Loading...
HomeMy WebLinkAbout2004-05-18; City Council; 17644; Proposed 2004/05 to Buildout Capital ImpAB# 17,644 MTG. 05/18/04 DEPT. FIN TITLE: CAPITAL IMPROVEMENT AND PROPOSED REVISIONS TO MASTER FEE SCHEDULE PROPOSED 2004-2005 TO BUILDOUT DEPT.HS *- CITY ATTY. CITY MGR I RECOMMENDED ACTION: Accept report. Set public hearing for June 15, 2004. IT EM EXPLANATION : The Capital Improvement Program (CIP) is a planning document as well as a budget document. It incorporates the current status of all of the City’s capital funds with the capital construction budgets and development projections for the upcoming years, and then projects future revenues and expenditures for all known projects until buildout of the City. This document is reviewed and updated every year during the budget process. Overview - Fiscal Year 2004-2005 During the CIP review process, staff took a close look at the construction schedules for City facilities in conjunction with the workload of the staff needed to complete the projects. and ranked using the criteria shown in the table. An evaluation of the availability of capital construction funds as well as operating funds was also part of the evaluation and scheduling process. Several projects funded with Public Facility Fees had budget increases and the expected fee revenue may no longer be sufficient to fund all projects as planned. This year’s proposed CIP reflects staffs recommendation to move out the construction of Poinsettia Park (Phase II) as well as the relocation of Fire Station No. 3 (Chestnut Avenue location). Moving these two projects out will provide sufficient funding for projects in the next 5 years. During this time an evaluation of the remaining projects in this fee program can occur, and Council can have an opportunity to revise the future construction plans of PFF funded projects and/or obtain additional funding. In addition, new projects were prioritized 2004-2005 Appropriations The 2004-2005 proposed budget for the Capital Improvement Program (CIP) totals $51.6 million, with estimated revenues of $53.6 million. Appropriations estimated at $1 36.7 million for ongoing capital projects remaining unspent at the end of FY 2003-2004 will be added to the new 2004-2005 CIP appropriations. The sum of $188.3 million will then comprise the total 2004-2005 CIP budget. Projects generally receive all of the required funding up front, yet construction often spans several years. The following table summarizes the projects to receive continuing appropriations into the 2004-05 fiscal year. PAGE 2 OF AGENDA BILL NO. 17,644 Project Park Proiects Pine Park Hidden Canyon Park Acquisition NE Quadrant Aviara Community Park Alga Norte Park Continuing Appropriation $4,167,753 1,66 1,040 4,549,523 9,392,642 11,984,655 Sewer Proiects Encina WPCF Projects N Agua Hedionda Interceptor S Agua Hedionda Force Main 6,468,471 3,414,968 4,951,085 Vista/Ca rlsbad In terce ptor Proj. 5,246,966 Water Proiects Misc. Potable Water Projects Recycled Water Phase II Major projects scheduled to receive new or additional funding in fiscal year 2004-05 are summarized as follows: 10,920,523 17,703,564 Park Proiects Streets and Traffic Sinnals El Camino Real Widening Traffic Signals Pavement Overlay Rancho Santa Fe Road All other projects Total Continuing Appropriations Appropriations for park construction projects total $8 million, or 15.5% of the total 2004-05 CIP budget. The largest appropriation is for the construction of an aquatic center at Alga Norte Park. Through 2003-04, $13 million has been appropriated for development of the park site at Alga Norte (not including the aquatic center), and an additional $850,000 is requested due to anticipated construction cost increases. This 32-acre park is located in the southeast quadrant of the City. Amenities include baseball and softball fields, basketball courts, tot lots, a skateboard park, picnic areas, a dog park, and an extensive internal and external trail and walkway system throughout the entire park. An additional $997,000 is being requested for park development at Pine in the Northwest Quadrant. Amenities include baseball fields, picnic areas, a tot lot, and an ornamental garden. At Poinsettia Community Park a request for $400,000 is requested for the construction of a maintenance building which will house tools and equipment, and include a small office and restroom. 2,120,371 3,905,622 5,432,932 22,796,610 16,,723,977 $1 36,660,625 2 PAGE 3 OF AGENDA BILL NO. 17,644 Civic Proiects Facility construction and maintenance projects total 19.8% of next year’s CIP budget, or $10.2 million in additional appropriations. The relocation of Fire Station No. 6 to Rancho Santa Fe Road will be funded at a total cost of $3.6 million. Of this amount, $2.6 million is for construction of the fire station, and $1 million is for construction of an access road to the site, a signal, off-site utilities, and demolition of the existing fire station. The City is also expecting additional grant funding ($2 million) for the Coastal Rail Trail, and an appropriation of $1.6 million is allocated for the installation of 2 synthetic turf multi-use fields (baseball, softball, soccer, football, lacrosse) at Stagecoach Park. Included is the cost of utility relocation, and installation of a drainage system. Street Proiects Street projects are scheduled to receive $9.4 million in 2004-05. Over $3 million is for the pavement overlay program and $1.9 million is planned for widening along two sections of El Camino Real (north of Cougar Drive, and from Tamarack Avenue to Chestnut Avenue). Funding is also included for construction of six new traffic signals, at a total cost of $1 .I million. Sewer Construction Proiects Sewer construction projects are 28.9% of the total 2004-05 appropriation at $14.9 million. Of that amount, $7.5 million in additional appropriations is for the Phase V expansion of the Encina Water Pollution Control Facility. This cost represents the City’s pro-rated share, approximately 21% of the total cost. The project includes expansion of the solids handling facility and energy management facilities to accommodate projected flows through 2025. Water Proiects Water and Recycled Water projects for 2004-05 total 9.6%, or $5 million. The largest appropriation is $2.7 million for replacement of 3000 feet of water pipeline in San Marcos Boulevard towards the west from Rancho Santa Fe Road. This project was expanded in scope due to the recent occurrence of a sinkhole in that area. In addition, $1.1 million is included for the construction of a pump station at the intersection of Palomar Airport Road and El Camino Real. Construction of the Recycled Water Facility will continue over the next year. This $41 million project includes construction of a four-million-gallons-per-day treatment plant, distribution pipelines, a flow equalization storage facility, and pump stations. Construction of the treatment plant is complete as of end of April 2004; however, timing of the plant operations is dependent upon completion of Encina’s Flow Equalization project. It is estimated this project will be complete in April 2005, at which time the recycling facility will become operational. The pipelines will also be completed by that time, and the pump stations and Mahr Reservoir will become operational around July 2005. Future Facilities - 2004-2005 to Buildout Capital Improvement Program Construction of City facilities such as libraries and administrative facilities, police and fire facilities total $96 million, or 22% of the total planned capital expenditures to buildout. The Capital Improvement Program includes funding to construct a new Civic Center and Public Works Facility in future years, and to reconstruct and expand the Cole Library. Funding is also provided for the relocation of Fire Station #3. In addition, approximately $30 million is set aside in this category for funding of projects included in the voter approved Proposition C ballot measure, which include an 3 PAGE 4 OF AGENDA BILL NO. 17,644 aquatic center, trail linkages and open space, a Citykafety training facility, and construction of a portion of Cannon Road east of College Boulevard (Reach 4). The original amount set aside was $35 million; however, next fiscal year an appropriation of $5.4 million is scheduled for the swimming pool complex. Approximately 21% of future expenditures, $93 million, is planned for street and traffic signal construction projects. Roadway projects include funding for the replacement of the Carlsbad Boulevard Encinas Creek Bridge, several road-widening projects, and over $50 million for future pavement overlay. Additional traffic signals are expected to cost approximately $5.5 million. The third largest expenditure category is for park and recreational facility construction and acquisition projects, which total $90 million, or 20.6%. In addition to the projects previously mentioned, park projects are planned within all quadrants of the City and include: Northwest Quadrant Northeast Quadrant Community Facility (Pine School) Cannon Lake Park Hosp Grove-Buena Vista Lagoon Recreational Improvements NE Quadrant Park Southwest Quadrant Poinsettia Park Phase II Aviara Community Facility Southeast Quadrant Alga Norte Park Aquatic Center at Alga Norte Leo Carrillo Park Phase Ill Citvwide Park and Recreational Projects Municipal Golf Course Business Park Recreational Facility Veteran’s Memorial Park Sewer projects are expected to cost $63.6 million, which includes over $40 million in sewer replacement projects. Funding is also provided for the repayment of bonds for the expansion of the Encina Wastewater Facility, and the Encina Water Pollution Control Facility projects. Future water projects total about $39.6 million (9.1%) and include construction of new waterlines, both potable and recycled, concurrent with new development. Some of the major areas in which these installations or upgrades are planned include segments of College Boulevard and El Fuerte, and along El Camino Real. Replacement of existing potable and recycled waterlines is also included in this category. Specific timing and cost estimates for all capital projects are identified in the Detail Schedule of Capital Projects (2004-2005 to Buildout). Following the schedule of funded CIP projects is a list of projects for which no funding has been identified at this time. Staff is investigating possible funding sources, such as Federal and State g rants . The unfunded projects are: Carlsbad Boulevard Encinas Creek Bridge Replacement El Camino Real Widening from Cassia Road to Camino Vida Roble Palomar Airport Road Widening and Bridge Reconstruction at Carlsbad Boulevard Poinsettia Lane - Reach “E” Cannon Road - Reach 4 - College to City Limits PAGE 5 OF AGENDA BILL NO. 17,644 Staff is requesting that Council set the public hearing for the adoption of the CIP as well as for the City’s Operating budget for the meeting of June 15, 2004. During this meeting, input from interested citizens and groups wishing to comment on the proposed budget is received and welcomed. Development Fees Each year, several development fees are adjusted by the change in the Engineering News Record Index as required by the respective fee programs. The adjusted fees are attached in Exhibit 2. FISCAL IMPACT: Upon adoption of the Capital Improvement Program budget on June 15, 2004, the total new appropriations on July 1, 2004 will be $51,573,664 from the CIP funds shown on the attached schedules. Existing expenditures are through March 31, 2004, and subsequent Council approved appropriations through April 30, 2004 are reflected in the attached schedules. In addition, revenue projections are provided to show the cash flows and balances for each of the funds. EXHIBITS: 1. 2004-2005 Preliminary Capital Improvement Program. 2. City of Carlsbad Proposed Revisions to the Master Fee Schedules, June 15, 2004. DEPARTMENT CONTACT: Helga Stover; (760) 602-2430; www.hstov@ci.carlsbad.ca.us 5 2004-2005 PRELIMINARY CAPITAL IMPROVEMENT PROGRAM Exhibit 1 OVERVIEW The City of Carlsbad Preliminary Capital Improvement Program (CIP) is a planning document that outlines the expenditure plan for future capital projects and the corresponding revenues to pay for those expenditures. The CIP is a financial planning document, not a commitment for spending. Spending authorization is given only at the time the City Council formally adopts the proposed budget, and, at that time, funds are only appropriated for the following fiscal year. The information shown in subsequent years is being provided to provide the most comprehensive snapshot of all the known future facilities the City of Carlsbad plans to construct. What is the definition of a CIP project? Projects that are shown in the CIP are generally defined as any construction (or reconstructionlreplacement) of major infrastructure such as streets, libraries, parks, tire stations and administrative facilities, water, sewer and drainage facilities, and other facilities that are located on or in the ground. In most cases, the total construction cost of each of these assets is recorded and tracked as part of the City’s inventory of capital infrastructure assets and other City-owned property. The 2004-2005 Preliminary Capital Improvement Program outlines $51.6 million in new appropriations to provide additional continued funding for the continuation of existing projects as well as funding for new projects. Projected revenues during the fiscal year are estimated at $53.6 million. Revenues are collected as building permits are issued, and as the need for facilities arises, the money is used to fund the new facilities. As the City continues to grow and develop, there is a corresponding increase in the demand for development-related services and new facilities. To ensure that the necessary infrastructure and facilities are built on a schedule that meets or exceeds this demand, the citizens of Carlsbad adopted a Growth Management Plan in 1986. The Growth Management Plan states that unless a standard level of facilities is available to meet new demands resulting from the City’s growth, development cannot proceed. This Plan is the foundation for making decisions about the timing and prioritization of the capital projects under consideration. A discussion of the City’s Growth Management Plan is located at the end of this report. This year’s CIP reflects the Council’s continued commitment to constructing the necessary facilities, in response to the current and anticipated development activity occurring throughout the City. In addition to prioritizing projects based on growth management, projects are continuously evaluated and prioritized to ensure the City will have the funds to operate the facilities as well as construct them. Thus, the CIP and the Operating Budget are integral parts of the total City financing plan. Projects are reviewed on an annual basis by the CIP Review Committee and subsequently by the City’s management and City Council. The Review Committee begins the project view by determining the need of a project based on the following criteria: I. Is the project required to ensure the health and safety of the citizens, as the result of a legal mandate, or to maintain compliance with the City’s Growth Management Plan? Are operating funds available to operate the facility? 2. Is the project needed soon for growth management compliance? 3. Is the project needed now for other City standards (example: ball field standards)? 4. Is the project needed soon for other City standards? 5. Does the project complete or provide part of the basic infrastructure (example: a linking road segment)? 6. Are there other reasons to construct the project (example: timing or funding opportunity, public demand)? Page 1 of 10 2004-2005 PRELIMINARY CAPITAL IMPROVEMENT PROGRAM Exhibit 1 25004 Actual Additional review of proposed projects relates to the overall timing of projects, the funding availability, an analysis of engineering cost estimates, and the requirement for City resources. tstimated FUTUREGROWTHANDDEVELOPMENT In order to estimate future revenues from development, several assumptions about the rate and type of future development need to be made. These assumptions can change from year to year and correlate with the economic climate. Every year, City staff evaluates all existing and future development projects and compares this information to the buildout capacity of the City using adopted general plans. Information about existing development activity combined with estimates of how remaining net developable land might develop are then summarized to prepare future projections about when and where residential and non-residential development will occur. Finance Department staff then prepare cash flow schedules using existing fund balances combined with future estimated fee revenues paid by those developments, and compares these balances of available funds to the expenditure plan to ensure that funding will be sufficient for construction of the planned capital projects as shown in the CIP. In addition to evaluating whether or not capital funds are sufficient, significant operating cost impacts and availability of staff resources are also used to evaluate the timing of projects. Where funding discrepancies occur, alternative financing methods and project timing are again evaluated and recommendations are made to resolve the discrepancies. This year's proposed CIP reflects staffs recommendation to move out the construction of Poinsettia Park (Phase II) as well as the relocation of Fire Station No. 3 (Chestnut Avenue location). Moving these two projects out will provide sufficient funding for projects in the next 5 years. During this time an evaluation of the remaining projects in this fee program can occur. Residential development is expected to remain fairly steady over the next few years. The number of annual building permits issued is expected to decrease when compared to the previous five-year period. An additional 6,800 units are remaining before the City is predominantly built out, and the development schedules of the remaining vacant parcels is driving the timing of those future units, rather than economic or market conditions. Residential development for 2003-2004 is projected at 1,200 units, and construction is expected to average about 740 units per year over the next five years, as compared to an average of over 1,300 units per year for the previous five-year period. 2000 1500 1000 500 0 1999 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 Page 2 of 10 2004-2005 PRELIM I NARY CAPITAL IMP ROVE M E NT PROGRAM Exhibit 1 The amount of non-residential development is also expected to remain fairly steady and actually increase over the next five years. The average annual square feet of non-residential development for the past 5 years was about 675,000. This year, the estimate is for 273,000 square feet, but the average annual development next 5-year period is more than 1,100,000 square feet per year. Projects include several neighborhood commercial/retail developments located in or near the areas where most of the residential development has recently occurred or where new development is planned over the next several years. In the southeast quadrant, commercial projects include retail and restaurants, a theater, and a daycare and church. Sunny Creek Plaza is a planned commercial development located east of El Camino Real at College Boulevard next to the Sunny Creek residential neighborhood, and the Bressi Ranch area will include 130,000 square feet of commercial development. Other commercial developments are planned at Calavera Hills and at Poinsettia Shores; at the La Costa Resort plans include construction of 184,000 square feet of commercial living units. Industrial development consists of various new office and industrial projects, as well as expansion of existing projects at Kelly Corporate Center, Callaway Golf, GIA, Legoland, and Grand Pacific timeshares located just east of the flower fields. dr, Development estimates provide the data and basis for estimating future fee revenues, which are calculated by multiplying each applicable development fee by the estimated number of dwelling units and/or square feet of construction expected during each year. The following table shows the number of residential units and non-residential square feet of development used in calculating estimated revenues for 2004-2005 and subsequent years to buildout. Projected Development Residential and Non-Residential Construction Residential Non-Residential Year Units Square Feet 2003-2004 current 1,198 273,336 2004-2005 1,355 76531 2 2005-2006 2006-2007 2007-2008 2008-2009 Years 6-1 0 1,025 1,383,740 81 5 1,505,003 131 1 ,I 52,053 373 1,082,072 1,991 5,263,610 Years 1 I-buildout 1,116 2,398,336 Total Future 6,806 13,550,126 REVENUES Revenues for Capital Projects from now until buildout total $443 million and are segregated into five major categories: (1) fees generated by development in Carlsbad, (2) special district fees and taxes (Community Facilities Districts and Bridge and Thoroughfare Benefit Districts), (3) Water and Sewer replacement reserves, (4) infrastructure replacement funds (other than sewer and water), and (5) other sources including grants, bond issues, and contributions from other agencies. Page 3 of 10 2004-2005 PRELIMINARY CAPITAL IMPROVEMENT PROGRAM Exhibit 1 Funding Sources 2004-2005 to Buildout Total Revenue = $443 million In Millions 160 140 120 100 80 60 40 20 0 Approximately 32% of all capital revenue is received as a result of development, and is dependent upon assumptions made about the City's annual growth in dwelling units and commerciallindustrial square feet. Development revenues include Public Facilities Fees (PFF), Traffic Impact Fees (TIF), Park-In-Lieu Fees (PIL), Planned Local Drainage (PLD) Fees, Water Connection Fees (MFF), and Sewer Connection charges. Revenue from special districts, such as Community Facilities Districts and Bridge and Thoroughfare Benefit Districts comprise 9% of the total. Water and Sewer replacement revenues generated by user fees equal approximately 23% of total revenues, and are used to pay for replacement of existing water and sewer facilities. Infrastructure Replacement revenues (1 5%) are transfers from the City's General Fund which are being set aside to pay for replacement and major maintenance of capital facilities other than sewer and water facilities. The remaining 21% consists of revenues from other agencies and includes federal and State grants, the County sales tax program (TransNet), Redevelopment agency revenue, and contributions from Cities and other agencies. Calculation of Future Fees The revenue projections of the Capital Improvement Program reflect the growth assumptions identified in the previous section. The following information delineates how those assumptions were applied to estimate future development revenues. The mix of multi-family and single-family residential units is assumed to be 35% and 65% respectively and reflects the anticipated mix of residential development for each Local Facilities Management Zone. The building permit valuation used for computing Public Facilities Fees is $156,025 per multi-family dwelling unit, and $240,800 per single-family dwelling unit. A building permit valuation of $38 per square foot of construction is used to calculate non-residential Public Facilities Fees. In order to calculate estimated revenues for Traffic Impact Fees (TIF), the number of average daily trips was computed for each type of development use. A multi-family residential dwelling unit is assigned eight trips per day and a single-family unit is assigned ten trips per day. Each residential trip is valued at the current TIF of $98. The trips-per-day value for commercial and industrial buildings are averaged at 23 trips per 1,000 square feet of development, although the actual volume of trips generated by commerciaVindustria1 building can vary widely depending on the ultimate land use. The value assigned to each commercial/industriaI trip is $40. CFD No. 1 is a Citywide district established to finance various civic facilities required under the City's Growth Management Plan. CFD No. 2 is proposed to fund Rancho Santa Fe Road and Olivenhain Road, but has not yet been formally established. A prepayment program is in place to enable development to proceed within this proposed district. Page 4 of 10 Exhibit 1 2004-2005 PRELIMINARY CAPITAL IMPROVEMENT PROGRAM @ Park-in-Lieu Fees are collected for the purchase and development of parkland within each quadrant of the City, and the fees are based on the acquisition cost of parkland. Projects in the CIP funded with Park-in-Lieu Fees include future park site acquisition, development and restoration. L There are two existing Bridge and Thoroughfare Fee Districts (BTD), which were formed by property owners to finance, specific road construction projects located within each of the district boundaries. Poinsettia Lane - Aviara Parkway (BTD No. 2) was formed to finance the construction of Poinsettia Lane between Aviara Parkway and El Camino Real and Aviara Parkway between Palomar Airport Road and Poinsettia Lane. BTD No. 3 (Cannon Road West) was formed to fund portions of Cannon Road from Interstate 5 to El Camino Real. Although construction of this project is complete, revenues collected from future development within the district will be used to repay an advance that provided interim funding to complete the project. CAPITAL PROJECTS The following two sections provide information about the major capital projects. The first section focuses on projects planned in the next five years, and the second section contains an overview of the entire expenditure plan through buildout of the City. CAPITAL PROJECTS -THE NEXT FIVE YEARS Some of the major projects planned for the next five years are discussed below. Their locations can be seen on the map following this section. Streets - Several street construction projects are planned for the next five years. Completion of the final segment of the widening and realignment of Rancho Santa Fe Road will improve regional and local traffic flow generated in the southern part of the City. Projects constructed by developers (funding not shown in the CIP) are College Boulevard and Cannon Road extensions to the east and north, Faraday Avenue and Melrose Drive extensions, and the extension of Poinsettia Lane and completion of El Fuerte. These roads are located east of El Camino Real and will alleviate traffic on Palomar Airport Road. Financing districts are in the formation process to provide funding for College Boulevard and Cannon Road extensions east of El Camino Real, the Melrose Drive and Faraday Avenue extensions, and the Poinsettia Lane extension and construction of El Fuerte east of El Camino Real. City staff is currently working with property owners with pending developments in those areas to assist in the formation of those financing districts. Replacement of the Carlsbad Boulevard Encinas Creek Bridge is planned in the next five years. In addition, there are several street widening projects planned along El Camino Real. The pavement overlay program is expected to cost about $3.3 million per year. Local streets are overlayed approximately every 7 years. Page 5 of 10 Exhibit 1 2004-2005 PRELIMINARY CAPITAL IMPROVEMENT PROGRAM Major Future Road Projects Aha Norte Park and Aquatic Center - This park site consists of 30 acres in the Southeast Quadrant and planned amenities include ball fields, soccer fields, picnic areas, tot lots, a skate park, a dog park, and restrooms and parking facilities, and an aquatic center. Construction is phased over the next several years. Pine School Park - Development of this park, located in the Northwest Quadrant is planned in the next five years. The master plan is complete, and the facility will include a multi-use field, basketball courts, picnic areas, tot lots and an ornamental garden area. 0 Staaecoach Park Synthetic Turf - Funding is included for the installation of approximately 5 acres of synthetic turf on outfield areas of fields 2 and 3 at Stagecoach Park. 0 Carlsbad Municipal Golf Course - The City has plans are to construct an 18-hole championship golf course on property located north of Palomar Airport Road along College Boulevard. An initial “clearing and grubbing” operating is expected to take place in the Fall of Page 6 of 10 Exhibit 1 2004-2005 PRELIMINARY CAPITAL IMPROVEMENT PROGRAM 2004, and formal grading is expected to begin in September 2005. The targeted opening is Spring 2007. 0 Lake Calavera Trails Master Plan and Construction - Funds for development of a Master Plan and construction of a public multi-use, recreational trail system are planned on property located at Lake Calavera in the northeast quadrant of the City. The project includes utilizing volunteers to construct approximately 2.5 miles of the proposed 5 miles of trails. 0 Civic Center and Public Works Center - Preliminary planning for a Civic Center and a Public Works Facility has begun. The Civic Center will consolidate administrative operations and facilities into a more centralized location. Staff, citizens and members of the business community have been participating in a visioning process to determine what the needs are - for the citizens and for the City as an organization. Once the process is complete, a site will be chosen, and design and construction can begin. 0 Fire Station No. 6 Relocation - Fire Station No. 6 is currently located in a temporary facility in the southeast quadrant of Carlsbad. Relocation of this station to a permanent facility along the east side of Rancho Santa Fe Road is scheduled to occur concurrent with the road alignment project. This fire station is required to ensure a five-minute response time within the southeast part of the City as development in that area occurs. 0 Vista/Carlsbad InterceDtor - The completed section of the Vista/Carlsbad Interceptor project involved installation of a new and upgraded sewer trunk line through the downtown portion of Carlsbad to the Encina Water Pollution Control Facility. The remaining sections of the project, extending from the Encina Facility to the Agua Hedionda Lift Station, are scheduled in the next five years. This project is required to handle buildout flows and replace deteriorated pipeline, and is partially funded by the City of Vista. Construction is currently underway and will continue for several more years. 0 Water Lines - Several major water lines are scheduled for construction within the next five bars: Cannon Road east of El Camino Real Carlsbad Boulevard - south of Avenida Encinas College Boulevard - various sections El Fuerte from Poinsettia Lane to Palomar Airport Road Faraday Avenue extension Melrose Drive from Palomar Airport Road to Faraday 0 Recycled Water Proqram - Construction of the Recycled Water Facility will continue over the next year. This $41 million project includes construction of a four-million-gallons-per-day treatment plant, distribution pipelines, a flow equalization storage facility, and pump stations. Construction of the treatment plant is complete as of end of April 2004; however, timing of the plant operations is dependent upon completion of Encina’s Flow Equalization project. It is estimated this project will be complete in April 2005, at which time the recycling facility will become operational. The pipelines will also be completed by that time, and the pump stations and Mahr Reservoir will become operational around July 2005. CAPITAL PROJECTS 2004-2005 TO BUILDOUT The CIP for 2004-2005 to buildout outlines approximately 159 future projects at $436.3 million. Page 7 of 10 & 2004-2005 PRELIMINARY CAPITAL IMPROVEMENT PROGRAM Exhibit 1 CIP Projects - All Future Projects Type of Project Quantity Total Cost Civic Facilities 19 $96,001,215 Streets/Circulation 54 93,303,115 16 89,933,808 Parks 25 63,614,916 Sewer 40 39,589,701 Water Drainage 5 16,253,524 37,615,990 Total Future Construction of City facilities such as libraries and administrative facilities, police and fire facilities, and projects funded with Proposition C allocations (open space and trails, a swimming pool, a safety training facility, and contributions towards the unfunded portions of Cannon Road east of College) total $96 million of the total planned capital expenditures to buildout. The Capital Improvement Program includes funding to construct a new Civic Center and Public Works Center, and to reconstruct and expand the Cole Library. Funding is also provided for the relocation of Fire Station #3 located at Chestnut and El Camino Real, and the construction and relocation of Fire Station #6 to a location along Ranch Santa Fe Road. Approximately 22% of future expenditures, $96 million, is planned for street and traffic signal construction projects. Included in this category is construction of major roadways that will add east to west and north to south connections and provide additional routes to the neighboring cities of Oceanside, Vista, and San Marcos. Sections of these roads are already under construction by developers. The future street projects anticipated in the City include: Faraday Avenue and Melrose Drive Extensions east of El Camino Real (*) - The formation of CFD No. 3 is targeted for August 2004, and construction of the road and improvements is planned in the years subsequent to the formation. 0 Poinsettia Lane east of El Camino Real (*) - The City and Property owners have formed the Poinsettia Lane East Assessment District No. 2002-01 for the purpose of financing the construction of certain street and other improvements. e Cannon Road and College Boulevard East of El Camino Real (*) - An assessment district has been formed and Council authorized the issuance of bonds to provide funding for the improvements in May 2004. (*) These roads will be constructed by developers that are required to build them in conjunction with their development projects in those areas. Funding provided by the aforementioned financing districts is therefore not included in the CIP. Additional roadway projects include replacement of the Carlsbad Boulevard Encinas Creek Bridge, several road-widening projects, and over $50 million for future pavement overlay. Additional traffic signals are expected to cost approximately $5.5 million. Page 8 of 10 2004-2005 PRELIMINARY CAPITAL IMPROVEMENT PROGRAM Exhibit 1 The third largest expenditure category is for park and recreational facility construction and acquisition projects, which total $89.9 million, or 20.6%. Park projects planned within all quadrants of the City are listed below in addition to the estimated year of construction: Northwest Quadrant Northeast Quadrant NW Quadrant Park (Pine School) 2004-05 Community Facility (Pine School) 2010-14 Cannon Lake Park 2015-20 Hosp Grove-Buena Vista Lagoon Recreational Improvements 201 5-20 Hidden Canyon Park 2004-05 Southwest Quadrant Poinsettia Park Phase II 2010-14 Aviara Community Park 2004-05 Aviara Community Facility 201 0-14 Southeast Quadrant Alga Norte Park 2005-06 Alga Norte Aquatic Center 2005-06 Leo Carrillo Park Phase Ill 2015-20 Citvwide Park and Recreational Proiects Municipal Golf Course 2005-06 Business Park Recreational Facility 201 5-2020 Veteran’s Memorial Park 201 0-2020 Sewer projects are expected to cost $63.6 million, which includes over $40 million in sewer replacement projects. Funding is also provided for the repayment of bonds for the expansion of the Encina Wastewater Facility, and the Encina Water Pollution Control Facility projects. Some of the major areas in which these installations or upgrades are planned include segments of College Boulevard and El Fuerte, and along El Camino Real. j?J ‘ ‘ ‘ ‘ ’ Future water projects total about $39.6 million (9.1%) and include construction of new waterlines, both potable and recycled, concurrent with new development. Replacement of existing potable and recycled waterlines is also included in this category, and additional reservoirs are planned to increase storage for ultimate demands. 4 b Specific timing and cost estimates for all capital projects are identified in the Detail Schedule of Capital Projects (2004-2005 to Buildout) following this narrative. Following the schedule of funded CIP projects is a list of projects for which no funding has been identified at this time. Staff is investigating possible outside funding sources, such as federal and State grants. Unfunded Proiects e 0 0 e El Camino Real Widening from Cassia Road to Camino Vida Roble Palomar Airport Road Widening and Bridge Reconstruction Poinsettia Lane - Read “E” Cannon Road - Raech 4 - College to City Limits SUMMARY The proposed 2004-2005 to Buildout CIP is being driven by the City’s commitment to ensure that facilities are available to service the developing areas as well as the current residents. Carlsbad’s philosophy has been to build quality capital facilities, which meet, and at times Page 9 of 10 2004-2005 PRELIMINARY CAPITAL IMPROVEMENT PROGRAM Exhibit 1 exceed, Growth Management standards. Phasing projects over a period of years to match funding availability for construction and operations is often used to meet the needs of Growth Management. The 2004-2005 to Buildout Capital Improvement Program reflects the commitment of Carlsbad’s Council and staff to continue providing its residents with a better quality of life. GROWTH MANAGEMENT PLAN The Growth Management Plan was developed and voted into law by the citizens of Carlsbad in 1986. The plan was established to manage development within the City by linking residential, commercial, and industrial development directly to standards for availability of public services and facilities. The Growth Management Plan adopted has established precise standards for eleven public facilities. Standards must be met at all times as growth occurs. Facilities for which standards have been established are as follows: - City Administrative - Wastewater Treatment - Circulation - Fire - Water Distribution - Schools - Library - Parks. - Drainage - Open Space - Sewer Collection The Plan requires that appropriate public facilities be available, in conformance with the adopted performance standards, as development occurs. Unless each of the eleven public facility standards have been met, no new development can occur. The Growth Management Plan impacts both the Operating Budget and the Capital Improvement Program. The detailed level of planning required by Growth Management has allowed Carlsbad’s Capital Improvement Program to anticipate the funding needed for capital improvements through buildout of the City. The timing of construction of facilities is governed by the rate of development and the eleven performance standards. New public facilities often require additional staffing and other resources, which affects the Operating Budget. Facilities such as community centers, parks, and fire stations have been constructed and opened to the public under this program. The Capital Improvement Program has been designed to specifically address areas where new or expanded facilities will be needed to maintain compliance with the adopted performance standards. With the adoption of the 2004-2005 CIP, compliance with the Growth Management Plan is assured. Page 10 of 10 3 2 f i I i f i I I I ! ! i ; 1 2 ! 2 i z L I I : 3 i 5 4 i 1 I I I !! i z i 4 I E 2 n 6 E Y C s E n d F E L n H .- m C .- .- - In z 0 0 N '0 0 # n 2 n r I i P : I i P i : i z 5 i i P I I P I P 1 5 2 ! 3 t i 5 E i L ; I I L i I i t 5 P L 5 L 1 5 l- E F a E 6 F E s E i 5 P s s r b E E E 8 B F a E ; 1 h k U ; J c 1 E a - I- 0 (D a, - P a a\ ! v i e u c I i L f L I f L 1 5 5 I I 1 i ! I i i 2 I 3 i : 3 z i 1 z 5 3 $ 6 I : i I I a ! i I i I I 3 3 3 I 3 f E $ " I ! 1 < I i I ! I I ! i I ! i I I I ! ! I ! I 1 IC 0 h - m 0 a CITY OF CARLSBAD CAPITAL FUNDS PROJECTED FUND BALANCES FOR PI 2003-2004 JULY 1,2003 ESTIMATED JUNE 30,2004 UNRESERVED ESTIMATED ESTIMATED DEBT SERVICE PROJECTED FUND BALANCE REVENUES EXPENDITURES LOANS&OTHER BALANCE ASSESSMENT DISTRICTS 652,205 251,200 313,968 191.029 398.408 BTD#2 - POINSETTIA LANE/AVIARA PKWY BTD#3 - CANNON ROAD WEST CFD #1 - CITYWIDE CFD #2 - RANCHO SANTA FE ROAD GAS TAX GENERAL CAPITAL CONST. GOLF COURSE GRANTS - FEDERAL GRANTS - STATE INFRASTRUCTURE REPLACEMENT OTHER PARK FEE ZONES 5,13,16 PARK-IN-LIEU NE PARK-IN-LIEU NW PARK-IN-LIEU SE PARK-IN-LIEU SW PLANNED LOCAL DRAING PUBLIC FACILITIES FEE REDEVELOPMENT VILLAGE REDEVELOPMENT SCCRDA SEWER BENEFIT AREAS SEWER CONNECTION SEWER REPLACEMENT TDA TRAFFIC IMPACT FEE TRANSNET/BlKE TRANSNET/HIGHWAY TRANSNET/LOCAL TRANSNET/STP WATER - MAJOR FACILITY WATER - RECYCLED WATER 5,078,146 3,304,294 32,973,206 26,472,040 4,521,749 47,224,449 1,210,000 67,587 316,217 10,844,364 2,226,222 719,956 1,747,320 1,300,790 1,445,177 667,453 7,951,336 33,992,248 870,086 (9,104) 5,154,252 32,266,072 18,972,792 305,389 7,783,846 42,352 1,880,369 8,059,803 358,132 10,093,861 14,725,000 2,492,064 0 649,100 8,915,132 1,600,000 1,000,000 0 1,116,419 0 126,560 1,000 19,531 0 139,374 244,437 657,756 314,625 3,007,212 0 636,000 1,564,272 973,011 3,160,000 0 439,002 0 0 3,300,000 0 1,349,147 22,327,518 1,302,742 1,219,489 146,487 13,280,871 688,531 2,761,153 51,611 319,042 0 446,768 47,536 452 24,685 0 0 0 145,667 3,713,675 15,206 0 978,451 374,650 1,778,312 0 96,856 41,384 70,020 5,528,990 94,880 947,614 14,734,067 0 1,000,000 331,309 0 0 0 0 0 0 0 0 0 0 704,000 1,000,000 0 0 0 0 368,586 0 936,256 1,500,000 158,560 0 0 0 0 0 2,030,428 3,862,078 6,267,468 1,084,805 33,144,510 22,106,301 5,433,218 45,463,296 1,158,389 864,964 316,217 10,524,156 2,179,686 739,035 1,722.635 736,164 689,614 1,325.209 8,120,294 33,285,785 854,880 258,310 5,740,073 31,928,177 18,854,480 146,829 8,125,992 968 1,810,349 5,830,813 263,252 8,464,966 18,456,373 WATER - REPLACEMENT 13,050,001 2,382,000 277,292 2,163,790 12,990,919 TOTAL 296,267,610 56,665,359 49,400,399 14,246,036 289,286,534 CITY OF CARLSBAD CAPITAL FUNDS PROJECTED FUND BALANCES FOR FY 2004-2005 JULY 1,2004 PROJECTED ESTIMATED FUND BALANCE REVENUES ASSESSMENT DISTRICTS 398,408 BTD#2 - POINSETTIA LANEIAVIARA PKWL BTD#3 - CANNON ROAD WEST CFD #1 -CITYWIDE CFD #2 - RANCHO SANTA FE ROAD GAS TAX GENERAL CAPITAL CONST. GOLF COURSE GRANTS - FEDERAL GRANTS - STATE INFRASTRUCTURE REPLACEMENT OTHER PARK FEE ZONES 5,13,16 PARK-IN-LIEU NE PARK-IN-LIEU NW PARK-IN-LIEU SE PARK-IN-LIEU SW PLANNED LOCAL DRAIN'G PUBLIC FACILITIES FEE REDEVELOPMENT VILLAGE REDEVELOPMENT SCCRDA SEWER BENEFIT AREAS SEWER CONNECTION SEWER REPLACEMENT TDA TRAFFIC IMPACT FEE TRANSNET/BlKE TRANSNET/HlGHWAY TRANSNET/LOCAL TRANSNETKTP WATER - MAJOR FACILITY WATER - RECYCLED WATER 6,267,468 1,084,805 33,144,510 22,106,301 5,433,218 45,463,296 1,158,389 864,964 316,217 10,524,156 2,179,686 739,035 1,722,635 736,164 689,614 1,325,209 8,120,294 33,285,785 854,880 258,310 5,740,073 31,928,177 18,854,480 146,829 8,125,992 968 1,810,349 5,830,813 263,252 8,464,966 18,456,373 0 2,148,660 0 6,530,202 28,781 2,519,687 2,430,854 350,000 1,870,000 0 3,713,150 986,854 85,364 459,985 151,235 491,095 461,097 1,951,925 5,903,080 1,400,000 851,000 716,106 1,818,348 2,200,000 0 1,395,075 120,000 0 3,019,678 0 2,855,013 6,792,997 WATER - REPLACEMENT 12,990,919 2,396,860 TOTAL 289,286,534 53,647,046 ~~ 2003-2004 CONTINUING NEW APPROPR. APPROPR. 357,753 1,229,607 33,030 65,831 22,021,513 4,231,633 3,646,613 988,000 851,434 240,000 672,288 455,069 0 1,661,040 0 0 216,005 4,622,528 31,387,262 1,845 255,000 4,951,085 7,707,909 1 1,901,190 0 2,417,024 0 1,753,831 5,509,131 212,951 4,596,473 17,703,564 0 1,190,000 925,000 110,000 0 805,000 9,033,800 350,000 1,870,000 35,000 1,037,000 1,041,854 0 0 0 0 550,000 1,365,524 6,158,308 1,380,000 851,000 0 12,305,941 2,581,014 0 1,797,708 120,000 0 3,093,000 0 853,500 159,527 6,971,016 3,960,488 136,660,625 51,573,664 2004-2005 TOTAL CIP APPROPR. 357,753 2,419,607 958,030 175,831 22,021,513 5,036,633 12,680,413 1,338,000 2,721,434 275,000 1,709,288 1,496,923 0 1,661,040 0 0 766,005 5,988,052 37,545,570 1,381,845 1,106,000 4,951,085 20,013,850 14,482,204 0 4,214,732 120,000 1,753,831 8,602,131 212,951 5,449,973 17,863,091 10,931,504 188,234,289 JUNE 30,2005 PROJECTED BALANCE 40,655 5,996,521 126,775 39,498,881 1 13,569 2,916,272 35,213,737 170,389 13,530 41,217 12,528,018 1,669,617 824,399 521,580 887,399 1,180,709 1,020,302 4,084,167 1,643,295 873,035 3,310 1,505,094 13,732,675 6,572,276 146,829 5,306,334 968 56,518 248,360 50,301 5,870,005 7,386,279 4,456,275 154,699,291 CITY OF CARLSBAD CAPITAL FUNDS REVENUES ACTUAL AND ESTIMATED 2000-2001 2001 -2002 2002-2003 2003-2004 2004-2005 ACTUAL ACTUAL ACTUAL ESTIMATED ESTIMATED FUND REVENUES REVENUE REVENUE REVENUE REVENUE ~ ASSESSMENT DISTRICTS BTD#2 - POINSETTIA LANE/AVIARA PKWY BTD#3 - CANNON ROAD WEST CFD #l - CITYWIDE CFD #2 - RANCHO SANTA FE ROAD GAS TAX GENERAL CAPITAL CONST. GOLF COURSE GRANTS - FEDERAL GRANTS - STATE INFRASTRUCTURE REPLACEMENT OTHER PARK FEE ZONES 5,13,16 PARK-IN-LIEU NE PARK-IN-LIEU NW PARK-IN-LIEU SE PARK-IN-LIEU SW PLANNED LOCAL DRAIN'G PUBLIC FACILITIES FEE REDEVELOPMENT VILLAGE REDEVELOPMENT SCCRDA SEWER BENEFIT AREAS SEWER CONNECTION SEWER REPLACEMENT TDA TRAFFIC IMPACT FEE TRANSNET/BIKE TRANSNET/HIGHWAY TRANSNET/LOCAL TRANSNETBTP WATER - MAJOR FACILITY WATER - RECYCLED WATER 99,664 1,196,818 294,547 13,431,776 1,817,868 2,058,987 5,470,004 0 17,008 1,593,186 3,415,471 328,364 197,908 107,109 299,488 575,018 327,437 818,567 11,200.696 65,394 0 1,193,530 6,273,019 3,517,708 216,490 2,274,739 0 85,482 2,186,597 127,491 4,746,830 652,387 1,254,130 3,850,521 200,151 8,150,245 3,268,765 2,078,795 4,278,498 0 342,827 1,070,012 3,676,384 146,865 108,709 532,417 282,916 538,255 979,445 1,177,836 6,741,413 130,718 0 800,554 9,472,325 3,171,976 7,941 1,242,674 0 52,570 2,508,640 70,313 2,546,628 16,722,716 196,887 251,200 0 926.437 404,647 6,500,700 14,050,018 1,851,118 36,905,004 600,000 208,914 244,735 4,114,930 1,098,283 64.865 245,976 1,520,779 475,468 9,593 739,807 6,436,638 18,552 146,305 1,308,913 4,855,445 3,115,527 302,968 1,762,612 11 3,689 1,205,103 2,878,396 15,933 2,192,288 6,869,702 2,492,064 0 649,100 8,915,132 1,600,000 1,000,000 0 1 ,I 16,419 0 126,560 1,000 19,531 0 139,374 244,437 657,756 314,625 3,007,212 0 636,000 1,564,272 973,011 3,160,000 0 439,002 0 0 3,300,000 0 1,349,147 22,327,518 2,148,660 0 6,530,202 28,781 2,519,687 2,430,854 350,000 1,870,000 0 3,713,150 986,854 85,364 459,985 151,235 491,095 461,097 1,951,925 5,903,080 1,400,000 851,000 71 6,106 1,818,348 2,200,000 0 1,395,075 120,000 0 3,019,678 0 2,855,013 6,792,997 WATER - REPLACEMENT 4,159,407 3,457,473 4,667,424 2,382,000 2,396,860 TOTAL CAPITAL FUNDS 69,570,013 79,153,030 106,047,656 56,665,359 53,647,046 Note: Revenues include interfund loans and transfers in. CITY OF CARLSBAD CAPITAL FUNDS BUDGET EXPENDITURE SCHEDULE 2001 -2002 2002-2003 2003-2004 FUND ACTUAL ACTUAL ESTIMATED ASSESSMENT DISTRICTS 1,136,432 BTDW - POINSElTIA LANE/AVIARA PKW'r BTD#3 - CANNON ROAD WEST CFD #1 - CITYWIDE CFD #2 - RANCHO SANTA FE ROAD GAS TAX GENERAL CAPITAL CONST. GOLF COURSE GRANTS - FEDERAL GRANTS - STATE INFRASTRUCTURE REPLACEMENT OTHER PARK FEE ZONES 5,13,16 PARK-IN-LIEU NE PARK-IN-LIEU NW PARK-IN-LIEU SE PARK-IN-LIEU SW PLANNED LOCAL DRAIN'G PUBLIC FACILITIES FEE REDEVELOPMENT VILLAGE REDEVELOPMENT SCCRDA SEWER BENEFIT AREAS SEWER CONNECTION SEWER REPLACEMENT TDA TRAFFIC IMPACT FEE TRANSNET/Bl KE TRANSNET/HIGHWAY TRANSNET/LOCAL TRANSNETKTP WATER - MAJOR FACILITY WATER - RECYCLED WATER 1,169,980 133,140 17,048,549 1,100,912 1,874,437 1,475,917 81,387 342,827 2,449,474 842,691 296,300 3,868 204,833 424,109 624,978 130,995 394.569 5,954,871 497,112 0 332,469 9,321,046 2,081,600 146,114 193,236 0 113,126 5,470,554 699,451 2,494,192 533,672 398,374 1,089,644 366,929 563,394 6,849,077 3,069,646 702,114 93,341 208,510 475,336 1,290,712 199,220 14,447 59,593 366,504 4,379,059 0 574,220 3,758,660 53,069 0 1,219,939 2,337,279 955,688 136,933 402,011 70,104 128,474 1,030,601 486,421 1,839,043 9,973,773 504,997 1,302,742 2,219,489 477,796 13,280,871 688,531 2,761,153 51,611 319,042 0 446,768 47,536 452 24,685 704,000 1,000,000 0 145,667 3,713,675 15,206 368,586 978,451 1,310,906 3,278,312 158,560 96,856 41,384 70,020 5,528,990 94,880 2,978,042 18,596,145 WATER - REPLACEMENT 1,643,575 3,155,390 2,441,082 TOTAL CAPITAL FUNDS 59,882,858 46,247,505 63,646,435 2003-2004 2004-2005 2004-2005 CONTINUING NEW TOTAL CIP APPROPR. APPROPR. APPROPR. 357,753 1,229,607 33,030 65,831 22,021.51 3 4,231,633 3,646,613 988,000 851,434 240,000 672,288 455,069 0 1,661,040 0 0 216,005 4,622,528 31,387,262 1,845 255,000 4,951,085 7,707,909 11,901,190 0 2,417,024 0 1,753,831 5,509,131 212,951 4,596,473 17,703,564 0 1,190,000 925,000 11 0,000 0 805,000 9,033,800 350,000 1,870,OOO 35,000 1,037,000 1,041,854 0 0 0 0 550,000 1,365,524 6,158,308 1,380,000 851 ,000 0 12,305,941 2,581,014 0 120,000 0 3,093,000 0 853,500 159,527 1,797,708 357,753 2,419,607 958,030 175,831 22,021,513 5,036,633 12,680,413 1,338,000 2,721,434 275,000 1,709,288 1,496,923 0 1,661,040 0 0 766,005 5,988,052 37,545,570 1,381,845 1,106,000 4,951,085 20,013,850 14,482,204 0 4,214,732 120,000 1,753,831 8,602,131 212,951 5,449,973 17,863,091 6,971,016 3,960,488 10,931,504 136,660,625 51,573,664 188,234,289 CITY OF CARLSBAD CAPITAL FUNDS ANALYSIS OF AVAILABLE BALANCES 2004 TO BUILDOUT EAR 1 2004 - 2005 1 BEG1 NNl NG FUND BAL 7/1 I2003 ASSESSMENT DISTRICTS 40,655 BTD#2 - POINSElTIA LANE/AVIARA PKWY 5,037,861 BTD#3 - CANNON ROAD WEST 1,051,775 CFD #1 - CITYWIDE 33,078,679 CFD #2 - RANCHO SANTA FE ROAD 84,788 GAS TAX 1,201,585 GENERAL CAPITAL CONST. 41,816,683 GOLF COURSE 170,389 GRANTS - FEDERAL 13,530 GRANTS - STATE 76,217 INFRASTRUCTURE REPLACEMENT 9,851,868 OTHER 1,724,617 PARK FEE ZONES 5,13,16 739,035 PARK-IN-LIEU NE 61,595 PARK-IN-LIEU NW 736,164 PARK-IN-LIEU SE 689,614 PARK-IN-LIEU SW 1,109,204 PLANNED LOCAL DRAIN'G 3,497,766 PUBLIC FACILITIES FEE 1,898,523 REDEVELOPMENT VILLAGE 853,035 REDEVELOPMENT SCCRDA 3,310 SEWER BENEFIT AREAS 788,988 SEWER CONNECTION 24,220,268 SEWER REPLACEMENT 6,953,290 TDA 146,829 TRAFFIC IMPACT FEE 5,708,968 TRANSN ET/BlKE 968 TRANSNET/HIGHWAY 56,518 TRANSNET/LOCAL 321,682 TRANSN ET/STP 50,301 WATER - MAJOR FACILITY 3,868,493 WATER - RECYCLED WATER 752,809 REVENUE 0 2,148,660 0 6,530,202 28,781 2,519,687 2,430,854 350,000 1,870,000 0 3,713,150 986,854 85,364 459,985 151,235 491,095 461,097 1,951,925 5,903,080 1,400,000 851,000 716,106 1,818,348 2,200,000 0 1,395,075 120,000 0 3,019,678 0 2,855,013 6,792,997 EXPENDITURES 0 1,190,000 925,000 110,000 0 805,000 9,033,800 350,000 1,870,000 35,000 1,037,000 1,041,854 0 0 0 0 550,000 1,365,524 6,158,308 1,380,000 851,000 0 12,305,941 2,581,014 0 1,797,708 120,000 0 3,093,000 0 853,500 159,527 ENDING 40,655 5,996,521 126,775 39,498,881 1 13,569 2,916,272 35,213,737 170,389 13,530 41,217 12,528,018 1,669,617 824,399 521,580 887,399 1,180,709 1,020,302 4,084,167 1,643,295 873,035 3,310 1,505,094 13,732,675 6,572,276 146,829 5,306,334 968 56,518 248,360 50,301 5,870,005 7,386,279 WATER - REPLACEMENT 6,019,903 2,396,860 3,960,488 4,456,275 TOTAL 1 52,625,909 53,647,046 51,573,664 154,699,291 (1) Beginning balance on 7/1/2004 is net of continuing appropriations. CITY OF CARLSBAD CAPITAL FUNDS ANALYSIS OF AVAILABLE BALANCES 2004 TO BUILDOUT EAR 2 2005 - 2006 1 BEGINNING FUND BAL 7/1/2004 REVENUE EXPENDITURES ENDING ASSESSMENT DISTRICTS 40,655 0 0 40,655 BTD#2 - POINSElTIA LANUAVIARA PKWY 5,996,521 1,133,153 0 7,129,674 BTD#3 - CANNON ROAD WEST 126,775 558,206 0 684,981 4,158,652 9,560,000 34,097,532 CFD #1 - CITYWIDE 39,498,881 CFD #2 - RANCHO SANTA FE ROAD 113,569 58,964 0 172,533 GAS TAX 2,916,272 1,700,000 785,000 3,831,272 35,961,237 GENERAL CAPITAL CONST. 35,213,737 1,060,000 31 2,500 GOLF COURSE 170,389 28,650,000 28,650,000 170,389 GRANTS - FEDERAL 13,530 1,804,000 . 1,804,000 13,530 GRANTS - STATE 41,217 0 0 41,217 INFRASTRUCTURE REPLACEMENT 12,528,018 3,824,545 985,000 15,367,563 OTHER 1,669,617 0 1,508,000 161,617 PARK FEE ZONES 5,13,16 824,399 137,544 0 961,942 PARK-IN-LIEU NE 521,580 191,105 0 71 2,685 PARK-IN-LIEU NW 887,399 109,720 860,000 137,119 PARK-IN-LIEU SE 1,180,709 491,095 0 1,671,804 PARK-IN-LIEU SW 1,020,302 298,880 0 1,319,182 5,504,062 PLANNED LOCAL DRAIN'G 4,084,167 1,419,895 0 PUBLIC FACILITIES FEE 1,643,295 5,197,810 5,436,000 1,405,106 REDEVELOPMENT VILLAGE 873,035 0 0 873,035 REDEVELOPMENT SCCRDA 3,310 0 0 3,310 SEWER BENEFIT AREAS 1,505,094 91 2,526 0 2,417,620 SEWER CONNECTION 13,732,675 5,509,838 11,392,034 7,850,479 SEWER REPLACEMENT 6,572,276 2,200,000 4,285,403 4,486,873 TDA 146,829 0 0 146,829 TRAFFIC IMPACT FEE 5,306,334 1,680,286 1,218,430 5,768,190 TRANSN ET/BlKE 968 0 0 968 TRANSNETMIGHWAY 56,518 0 0 56,518 TRANSNET/LOCAL 248,360 2,550,000 2,600,000 198,360 TRANSN ET/STP 50,301 0 0 50,301 WATER - MAJOR FACILITY 5,870,005 2,856,091 1,416,700 7,309,397 WATER - RECYCLED WATER 7,386,279 7,795,625 7,929,932 7,251,972 WATER - REPLACEMENT 4,456,275 9,691,597 5,899,500 8,248,372 TOTAL 154,699,291 83,989,531 84,642,499 154,046,323 CITY OF CARLSBAD CAPITAL FUNDS ANALYSIS OF AVAILABLE BALANCES 2004 TO BUILDOUT YEAR 3 2008 - 2007 i BEGINNING FUND BAL 7/1/2005 REVENUE EXPENDITURES ENDING ASSESSMENT DISTRICTS 40,655 0 0 40,655 BTD#2 - POINSETTIA LANWAVIARA PKWY BTD#3 - CANNON ROAD WEST CFD #1 - CITYWIDE CFD #2 - RANCHO SANTA FE ROAD GAS TAX GENERAL CAPITAL CONST. GOLF COURSE GRANTS - FEDERAL GRANTS - STATE INFRASTRUCTURE REPLACEMENT OTHER PARK FEE ZONES 5,13,16 PARK-IN-LIEU NE PARK-IN-LIEU NW PARK-IN-LIEU SE PARK-IN-LIEU SW PLANNED LOCAL DRAIN'G PUBLIC FACILITIES FEE REDEVELOPMENT VILLAGE REDEVELOPMENT SCCRDA SEWER BENEFIT AREAS SEWER CONNECTION SEWER REPLACEMENT TDA TRAFFIC IMPACT FEE TRANSN ET/BIKE TRANSN ET/HIGH WAY TRANSN ET/LOCAL TRANSN ET/STP WATER - MAJOR FACILITY WATER - RECYCLED WATER 7,129,674 684,981 34,097,532 172,533 3,831,272 35,961,237 170,389 13,530 41,217 15,367,563 161,617 961,942 712,685 137,119 1,671,804 1,319,182 5,504,062 1,405,106 873,035 3,310 2,417,620 7,850,479 4,486,873 146,829 5,768,190 968 56,518 198,360 50,301 7,309,397 7,251,972 1 14,003 602,918 3,389,155 690,146 1,750,000 1,250,000 0 0 0 3,939,281 0 197,551 453,319 269,851 457,763 32,222 1,185,160 4,501,225 0 0 799,240 5,292,253 4,200,000 0 1,648,903 0 0 3,609,000 0 2,241,676 160,000 0 600,000 10,752,000 0 985,000 0 0 0 0 0 0 0 0 0 1,250,000 0 0 0 0 0 2,000,000 5,933,944 2,979,738 0 370,000 0 0 3,459,000 0 355,000 7,409,527 7,243,677 687,899 26,734,687 862,679 4,596,272 37,211,237 170,389 13,530 41,217 19,306,843 161,617 1,159,493 1,166,004 406,970 879,567 1,351,404 6,689,222 5,906,331 873,035 3,310 1,216,860 7,208,788 5,707,135 146,829 7,047,093 968 56,518 348,360 50,301 9,196,073 2,445 WATER - REPLACEMENT 8,248,372 9,737,229 500,000 17,485,601 TOTAL 154,046,323 46,520,895 36,594,209 163,973,009 as CITY OF CARLSBAD CAPITAL FUNDS ANALYSIS OF AVAILABLE BALANCES 2004 TO BUILDOUT YEAR 4 2007 - 2008 1 BEGINNING FUND BAL 7/1/2006 REVENUE EXPENDITURES ENDING ASSESSMENT DISTRICTS 40,655 0 0 40,655 BTD#2 - POINSETTIA LANE/AVIARA PKWY BTD#3 - CANNON ROAD WEST CFD #1 - CITYWIDE CFD #2 - RANCHO SANTA FE ROAD GAS TAX GENERAL CAPITAL CONST. GOLF COURSE GRANTS - FEDERAL GRANTS - STATE INFRASTRUCTURE REPLACEMENT OTHER PARK FEE ZONES 5,13,16 PARK-IN-LIEU NE PARK-IN-LIEU NW PARK-IN-LIEU SE PARK-IN-LIEU SW PLANNED LOCAL DRAIN'G PUBLIC FACILITIES FEE REDEVELOPMENT VILLAGE REDEVELOPMENT SCCRDA SEWER BENEFIT AREAS SEWER CONNECTION SEWER REPLACEMENT TDA TRAFFIC IMPACT FEE TRANSNET/BIKE TRANSNET/HIGHWAY TRANSNET/LOCAL TRANSNETSTP WATER - MAJOR FACILITY WATER - RECYCLED WATER 7,243,677 687,899 26,734,687 862,679 4,596,272 37,211,237 170,389 13,530 41,217 19,306,843 161,617 1,159,493 1,166,004 406,970 879,567 1,351,404 6,689,222 5,906,331 873,035 3,310 1,216,860 7,208,788 5,707,135 146,829 7,047,093 968 56,518 348,360 50,301 9,196,073 2,445 0 384,740 1,632,772 41 1,000 1,800,000 320,000 0 0 0 4,057,459 0 143,751 191,105 62,273 0 2,222 447,054 3,168,491 0 0 341,790 668,518 2,200,000 0 968,955 0 0 2,450,000 0 936,659 160,000 0 0 10,752,000 0 800,000 0 0 0 0 0 0 0 0 320,000 0 0 0 0 0 0 100,000 935,506 996,770 0 370,000 0 0 2,600,000 0 2,012,300 159,527 7,243,677 1,072,639 17,615,460 1,273,679 5,596,272 37,531,237 170,389 13,530 41,217 23,364,303 161,617 1,303,244 1,357,108 149,244 879,567 1,353,626 7,136,276 9,074,822 873,035 3,310 1,458,650 6,941,799 6,910,365 146,829 7,646,048 968 56,518 198,360 50,301 8,120,432 2,918 WATER - REPLACEMENT 17,485,601 2,401,249 652,900 19,233,950 TOTAL 163,973,009 22,748,039 19,699,003 167,022,045 CITY OF CARLSBAD CAPITAL FUNDS ANALYSIS OF AVAILABLE BALANCES 2004 TO BUILDOUT YEAR 5 2008 - 2009 i BEGINNING FUND BAL 7/1/2007 REVENUE EXPENDITURES ENDING ASSESSMENT DISTRICTS 40,655 0 0 40,655 BTD#2 - POINSETTIA LANUAVIARA PKWY BTDM - CANNON ROAD WEST CFD #1 - CITYWIDE CFD #2 - RANCHO SANTA FE ROAD GAS TAX GENERAL CAPITAL CONST. GOLF COURSE GRANTS - FEDERAL GRANTS - STATE INFRASTRUCTURE REPLACEMENT OTHER PARK FEE ZONES 5,13,16 PARK-IN-LIEU NE PARK-IN-LIEU NW PARK-IN-LIEU SE PARK-IN-LIEU SW PLANNED LOCAL DRAIN'G PUBLIC FACILITIES FEE REDEVELOPMENT VILLAGE REDEVELOPMENT SCCRDA SEWER BENEFIT AREAS SEWER CONNECTION SEWER REPLACEMENT TDA TRAFFIC IMPACT FEE TRANSNET/BIKE TRANSNET/HIGHWAY TRANSNET/LOCAL TRANSNET/STP WATER - MAJOR FACILITY WATER - RECYCLED WATER 7,243,677 1,072,639 17,615,460 1,273,679 5,596,272 37,531,237 170,389 13,530 41,217 23,364,303 161,617 1,303,244 1,357,108 149,244 879,567 1,353,626 7,136,276 9,074,822 873,035 3,310 1,458,650 6,941,799 6,910,365 146,829 7,646,048 968 56,518 198,360 50,301 8,120,432 2,918 0 384,740 2,032,561 248,250 2,050,000 0 0 0 0 4,179,183 0 143,751 191,105 121,581 0 2,222 552,752 2,417,954 0 0 341,790 650,686 2,200,000 0 1,058,034 0 0 1,193,154 0 4,010,862 160,000 0 0 1 10,000 0 2,230,000 0 0 0 0 0 0 0 0 0 0 0 0 0 0 0 355,000 937,169 91 5,999 0 370,000 0 0 1,370,000 0 11,475,000 159,527 7,243,677 1,457,379 19,538,021 1,521,929 5,416,272 37,531,237 170,389 13,530 41,217 27,543,486 161,617 1,446,995 1,548,213 270,825 879,567 1,355,848 7,689,028 11,492,777 873,035 3,310 1,445,440 6,655,316 8,194,366 146,829 8,334,082 968 56,518 21,514 50,301 656,294 3,391 WATER - REPLACEMENT 19,233,950 2,460,000 3,900,500 17,793,450 TOTAL 167,022,045 24,398,626 21,823,195 169,597,476 CITY OF CARLSBAD CAPITAL FUNDS ANALYSIS OF AVAILABLE BALANCES 2004 TO BUILDOUT YEAR 6-10 2009 - 2014 i BEGINNING FUND BAL 7/1/2008 REVENUE EXPENDITURES ENDING ASSESSMENT DISTRICTS 40,655 0 0 40,655 BTD#2 - POINSElTIA LANE/AVIARA PKWY BTD#3 - CANNON ROAD WEST CFD #1 - CITYWIDE CFD #2 - RANCHO SANTA FE ROAD GAS TAX GENERAL CAPITAL CONST. GOLF COURSE GRANTS - FEDERAL GRANTS - STATE INFRASTRUCTURE REPLACEMENT OTHER PARK FEE ZONES 5,13,16 PARK-IN-LIEU NE PARK-IN-LIEU NW PARK-IN-LIEU SE PARK-IN-LIEU SW PLANNED LOCAL DRAIN'G PUBLIC FACILITIES FEE REDEVELOPMENT VILLAGE REDEVELOPMENT SCCRDA SEWER BENEFIT AREAS SEWER CONNECTION SEWER REPLACEMENT TDA TRAFFIC IMPACT FEE TRANSNET/BIKE TRANSNET/HIGHWAY TRANSNET/LOCAL TRANSNET/STP WATER - MAJOR FACILITY WATER - RECYCLED WATER 7,243,677 1,457,379 19,538,021 1,521,929 5,416,272 37,531,237 170,389 13,530 41,217 27,543,486 161,617 1,446,995 1,548,213 270,825 879,567 1,355,848 7,689,028 11,492,777 873,035 3,310 1,445,440 6,655,316 8,194,366 146,829 8,334,082 968 56,518 21,514 50,301 656,294 3,391 2,900,160 1,547,241 3,637,718 628,900 10,510,000 0 0 0 0 20,500,000 0 870,642 1,168,851 71 1,696 0 573,315 3,279,291 12,440,389 0 0 2,032,852 2,826,742 11,000,000 0 5,254,696 0 0 0 0 6,673,762 765,000 0 1,000,000 13,222,000 0 15,185,000 31,116,000 0 0 0 2,500,000 0 0 0 600,000 0 0 2,283,000 29,287,177 851,215 0 0 4,656,782 5,539,661 0 4,085,000 0 0 0 0 7,299,100 764,013 10,143,837 2,004,620 9,953,739 2,150,829 741,272 6,415,237 170,389 13,530 41,217 45,543,486 161,617 2,317,637 2,717,064 382,521 879,567 1,929,163 8,685,319 (5,354,012) 21,820 3,310 3,478,292 4,825,276 13,654,705 146,829 9,503,778 968 56,518 21,514 50,301 30,957 4,378 WATER - REPLACEMENT 17,793,450 12,800,000 3,625,660 26,967,790 TOTAL 169,597,476 100,121,254 122,014,608 147,704,122 CITY OF CARLSBAD CAPITAL FUNDS ANALYSIS OF AVAILABLE BALANCES 2004 TO BUILDOUT 2014 to Bulldout i BEGINNING FUND BAL 7/1/2013 REVENUE EXPENDITURES ENDING ASSESSMENT DISTRICTS 40,655 0 0 40,655 BTDW - POINSETIA LANEIAVIARA PKWY BTD#3 - CANNON ROAD WEST CFD #1 - CITYWIDE CFD #2 - RANCHO SANTA FE ROAD GAS TAX GENERAL CAPITAL CONST. GOLF COURSE GRANTS - FEDERAL GRANTS - STATE INFRASTRUCTURE REPLACEMENT OTHER PARK FEE ZONES 5,13,16 PARK-IN-LIEU NE PARK-IN-LIEU NW PARK-IN-LIEU SE PARK-IN-LIEU SW PLANNED LOCAL DRAIN'G PUBLIC FACILITIES FEE REDEVELOPMENT VILLAGE REDEVELOPMENT SCCRDA SEWER BENEFIT AREAS SEWER CONNECTION SEWER REPLACEMENT TDA TRAFFIC IMPACT FEE TRANSNETIBIKE TRANSNETIHIGHWAY TRANSNETILOCAL TRANSN ETISTP WATER - MAJOR FACILITY WATER - RECYCLED WATER 10,143,837 2,004,620 9,953,739 2,150,829 741,272 6,415,237 170,389 13,530 41,217 45,543,486 161,617 2,317,637 2,717,064 382,521 879,567 1,929,163 8,685,319 (5,354,012) 21,820 3,310 3,478,292 4,825,276 13,654,705 146,829 9,503,778 968 56,518 21,514 50,301 30,957 4,378 2,213,460 27,600 2,205,255 0 16,643,344 0 2,737,200 0 0 25,200,000 0 569,950 1,312,458 907,412 0 415,542 3,687,669 6,523,499 0 450,000 1,513,994 1,758,276 16,477,592 0 2,913,848 0 0 0 0 3,913,226 0 9,583,344 400,000 9,675,000 0 16,000,000 0 2,737,200 0 0 5,000,000 0 2,626,000 4,000,000 1,280,000 800,000 2,300,000 12,215,000 5,193,000 0 451,000 3,277,592 2,172,191 9,837,764 0 6,030,000 0 0 0 0 3,624,900 0 2,773,953 1,632,220 2,483,994 2,150,829 1,384,616 6,415,237 170,389 13,530 41,217 65,743,486 161,617 261,587 29,522 9,934 79,567 44,705 157,988 (4,023,513) 21,820 2,310 1,714,694 4,411,361 20,294,533 146,829 6,387,626 968 56,518 21,514 50,301 319,283 4,378 WATER - REPLACEMENT 26,967,790 21,620,000 2,762,100 45,825,690 TOTAL 147,704,122 11 1,090,325 99,965,091 158,829,356 33 CITY OF CARLSBAD CAPITAL FUNDS ANALYSIS OF AVAILABLE BALANCES 2004 TO BUILDOUT GRAND TOTALS ALL YEARS I BEGINNING TOTAL TOTAL FUND BALANCE REVENUE EXPENDITURES ENDING ASSESSMENT DISTRICTS 40,655 0 0 40,655 BTDM - POINSETTIA LANWAVIARA PKWY BTD#3 - CANNON ROAD WEST CFD #1 - CITYWIDE CFD #2 - RANCHO SANTA FE ROAD GAS TAX GENERAL CAPITAL CONST. GOLF COURSE GRANTS - FEDERAL GRANTS - STATE INFRASTRUCTURE REPLACEMENT OTHER PARK FEE ZONES 5,13,16 PARK-IN-LIEU NE PARK-IN-LIEU NW PARK-IN-LIEU SE PARK-IN-LIEU SW PLANNED LOCAL DRAIN'G PUBLIC FACILITIES FEE REDEVELOPMENT VILLAGE REDEVELOPMENT SCCRDA SEWER BENEFIT AREAS SEWER CONNECTION SEWER REPLACEMENT TDA TRAFFIC IMPACT FEE TRANSNEnBlKE TRANSNET/HIGHWAY TRANSNET/LOCAL TRANSNETKTP WATER - MAJOR FACILITY WATER - RECYCLED WATER 5,037,861 1,051,775 33,078,679 84,788 1,201,585 41,816,683 170,389 13,530 76,217 9,851,868 1,724,617 739,035 61,595 736,164 689,614 1,109,204 3,497,766 1,898,523 853,035 3,310 788,988 24,220,268 6,953,290 146,829 5,708,968 968 56,518 321,682 50,301 3,868,493 752,809 8,509,436 3,505,445 23,586,316 2,066,041 36,973,031 5,060,854 31,737,200 3,674,000 0 65,413,618 986,854 2,148,552 3,967,927 2,333,770 1,439,953 1,785,500 12,523,746 40,152,449 1,400,000 1,301,000 6,658,298 18,524,660 40,477,592 0 14,919,796 120,000 0 12,821,832 0 23,487,290 15,833,622 10,773,344 2,925,000 54,181,000 0 36,790,000 40,462,300 31,737,200 3,674,000 35,000 9,522,000 2,549,854 2,626,000 4,000,000 3,060,000 2,050,000 2,850,000 15,863,524 46,074,485 2,231,215 1,302,000 5,732,592 38,333,567 27,136,349 0 14,241,138 120,000 0 13,122,000 0 27,036,500 16,582,053 2,773,953 1,632,220 2,483,994 2,150,829 1,384,616 6,415,237 170,389 13,530 41,217 65,743,486 161,617 261,587 29,522 9,934 79,567 44,705 157,988 (4,023,513) 21,820 2,310 1,714,694 4,411,361 20,294,533 146,829 6,387,626 968 56,518 21,514 50,301 319,283 4,378 WATER - REPLACEMENT 6,019,903 61,106,935 2i,3oiti4a 45,825,690 TOTAL 152,625,909 442,515,717 436,312,269 158,829,356 Exhibit 2 Fee per gross acre Area / Basin Name CITY OF CARLSBAD PROPOSED REVISIONS TO THE MASTER FEE SCHEDULES JUNE 2004 FOR INFORMATIONAL PURPOSES ONLY These fees are increased annually based upon an index as stated in the resolutions or ordinances establishing the fees. Current Revised Chanae Affordable housing credit $43,000 $43,000 $0 Current Revised Low High Low High Runoff Runoff Runoff Runoff License Tax on New Construction-mobile homes $1,561 $1,582 $21 Traffic Impact Current Revised Chanae Traffic Impact Fee - Residnt'l Cost Per Trip (Out of CFD) $98 $101 3 Traffic Impact Fee - Commrc'lllndust Cost Per Trip (Out of CFD) Traffic Impact Fee - Residnt'l Cost Per Trip (Inside CFD) 40 41 64 66 Traffic Impact Fee - Commrc'lllndust Cost Per Trip (Inside CFD) 26 26 0 IPlanned Local Drainane Area Fees I A Buena Vista Lagoon B Agua Hedionda Lagoon C Encinas Creek D Batiquitos Lagoon $1,837 $3,007 3,949 6,463 2,953 4,832 40 66 $1,865 $3,052 4,009 6,560 2,997 4,905 41 67 Sewer Connection Fees Current Revised Chanae General Capacity Fee All Areas $927 $927 $0 Sewer Benefit Area Fees Current Revised Channe Area C $ 1,645 $ 1,675 $ 30 Area D 1,648 1,678 30 Area E 2,430 2,475 45 Area F 2,443 2,488 45 Area H 808 808 Bridge & Thoroughfare District #2 Fees Current Revised Change Zone 5 $239 $246 $7 Zone 20 1,242 1,278 36 Zone 21 990 1,032 42 Bridge & Thoroughfare District #3 Fees Current Revised Change Fee per ADT $1 38 $140 $2 IAgricultural Mitigation Fees Current Revised Chanael I $8.858 $9.744 $8861 F=theMbmmdmof~e From: Carrie Loya-Smalley To: Ray Patchett Date: 5/18/04 1 1 :54AM Subject: Drainage Projects at RCMHP Per Council's request attached is a summary sheet of the three drainage projects adjacent to the Rancho Carlsbad Mobile Home Park. I've also attached the Technical Appendix sheets for each of the three individual projects, which includes more detailed information. Please let me know if you need any additional information. Carrie Loya-Smalley City of Carlsbad Engineering Department Phone 760-602-2746 Fax 760-602-8562 cc: Cindee Hollingsworth; David Hauser; Helga Stover; Lisa Hildabrand 2 0 F e z n o Cn W I- o W G PL e a I- o - 2 0 c .- E Ei 8 & 0 v) m a, - .. n W W z I- o w i$ n v) a, a, LL s J a 2 0 F= e z n o u) W I- o w PL e 5 a 2 I- 0 - 2 0 i= e 0 0 0 0 O? x 0 II UJ 0 0 m IC) - IC) Y ! Y Table 52: Average Amount of Money Allocated to Different Proposals. N Minimum Maximum Mean Std Deviation 977 0 100 26.02 25.722 Interconnecting Trails 977 0 100 25.91 23.045 Open Space and Trails Park 977 0 100 25.01 22.581 Active Use Parks 977 0 100 23.07 24.889 ' '' 4 and Protected Open Valid N (listwise) 977 Figure 2 illustmtes that the docation for each of the four proposals did not deviate much hm $25. Of the 1,007 respondents in 2003, 1 18 allotted $25 to each proposal. One possible interpretation of this pattern is that these individuals didn't have an opinion on these proposals, so we also made comparisons of the allocations to the different proposals with these individuals removed from the analysis. Removing these individuals from the comparisons among the proposals had no signtscant impact on the results. City of Carlsbad 2003 Public Opinion Survey Report; SBRI 58 Table 53: Rankings of the Open Space Proposals. 1 Firstchoice 2 SecondChoice 3 Thirdchoice 4 Fourthchoice Preserved and Protected Count 188 136 155 I28 YO 3 1 .O% 22.4% 25.5% 21.1% Open Space Ranking Interconnecting Trails count 162 194 170 16 % 29.9% 35.8% 31.4% 3.oyo Open Space & Trails count 140 188 214 52 YO 23.6% 31.6% 36.0% 8.8% Park Active Use Park Count 168 116 130 150 % 29.8% 20.6% 23.0% 26.6% Figure 3: Preserved and Protected Open Space. IrJIrn First Choice Third Choice Second Choice Fourth Choice City of Carlsbad 2003 Public Opinion Survey Report; SBRI 60 r i a L (I W W ul .- I .i I&*. k GREEN CONTINUED FROM F1 Veoetation b found to be physically rest ora t ive In a series of experiments with children, Kuo and col- leagues Andrea Faber Taylor and William Sullivan have shown a link between nearby nature and attentional skills. In one study a few years ago, among 169 urban children, girls tended to score better on tests of self- including skills such as concentration and abili- ty to resist impulse - when mothers reported more natural views from the home. But the effect was not found in boys, Kuo says of the re- search. ‘We thought it might be because the boys are not home very much,” compared with girls, who play more often at home. “And everything we’ve done since seems to be confirming that.” How green? Instead of just asking how natural the immediate sur- roundings of the children’s homes were, later research asked parents to characterize the greenness of the place where their children played most often. ‘The place they ac- tually play in - that very strongly and consistentlypre- dicts how well they’re doing,” Kuo said. One study of attentional skills focused on children with attentiondeficit disorder. Par- ents of the 7- to 12-year-olds in that study reported less severe attention difficulties when their kids had spent playtime in a natural area, rather than other settirgs. The greener a child’s play $ea, the iess severe the at- tenticn problems, the data showd. Newer, not-yet-published re- search heips nail down the na- ture-attention cmnecion. said Kuo. who with Sullivan founded their university‘s Human-Envi- ronnent Research Laboratori. Inste:id oireiying on parents’ reports, rhe new research test- ed chiidren’s ability to focus on a specilic task, she said. .+gain. nature helped. A compleaentary study. us- ing subjects who were enlisted through the Internet. found that nature could exert its posi- tive effect on a broad popda tion of youngsters with atten- tiondeficit problems. The benefits were detected in kids from 5 to Byears-old. in boys as well as &Is. in every income bracket studied, across all ranges of symptom severity, and for children with a variety of co-occuning behavioral problems, Kuo said. Also, the effect was found not just in big cities - where a patch of green can be a novelty - but in rural areas. ‘We found it pretty much everywhere we looked,” Kuo said. The study‘s publication is pending in the AmericanJournal ofpublic Health. Research from Cornell Uni- versity has likewise found an impact of green space in rural areas - in this case, on chil- dren’s stress levels. That study assessed exposure to nature . based on number of indoor plants, amount of nature seen in window views, and whether the child’s home has a yard of grass, dirt or concrete. Among 337 children in grades three to five, those in homes with more nature inside and out appeared to be less affected by stress in their lives. And the more nature, the better. “The data suggest that there is little ‘ceiling effect‘ with respect to the benefits of expo- sure to the natural environ- ment,“ researchers Nancy Wells and Gary Evans wrote last spring in the journal Envi- ronment and Behavior. “Even in a setting with a relative abun- dance of green landscape, more appears to be better when it comes to jolstering cfril- dren’s resilience against stress or adversity.” Green mace offers advan- tages to adults as well as chi:- dren, research from the Illinois lab has shown. FQr instance: 9 -hnong residents of a Chi- cago housing project. L\OSZ who lacked nearby nature saw their troubles as more severe, longer-lasting and more intrac- table. Those residents ap peared less able to focus on ad- dressing major life challenges. The study encompassed 145 residents assigned to different Among 337 children, those in homes with more nature in and out appeared to be less affected by stress. apartments in the housing pro- ject, where buildings were iden- tical but surroundings were not. 0 Separate data from the same residents showed higher levels of aggression and vio- lence in the people with the more barren surroundings. Results kom these two stud- ies appear related to mental fa- tigue, the researchers reported. Such fatigue can affect how well people fend off unproduc- tive impulses, handle conflict and keep a lid on their tempers, Kuo said. 0 Lower crime rates appear to accompany buildings with more natural surroundings. Among 98 apartment buildings in another Chicago project, the greener the surroundings, the fewer violent crimes and the fewer property crimes report- ed, researchers found. ent ’link to aggression may ex- ?lain some of the crime Mer- ence, another force seems to be at work, Kuo said - the fact While mental fatigue’s appar- tlat green spaces can act 3s “peopie magnets.” “In an innercity area, -Nhere apartinens are pretty mail or crowded. if the green space is at all habitable. people go out there, they sw to occ~py hose ;paces, they get to how their neighbors. And that tsasi- cally sets up an informal sort of neighborhood watch,” she ex- plains. Yet nature doesn’t have to be in the neighborhood to pro- mote mental well-being, other research shows. Roadside green space can benefit com- muters, Ohio State’s Nasar and colleague Jean Marie Cackotvs ki reported last fall in Environ- ment and Behavior. The team lint subjected 106 college students to various stressors in the lab, then mea- sured anger levels. Next the subjects watched one of three videos of drives, one in traflic on a scenic parkway; another on a garden highway with few man-made structures; and the third on a highway with little vegetation. Researchers mea- sured anger levels again, as well as the students’ frustration levels. Those subjects who viewed the most natural scen- ery showed less frustration. Green spaces may help peo- ple mentally by providing a sense of control in their lives, Nasar said. “Nearby nature is positive even if you don’t use it; if ifs something you know is there, as kind of an escape, you feel better.” For drivers actually on the road, Nasar suggested alleviat- ing hstration by taking safe opportunities - such as while stopped in traffic or at a red light - to shift attention to any greenery in view. Kuo said people should ex- periment with daily doses of greenery. ‘We’re seeing that, amazingly, you can detect e€- fects even after not very much exposure. Even 20 minutes in a somewhat green place Seems to be better than the same 20 minutes indoors.” ’ SUBJECT: POINSETTIA PARK TENNIS FACILITY ISSUE: Three organized groups have used Carlsbad High School [9 courts] for many years under a joint use agreement. CHS is becoming much less available due to increased enrollment [more tennis classes] and securityconcems. No other facilities exist in Carlsbad to accomodate the existing groups and population growth. No new courts have been built since 1996. -l& 'x b+ No new courts are planned except at Poinsettia Park. SOLUTION: Build the additional 7 "regular" courts at Poinsettia at the earliest possible time CAPITAL: Staff indicated 80K to 100K per court, therefore, total cost between 560K and 700K. BENEFITS: Facility will ammodate needs of existing groups and population growth [particularly east of Poinsettia Park]. Will create a site suitable for youth and adult tournaments No additional cost for operating expenses [occasional court sweeping trades off with current weed control cosfs] Completion of the 7 regular tennis courts at Poinsettia Park fills in a gap in park creation that was initially planned to be completed in FY2002. Dependence on joint use of the CHS courts is dearly not a good option now or in the future. CONCLUSION: The Council is urged to fund this portion of the Poinsettia Park plan to meet the needs of the current and increasing population of Carlsbad. From: Geo Strell <gstrell36@yahoo.com> Date: Mon May 3, 2004 1 :19:18 PM US/Pacific To: dalcurt@adelphia.net Subject: Tennis List Name (Last) Beyer, Evelyn Calle, Rita Cannon, Stephanie Christiano, Sara Firman, Dori Fletcher, Shirley Freeman, Genevieve Guldan, Judy Hansen, Pat Hood, Cora Katz, Roz Kelly, Joan Lange, Anita LeMieux, Kathy Madden, Pamela Ma nza no, Barbara Niblo, Sylvia Prescott, Betty Roberts, Alma Scher, Elaine Shandoff, Jane Shelly, Joan Strell, Betty Vaslow, Ella Vermilyea, Ruth Vickers, Gwen Voertman, Jo Zappia, Jane Zografos, Diana Phone 438-2520 438-4566 72 1-8777 630-01 05 630-9526 434-4355 4334261 634-6602 729-3383 804-1 620 438-3931 720-1 222 431-1245 603-0969 967-2767 434-1667 729-6344 598-031 0 729-86 1 9 434-0452 603-81 16 757-8760 438-2346 431 -8466 753-3276 967-7080 72 1 -6674 431 -91 64 757-0797 Address 1854 Tule Ct. 92009 P.O. Box 130159,92013-0159 3333 Tripoli Way 0 92056 777 Anns Way, #I 3, V 92083 1305 Napoli St 0 4921 Loma Way 92008 900 N Cleveland #59 0 92054 630 W Bluff Ct E 92024 3514 Highland Dr., 92008 7214 Linden Ter 92009 6765 Heath Ct 92009 1368 Cynthia Ln 92008 2640 Acuna Ct 92009 7069 Estrella de Mar #67 92009 1938 S Pacific 0 92054 1250 Hoover St 92009 2629 Valewood 92008 3632 Decora Cir SM 92069 1868 Outrigger Ln 92008 4445 Mayfair Ct 92008 614 Compass Ct 92009 4452 Dulin PI, 0 92057 701 9 Rockrose Ter 92009 7321 Linden Ter 92009 7742 Palenque ST 92009 2180 Castilla Way, 0 92056 161 7 So Pacific St 0 92054 1485 Turquoise Dr 92009 5850 Caminita Encinas 92008 Betty Strell CARLSBAD SENIORS TENNIS GROUP Jeff Armour John Bertoldi Bill Beverly Paul and Sandy Blake Mort Block David and Kay Bryant Preston Butler Sy Cra dman Sal Diele Norm Dobruskin Mike Donahoe Charlie Donnelly Jack Easley Charles and Barbara Ellis Will Engelhard JackFairbanks Ron Goodno Doug Hoffman John Huenneke Roger Jones Haasan Kamib Joe Kearns Fritz Koolhof Krish Klakshmi KriShKUmar Hal Kutler Chuck Letson Frank Maldonado Maren ? Ted Michael Larry Morse Nelson Nemerow Sriniva Praba Jim Redondo Mario Reveles Ted Richter Jim and Renee Rosen Steve Salm Alex Scher Hershel Sakulsky Jim and Martha Sheets Stewart Shinto Charlie Stewart David Wells V&dA//CA Doren E urtiss -5M Dhq 602-20 1 2 929-9759 729-61 12 434-2608 930-9686 438-4775 754-2902 439-21 44 431 -1 21 3 603-8824 720-0673 522-5644 434-5779 72 1 -8067 71 7-71 54 438-81 25 729-0773 43 1 -028 1 51 8-6530 753-5323 729-42 1 3 729-4074 434-761 3 438-3364 724-6564 603-2797 433-7894 967-761 8 729-3571 434-321 6 434-9864 729-79 1 8 942-9407 729-497 1 757-9659 722-53 1 6 434-6992 804-3723 434-0452 720-1 669 433-2907 440-9777 756-2226 434-8876 720-3778 q39-6.po 4346WO March 2004 mrr&b g=oWzS&1 WM - AMLING, WALLY ;YC M4JOHfE 1650 LEOR4 LANE, LELTCADL4 92024 760-753-9163 BRAUNSTEIN, HENRY & MAE 2033 COLUMBUS WAY, VISTA 760-72 7-941 7 92083 SERNlNG, LOlS 900 N CLEWLAPID S'1' #157R OCEANSIDE CA 92054 760-721-8929 BOIJCHER, JOE 7113 SAN BARTOLO, CARLSBAD 92009 740-43 1-1 525 cmis'ruiv, LEO BETTE 4961 PARK DRIVE, CARLSBAD 92008 740-729-5395 CLARKE, SALLY 201 EASY PLA4CE, CARLSB'QD 92009 760-438-021 6 COO& DICK & GWlL 2289 CAMEO HD. CAKLSBAD 92008 760-729-3033 DAVIS, HAROLD (HAL) 2390 RISING GLEN CVY #212, CARLSBAD 92008 92234 760-434-0518 6 1 ?-32 8-8 75 1 FERRONE, GEORGE & DORIE 68015 Village Dr, CATHEDR4L ClTY CA (SCRMMEH YLA4E'ERS) FORVAL, ALMA 2475 JEFFERSON, #404, CAHLSBAD 5955 HUDSON L4VE, SAN BERWARDINQ 92008 92404 760-729-1 987 909-862-5603 GAIWNER, BiLL & DONN,4 3450 WOODLAND WAY,CARLSBAD 92008 92054 760-729-1016 760-439-7506 GEMNIO, RIIKE 24 DANNY 3474 PEACH TREE WAY, OCEANSIDE GIBSON, CHUCK Sz DOTTIE 2715 WOODWIND KI), CAKISBAI) 760-434-0743 HAASIS, JACK p(r B-ARBARI 2746 BANFF COURT, CARLSBAD Y2008 760-729-4304 L. H,QGGERTY, JOHN & MARY 3105 BLENKARNE DR. CAHLSBAD 92008 760-729-9528 HILLTARD, EVERETT l? J0.4N 5140 DON RODOLFO, CARLSBAD 92008 760-431-7636 97007 503-52 1-9224 c mail bufickat.aol,com KAIJFENBERG, HAROLD & JUNE 9590 160"'" AVE, BEAVERTON, OK KINGHORN, JIM & JOAN 2140 BASSWOOD, CARLSBAD 92008 760-729-1 502 LEWIS, JUSTIN & PHYLLIS 605 kL4PLE TRACE CINCINNATI, OH 45246 5 13-782 -6451 MALONEY, BETTE 3473 BAY LEAF WAY, OCEANSIDE 92057 760-433-1685 NEURL4N, AL & ELLIE 1259 L,4S ViSTILLAS LANE, L4KE SAN MAHCOS, CA 92069 760-591 -0579 NEWMAN, KAY 401 STILLWATER CT, POST FALLS, ID 83854 208-777-1947 REVELES, MARIO S. 544 Vl3E SI', OCEANSIDE c.: 92054 760-722-5316 RIFKIN, CONNIE 617 VIA BOGOTA, VISTA 760-945-4 13 1 92083 SACKLER, AL & ELIZABETH 2813 FOREST VIEW WAY, CA4RLSBA4D 92008 760-434-6789 SIIOMATE, ZOE 2715 GRENNOCK CT, CARLSBAD 92008 760-434-3209 STRAUSE, BOB & IRENE 3219 HIGHLAND DR, CARLSBAD 93008 760-729-1 670 VOHECK, WALLY & RUTH 1648 VIA OCIOSO, LK SAN RlARCOS 44 EAST SHORE TRAIL, SPAR4T NJ 92069 07871 760-51 0-6996 973-729-2252 92069 07871 760-510-6996 973-729-2252 WORR-ALL, GEORGE 2706 SOCORRO LN, CARLSBAD 92009 760-43 1-01 54 92 054 -. 760-757-1 153 ..- Keeping Fit JACK WILLIAMS 1: i- I Tennis brings gold to golden years Fred DarG is, indeed, in the golden years of life. To look at m- on the tennis court is to see an agilean- tique, a resilient relic largely devoid of rust and Medicare moments. At 82, Darling has more than a dozen miniature gold tennis balls to his name, each a symbol of a national age group championship in dou- bles play. He’s done it since doors, on clay, grass and hard- court surfaces. And he’s done it without qeeding ice, aspirin, ibuprofen or a serious stretch- ing regimen. No exotic supplements, ei- ther, unless you consider a daily dose of cod liver oil and flaxseed on the cutting edge. “I’ve been fortunate,” he , tells you. “Blessed with good health.” At an age when many ten- nis players are betrayed by * wounded knees and hips, leading them to the more joint-friendly challenge of golf, Darling did the opposite. At an age when many com- plain of back pain, Darling left his in thg redew mirror. “I guess I did it kind of bass-ackwards,’ ” he said. Darling, a resident of La Jolla, developed a passion fof golf as a youth in Los Angeles. He caddied and played, reach- ing a sub20 handicap. turning 66 -indoors and Out- ‘ o look at his mother lode of senior-tennis awards, it% easy to conclude that But after injuring his back , when he fell off a ladder in the Navy during World War 11, his golf game suffered. “I gave it up,” he said. ”Sometimes I would PO out and take a divot, T and I would be in bed two or three days. My back would give out” At age 50, reasonably fX from all the light Wing he did in the garment industry, Dar- ling tried tennis. Although a far cry €rom handball, in which he had taken two fourth places in LA city champion- ships as a teen, the game awakened his competitive juices. What it didn’t do was aggra- date his back Had the statute of limitations run out? Or was the pain about to drop to his knees? “Oh, I get a little tender- ness,” he conceded. “I’ve had both knees arthroscoped (minimally invasive surgery), but recovered quickly.” Next month, Darling will seek another national title in 80-andaver doubles at Mor- gan Run Resort in Rancho Santa Fe. Meanwhile, he works out fie times a week on various tennis courts in San Diego. “One day of the week I may go to the gym, but the tennis keeps me fit I train year-round.” Darling, who won his first title on grass in 1988, may be prolonging his career by shar- ing the load with a partner in doubles. “Hopefully, I’ll be able to complete another five to seven years,” he said. “In doubles, it‘s not just hit- ting and waiting. It‘s hitting shallow, at the feet, and mov- ing to a certain place.” Darling, who only plays sin- gles when he’s ‘%orsing around: is at the vanguard o a senior tennis movement that has seen participation rise as much as 20 percent per year in the national champion- ShipS. What he is doing for his self-image and his inventory of gold tennis balls is carrying over to his health. Research reported by the US. Tennis Association indi- cates that, while the aerobic capacity of sedentary individu- als declines 10 percent per de- cade, the decwe is half that among regular tennis players. A study by Dr. Ralph Paf- fenbarger in the New Enghnd Jounzal ofA4edicine found that those who played tennis at least three times weekly had a 41 percent lower risk of death from coronary heart disease. Because tennis is a weight- bearing exercise, with lateral movement, it also improves balance and prevents the bone deterioration of osteoporosis. “I would recommend it for older people, even if they’re out of shape,” Darling said. “It‘s a little strenuous, but if you take it easy, you can han- dle it’’ As for golf, there’s no turn- ing back. ‘Too boring,” he said. - 1 0 1 1 City of CarlsbadProposed2004-2005 to BuildoutCapital Improvement Program 20042004--20052005Capital Improvement ProgramCapital Improvement Program99Budget CalendarBudget Calendar99CIP ProcessCIP Process99Development ProjectionsDevelopment Projections99Revenue EstimatesRevenue Estimates99New Facilities New Facilities ––next 5 yearsnext 5 years99Maintenance ProjectsMaintenance Projects99Continuing appropriations Continuing appropriations 99Fee IncreasesFee Increases Budget CalendarBudget CalendarCouncil MeetingsCouncil Meetings••TodayToday––CIP WorkshopCIP Workshop––Set Public Hearing for June 15Set Public Hearing for June 15thth••June 1June 1––Operating Budget WorkshopOperating Budget Workshop••June 15June 15––Operating Budget and CIPOperating Budget and CIP––Public Hearing and AdoptionPublic Hearing and AdoptionOther Public MeetingsOther Public Meetings••June 9June 9––Citizen’s Budget ForumCitizen’s Budget Forum Citizen’s Budget ForumCitizen’s Budget Forum•When:Wednesday,June 9th•Where:Faraday Center1635 Faraday Avenue•Time:5:00pmQuestions:Call the Finance Department at (760) 602-2430 for additional information. OverviewOverviewPlanning documentExpenditures planRevenue planCIP Review Committee Project ReviewEvaluation of:Construction schedulesStaffing needsFunding availabilityCompliance withGrowth Management Project Ranking Criteria•Health and Safety•Legal Mandates•Operating Cost Impacts •Compliance with Growth Management •Compliance with Other Standards•Completion of Basic Infrastructure•Funding or Timing Opportunity 20042004--20052005Capital Improvement ProgramCapital Improvement ProgramDevelopment ProjectionsDevelopment Projections Development ProjectionsWhen will development occur?Sufficient revenues for capital construction? Residential ConstructionTotal Units toBuildout25,00030,00035,00040,00045,00050,0001990199520002005201020152020+Future Units = 6,806 Residential ConstructionPast and Future05001,0001,5002,0002,50019992000200120022003200420052006200720082009FutureExistingResidential Units Summit Apts.Summit Apts.Calavera HillsCalavera HillsRobertson Robertson RanchRanchSunny CreekSunny CreekPoinsettia Poinsettia PropertiesPropertiesThompsonThompsonTabataTabataBressi Bressi RanchRanchVillages of La Villages of La CostaCosta87321886453,700 Units –Next 5 years12345678 NonNon--Residential ConstructionResidential ConstructionPast and FuturePast and Future0500,0001,000,0001,500,0002,000,0002,500,00019992000200120022003200420052006200720082009Sq FeetProjectedActual 5.8 million sq ft –next 5 years560,0002.200.000730,000725,000693,000335,000210,000HotelsRestaurantsTimesharesAssisted LivingChurchesTheaterRetailGIA ExpansionCorporate CentersIndustrial Funding SourcesTotal Revenue = $443 million$0$20$40$60$80$100$120$140$160DevelopmentFeesSpecialDistrictsWater/SewerReplacementInfrastructureReplacementOther SourcesIn MillionsReplacement Revenues = 38% Development Revenues$144 million•Water and Sewer Connection Fees •Public Facilities Fees •Park In Lieu Fees•Traffic Impact Fees•Planned Local Drainage Fees$0$20$40$60$80$100$120$140$160DevelopmentFeesSpecialDistrictsWater/SewerReplacementInfrastructureReplacementOther Sources Special Districts$38 million$0$20$40$60$80$100$120$140$160DevelopmentFeesSpecialDistrictsWater/SewerReplacementInfrastructureReplacementOther Sources–CFD#1 -Citywide–* CFD#2 -Rancho Santa Fe Road–BTD#2 -Aviara Pkwy-Poinsettia Lane–BTD#3 -Cannon Road West–(*) Proposed District Water and Sewer Replacement Funds$102 million$0$20$40$60$80$100$120$140$160DevelopmentFeesSpecialDistrictsWater/SewerReplacementInfrastructureReplacementOther Sources•Transfers from operating funds •Used for replacement of existing facilities Infrastructure Replacement Funds$65 million•Set aside annually to fundreplacement of city owned facilities$0$20$40$60$80$100$120$140$160DevelopmentFeesSpecialDistrictsWater/SewerReplacementInfrastructureReplacementOther Sources Other Revenues$94 million$0$20$40$60$80$100$120$140$160DevelopmentFeesSpecialDistrictsWater/SewerReplacementInfrastructureReplacementOther Sources•TransNet allocation•Gas Tax•Redevelopment•Federal and State grants•Other agencies Project Expenditures2004-05 to Buildout$436 millionParks21%Sewer/Drainage18%Civic22%Loans9%Water9%Streets21% Review of ProjectsThe next 5 Years…FY 2005 through 2009 CIVIC PROJECTS Civic Center & Public Works Center$39.3 million•What are the needs of…..–Citizens–City organization•Visioning process:–Citizens–Business community–City workersFunding:CFD No. 1 = $32.2 millionWater Repl. = $4.8 millionSewer Repl. = 2.3 million Fire Station #6•Public Facilities Fee Fund •Relocate Existing Station•5,000 Square Foot Facility•$3.5 million Coastal Rail Trail•Bicycle/Pedestrian Trail •Two Phase Project•$2.1 million Phase 1 cost•State & Federal Grants•Matching funds from General Fund Senior Center CUSD Acquisition•14,000 square feet of office space •$2.2 million total cost•$1.4 million Redevelopment Fund•$800,000 General Fund Park Development Projects ÃAviara Aviara Community ParkCommunity ParkÃAlga Norte Park Alga Norte Park ÃHidden Canyon Hidden Canyon ParkParkÃnorthÃGolf CourseGolf CoursePark ProjectsPine School Pine School Park Park Hidden Canyon Park(formerly named LarwinPark)Total Cost = $1,780,000 •Trails, tot lots, picnic areas, restroom and additional parking at the dog park•Opening in summer 2005 Aviara Community Park $10.7 million(previously appropriated)2004-052005-062006-072007-082008-09Construction•24 acres•Ball field•Soccer field•Basketball courts•Open play and picnic areas•Tot lot AlgaNortePark -$13.8 millionAquatic Complex-$11.3 million2004-052005-062006-072007-082008-09Construction •Ball fields•Picnic areas•Tot lots•Skate park•Dog park•Aquatic Complex Park Development –NW Quadrant(Pine School) Total Cost = $6.2 million2004-052005-062006-072007-082008-09Construction–Multi-use field–Basketball courts–Picnic areas–Tot lots–Ornamental garden Poinsettia ParkMaintenance Building$400,000•Storage for tools and equipment•Small office space Carlsbad Municipal Golf Course$30 millionChampionship Golf CourseOpening Spring 20072004-052005-062006-072007-082008-09Clearing and grubbingGrading/construction Carlsbad Municipal GolfCarlsbad Municipal Golf WATERFALLWATERFALL CLUBHOUSECLUBHOUSE Lake Calavera TrailsTotal Cost = $412,5002004-052005-062006-072007-082008-09ConstructionMaster Plan•Funding:–Master Plan–Construction –5 miles of trails–General Capital Construction Fund•Volunteers Sewer Projects•Encina Water Pollution Control Facility•Sewer Collection System Projects Encina Projects Next 5 years•Phase V Expansion –$8.4 millionAmount shown is Carlsbad’s share of the total cost. Vista-Carlsbad InterceptorCannon RI-5 Tamarack AveCarlsbadVillage DriveOCEANSIDEP acific O ceanNEncinaLift StationProject Costs•$2.9 million•$3.6 million•$6.3 million•$10.2 millionoa North & South Agua Hedionda InterceptorsAgua Hedionda LagoonE l C am ino R ealP a c if ic O c e a n I n t e r s t a t e 5 Cannon RoadTamarack AveFaraday AveProject Costs•$3.63 million•$620,000•$1.63 million•$8.83 million DRAINAGE PROJECTSCollege Boulevard/Cannon Road Drainage–15 acre Retention Basin–Planned Local Drainage Area Fees–$1.1 million–Reimbursement to developer–Reduce potential flooding along Agua Hedionda Creek WATER PROJECTSWater Enterprise Funds•Connection Fees•Replacement Funds•$22.8 million in new appropriations New PipelinesLEGENDRAILROADFARADAYAVE.PALOMARAIRPORTRD.ELCAMINO R E A L E L FUERTEST.LACOSTAAVE.A V IA R A PKWY.ALGARD.COLLEGEBL.CANNONRD.B L .A V E N ID A E N C IN A S RANCHOSANTAFERD.POINSETTIALN.M E L R O S E D R .IN T E R S T A T E 5PALOMARAIRPORT NOT TO SCALEPACIFICOCEANNEW WATERLINESC A R LS B A D Pipeline ReplacementMiscellaneous Pipelines•Downtown area•Increase Fire Protection•$1.6 millionSan Marcos Boulevard•Connection to SDCWA Pipeline•Existing Pipeline is over 40 years old•$2.7 million Lake Calavera Reservoir Improvements•$2.7 million•Water Replacement Fund•Extensive Environmental Studies•Repairs •Construction without draining reservoir Pump Station•Palomar Airport Road & El Camino Real•Maintenance/Emergency use•$1.2 million•Replacement & Connection Fee Funds Maerkle Reservoir•15 million gallon underground tank•Provides storage & redundancy•$11.5 million•Connection Fee Funds Recycled Water Facility$43 million (previously appropriated)•Treatment plant•Pipelines•Pump stations•Flow equalization•Reservoirimprovements•Construction underway STREET Multiple Funding Sources•Developer Fees•Federal & State GrantsPROJECTS El Camino Real Widening•Rancho Carlsbad to Sunny Creek Road•North of Cougar Drive•Lisa Street to Crestview Drive•Tamarack Ave to Chestnut AveTransnet & TIF Funds Carlsbad Boulevard Encina Creek Bridge Replacement•Located south of Palomar Airport Road•Constructed in 1913•Preliminary Estimate $2.3 million•Redevelopment Funds & Federal Grants Faraday Avenue and Melrose Drive ExtensionCannon RoadCollege BlvdPalomarAirport RoadIn te rs ta te marack Ave.Faraday Ave.Me lro s e D riv e (Timing is developer driven.) Poinsettia Lane$8.1 millionNLA COSTA AVE.ALGA ROADPALOMAREL CAMINO REAL POINSETTIALANEAVI A RA PARKWAYI-5 BARCELONAC A R L SB A D B L V DAIRPORTROAD LA COSTA AVE.RANCHO SANTA FE ROADI-5BLVD.OLIVENHAINROADLEUCADIAM ELRO SE DRIVECALLE(Timing is developer driven.) Cannon Rd./College Blvd.E l C a m in o R e a lCollege BlvdPalomarAirport RoadIn te rTamarack AvebadVillage DriveM e Faraday Ave.C o lle g e B lv d .CannonRoads (Timing is developer driven.) Rancho Santa Fe Road Projects$48 millionNLA COSTA AVE.ALGA ROADPALOMAREL CAMINO REAL POINSETTIALANEA V IA R A PARKWAYI-5 BARCELONAC AR L S B A D B L V DAIRPORTROAD LA COSTA AVE.RANCHO SANTA FE ROADI-5 BLVD.OLIVENHAINROADLEUCADIAM ELRO SE DRIVECALLENorth Phase IIIncluding SM Creek Bridge$18.4 MillionNorth Phase I$26 MillionRancho Santa Fe/Olivenhain Rd Intersection $3.8 Million(Timing is City & developer driven.) Traffic Signals (8)Total Cost = $1. 6 millionFunding:Gas Tax RevenueGeneral Fund El Camino Real at Plaza Drive, Hosp Way and Marron RoadTraffic Signal ReplacementTotal Cost = $1.2 million TransNet-Local funding(previously appropriated) Maintenance Projects$33 million in next 5 yearsQSewer/WaterQDrainageQStreetsQBuildings and parks Replacement Projects $1,667,000New appropriations for:•Beach access improvements•Calavera Community Center siding•Restroom improvements:–Holiday Park–Laguna Riviera Park•Holiday Park Tot Lot improvements •Cole Library HVAC replacement Appropriations Carried Forward = $136.7 million•Pine School Park•Aviara Community Park•Alga NortePark and Aquatic Complex•Park Site Acquisition –NE Quadrant•Encina Projects•Vista-Carlsbad Interceptor•Rancho Santa Fe Road Construction•Recycled Water System•Pavement overlay •New Traffic Signals UnfundedProjects$ 36.6 million1.Palomar Airport Road Widening and Bridge reconstruction2.El Camino Real Widening from Cassia to Camino Vida Roble3.Poinsettia Lane –Reach “E”4.Cannon Road –College Blvd. to city limits Fees Increases•License Tax on New Construction•Traffic Impact Fee•Planned Local Drainage Area Fees•Sewer Fees•Bridge & Thoroughfare District No. 2 Fees•Bridge & Thoroughfare District No. 3 Fees•Agricultural Mitigation Fee•Housing In-Lieu Fee Conclusion Action ItemAction Item1.Set Public Hearing for 2004-05 Operating and Capital Budgets for June 15, 2004. Blank Slide Excess Dwelling Unit BankDec. 3, 2002: eliminated 3,200 unitsMaximum at buildout= 48,360Deleted quadrant based bank balancesEstablished Citywide bankStill tracked to ensure compliance with Prop E40 units used from unit bank to-date PFF Projects beyond 5 years •Fire Station 3 Relocation•Cole Library Expansion•Cannon Lake Park•Pine Community Building•Aviara Community Building•Poinsettia Park Phase II•Leo Carrillo Park Phase III•Carlsbad Boulevard Median –Tamarack to Pine•Traffic Signals (11)