Loading...
HomeMy WebLinkAbout2003-11-18; City Council; 17378 Water Update3; Water Master Plan Update MapsZone Description/Location Project TypeExisting Diam.New Diam.Pipeline Length330Upsize 6" and 4" PL in Jeanne Place to end of cul-de-sacPipeline Replacement6-in. 8-in. 600'446 Upsize 6" PL in Nob Hill Drive to end of cul-de-sacPipeline Replacement6-in. 8-in. 650'446Upsize 6" PL in Holly Brae Lane and Alder Ave east of Skyline Dr.Pipeline Replacement6-in. 8-in. 890'446Upsize 6" PL in Falcon Dr. east of Donna Dr. to cul-de-sacPipeline Replacement6-in. 8-in. 870'255Upsize 6" PL in Cynthia Ln & Gregory Dr, from Knowles Av to cul-de-sacPipeline Replacement6-in. 8-in. 710'330Upsize 6" PL in Tamarack Av from Highland Drive west to Adair St., and in Adair St to cul-de-sacPipeline Replacement6-in. 8-in. 1250'330Upsize 6" PL in Highland Dr. from Yourell Ave to RatcliffPipeline Replacement6-in. 8-in. 700'580Switch supply to hydrants at the Calavera Rec. center from the 580 Zone to the 446 Zone New Connection to Fire HydrantsNA NA NA330Upsize 6" PL from Chestnut Ave at Woodland Way to the end of Woodland Way.Pipeline Replacement6-in. 8-in. 560'255Upsize 6" PL in Garfield from Chinquapin Ave to end of cul-de-sacPipeline Replacement6-in. 8-in. 846'255Upsize 6" PL in Arland Road from Highland to Buena Vista WayPipeline Replacement6-in. 12-in. 780'330Install parallel pipeline in Highland Dr. from Hillside Dr. south to Adams St.New Watermain6-in. 8-in. 2400'255 Install parallel pipeline in Cove Dr. from Park Dr. to endNew Watermain6-in. 10-in. 1300'680High elevation areas in the vinicity of Obelisco Place/CircleEmergency PumpNA NA NA255From end of Marron Road east to Tamarack; 446=>255 PRV at TamarackNew Watermain & PRSNA 12-in. 6600'255Parallel existing 8" PL in Crestview Drive, south of El Camino RealNew Watermain8-in. 8-in. 600'255 El Camino Real south from Kelly Dr. to Lisa St.New WatermainNA 10-in. 1500'375Bryant Dr. from Longfellow to El Camino Real, south on ECR to College and NE on College to Badger LnNew WatermainNA 12-in. 4000'490Upsize existing 20" to 30" along El Camino Real from Cougar Dr. to Faraday Ave including Maerkle Control Watermain Replacement20-in. 30-in. 1500'490/ 446College Blvd from Carlsbad Village Drive south to Cannon Road, 490=>446 PRS Watermain & PRSNA 16-in. 6330'490College Blvd from future intersection with Cannon south to future Tee leading to Maerkle ReservoirNew WatermainNA 16-in. 4000'375College Blvd from Cannon Road south to Badger LaneNew WatermainNA12-in.4130'375In Cannon Rd., from Merwin Dr. east to intersection with future College Blvd.New WatermainNA 12-in. 4400'490In College Ave, from Badger Ln. north ~1200 ft, then east thru future developmntNew WatermainNA 36-in. 5200'490Connection from terminus of Project #10 to Maerkle ReservoirNew WatermainNA 36-in. 4100'700In future extension of Melrose Dr., from PAR north to future Faraday Rd.New WatermainNA 16-in. 4000'700In north El Fuerte St. extension, to future Faraday Rd. New WatermainNA16-in.2200'700In future Faraday Rd. extension, between El Fuerte St. and Melrose Dr.New WatermainNA 16-in. 3600'700El Fuerte Street from PAR south to Rancho PanchoNew WatermainNA24-in.5200'550El Camino Real from Palomar Airport Road south to Cassia RoadWatermain Replacement20-in. 24-in. 6100'375 Poinsettia Ln. west from Skimmer Ct. to Blackrail Rd.New WatermainNA 12-in. 4500'550 Poinsettia Road, 1100 feet east of Blackrail Rd.Watermain Replacement18-in. 30-in. 1100'550Aviara Pky at Plum Tree north to Mariposa St, then east to Sapphire Dr. New WatermainNA 8-in. 3100'700Northeast corner of El Camino Real and Palomar Airport RoadPump StationNA680 Intersection of El Fuerte and Corintia St.New 700 => 680 PRSNA NA NALabel123F11F10F9F8F1F2456F7F3F4F5F6789101112131415Capacity = 2,500 gpm211617181920F14F13F12318Carlsbad Boulevard from Avenida Encinas south to the District boundaryNew WatermainNA 12-in. 4900'375 Cannon Road, 1,800 feet NE from Faraday RoadNew WatermainNA 16-in. 2760'550Parallel ex. PL in Poinsettia Rd from Ambrosia Ln. to Blackrail Rd.New Watermain18-in & 30-in12-in. 2000'375Poinsettia Road from El Camino Real west to Skimmer Court (Poinsettia Lane)New WatermainNA 12-in. 1300'700 Palomar Airport Road west of SDCWA Conn. #1Watermain Replacement20-in. 30-in. 1500'375Construct new 375 Zone water reservoir next to existing D-3 ReservoirNew Water ReservoirNA490Construct buried storage reservoir next to existing Maerkle ReservoirNew Water ReservoirNA490 Maerkle Pump Station Capacity ImprovementsEnlarge Pump StationNA375 Gross Pressure Reducing Station Improvements490=>375 PRS UpgradeNA NA NA490El Camino crossing at Kelley Dr.New WatermainNA12-in.300NA Foussat Road Well AbandonmentWell AbandonmentNA NA NANA Lake Calavera Reservoir ImprovementsReservoir ImprovementsNA NA NA255Oceanside Intertie UpgradeIntertie UpgradeNANANA392Install 490=>392 PRS at Cannon Rd. & College Blvd.490=>392 PRSNA NA NANA Groundwater/seawater desalination studyReport/StudyNA NA NA580Calavera PS, College Blvd at Carlsbad Village Dr.PS upgradesNA NA NA3722242526Add'l capacity = 10,000 gpm303127Capacity = 8.5 MG28Capacity = 15 MG36323334352923Benefit/CommentsUpsize to provide Residential fire flowUpsize to provide Residential fire flowUpsize to provide Residential fire flowUpsize to provide Residential fire flowUpsize to provide Residential fire flowUpsize to provide Residential and Multi-family fire flowUpsize to provide Residential fire flowThe 580 Zone has no storage. Modify system to provide Comm/Ind fire flow to recreation center from the 446 Zone and TAP Reservoir Upsize to provide Multi-Family fire flowUpsize to provide Comm/Ind fire flowUpsize to provide Comm/Ind fire flowUpsize to provide residential fire flow & redundant supplyUpsize to provide Multi-Family fire flow & provide redundant supplyInstall emergency pump to boost pressures & provide the req'd fire flow @ 20psi Supply new developments in LFMZ 25 & provide additional supply to the 255 ZoneProvides redundant supply to existing residential area Provides looping to improve pressures and reliabilityConnects isolated portions of 375 Zone; Provides supply from Maerkle Res. for ex. & future development.Larger diam. pipe reduces pressure loss during emergency supply to 550 Zone from Maerkle DamIncrease supply capacity to 446 Zone from Maerkle Res.Primary feed for Robertson Ranch (490=>255 PRV); Increase supply capacity from MaerkleSupply for new development & create 375 Zone loop east of ECRSupply for new development & create 375 Zone loop east of ECRIncrease supply capacity from Maerkle Res and provide a redundant supply pipelineIncrease supply from Maerkle Res.; Supply to new 490 development east of El Camino and Rancho Carlsbad GCProvide looped supply to fut. north 700 zone business park in LFMZ 16Provide looped supply to fut. north 700 zone business park in LFMZ 16Provides looped supply to LFMZ 16 & supply to 550 Zone from 700=>550 PRVConnects 700N and 700S Zones; Supply for future development Replace existing pipeline and provide increased flow capacity Completes 375 Loop along Poinsettia Ln; Increase capacity to/from the D3 ReservoirIncrease supply to 550 Zone and D3 ReservoirProvide redundant supply to residential developmentProvide emergency supply to 700, 680, 510, and 580S Zones from Maerkle Res; PS sized to supply the ult ADD of the zones supplied. Provide redundant supply to 680, 580S and 510 Zones2-way Emergency Conn. with SDWD 240 Zone; emergency supply to 318 Zone west of I-5 & portion of the 255 ZoneProvide 375 supply from Maerkle Res; Increased capacity for fut. developmentProvide redundant supply to residential developmentsParallel ex. 8-inch to increase capacity in the 375 Zone and supply from the 550 ZoneReduce velocity & provide increased capacity from SDCWA #1 Connection into 700 Zone.Provides additional daily storage within the distribution system for ultimate demandsProvides add'l emergency storage to meet 10-day storage criteria based on ult. demandsReq'd for emergency supply from Maerkle Dam. Increase PS capacity to existing ADDIncrease capacity of existing Gross PRS to supply new development from 490 ZoneIncrease supply to the 255 Zone directly from 490 Zone thru Kelley PRSAbandon well per State standards; removal of pumps, structures & restoration of propertyReplacement of outlet tower valves & piping; Re-grade reservoir bottomValve, pipeline & meter replacements for the existing inter-tieProject will take place when ex. "C" Reservoir is taken out of serviceInvestigate treatment/delivery of City owned groundwater;seawater desalination feasibilityInstall standby generator & building, hydropneumatic tank & add'l pump City of Carlsbad Water System Hydraulic Models File Management: The AutoCAD File for each model contains all linework data. The two subdirectories contain all the modeling data, including output. File Directory Structure: Scenario Manager Information 2001 Model Demand Set Valve Set Fireflow Set 1AAD EPS 1AAD 1AAD 1MDD EPS 1MAX 1MAX 1MIN EPS 1MIN 1MIN 2AAD Steady State 2AAD AAD 2MMD Steady State 2MDD MAX RESFF CIFF Steady State 2MDD MAX CIFF MFFF Steady State 2MDD MAX MFFF RESFF Steady State 2MDD MAX RESFF 2PEAK Steady State 2PEAK MAX MAX Ultimate Model Operation Set Valve Set Control Set 1MIN EPS 1AAD 1AAD AAD 2AAD Steady State ADDSS AAD 2MDD Steady State BASE MAX BASE 3AAD EPS AAD AAD AAD 3AAD_EM EPS AAD_EM AAD_X ADD_EM 3MMD EPS MDD MAX MDD 4PEAK Steady State PEAK MAX MDD