HomeMy WebLinkAbout2002-05-14; City Council; 16754; 2002-2003/Buildout Capital Improvement Program% CITY OF CARLSBAD -AGENDA BILL rB# 16,754 CITY MGR sx? )EPT. FIN CITY ATTY. & PROPOSED 2002-2003 TO BUILDOUT NTG. 05/14/02 TITLE: CAPITAL IMPROVEMENT PROGRAM qECOMMENDED ACTION: Accept report. Set public hearing for June 18, 2002. TEM EXPLANATION: The Capital Improvement Program (CIP) is a planning document as well as a budget document. It incorporates the current status of all of the City's capital funds with the budgets for the upcoming year, and then projects future revenues and expenditures for all known projects until buildout of the City; this document is reviewed and updated every year during the budget process. This year during the review process, staff took a close look at the construction schedules for City facilities and the workloads of the staff needed to complete the projects. Projects were prioritized and ranked using growth management and related criteria, and the results provided the basic framework for the scheduling of projects. Cost estimates were also reviewed more closely, resulting in some increased costs to reflect the overall cost increases seen in construction. Overview Street and traffic signal construction projects continue to receive high priority, making up about 35%, or $12.8 million of the new appropriations for next year. Funding for new construction includes almost $1 million for design of Cannon Road east of El Camino Real and $1.2 million in additional funding for the Rancho Santa Fe Road widening and realignment project. In addition, staff is continuing to work with the development community to plan for the construction of major roadways that will add east-west connections and improve the flow of regional and local traffic throughout the City. These roads are the extensions of Faraday Avenue and Melrose Drive, Poinsettia Lane east of El Camino Real, and Cannon Road and College Boulevard east of El Camino Real. In order to provide sufficient park acres to serve the existing and developing communities, parkland acquisition and development continues to be a major area of focus. The proposed CIP includes funding in fiscal year 2002-03 for construction of Latwin Park, Aviara Community Park, development of the Pine School Park site, as well as funding for design of Alga Norte Park. As the City ages and new construction declines, maintenance projects begin to take on a higher priority. The CIP includes funding for almost $6 million for pavement maintenance costs in the next fiscal year. In addition, ten traffic signals are planned PAGE 2 OF AGENDA BILL NO. 16,754 in the next fiscal year, as well as a traffic signal replacement and intersection reconstruction project located at El Camino Real, Plaza Drive, and Marron Road. 2002-2003 Amropriations The 2002-2003 proposed budget for the CIP totals $36.1 million, with estimated revenues of $33.1 million. Appropriations estimated at $136.9 million for on-going capital projects remaining unspent at the end of FY 2001-2002 will be added to the new 2002-2003 CIP appropriations. A sum of $173.0 million will then comprise the total 2002-2003 CIP budget. Major projects scheduled for next year are summarized below. Street & Traffic Signal Projects Street construction projects are 35% of the total 2002-2003 expenditures at $12.8 million. Of that amount, $1.2 million in additional appropriations is for improvements to Rancho Santa Fe Road. This $37 million project is primarily funded from developer fees, Community Facilities District No. 1, and a Federal Grant. Pavement Management and Reconstruction projects are scheduled for a $7.8 million appropriation to maintain the safety and drivability of City streets. Sidewalk construction projects are expected to cost $470,000 next year. Park Projects Park construction projects are 9.6% of the total 2002-2003 expenditures at $3.5 million. The CIP includes an additional appropriation of $1.0 million to develop Aviara Community Park for a total cost of $12 million. In addition, there is $670,000 programmed for the construction of Larwin Park, $900,000 to begin design and development of Pine School Park (total cost is $1.2 million), and $700,000 to begin designing Alga Node Park. Sewer Projects Sewer funding of $10.4 million reflects Carlsbad's share of costs for the Encina Wastewater Facility capital improvements and several interceptor projects. The scheduled appropriations include $2.6 million for the Vista-Carlsbad Interceptor, and $4.9 million for the Encina Flow Equalization and other related Encina projects. The Flow Equalization project involves construction of a reservoirhank to retain flows that exceed the capacity of the ocean outfall; during periods of low flow, the retained flows could then be released. Water Projects Water and Recycled Water projects total 12.3% of the total 2002-2003 CIP with $4.4 million scheduled for additional projects. Expenditures totaling $1.4 million are planned for construction of transmission mains along El Camino Real. The annual debt service payment on previous potable and recycled water projects is $1.2 million. PAGE 3 OF AGENDA BILL NO. Drainage Projects Drainage projects total $2.9 million next fiscal year. Of this amount, $2.6 million is for drainage facilities along College Boulevard and Cannon Road. Civic Projects Civic projects .total 3.2%, or $1 .I million of the 2002-2003 capital appropriation. This amount includes $325,000 for various ADA projects, $264,000 for the Village Parking Enhancement program, and $275,000 for facility maintenance projects. Future Facilities ... 2002-2003 to Buildout Capital Improvement Program Of all the capital projects the City has planned for the future, the largest amount of money will be spent on street and traffic signal construction projects, which total $1 15.3 million, or 32.1% of all future projects. Included in this category is the construction of several major roadways that will add east-west connections, as well as providing additional routes to the neighboring cities of Oceanside, Vista, and San Marcos. The following is a list of major street projects in the 2002-2003 to Buildout CIP: Faraday Avenue and Melrose Drive Extensions east of El Camino Real Poinsettia Lane to El Camino Real Poinsettia Lane east of El Camino Real Cannon Road to El Camino Real Cannon Road and College Boulevard East of El Camino Real Rancho Santa Fe Road to San Marcos and Encinitas Sewer projects are the second largest expenditure category and total $74.2 million. Projects include the construction of the south Agua Hedionda interceptor, the VistalCarlsbad trunk line interceptor, cleaning and refurbishment of existing sewer lines and access holes, the repayment of bonds for the expansion of the Encina Wastewater Facility, and the Encina parallel ocean outfall and cogeneration projects. The largest of these projects is construction of the Vista-Carlsbad Interceptor. Construction will occur along Jefferson Street from Interstate 5 to Oak Avenue and along Oak Avenue from Jefferson Street to the west side of the railroad right-of-way, and is expected to span over several years. The third largest expenditure category is for park projects, which total $63.8 million, or 17.7%. Park projects include acquisition andlor development of acreage within all quadrants of Carlsbad. Future park projects include: Northwest Quadrant Northeast Quadrant NW Quadrant Park (Pine School) Larwin Park Community Facility (Pine School) Cannon Lake Park Hosp Grove-Buena Vista Lagoon Recreational Improvements 3 PAGE 4 OF AGENDA BILL NO. 16.754 Southwest Quadrant Poinsettia Park Phase II Aviara Community Park Southeast Quadrant Alga Norte Park Swimming Pool at Alga Norte Leo Carrillo Park Phase 111 In addition, Veteran’s Memorial Park, a 100-acre site centrally located in the City of Carlsbad, and a business park recreational facility located in the industrial area are planned. Water projects total about $26.0 million (7.2%) and include reservoir construction and improvements and recycled and potable pipelines. Some of the major areas in which these installations or upgrades are planned include segments of College Boulevard, El Fuerte, and along El Camino Real. Construction of City facilities such as libraries, administrative facilities, and police and fire facilities total $43.9 million, or 12.2% of the total planned capital expenditures to buildout. The Capital Improvement Program includes funding to construct a new City Hall in future years, and to reconstruct and expand the Cole Library. Funding is also provided for the relocation of Fire Station #3, and the construction and relocation of Fire Station #6. Specific timing and cost estimates for all capital projects are identified in the Detail Schedule of Capital Projects (2002-2003 to Buildout). Staff is requesting that Council set the public hearing for the meeting of June 18, 2002, when input will be received from interested citizens and groups wishing to comment on the proposed capital budget. Development FeeslAffordable Housina Credits Each year, several development fees are adjusted by the change in the Engineering News Record Index as required by the respective fee programs. The adjusted fees are attached in Exhibit 2. The cost of an Affordable Housing Credit in the Villa Loma project is also adjusted each year, based on additional interest costs per Council Policy 58. The revised fee is $41,200. FISCAL IMPACT: Upon adoption of the Capital Improvement Program budget on June 18, 2002, the total new appropriations on July 1, 2002 will be $36,130,744 from the CIP funds shown on the attached schedules. Revenue projections are provided to outline the cash flows and balances for each of the funds. EXHIBITS: 1. 2002-2003 Preliminary Capital Improvement Program. 2. City of Carlsbad Proposed Revisions to the Master Fee Schedules, June 2002. .I EXHIBIT 1 2002-2003 PRELIMINARY CAPITAL IMPROVEMENT PROGRAM OVERVIEW The City of Carisbad Preliminary Capital Improvement Program (CIP) is a planning document, which outlines the expenditure plan for future capital projects and the corresponding revenues to pay for those expenditures. The CIP is a financial planning document, not a commitment for spending. Spending authorization is given only at the time the City Council formally adopts the proposed budget, and, at that time, funds are only appropriated for the following fiscal year. The information shown in subsequent years is being provided to provide the most comprehensive snapshot of all the known future facilities the City of Carlsbad plans to construct. What is the definition of a CIP project? Projects that are shown in the CIP are generally defined as any construction (or reconstruction) of major infrastructure or buildings that are located on or in the ground. In most cases, the total construction cost of each CIP project is added to the City's inventory of major infrastructure and buildings. The 2002-2003 Preliminary Capital Improvement Program outlines $36.1 million in new appropriations and .projected revenues during the fiscal year are estimated at $33.1 million. As the City continuesTo grow and develop, there is a corresponding increase in the demand for development-related services and new facilities. To ensure that the necessary infrastructure and facilities are built on a schedule that meets or exceeds this demand, the citizens of Carlsbad adopted a Growth Management Plan in 1986. The Growth Management Plan states that unless a standard level of 'facilities is available to meet new demands resulting from the City's growth, development cannot proceed. This Plan is the foundation for making decisions about the timing and prioritization of the capital projects under consideration. A discussion of the City's Growth Management Plan is located at the end of this report. This year's CIP.reflects the Council's continued commitment to constructing the necessary facilities, in response to the current and anticipated development activity occurring throughout the City. .. In addition to prioritizing projects based on growth management, projects are continuously evaluated and prioritized to ensure the City's resources for facilities are allocated based on a well thought-out plan. Projects in this CIP document were prioritized based on the following criteria: 1. Is the project needed now for growth management compliance, legal mandates, or the health and safety of the citizens? 2. Is the project needed soon for growth management compliance? 3. Is the proiect needed now for other City standards (example: ball field standards)? 4. Is the project needed soon for other City standards? 5. Does the project complete or provide part of the basic infrastructure (example: a linking road segment)? timing or funding opportunity)? 6. Are there other reasons to construct the project (example: EXHIBIT 1 2002-2003 PRELIMINARY CAPITAL IMPROVEMENT PROGRAM FUTURE GROWTH AND DEVELOPMENT In order to estimate future revenues from development, several assumptions about the rate and type of growth need to be made. These assumptions can change from year to year and correlate with the economic climate. Every year, City staff evaluates all existing and future development projects and compares these projects to the buildout capacity of the City using adopted general plans. Information about existing building activity combined with estimates of how remaining net developable land might develop are then summarized to prepare future projections about when and where growth will occur. Finance Department staff then prepares estimates of future development fee revenues paid by those developments, and compares these revenue estimates to the expenditure plan to ensure that funding will be sufficient and available for construction of the planned capital projects as shown in the CIP. In addition to evaluating whether or not capital funds are sufficient, several projects have significant operating cost impacts that are also analyzed at that time. Where funding discrepancies occur, project timing is again evaluated and recommendations are made to resolve the discrepancies. Residential development is expected to slow down in the coming years, as compared to the previous 5-year period. This slow down is not necessarily based on economic conditions, but for.2001-2002 was projected at 587 building pemlits; however, recent estimates anticipate abou: rather on the development schedules of the remaining vacant parcels. Residential development 733 units will be permitted by the end of the current fiscal year. Construction is expected to decrease to about 930 units per year for the next five years, as compared to an average of over 1600 units per year for the previous 5-year period. Residential Units Trend 1986 to 2007 Non-residential development is also showing signs of slowing down. The average annual building permits for the past 5 years was about 1,500,000 square feet of non-residential development. This year, the estimate is for just over 800,000 square feet, and estimates for the nest 5 years are approximately 900,000 square feet per year. Projects include several commercial/retail developments located in or near the areas where most of the residential development has occurred or is planned over the next several years. A variety of projects are planned in the next 5 years, including restaurants, hotels, shopping centers, golf company expansions, and various other industrial and commercial development projects. The following EXHIBIT 1 2002-2003 PRELIMINARY CAPITAL IMPROVEMENT PROGRAM table shows the number of residential units and non-residential square feet of development used in calculating estimated revenues for 2002-2003 and subsequent years to buildout. Projected Development Residential and Non-Residential Construction I Residential Non-Residential I 2003-2004 1,112 912,633 2004-2005 1,001 962,393 2005-2006 964 974,510 2006-2007 925 1,034,120 Years 6-10 2,505 6,258,156 REVENUES Revenues for Capital Projects from now until buildout total $393.4 miliion .and may be district fees and taxes (Community Facilities Districts and Bridge and Thoroughfare Benefit segregated into four major categories: 1) fees generated by development in Carlsbad. 2) special Districts), 3) Water and Sewer replacement reserves, and 4) other sources including grants, bond issues, and contributions from other agencies. Funding Sources 2002-2003 to Buildout Total Revenue = $393.4 million Development Special WatdSewer Infrastructure Other Fees Districts Replacement Maintenance Agencies Approximately 41% of all capital revenue is received as a result of development, and is dependent upon assumptions made about the City’s annual growth in dwelling units and commerciallindustrial square feet. Development revenues include Public Facilities Fees (PFF), Traffic Impact Fees (TIF), Park-In-Lieu Fees (PIL), Planned Local Drainage (PLD) Fees, Water Connection Fees (MFF), and Sewer Connection charges. Revenue from special districts, such as Community Facilities Districts and Bridge and Thoroughfare Benefit Districts comprise 13% of the total. Water and Sewer replacement revenues generated by user fees equal approximately 7% of total revenues, and are used to pay for replacement of existing water and sewer facilities. EXHIBIT 1 2002-2003 PRELIMINARY CAPITAL IMPROVEMENT PROGRAM Infrastructure Maintenance revenues are transfers from the Cities General Fund which are being set aside to pay for replacement and major maintenance of capital facilities other than sewer and water facilities. The remaining 24% consist of revenues from other agencies including Federal & State grants, the County sales tax program (TransNet). contributions from other Cities and Counties, and pending financing districts. Calculation of Future Fees The revenue projections of the Capital Improvement Program reflect the growth assumptions identified in the previous section. The following information delineates how those assumptions were applied to estimate future development revenues. The mix of multi-family and single-family residential units is assumed to be 35% and 65% respectively and reflects the anticipated mix of residential development for each Local Facilities Management Zone. The building permit valuation used for computing Public Facilities Fees is $154,000 per multi-family dwelling unit, and $240,800 per single-family dwelling unit. A building permit valuation of $38 per square foot of construction is used to calculate non-residential Public Facilities Fees. In order to calculate estimated revenues for Traffic Impact Fees (TIF), the number of average daily trips was computed for each type of development use. A multi-family residential dwelling unit is assigned eight trips per day and a single-family unit is assigned ten trips per day. Each residential trip is valued at the current TIF of $94. The trips-per-day value for commercial and industrial buildings are averaged at 32 trips per 1,000 square feet of development, although the actual volume of trips generated by commerciallindustrial building can vary widely depending on the u ultimate land use. The value assigned to each commercial/industriaI trip is $38. The implementation of CFD No. 1 in 1991 reduced the total amount of projected PFF and TIF revenues, since some projects previously funded from these sources are now funded through this CFD. CFD No. 2 is proposed to fund Rancho Santa Fe Road and Olivenhain Road, but has not yet been formally established. A prepayment program is in place to enable development to proceed within this proposed district. Park-in-Lieu Fees are collected for the purchase and development of parkland within each quadrant of the City. The fees are based on the acquisition cost of parkland, and were throughout the City. Projects in the CIP funded with Park-in-Lieu Fees include Pine School Park site development in the NW the NE Quadrant, parkland restoration and acquisition in the SW Quadrant, Larwin Community Park and future park development in Quadrant. and Alga Norte parkland acquisition in the SE Quadrant. There are two existing Bridge and Thoroughfare Fee Districts (BTD), which were formed by property owners to finance specific road construction projects located within each of the district boundaries. Poinsettia Lane - Aviara Parkway (BTD No. 2) was formed to finance the construction of Poinsettia Lane between Aviara Parkway and El Camino Real and Aviara Parkway between Palomar Airport Road and Poinsettia Lane. BTD No. 3 (Cannon Road West) was formed to fund portions of Cannon Road from Interstate 5 to El Camino Real. Two additional financing districts may be formed in the upcoming years to fund College Boulevard and Cannon Road extensions east of El Camino Real, and Melrose Drive and Faraday Avenue extensions. City staff is currently working with property owners with pending developments in those areas to assist in the formation of those financing districts. I - , . .. -.* increased in June 2001 to reflect the escalating cost of land EXHIBIT 1 2002-2003 PRELIMINARY CAPITAL IMPROVEMENT PROGRAM CAPITAL PROJECTS The following two sections provide summary expense and revenue data, as well as a description of the major capital projects. The first section contains information through buildout, and the second section focuses on the next five years. CAPITAL PROJECTS 2002-2003 TO BUILDOUT The CIP for 2002-2003 to buildout outlines approximately 177 future projects at $359.6 million. CIP Project Statistics I Expenditures by Category 2002/2003 to buildout Total = $359.6 million 1zu 100 80 60 40 to 0 Civic Drainage Parks Sewer Water Streets Loans The largest expenditure category is for street and traffic signal construction projects, which total $115.3 million or 32.1% of all future projects. Included in this category is construction of several major roadways, which will add east-west connections and improve the flow of regional traffic as well as local traffic throughout the City. Several of these roads will provide additional routes to the neighboring cities of Oceanside, Vista and San Marcos. 4 EXHIBIT 1 2002-2003 PRELIMINARY CAPITAL IMPROVEMENT PROGRAM Major street projects in the 2002-2003 to Buildout CIP: Faraday Avenue and Melrose Drive Extensions east of El Camino Real Poinsettia Lane to El Camino Real Poinsettia Lane east of El Camino Real Cannon Road to El Camino Real Cannon Road and College Boulevard East of El Camino Real Rancho Santa Fe Road to San Marcos and Encinitas Proposed Major Road Projects in EXHIBIT 1 2002-2003 PRELIMINARY CAPITAL IMPROVEMENT PROGRAM Sewer projects are the second largest expenditure category and total almost $74.2 million. Projects include the construction of the South Agua Hedionda interceptor, the Vista/Carlsbad trunk line interceptor, cleaning and refurbishment of existing sewer lines and access holes, the ocean outfall and cogeneration projects. The largest of these projects is the Vista/Carlsbad repayment of bonds for the expansion of the Encina Wastewater Facility, and the Encina parallel interceptor currently under con,struction. There are several phases to this project which will span over several years. Construction will occur along Jefferson Street from Interstate 5 to Oak Avenue and along Oak Avenue from Jefferson Street to the west side of the railroad right-of- way. The third largest expenditure category is for park projects, which total $70.7 million, or 16.2%. Park projects include acquisition andlor development of acreage within all quadrants of Carlsbad. Future park projects include: Northwest Quadrant NW Quadrant Park (Pine School) Northeast Quadrant Larwin Park Community Facility (Pine School) Cannon Lake Park Hosp Grove-Buena Vista Lagoon Recreational Improvements Southwest Quadrant Poinsettia Park Phase II Aviara Community Park Southeast Quadrant Alga Norte Park Swimming Pool at Alga Norte Park Leo Carrillo Park Phase' Ill In addition. Veteran's Memorial Park, a 100-acre site, which is centrally located in the City of Carlsbad, and a business park recreational facility located in the industrial area is planned. Environmental permits are continuing to be processed for the City's 250-acre golf course located currently on hold pending coastal commission review. in the industrial corridor directly south of the future Veterans Memorial Park. Development is Water projects total about $26 million (7.2%). The primary projects and construction of recycled and potable pipelines. Some of the major included in this category are reservoir construction and improvements, areas in which these installations or upgrades are planned include segments of College Boulevard. Poinsettia Lane, El Fuerte, and along El Camino Real. . facilities, and police and fire facilities total $43.9 million, or A Construction of City facilities such as libraries, administrative 12.2% of the total planned capital expenditures to buildout. The Capital Improvement Program includes funds to reconstruct and expand this facility in future years. A new City Hall is planned for construction in the future; the timing and 1 location have not been determined. Specific timing and cost estimates for all capital projects are identified in the Detail Schedule of Capital Projects (2002-2003 to Buildout) following this narrative. EXHIBIT 1 2002-2003 PRELIMINARY CAPITAL IMPROVEMENT PROGRAM CAPITAL PROJECTS -THE NEXT FIVE YEARS Some of the major projects planned for the next five years are discussed below; their locations can be seen on the map in the previous section. 0- Streets - Several large street construction projects are planned for the next 5 years. The extensions of Cannon Road and Poinsettia Lane to El Camino Real are located west of El Camino Real and are being constructed primarily as a result of residential developments in those areas. College Boulevard and Cannon Road extensions to the east and north, as well as Faraday Avenue and Melrose Drive extensions, are located east of El Camino Real and will alleviate traffic on Palomar Airport Road. The widening and realignment of Rancho Sank Fe will improve regional and local traffic flow generated in the southern part of the City. Aviara Communitv Park - Construction is scheduled to begin next fiscal year on this 24-acre site located in the southwest quadrant north of Poinsettia Lane and west of El Camino Real. The park is planned to include ball fields, soccer fields, basketball courts, tot lots, and open play and picnic areas. A community center will also be constructed at this location. Larwin Park - Larwin Park is located on a 22-acre site in the northeast quadrant of the City. Plans for development of this park include constructing trails, a tot lot, and other amenities. Aha Norte Park - This park site consists of 30 acres in the Southeast Quadrant and may include amenities such as ball fields, soccer fields, tennis courts, picnic areas, tot lots, restrooms and parking facilities. Design of the park will begin next fiscal year, with construction in the years to follow. Poinsettia Park Phase II - Within the next five years, development of the final phase of Poinsettia Park is scheduled. Plans include a community centedgymnasium. an enclosed soccer field, tot lots, picnic areas, a tennis complex, and additional parking. Pine School Park - Prior to development of this 7-acre site, an extensive community outreach program with local residents and various organizations will be implemented to gather public input for the ultimate design. Design and construction are planned in the next two years. Fire Station No. 6 Relocation - Fire Station No. 6 is currently located in a temporary facility in the southeast quadrant of Carlsbad. Relocation of this station to a permanent facility along the east side of Rancho Santa Fe Road is scheduled to occur concurrent with the road alignment project. This fire station is required to ensure a five-minute response time within the southeast part of the City as development in that area occurs. Drainaae Facilities - Funding for the construction of drainage facilities along College Blvd. and Cannon Road are scheduled next fiscal year. VistalCarlsbad Interceptor - The VistalCarlsbad Interceptor project involves installation of a new and upgraded sewer trunk line through the downtown portion of Carlsbad to the Encina Water Pollution Control Facility. The interceptor will run along Jefferson Street from Interstate 5 to Oak Avenue and along Oak Avenue from Jefferson Street to the west side of the railroad right-of-way. This project is required to handle buildout flows and EXHIBIT 1 2002-2003 PRELIMINARY CAPITAL IMPROVEMENT PROGRAM replace deteriorated pipeline, and is partially funded by the City of Vista. Construction is currently underway and will continue for several more years. Waterlines - Several major water lines are scheduled for construction within the next five years: - Aviara Parkway from Poinsettia Lane to Palomar Airport Road - College Boulevard from Cannon Road to Carlsbad Village Drive - El Camino Real from Cassia to Poinsettia Lane - El Fuerte from Poinsettia Lane to Palomar Airport Road - College Boulevard from Maerkle Reservoir to Agua Hedionda Creek Rewcled Water Proqram - The city plans to construct a recycled water facility to increase the supply of water and reduce dependence on external suppliers. Funding has already been authorized for this project, which will span over several years. The proposed 2002-2003 to Buildout CIP is being driven by the City's commitment to insure that facilities are available to service the developing areas as well as the current residents. Carlsbad's philosophy has been to build quality capital facilities, which meet, and at times exceed Growth Management standards. Phasing projects over a period of years to match funding availability and maximizing the use of available resources are methods used in order to meet the needs of Growth Management. The 2002-2003 to Buildout Capital Improvement Program reflects the commitment of Carlsbads Council and staff to continue providing its residents with a better quality of life. IS EXHIBIT 1 2002-2003 PRELIMINARY CAPITAL IMPROVEMENT PROGRAM GROWTH MANAGEMENT PLAN The Growth Management Plan was developed and voted into law by the citizens of Carlsbad in 1986. The plan was established in an effort to manage development within the City by linking residential, commercial, and industrial development directly to standards for availability of public services and facilities. The Growth Management Plan adopted has established precise standards for eleven public facilities. Standards must be met at all times as growth occurs. Facilities for which standards have been established are as follows: - City Administrative - Wastewater Treatment - Circulation - Fire -Water Distribution - Schools - Library - Parks - Drainage - Open Space - Sewer Collection The Plan requires that appropriate public facilities be available, in conformance with the adopted performance standards, as development occurs. Unless each of the eleven public facility standards have been met, no new development can occur. The Growth Management Plan impacts both the Operating Budget and the Capital Improvement Carlsbad’s Capital Improvement Program to anticipate the funding needed for capital Program. The detailed level of planning required by Growth Management has allowed the rate of development and the 11 performance standards. New public facilities often require improvements through buildout of the City. The timing of construction of facilities is governed by . community centers, parks, and fire stations have been constructed and opened to the public additional staffing and other resources, which affects the Operating Budget. Facilities such as under this program. The Capital Improvement Program has been designed to specifically address areas where new or expanded facilities will be needed to maintain compliance with the adopted performance standards. With the adoption of the 2002-2003 CIP. compliance with the Growth Management Plan is assured. EXHIBIT 1 2002-2003 PRELIMINARY CAPITAL IMPROVEMENT PROGRAM CALIFORNIA ASSEMBLY BILL 1600 (AB 1600) In 1987, the California Legislature passed Assembly Bill 1600 (AB 1600) which set forth the process a city or county must follow to establish developer fees to finance public facilities. This legislation applies to fees established, increased, or imposed on or after January 1, 1989, the effective date of the law. AB 1600 contains four general requirements: 1. A "nexus" or connection must be established between a development project-or class of project and the public improvement being financed with the fee. All AB 1600 fees adopted by the City have met the nexus test. For example, Traffic Impact, Bridge and Thoroughfare District and Drainage Sewer Benefit Area Fees were all established under AB 1600. 2. The fee must be segregated from the General fund. Carlsbad segregates all capital funds not only from the General fund, but also each classification of fee as well. 3. Fees collected by a city or county must be spent or committed to a project within a five-year period. Funds are viewed to be committed if they are programmed to be spent on a specific project(s). If the money is not spent, findings must be made describing the continuing need for that money each fiscal year after the five years has expired. The City of Carlsbad commits the revenues from these fees through its Capital Improvement Program budget. This budget, which is adopted by the City Council, sets forth the Citfs Capital expenditure program from the current year to projected build out of the City. The expenditure plan is updated annually as part of the Citfs budget process. 4. Refunds must be made only if the City cannot make the required findings. At this time, no refunds are due because the City's Capital Improvement Program commits all AB 1600 fees to projects to be constructed both in the current year and in the future. ! c CAPITAL IMPROVEMENT PROGRAM CITY OF CARLSBAD ANALYSIS OF AVAIUBLE BALANCES 2002 TO BUILDOUT I ZOO2 - ZOO3 I BEGINNING - GENERAL CAPITAL CONST. FUND INFRASTRUCTURE MAINT a REPL GOLF COURSE PUBLIC FACILITIES FEE ZONE 5.13.16 PARK FEE PIL AREA 1 NW PIL AREA 2 NE PIL AREA 3 SW TRAFFIC IMPACT FEE PIL AREA 4 SE TRANSNEnLOCAL TRANSNET/HlGHWAY TRANSNETlBlKE TRANSNETISTP TDA STATE GRANTS ASSESSMENT DISTRICTS COUNTY GRANTS BTDY2 POINS. LN-AVIARA PW BTOM CANNON ROAD WEST CFO #1 CFD #2 FEDERAL GRANTS PLANNED LOCAL DRAINAGE SEWER BENEFIT AREAS SEWER CONNECTION WATER ~ RECYCLED WATER SEWER REPLACEMENT WATER CONNECTION WATER REPLACEMENT GAS TAX REDEVELOPMENT BONDS BAL 7/1/2002 5,625,625 6,543,151 0 9,888,939 732.782 263.080 956,221 1,421,790 4.225.480 ,211,414 1,769,733 335,312 321,751 0 1,469 241.884 925,854 3,215,141 155.236 1383,143 15,223,073 ,822,416 16,340 5.255.988 22.558.037 2.383.851 7,903,635 2,902,056 12250.464 5223,818 304,128 506,365 REVENUE 0 3,100,000 0 3,397,914 141,794 32,619 342,211 8.889 929,395 86.664 4,546,000 905,000 0 70,000 0 0 0 1,620,700 0 6,523,950 135.252 0 0 603,266 400.000 1,977,500 1,400,000 160,000 2,236,860 817,740 0 2.469.687 EXPENDITURES 1.33830; 614,400 0 3.050.000 0 670,000 0 1,000,000 0 6.300.000 470.000 1,240.000 0 70.000 0 229,065 153,000 0 0 110.000 0 0 0 2.854.000 0 7302.881 3,132,599 2,662,107 519,527 1260.178 304.000 1,699,687 ENDING 4.287325 9,028,751 0 10236,853 295,699 874.576 628.433 430.679 298.078 4.684.875 15,733 312 0 321.751 1,469 12,819 925.854 2,236 4.835.841 21,637,024 1,518395 822.416 16,340 3,005,254 2,783.851 17,232,656 6.171.036 2.542.529 3,379,451 13.227.146 128 1,276,365 OTHER 238,323 1.151.000 1.151.000 238,323 TOTAL 114241,217 33,056,441 36,130,744 111,166,914 ~~ ~ (1) BEGINNING BALANCE ON 7/1/2002 IS NET OF CONTINUING APPROPRIATIONS CITY OF CARLSBAD CAPITAL IMPROVEMENT PROGRAM ANALYSIS OF AVAILABLE BALANCES 2002 TO BUILDOUT EAR 2 2003 - 2004 1 FUND BAL 7/1/2003 BEGINNING GENERAL CAPITAL CONST. REVENUE 4.287.325 INFRASTRUCTURE MAINT 8 REPL 0 GOLF COURSE 9.028.751 3.100.000 PUBLIC FACILITIES FEE 10,236,853 0 5,413,802 0 ZONE 5.13,16 PARK FEE 874.576 147.268 PIL AREA 1 NW PIL AREA 2 NE 295,699 284.678 628.433 242,214 PIL AREA 3 SW 430,679 PIL AREA 4 SE 437,764 298.078 TRAFFIC IMPACT FEE 4,684,875 37,i77 TRANSNETAOCAL 15,733 1,296,599 TRANSNETMIOMNAY 3.000.WO TRANSNETlSTP 321,751 312 0 TDA 0 1,469 0 STATE GRANTS COUNTY GRANTS 925.854 12.819 0 ASSESSMENT DISTRICTS 2,236 0 BTD#2 POINS. LN-AVIARA PKWY 0 BTW3 CANNON ROAD WEST 4,835.841 1,052,500 CFD X1 21,637,024 1,518.395 194.652 6,418,741 CFD x2 FEDERAL GRANTS 822.416 16,340 5.821.604 33,026 SEWER BENEFIT AREAS PLANNED LOCAL DRAINAGE 2.783.851 3.005.254 1.163,185 SEWER CONNECTION 400,000 SEWER REPLACEMENT 17,232,656 6.171.036 1,921,112 WATER - RECYCLED WATER 2,542,529 1,400,000 WATER CONNECTION 3,379,451 160,000 1.7[34,731 WATER REPLACEMENT 13.227.146 REDEVELOPMENT BONDS 2,281,597 128 GAS TAX 0 1,276,365 1.650.000 EXPENDITURES 150,oQo 80,000 0 12,746,000 0 0 0 0 9M.000 0 3,000,000 0 0 0 0 0 0 0 110.000 0 0 5,821.600 0 9.048.059 0 1,794,629 559,527 3,289.178 866,272 750.000 0 4,137,325 ENDING 12,048,751 0 2,904,655 1.021.845 580.377 866.442 870,647 335.854 5,031,474 15,733 312 321,751 12,819 1,469 925.854 5,888,241 2.236 1.713.047 27,945,764 855.442 4.168.438 16,340 10.105.709 3.183.851 2.143.002 5,776,407 14,692,471 1,795.004 128 2.176.365 ' OTHER 238.323 TOTAL 0 111,166,914 38,161,246 0 39,165,265 238,323 110.162.895 CITY OF CARLSBAD CAPITAL IMPROVEMENT PROGRAM ANALYSIS OF AVAILABLE BALANCES 2002 TO BUILDOUT 3 2004 - 2005 1 FUND BEGINNING BAL 7/1/2004 RMNUE 4,137,325 0 12,048.751 3.100.WO GOLF COURSE 0 0 ZONE 5.13,16 PARK FEE PUBLIC FACILITIES FEE 2,904,655 5.046.983 1.021.845 159,017 PIL AREA 1 NW 580.377 PIL AREA 2 NE 432.948 870.647 PIL AREA 3 SAW 868,442 642,201 479,984 PIL AREA 4 SE 335.854 TRAFFIC IMPACT FEE 259,992 5,031,474 TRANSNETLOCAL 1,332,643 15,733 TRANSNETMIGHWAY 3,100,000 312 TRANSNET/STP 321,751 0 TDA 1,469 0 STATE GRANTS 0 COUNTY GRANTS 12.819 0 925.854 0 ASSESSMENT DISTRICTS 2.236 0 BTDm POINS. LN-AVlARA PKWY BTM3 CANNON ROAD WEST 5.888.341 1,713,047 1,432,045 CFD X1 27,945,764 142,560 CFD #Z 5.889.330 855.442 FEDERAL GRANTS 129,291 PLANNED LOCAL DRAINAGE 4.168.438 16,340 1,139,701 0 SEWER BENEFIT AREAS SEWER CONNECTION 3.183.851 400,000 SEWER REPLACEMENT 10,105,709 5,919,330 5,776,407 WATER - RECYCLED WATER 2,143,002 1,400,000 160,000 WATER CONNECTION 1,795,004 2,603,311 WATER REPLACEMENT 14,642,471 3,327,229 REDEVELOPMENT BONDS 128 GAS TAX 0 2.176.365 1,700,000 GENERAL CAPITAL CONST. INFRASTRUCTURE MAW a REPL MPENDINRES 125,OOg 0 0 1,750,000 0 0 0 550,000 1,852,708 0 3.100,Ooo 0 0 0 0 0 0 0 ll0.WO 0' 0 0 0 100,000 6,599,666 2.061.729 159.527 1,300,000 150.000 0 10b.000 4.012.325 ENDING 15.148.751 0 6,201.638 1,180,862 1,013,326 1.512.848 798.427 595,846 4.51 1,409 15,733 312 321,751 12.819 1,469 925.854 7.320.386 2.236 1,855,607 33,725,095 984.733 16,340 5.308.139 3.483.851 9.425.372 5,114,678 2.143.475 17,869,700 3.298.315 3.726.365 128 OTHER 238.323 TOTAL 15.000,OW 110,162,895 14,790.854 53,996,565 32.749.4W 447,469 131,409,976 .. 2.5 CAPITAL IMPROVEMENT PROGRAM CITY OF CARLSBAD ANALYSIS OF AVAIIABLE BALANCES 2002 TO BUILDOUT 4 ZOOS - 2006 i BEGINNING FUND BAL 7/1RW5 REVENUE EXPENDITURES ENDING GENERAL CAPITAL CONST. 4.012,325 0 9 INFRASTRUCTURE MINT 8 REPL 15,148,751 3.100.0W 0 18.248,751 4.012.325 GOLF COURSE ZONE 5.13,16 PARK FEE WBLIC FACILITIES FEE PILAREA 2 NE PIL AREA 1 NW PIL AREA 3 SW PIL AREA 4 SE TRAFFIC IMPACT FEE TRANSNET/LOCAL TRANSNETMIGHWAY TRANSNET/- TDA STATE GRANTS ASSESSMENT DISTRICTS COUNTY GRANTS BTLW POINS. LNAVIARA PKWY BTW3 CANNON ROAD WEST CFD W1 CFD W2 FEDERAL GRANTS PLANNED LOCAL DRAINAGE SEWER BENEFIT AREAS SEWER CONNECTION WATER - RECYCLED WATER SEWER REPLACEMENT WATER CONNECTION WATER REPLACEMENT GAS TAX REDMLOPMENT BONDS 0 6.201.638 1,180,862 1,013,326 1.512.848 798,427 4,511,409 595.846 15,733 321,751 312 1,469 925.854 12.819 2.236 7,320,386 33.725.095 1,855,607 984,733 5,308,139 16,340 3,483,851 9,425,372 5.1 14,678 2,143,475 3,298.315 17,869,700 128 3,726,365 4.929.822 0 110,000 530.807 566.648 368.8TI 1.269.317 371.099 1,900.000 0 0 0 0 0 1,307,680 0 4,546,366 151.800 0 0 1.185.487 400,000 6,782.217 1,400,000 2,530,897 160.000 241,249 0 1.750.000 7,495.000 0 1,080,000 0 0 0 0 1,900.000 470.000 0 0 0 0 0 0 0 0 110.000 0 0 0 355,000 11,314,271 811.529 159,527 100.000 400,000 0 0 3,636,461 0 1,290,862 464.132 2.079.496 1.167.304 5,310,726 966.845 15,733 321.751 312 12.819 1,469 925.854 2.236 8828,066 34,161,460 2,007,407 984.733 6,493,626 16,340 3.528.851 4.893.318 5,703,149 2.143.948 5,729,212 17,710,949 128 5,476,365 OTHER 447,469 TOTAL 131,409,976 0 33,602,266 24,195,327 447,469 140,816,915 0 CAPITAL IMPROVEMENT PROGRAM CITY OF CARLSBAD ANALYSIS OF AVAILABLE BALANCES 2002 TO BUILDOUT 5 ZOO6 - 2007 i BEGINNING FUND BAL 7/1/2006 REVENUE EXPENDITURES GENERAL CAPITAL CONST. 4,012,325 0 0 4.012.325 ENDING .WFRASTRUCTURE MINT B REPL GOLF COURSE ZONE 5.13,16 PARK FEE PUBLIC FACILITIES FEE PIL AREA 1 NW PIL AREA 2 NE PIL AREA 3 SW TRAFFIC IMPACT FEE PIL AREA 4 SE TRANSNET/LOCAL TRANSNET/HIGHWAY TRANSNETISTI' TDA STATE GRANTS COUNTY GRANTS .'kSSESSMENT DISTRICTS BTDm POINS. LN-AVIARA PKWY BTW3 CANNON ROAD WEST .CFD Y1 CFD #Z FEDERAL GRANTS PLANNED LOCAL DRAINAGE SEWER CONNECTION SEWER BENEFIT AREAS WATER - RECYCLED WATER SEWER REPLACEMENT WATER CONNECTION WATER REPLACEMENT REDEVELOPMENT BONDS GAS TAX 18,248,751 0 3,636,461 1.290.862 2,079,496 464,132 1.167.304 966,945 5.310.726 15,733 312 321,751 1,469 12.819 925.854 8,628,066 2,236 2.007.407 38.161.460 984.733 16,340 6,493,626 4,893,318 3,528,851 2,143.948 5,703,149 17,710,949 5,729,212 5,476,365 128 3,100,000 0 4.848.761 551,564 170,000 555.538 217,771 1,220,767 371,099 2,9W,OOO 0 0 0 0 0 0 667.690 86,856 4.185.590 0 864.238 0 1.983.140 400.000 1,400,000 160,000 2,530,173 300,000 1,800,000 0 - 0 0 0 0 0 0 1.000.0w 0 470,000 2,9W.O00 0 0 0 0 0 0 0 0 11 0,000 0 0 0 0 1.080.444 526,531 159.527 100,000 400,000 0 0 21348.751 8.485.221 0 1,460,662 2,635,034 1,015,697 1,385,074 6,061,493 338.044 15,733 312 321.751 1,469 12.819 925.854 2.236 9295.756 42,237,051 2.094283 9s4.733 7357,863 16.340 3.928.851 6.576.618 5,796,015 2,144,421 8,159,385 17,610,949 128 7,276,365 TOTAL OTHER 140.816.915 447,469 28.313.186 0 6.746.502 0 447.469 162383.600 CITY OF CARLSBAD CAPITAL IMPROVEMENT PROGRAM ANALYSIS OF AVAIUBLE BAUNCES ZOO2 TO BUILDOUT 8-10 2007 - 20W i BEGINNING FUND BAL 7/1/2007 REVENUE GENERAL CAPITAL CONST. 4,012,325 0 INFRASTRUCTURE MINT 8 REPL GOLF COURSE 21,348,751 0 15,500,000 0 PUBLIC FACILITIES FEE 6.465.221 12,345,856 ZONE 5,13,16 PARK FEE 1,450,862 993,797 PIL AREA 1 NW PIL AREA 2 NE 2.635.034 1,015,697 1.451.W 1233.606 PILAREA3sw PIL AREA 4 SE 1.385.074 338.044 786.067 TRAFFIC IMPACT FEE 679,976 6,061.493 TRANSNET/LOW 15,733 6,096,593 TRANSNETkIlGHWAY 2.300,OOO TRANSNET/STP 321.751 312 0 TDA 1,469 0 STATE GRANTS 12.819 0 0 COUNTY GRANTS 925,654 ASSESSMENT DISTRICTS 0 BTWZ POINS. LN-AVlARA PKWY 9,295.756 2,236 0 BTWM CANNON ROAD WEST 2.163.529 CFD X1 2,094,263 3.198.360 42,237,051 5,224,990 CFD #2 984.733 910,336 FEDERAL GRANTS PLANNED LOCAL DWNAGE 16,340 7,357,863 0 2,669,240 SEWER BENEFIT AREAS SEWER CONNECTION 3.928.651 2,000,000 5,796,015 SEWER REPLACEMENT 6,576,618 2,000,000 8,090,961 WATER ~ RECYCLE0 WATER 2,144,421 600,000 WATER REPLACEMENT WATER CONNECTION 6,159,385 5,070,584 REDEVELOPMENT BONDS 0 128 0 GAS TAX 7,276,365 11,000,000 17,610.949 EXPENDITURES l.l06.62_5 0 0 17,678,177 0 0 0 0 0 3,150,000 2.300,000 0 0 0 0 0 0 3.848.000 39.834.000 2,500,000 0 500,000 0 6.908.027 0 2,929,630 797,635 9.428300 4,414,000 300,000 0 2,905,700 ENDING 36,848,751 0 3,152,900 2.454.658 2,249.303 4.066.098 2.171.162 9.006.065 1,018,022 15,733 312 321.751 1.469 12.819 925.854 2,236 7.611.285 7.628.041 2.792.623 1.695.070 16,340 9,527,103 4,978,448 5,926.851 5.646.986 2.146.766 13,196,449 3.601.469 17,976,365 126 OTHER 447.469 11,845.000 11,845,000 TOTAL 162.383.600 96,359,981 109,539,594 447.469 149,203,987 CAPITAL IMPROVEMENT PROGRAM CITY OF CARLSBAD ANALYSIS OF AVAllAELE BALANCES 2002 TO BUILDOUT p12 to Buildout 1 BEGINNING FUND BAL 7/1/2012 REVENUE EXPENDITURES GENERAL CAPITAL CONST. 2,905,700 0 0 2.905.700 ENDING INFRASTRUCTURE MINT a REPL GOLF COURSE PUBLIC FACILITIES FEE ZONE 5.13.16 PARK FEE PIL AREA 1 NW PIL AREA 3 SW PIL AREA 2 NE TRAFFIC IMPACT FEE PIL AREA 4 SE TRANSNET/HIGWAY TRANSNETLOCAL TRANSNET/STP TDA COUNTY GRANTS STATE GRANTS ASSESSMENT DISTRICTS BTW2 POINS. LN-AVIARA PM BTDM CANNON ROAD WEST CFD H CFD %? FEDERAL GRANTS SEWER BENEFIT AREAS PLANNED LOCAL DRAINAGE SEWER CONNECTION WATER - RECYCLED WATER SEWER REPLACEMENT WATER CONNECTION WATER REPLACEMENT REDEVELOPMENT BONDS GAS TAX 36.848.751 3.152.900 0 2.454558 2,249,303 4.086.098 2.171.162 1.018.022 15,733 312 321.751 12.819 1,469 925.854 2.236 7.61 1.285 2.792.623 7,628,041 1,895,070 16.340 9,527.103 4.978.948 5,928,851 5.646.988 2.146.786 13.196.949 3.801.469 17,976,365 128 9,'008.085 28,000,000 2.737.200 9,507,549 609.698 1,304,776 3,428,777 528.872 0 3.857.001 0 0 0 0 0 0 0 1.667.550 0 2.777.41 1 1,437,613 5,174,752 0 8,900,000 7,561,269 7,812,494 3,644,457 320.000 1,605.000 19,000,000 0 * 0 10.250.000 2,737,200 2,626,000 2,980,000 7.SaO.oOO 2,700,000 1,250,000 8,810,WO 0 0 0 0 0 0 0 8,772,000 9,895.000 1.664.000 0 0 14,315,000 7,078.494 9,312,710 5,656,697 1,890,432 0 0 0 13,325,000 64.B48.751 2,410.449 0 438.356 574.079 14.875 33 4,055,085 (231.978) 15,733 321,751 312 1.469 12.819 925.854 2,236 M6.835 1.128.623 510,452 3332.683 386.855 16,340 7,750,357 3,227,507 7.802.785 7.445.926 576.354 14.801.949 128 23,651,365 .. OTHER 447,469 TOTAL 149.203.987 350.000 109.874.418 111,112,533 97,469 147,955,872 0 CAPITAL IMPROVEMENT PROGRAM CITY OF CARLSBAD ANALYSIS OF AVAILABLE BALANCES 2002 TO BUILDOUT BEGINNING TOTAL TOTAL FUND BALANCE RMNUE EXPENDITURES ENDING GENERAL CAPITAL CONST. INFRASTRUCTURE MINT 8 REPL GOLF COURSE PUBLIC FACILITIES FEE ZONE 5.13.16 PARK FEE 5625.625 6.543.151 59,000,000 694.400 0 2,737,200 9.888.939 2.737.200 45,490,687 52,969,177 732.782 2,331,574 PIL AREA 1 Nw 263.080 4,371,000 2,626,000 PIL AREA 2 NE 956.221 7.228.654 8.170.000 4.060.wO PIL AREA 3 SW 1,421,790 2.828.243 4.250.000 TRAFFIC IMPACT FEE PIL AREA 4 SE 211,414 4,225,480 1,806,608 16.W2.314 2,250,000 TRANSNET/LOCAL 1,769,733 17.746.W 19.5OO.MM 16,172,708 TRANSNETlHlGHWAY TRANSNETMP 335.312 321.751 905.W 1,240,000 0 n 0 2.719.92_5 2,905,700 TDA STATE GRANTS COUNlY GRANTS ASSESSMENT DISTRICTS BTIW POINS. LN-AVIARA PKWY CFD I1 BTW CANNON ROAD WEST CFD #2 FEDERAL GRANTS PLANNED LOCAL DRAINAGE SEWER BENEFIT AREAS SEWER CONNECTION SEWER REPLACEMENT WATER - RECYCLED WATER WATER CONNECTION WATER REPLACEMENT REDEVELOPMENT BONDS GAS TAX 241.884 1,469 925,654 3,215,141 155.236 15,225,073 1.383.143 822,416 16.240 5.255.988 2.383.851 22.558.037 7,903,635 2,902,056 5.223.818 12,250,464 304,128 506,365 70,000 0 0 0 3,909,480 9.91 1,694 35,566,379 2.510.267 5.821.600 12.799.867 24.235.529 12,900,000 16.812.494 19.101.893 1,920,000 9,991,935 0 39,369.687 - 70,000 229.065 153,000 0 12,620,000 50.279.wO 4.164.000 5,821,600 0 17,669,000 7533,494 53.566.058 16,913,344 16.879.765 4.245.702 7,440,450 304,000 16224.687 64,848,751 0 2.410.449 438.356 574.079 14,875 (231.976) 33 4,055.086 15,733 312 321,751 1,469 925.854 12.819 2.236 1.128.623 506.835 5,332,683 510,452 16.340 386,855 7,750,357 3,227,507 7.802.785 576,354 7,445,926 14.801.949 23.651.365 126 OTHER 236.323 27,996,000 28,136.854 TOTAL 114,241,217 393,364,104 359,639,449 97,469 147.965.872 EXHIBIT 2 CITY OF CARLSBAD PROPOSED REVISIONS TO THE MASTER FEE SCHEDULES JUNE 2002 These fees are in-& annually based upon an index as stated in the molutions or ordinamas establishing the fees. !2ilsHd EwisEdamae Affordable housing cmdit $39.400 $41.200 51,800 License lax on Uew Consbudionmobile homea 51.485 51.561 - $76 Traffic impact !aueDl RwisedfaaRae Tmm IWaU FI. ~ Ra"i Cml Par Trip (Out ol CFD) TnmC lmpaa Fm ~ Ccm&WWsl Cod Per Mp (Out of CFD) 194 ss8 58 39 2 TRmC IIIWcI FW - Residnll Cart Pa Tiip (Insdo CFD) 1 61 63 2 TRmc Impact Fm - CommeVlndW Coat Pef Trip (lnr(ds CFD) 25 25 0 Planned Local Dninage Area Fees Fee per gross am Area I Basin Name Low Hgh Runoff Runoff Runoff Runoff Low Huh Current Rwissd A Buena Vmta ~agmn C Endm Creek D BaWuh Lagom Sewer Connection Fees 40 60 38 82 B Ague Hedlonda lagoon 11.733 U.837 2.786 4.559 3.725 8,097 r1.1137 $3.007 3.949 6,483 2953 4132 GluLentMQaUge Ge~nl Cspadly Fee All &Us $2,019 12.M)o $41 Plus Sewor Bsmfi( Frrrr shwn blnv Sewer Benefit Area Fees - CUEm RWisEd QaUge' AraA 1360 $379 119 -0 AR.C 634 607 526 553 33 27 h8 D 1.014 AraE 1.037 (.MI6 52 Am F 1.090 1.135' 1.193 53 511 &UG hn 98 eu4 103 5 Area I 698 34 388 &UJ 387 19 1.288 ArsrK 1.333 05 2.558 2.690 AraL 1.002 132 ARaM 49' 1.054 52 52 3 . Bridge (L Thomughfam District #Z Fees Current Revised Change 2ona5 1290 1296 S6 Zone21 Zone 20 802 815 312 319 13 7 Bridge & Thoroughfare District #3 Fees Current Revised Change Fee per ADT $132 1135 13 Agricultureai Mitigation Fees Current Revised Change . 2 (D H 3 n P) i3 8 v) m. . . 2 (D s n (D < (D 3 S (D rn v) rt 3 ii: P) v) . 0 3 (D 3 * a UI tD n * -I 0 f v) to w 0 VI 0 0 w .. 3 NG,WPPVI 000000 000000 u VIOVIOVIO Y u & 000000 Y u Y co ca 0 co co VI & N 0 0 0 0 N 0 VI 0 N 0 & 0 N VI & N 0 0 N - \ --rAh)NO 0000000 000000 a "0 "a "0 "a "0 1986 1987 1988 1989 1990 1991 1992 1993 1994 1995 1996 1997 1998 1999 2000 2001 2002 2003 2004 2005 2006 2007 0 ~~h)h)U 000000 VI -0 -VI ‘0 “VI -0 Y 000000 0 ‘0 ‘0 -0 ‘0 ‘0 000000 000000 1995 2001 2002 2003 2004 2005 2006 L Q P, 52. r n - S I. CD C. CD CD v) Q S v 0 P, 0 I. - n I. - I. rc CD v) CD CD v) I. n H w I "I@ I ID 30 Y n C c" 3 n CD CD 0 rc z (D 'T c) 0 C S c) 9) v) "I 9) X "I 3 0 9) rc 0 S -1 m PI v) 7i' r IO Iz\ 0 0 c rn 0 n D n u X QJ 3 3 iir * -. 5' 3 W * VI 0 0 n 0 0 rF n QJ n -. 0 n QJ iir m X v) I. m G " 5. 3 v) n QJ n -. n m m n S 3 CL n C S Q S m II IT] I. n n n (D (D v) h) 0 0 h) GJ 6 h) 0 0 GJ P 6 h) 0 0 P VI 6 3 D n 3 5’ D 3 1 n + 1 I 5 5’ + 3 N 0 0 N 0 6 N 0 0 0 P 6 3 D D 1 5 I. h) 0 0 h) W 6 P, S Q 0 S 0 P, P, v) I. I. 3 rn h) 0 5. -h 6 Q P - v) h) 0 0 P VI 6 h) 0 0 VI Q, 6 h) 0 0 h) G) 6 h) 0 0 0 P 6 h) 0 0 P ul 6 h) 0 0 ul Q, 6 h) 0 0 Q, 4 6 2 (D k 01 T (D PI L 9) II I i3)s 3O I. s 0, (D 9) D 1 I. a. CQ (D < v) I v) u mm.. 00 OS00 n 0 r (D < a - zi "0 zi n (D a, (D 3 G w 00 . 1 3 I. n "I w A P I n "I 3 I. -. 3 I. v) (D < (D 0 - 7' (D 3 . J Qbj n S 3 Q - I. 0 n 9) 0 I. - I. u" 7 CD CD v) 0 cn d II iu 2 e. 0 "I v, I. 0 (D (D 3 v) a 3 m c I. - 3- U S tQ tn I. Qv, . -. < (D a S (D n CD U 0 a cn 0 CD 0 a a v) 2 (D 1 3 CD S * -. S n 3 c S S Q 0 CD TI CD 0 II e3 4 0 0 0 0 0 L. a s Y rn TI rn TI x (D 0 Y 0 - x n, 3 0 IT 0 D e -. a n, v n D 0 7e S U 3 -. 0 i 7 0 2 (D z 0 (D a, 0 0 u, m z iD" n, 1 3 3 u" S 3 -. a n, n, 3 a, ?? - 0 (D II ll (D 0 0) a, x .. -. 0 - 5 5 1 -64 a n, z n, 0 a I 7 0 0 S cn m 0 S cn -. -. 13 S n, a, + -. 0 + 2 f 0 0 + -. H r tD 3 -I Ti' 8 0 3 2 2 n 0 3 v) rt i 5' 3 0 0 0 rn $ tD U 1 3 UI tD n = ~ 0 3 g 1 II 3 m m. 3 5' -* -3 m 0 * 0 * 3 (D E' Po m