HomeMy WebLinkAbout2004-07-06; City Council; 17698; Hidden Canyon Community Park construction contractCITY OF CARLSBAD --AGENDA BILL
TITLE: -
AWARD CONTRACT FOR CONSTRUCTION OF 17,698 AB#
MTG. 7/6/04 HIDDEN CANYON COMMUNITY PARK AND
DEPT. RECREATION APPROPRIATE ADDITIONAL FUNDS
A
CITY DE PT- ATTY D*%
CITY MGR-
RECOMMENDED ACTION :
It is recommended the City Council ADOPT RESOLUTION NO. 2004-224 accepting bids
and awarding a construction contract to Griffith Company for the construction of Hidden
Canyon Community Park, Contract No. 38561-A; and appropriate additional funds to the
project account.
ITEM EXPLANATION :
On April 6, 2004, the City Council approved the plans and specifications and authorized the
advertisement of bids for the construction of Hidden Canyon Community Park, City Project No.
38561-A. This 22-acre park site is located at Vancouver Street in the vicinity of Carlsbad Village
Drive and Concord Drive (Exhibit 2).
The park includes the following elements: (Exhibit 3)
Asphalt paved parking lot at Vancouver Street (16 spaces)
Privacy screen walls to screen new parking lot from 2 adjacent residences
Tot lots with modular play structures and a swing
Picnic areas with picnic tables and grills
Viewlseating areas with benches
Restroom and equipment storage facility
Internal path system connecting to the City-wide trail system; (trail connection
from the lower site to the Dog Park has been completed utilizing volunteers)
Extensive landscaping and unassigned open green space areas
Expansion of the gravel parking lot at the Dog Park (1 1 additional spaces)
Public art component (approved by Council 6/24/03)
City Council approved the plans and specifications and authorized staff to bid the project at the
April 6, 2004 meeting.
On June 9, 2004, the City received sealed bids for this project. A summary of bids received for
this project are as follows:
Contractor Name CitylState Lump Sum
Griffith Company Santa Ana, CA $1,414,414
Western Rim Constructors Escondido, CA $1,427,799
Wier Construction Escondido, CA $1,559,000
LE. Pacific San Diego, CA $1,639,000
Heffler Company Inc. National City, CA $1,645,000
Staff has reviewed the bids, checked contractors qualifications, and is recommending Griffith
Company as the lowest responsive bidder.
I
AB# 17,698
PAGE 2
Construction Contingency (I 5%)
Construction Management, Inspection and Testing (1 0%)
Construction Phase Desian Surmort, and Biological Survev (allowance)
ENVIRONMENTAL REVIEW:
$21 2,162
$141,441
$21,000
A Mitigated Negative Declaration was issued by the Planning Department and the Planning
Commission approved a Conditional Use Permit (C.U.P. 02-23/HDP) on April 2, 2003 for the park
Master Plan, which includes all work listed above.
FISCAL IMPACT:
The current appropriation of funds for the project is not adequate to cover the costs of
construction for the low bid received. A summary of the project funding is shown in the table
below.
Summary of Project Funding
I Total Desian and Develorsment I $97.749 I I Contract Amount 1 $ 1.414.414 I
I Estimated Project Cost I $1,886,766 I
Appropriations to-date I $1,758,000
When Council authorized going to bid in April ’04, the engineer’s estimate for the project was
$1,316,000 (vs. current low bid of $1,414,414; a difference of $98,414). The estimate was based
on bids received for the identical project back in September ’03 (bids were rejected at that time
due to the inability to complete grading prior to the gnacatcher breeding season restriction). To
arrive at the engineer’s estimate presented to Council in April, staff added a 10% inflationary
factor to the average bid price from September ‘03. Analyzing the low bid received vs. last years,
the actual increase was 18% over 8 months for the identical project. This reflects the dramatic
construction increases taking place over the past several months due to material shortages and
record level prices for structural steel, framing lumber and plywood as well as relatively high
increases in labor costs. In addition the construction industry is still very active and not
conducive to low bid prices.
As is evident from the above, the total estimated project cost is under-funded by $128,766 and
additional funding would need to be appropriated to construct the project in accordance with work
outlined in the base bid construction.
Adequate funds are available in the NE Quadrant Park-in-lieu Fund (PIL-NE Fund) account to
cover the additional appropriation. Staff recommends an additional appropriation in the amount
of $128,766 from the Park-in-lieu Fund to the Hidden Canyon Community Park account. The
additional appropriation of funds for this project means there will be less money in the future to
pay for the other park project in that quadrant which utilizes the PIL NE Fund.
An option for Council to consider would be the elimination of one or both of the “deductive
alternates” included in the bid; the restroom which was bid at $145,000, and the 2-5 year old’s
totlot bid at $40,000 (there is also a separate 6-12 year old’s totlot that was not a deductive
alternate). Because of the anticipated use by children and their parents however, staff does not
recommend eliminating the restroom.
AB# 17,698
PAGE 3
On going maintenance and operation costs are estimated at $80,000 per year for this park after
construction is completed.
EXHIBITS:
1. Resolution No. 2004-224 accepting bids and awarding a contract to Griffith
Company for the construction of Hidden Canyon Community Park and appropriating
additional funds to the project account.
2. Location Map
3. Hidden Canyon Community Park Site Plan
DEPARTMENT CONTACT: Liz Ketabian, (760) 434-2978, Lketa@ci.carlsbad.ca.us
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
RESOLUTION NO. 2004-224
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
CARLSBAD, CALIFORNIA, AWARDING A CONTRACT FOR
HIDDEN CANYON COMMUNITY PARK, CITY PROJECT
NO. 38561-A AND APPROPRIATING ADDITIONAL FUNDS FOR
THE PROJECT.
WHEREAS, on April 6, 2004 the City Council of the City of Carlsbad, California,
approved the plans and specifications and authorized the advertisement of competitive bids for
the construction of Hidden Canyon Community Park, hereafter referred to as the “Project;” and
WHEREAS, on June 9, 2004, the City received sealed bids for said Project which were
opened in public; and
WHEREAS, the lowest responsive, responsible bid was submitted by The Griffith
Company Incorporated in the amount of $1,4 14,4 14 and
WHEREAS, additional funds in the amount of $128,766 are required to successfully
complete the project; and
WHEREAS, adequate funds are available in the NE Quadrant Park-in-Lieu Fee account
to cover the additional appropriation in the amount of $128,766.
WHEREAS, it is necessary, desirable, and in the public interest to proceed with the
award of the construction contract for said Project at this time.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carlsbad,
California, as follows:
1. That the above recitations are true and correct.
2. That the City Council does hereby authorize the Finance Director to appropriate
additional funds for the project in the amount of $128,766.
3. That the City Council does hereby award a contract for the Project to the lowest
responsive, responsible bidder, GriMith Company in the amount of $1,414,414 and the
Mayor is authorized to execute said contract on behalf of City.
Y
~- -
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
4. That the City Manager is hereby given the authority to approve construction change
orders; singly or in aggregate, up to the amount of the specified contingency.
PASSED, APPROVED AND ADOPTED at a regular meeting of the Carlsbad City Council held
onthe 6th dayof July- 2004 by the following vote, to wit:
AYES: Council Members Lewis, Finnila, Kulchin, Hall and Packard
NOES: None .
ABSENT: None
ATTEST:
/&&h?W
INE M. WOOD, Cii ty Clerk
-2-
__
5
. ..
PROJECT LOCATION MAP:
..
I
I
EXt-IIBiT 2
6
Hidden Canyon Community
Park
,/'
__.,
i
1
EXHISIT 3
7