Loading...
HomeMy WebLinkAbout2002-08-06; City Council; 16849; Poinsettia Lane Reach C & Recycled Water MainsrB# 16,849 m: AUTHORIZATION TO ADVERTISE FOR BIDS FOR n r A-, I THE CONSTRUCTION OF POINSETTIA LANE REACH"C AND ATG. )EPT. ENG d-o--UL DOMESTIC AND RECYCLED WATER TRANSMISSION MAINS CITY ATTYW PROJECT NOS. 36731, 35851 AND 36752 CITY MGR. RECOMMENDED ACTION: Adopt Resolution No. 2002-240 approving plans and specifications and authorizing the City Clerk to advertise for bids for the construction of Poinsettia Lane Reach "C" and Domestic and Recycled Water Transmission Mains, Project Nos. 36731, 35851, and 36752. Adopt Resolution No. 1162 District's Secretary to the Board to advertise for bids for the construction of Poinsettia Lane Reach approving plans and specifications and authorizing the "C" and Domestic and Recycled Water Transmission Mains, Project Nos. 36731, 35851, and 36752. ITEM EXPLANATION: The project includes an extension of Poinsettia Lane between Black Rail Road and Ambrosia collector sewer, and storm drain. Poinsettia Lane is a major arterial roadway in the City's Master Lane, installation of domestic water transmission mains, recycled water transmission mains, already obtained the necessary roadway easements from three adjacent property owners. The Plan and the 1,400-foot extension is part of Bridge and Thoroughfare District No. 2. The City has improvements include a four-lane roadway with landscaped median, bike lanes, and street lights. The domestic water transmission mains include 30", 24, 16", and 12" pipelines installed as part of CMWD's Water Master Plan. The recycled water transmission mains include 24" and 18 pipelines to be installed as part of the Phase II Recycled Water System. The collector sewer will be 725 feet of 8" PVC and the storm drain will be 750 feet of reinforced concrete pipe. ENVIRONMENTAL REVIEW: The potential impacts of the construction of this portion of Poinsettia Lane have been reviewed consistent with the California Environmental Quality Act which resulted in the certification on the Environmental Impact Report for the Zone 20 Specific Plan (EIR 90-03). In addition, the Mitigated Negative Declaration for the De Jong residential project (CT 98-05) issued on November 30, 1998, supported the findings of EIR 90-03. The Planning Director determined that the environmental effects of this project have already been considered in conjunction with the previously mentioned environmental documents and, therefore, no additional environmental review is required. A public Notice of Prior Environmental Compliance was published on January 6, 1999, and a Notice of Determination was filed immediately thereafter. The Coastal Development Permit 98-26 was approved in Planning Commission Resolution No. 4508. FISCAL IMPACT: The project will be funded through a variety of fund sources. The domestic water mains will be funded from Water Connection Fees (CIP #35851). The recycled water mains will be funded by the Encina Basin Water Reclamation Program, Phase II Project (CIP #36752). The sewer and road frontage improvements adjacent to the DeJong property and Redeemer by the Sea Church property will be paid for with developer deposits, which will be obtained prior to award of the construction contract. Page 2 of Agenda Bill No. 16,849 The frontage improvements adjacent to the Daybreak Church property will be funded from Bridge and Thoroughfare District No. 2 (B&TD #2) fee revenues as part of the consideration for the the City for one-half of their frontage improvement costs at the time they obtain permits to develop acquisition of the road easement along their property frontage. Daybreak Church will reimburse their property. The road grading work, middle two traffic lanes, median curbs, and storm drain improvements will be funded by B&TD #2 fee revenues. Council previously approved a loan to BTD #2 from the General Fund for $500,000 and a loan from the Gas Tax Fund for $2.5 million. These loans paid for the School obligations for the road improvements could be paid. The fees for B&TD #2 were recently increased, District's share of the road improvements ($1.5 million) as well as provided cash flow so that current however, there still are insufficient funds available in B&TD #2 to build Reach "C of Poinsettia Lane. Approximately $1.3 million is currently available in B&TD #2 for this project. As a result, the City will need to loan B&TD #2 approximately $500,000 from the General Capital Construction Fund. The loan and appropriation of B&TD #2 funds will be requested at the time of bid award. Assuming the adjacent land develops as planned, the loan will be repaid as the B&TD #2 fees are collected. The estimated construction costs and funding sources for each of these improvements are shown in the following table: B&TD #2 Road Improvements Construction Contingency (1 0%) $1,421,391 $250,000 Inspection, Testing, and Construction Management $142,139 Subtotal: B&TD #2 $1,813,530 tion, Testing, and Construction Management $100,000 I Domestic Water St I lnspec 35851) $724,000 $72,400 Water Connection Ibtotal: I $896,400 I Fees I Council recently appropriated $15.8 million to construct Phase I1 Recycled Water Pipelines and the domestic water pipelines have $1.6 million remaining appropriation; therefore, sufficient funds are available to construct the domestic and recycled water transmission mains. Page 3 of AB 16,849 EXHIBITS: 1. Location map. 2. Resolution No. 2002-240 approving plans and specifications and authorizing the City Clerk to advertise for bids for construction of Poinsettia Lane Reach "C" and Domestic and Recycled Water Transmission Mains, Project Nos. 36731, 35851, and 36752. 3. Resolution No. 1162 Secretary to the Board to advertise for bids for the construction of Poinsettia Lane Reach "C' approving plans and specifications and authorizing the District's and Domestic and Recycled Water Transmission Mains, Project Nos. 36731, 35851, and 36752. LOCATION MAP NOT TO SCALE \ ClW k ENCINilAS w PROJECT NAME POINSETTIA LANE REACH 'C' AND EXHIBIT DOMESTIC AND RECYCLED WATER TRANSMISSION MAINS I 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 RESOLUTION NO. 2002-240 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD, CALIFORNIA, APPROVING PLANS AND SPECIFICATIONS AND AUTHORIZING THE CITY CLERK TO ADVERTISE FOR BIDS FOR THE CONSTRUCTION OF POINSETTIA LANE REACH "C" AND DOMESTIC AND 36731, 35851, AND 36752. RECYCLED WATER TRANSMISSION MAINS, PROJECT NOS. WHEREAS, the City Council of the City of Carlsbad, California, has determined it necessary, desirable and in the public interest to construct Poinsettia Lane Reach "C" and Domestic and Recycled Water Transmission Mains, Project Nos. 36731, 35851, and 36752; and WHEREAS, the plans and specifications for furnishing of all labor, materials, tools, equipment, transportation, and other expenses necessary or incidental to this project have been prepared and are on file in the Public Works-Engineering Department of the City of Carlsbad and are incorporated herein by reference; and NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carlsbad, California, as follows: 1. That the above recitations are true and correct. 2. That the plans, specifications, and contract documents on file in the Public Works- Engineering Department of the City of Carlsbad are hereby approved for construction of Poinsettia Lane Reach "C and Domestic and Recycled Water Transmission Mains, Project Nos. 36731, I I 35851, and 36752 1 2 3 4 5 6 7 8 9 10 11 12 13 14 ca 17 18 19 20 21 22 23 24 25 26 27 28 3. The City Clerk of the City of Carlsbad is hereby authorized and directed to publish, in lccordance with State law, a Notice to Contractors Inviting Bids for the construction of Poinsettia .ane Reach "C" and Domestic and Recycled Water Transmission Mains, Project Nos. 36731, 15851, and 36752, in accordance with the plans, specifications, and contract documents referred o herein PASSED, APPROVED AND ADOPTED at a regular meeting of the Carlsbad City Council leld on the 6th day of August , 2002 by the following vote, to wit: AYES: Council Members Lewis, Kulchin, Finnila, Nygaard, and Hall tTTEST' -pi&+&% RRAINE WOOD, City Clerk 'ge 2 of 2 of Resolution No. 2002-240 (SEAL) 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 RESOLUTION NO. 1162 I A RESOLUTION OF THE BOARD OF DIRECTORS OF CARLSBAD MUNICIPAL WATER DISTRICT (CMWD) APPROVING PLANS AND SPECIFICATIONS AND AUTHORIZING THE SECRETARY OF THE BOARD TO ADVERTISE FOR BIDS FOR THE CONSTRUCTION OF POINSETTIA LANE REACH "C" AND DOMESTIC AND 36731, 35851, AND 36752. RECYCLED WATER TRANSMISSION MAINS, PROJECT NOS. WHEREAS, the Board of Directors of Carlsbad Municipal Water District (CMWD) of the City of Carlsbad, California, has determined it necessary, desirable and in the public interest to construct Poinsettia Lane Reach "C" and Domestic and Recycled Water Transmission Mains, Project Nos. 36731,35851, and 36752; and WHEREAS, the plans and specifications for furnishing of all labor, materials, tools, equipment, transportation, and other expenses necessary or incidental to this project have been prepared and are on file in the Public Works-Engineering Department of the City of Carlsbad and are incorporated herein by reference; and WHEREAS, funds in the amount of $15.8 million have been previously appropriated to construct the recycled water pipelines, and funds in the amount of $1.6 million are available and have been previously appropriated to construct the domestic water pipelines; therefore, sufficient funds are available to construct the domestic and recycled water transmission mains; and NOW, THEREFORE, BE IT RESOLVED by the Board of Directors of Carlsbad Municipal Water District (CMWD) of the City of Carlsbad, California, as follows: 1. That the above recitations are true and correct. 2. That the plans, specifications, and contract documents on f;le in the Public Works- Engineering Department of the City of Carlsbad are hereby approved for construction of Poinsettia Lane Reach "C" and Domestic and Recycled Water Transmission Mains, Project Nos. 36731, 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 c 17 19 20 21 22 23 24 25 26 27 28 3. The District's Secretary to the Board is hereby authorized and directed to publish, n accordance with State law, a Notice to Contractors Inviting Bids for the construction of Poinsettia Lane Reach "C" and Domestic and Recycled Water Transmission Mains, Project Nos. 36731, 35851, and 36752, in accordance with the plans, specifications, and contract documents referred to herein. PASSED, APPROVED AND ADOPTED at a special meeting of the Carlsbad Municipal Nater District held on the 6th day of August , 2002 by the following vote, to wit: AYES: Board Members Lewis, Kulchin, Finnila, Nygaard, and Hall NOES: None 4TTEST/? , %hG%77L !ORRAI~E M. WOOD, Secretary J Page 2 of 2 of CMIJD Resolution No. 1162. (SEAL)