXPLANATION: The 2000/01 Pavement Overlay Project is part of the City’s ongoing Pavement Maintenance Program. Streets selected for this project are generally older streets with considerable wear and/or cracking (see Exhibit 1). Approximately eight miles of roadway will receive a pavement overlay. In addition to the pavement overlay, the construction on some of the streets will include curb and gutter, gutter drains, driveway aprons and full depth pavement section reconstruction. The engineer’s construction cost estimate for this project was $2,220,000. On August 9, 2001, four (4) sealed bids were received for the construction of this project as shown on Table 1: TABLE 1 - CONSTRUCTION BIDS ! *>, :,:.,,‘L ,$ II v ,_ _, < ~~NTR$@F$@~ ” “‘:’ “’ ‘:‘l;;:‘q:i -1 ‘! ?‘: :_ ~~@!$@i@:: ‘j “‘i‘:i: Nicholas Grant Corp. $2,038,387.00 Hazard Construction Company $2,041,957.00 J.D. Paving Inc. $2,148,186.38 Hanson, SJH Construction $2,184,228.73 _ With a bid of $2,038,387, Nicholas Grant Corporation is the lowest responsive bidder. All bid documents submitted by Nicholas Grant Corporation have been reviewed by staff and found to be in order. ENVIRONMENTAL COMPLIANCE: This project is categorically exempt from the environmental review process under Section 15301 Class 1 (C) of the California Environmental Quality Act. FISCAL IMPACT: The estimated construction costs associated with the project is $2,344,145 as summarized in Table 2. TABLE 2- CONSTRUCTION COST OVERVIEW * See Table 3 below. Page 2 of Agenda Bill No. 114,331 The funding for this project, which has been appropriated, comes from TransNet-Local Increment, Gas Tax and AB 2928 as summarized in Table 3. AB 2928, also known as the Traffic Congestion Relief Act of 2000, is a new source of State funding for transportation projects. TABLE 3 - PROJECT FUNDING EXHIBITS: 1. 2. Seven (7) Location Maps (Exhibit 1). Resolution No. 2mj - 2% j accepting bids and awarding the contract to Nicholas Grant Corp. for the construction of the 2000/01 Pavement Overlay Project, Project No. 3667-4. 2 WET 1 Of 6 ‘ROJECT NAME PROJECT EXHIBIT 2000/01 PAVEMENT OVERLAY NUMBER 3667-4 I N By: SCOTT EVANS, CARLSBAD ENGINEERING DEPT. 4/23/01 C: WAPITAL\PLANT~\.~~K~-~ I nrdnmh~ U~PS-~CF~J”~ “we LEGEND: STREETS TO BE OVERLAYED NOT Tb SCALE SHEET 2 OF 6 PROJECT NAME PROJECT EXHIBIT 2000/01 PAVEMENT OVERLAY NUMBER 3667-4 I b?d By: SCOTT EVANS, CARLSBAD ENGINEERING DEPT. 4/23/U C: \CAPITAL\PLANTZ\3&57-4 LOCAT,ON MAPS-AGENDA.DWG LEGEND: STREETS TO BE OVERLAYED LEGEND: STREETS TO BE OVERLAYED SHEET 3 OF 6 PROJECT NAME PROJECT EXHIBIT 2000/01 PAVEMENT OVERLAY NUMBER 3667-4 I w By: SCOTT EVANS, CARLSEAD ENGINEERING DEPL 4123101 GUTTER DRAlN SYSTEM 10 BE /NSTAlLED LEGEND: STREETS TO BE OVERLAYED SHEET 4 OF 6 PROJECT NAME PROJECT EXHIBIT 2000/01 PAVEMENT OVERLAY NUMBER 3667-4 I IW BY: SCOTT EVANS, CARLSBAD ENGINEERING DEPT. 4/23/01 C:\CAPITAL\P~ANTZ\~~~~-~ LOCATION MAPS-AGENDA.DWG b GUTTER DRAIN SYSTEM TO BE /NSTALLED ON CARLlNA STREET NOT TO SCALE LEGEND: STREETS TO BE OVERLAYED SHEET 5 Of 6 PROJECT NAME PROJECT EXHIBIT 2OOO/Of PAVEMENT OVERLAY NUMBER 3667-4 I ‘AUN By: SCOTT EVANS, CARLSEAL? ENGINEERING DEPT. 4/23/01 C:\CAPITAL\PLANT2\3667-4 LOCATION MAPS-AGENDABWG NOT 10 SCALE m-7-F CAFlLSBAD c/n OF ENClNlTAs LEGEND: STREETS TO BE OVERLAYED SHEET 6 OF 6 PROJECT NAME 2000/01 PAVEMENT OVERLAY tU%’ By: SCOTT EVANS. CARLSBAD ENGlNEERlNG DEPT. 4/23/U C: \CAPITAL\PLANT2\3667-4 LOCATION MAPS-AGENDADVG PROJECT EXHIBIT NUMBER 366 7-4 I 6 CITY OF OCEANSIDE LEGEND: LOCA T/ON OF 0 VERLA Y EET 1 OF 1 (ADDENDUM) ROJECT NAME PROJECT EXHIBIT 2000/2001 PAVEMENT OVERLAY PROJECT NUMBER 36674 I 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 RESOLUTION NO. 2001-281 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD, CALIFORNIA, ACCEPTING BIDS AND AWARDING A CONTRACT FOR THE CONSTRUCTION OF THE 2000/01 PAVEMENT OVERLAY PROJECT, PROJECT NO. 3667-4 TO NICHOLAS GRANT. WHEREAS, on June 5”, 2001 the City Council of the City of Carlsbad approved plans for the construction of the 2000/01 Pavement Overlay Project, Project No. 3667-4; and WHEREAS, four (4) sealed bids were received on August 9, 2001 by the City of Carlsbad for the construction of said project; and WHEREAS, the low bid to construct said project was submitted by Nicholas Grant Corporation in the amount of $2,038,387; and WHEREAS, the low bid to construct said project submitted by Nicolas Grant Corporation is responsive; and WHEREAS, the total estimated cost to complete this project is $2,344,145 (which includes construction, project management, inspection, and construction contingencies); and WHEREAS, there are sufficient funds available to complete the project; and WHEREAS, subsection 3.28.172(c)(l) of the Carlsbad Municipal Code authorizes the City Manager to approve change orders in the amount equal to the contingency. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carlsbad, California, as follows: 1. That the above recitations are true and correct. 2. That, the low bid of $2,038,387 submitted by Nicholas Grant Corporation for the construction of the 2000/01 Pavement Overlay Project, Project No. 3667-4, is accepted and the Mayor is hereby authorized to execute a contract with Nicholas Grant Corporation for Project No. 3667-4. 3. That the City Manager is hereby authorized to approve construction change orders UP Ill Ill Ill ill to $203,839. 1 4. That the award of this contract is contingent upon the bidder submitting the lowest 2 responsive bid executing the required contract and submitting the required bonds and insurance 3 policies, as described in the contract, within twenty (20) days of adoption of this resolution. 4 The City Manager may grant reasonable extensions of time. 5 PASSED, APPROVED AND ADOPTED at a regular meeting of the Carlsbad City Council 6 held on the 18th day of September , 2001 by the following vote, to wit: 7 AYES: Council Members Lewis, Kulchin, Finnila, and Hall. 8 NOES: None. Council Me 11 12 18 19 20 21 22 23 24 25 26 27 28 (SEAL)