Loading...
HomeMy WebLinkAbout2005-02-08; City Council; 17969; Carlsbad Blvd Left-Turn Lane at Breakwater Rd4B# 17,969 TITLE: AUTHORIZATION TO ADVERTISE YITG. 2/8/05 LEFT-TURN LANE AT BREAKWATER ROAD IEPT. ENG FOR BIDS FOR CARLSBAD BOULEVARD PROJECT NO. 3947-1 RECOMMENDED ACTION: &@ CITY ATTY Adopt Resolution No. *CN35-035 approving plans and specifications and authorizing the City Clerk to advertise for bids for the construction of the Carlsbad Boulevard Left-Turn Lane at Breakwater Road, Project NO. 3947-1. DesignIAdministration Engineer’s Estimate for Construction Construction Inspection 8, Administration (1 5%) ITEM EXPLANATION: $21,481 $1 36,000 $20,400 Public vehicular access to the South Carlsbad State Beach campground facility is restricted to southbound traffic on Carlsbad Boulevard at Poinsettia Lane. Vehicles approaching on westbound Poinsettia Lane and northbound Carlsbad Boulevard must divert north on Carlsbad Boulevard. The proposed left-turn lane will allow these northbound vehicles to U-turn at Breakwater Road and enter the campground from southbound Carlsbad Boulevard. Plans and specifications for this project have been completed. This project was approved in the 2004l2005 Capital Improvement Program for design and construction, and funding for this project is available from the South Carlsbad Coastal Redevelopment Area tax fund. Construction Contingencies (1 5%) ENVIRONMENTAL REVIEW: $20,400 The proposed improvements to Carlsbad Boulevard consist of installation of a left turn pocket at an existing intersection and the addition of paved area to facilitate U-turns for larger vehicles. All work would be conducted within the existing public right-of-way and no significant increase in traffic circulation or roadway capacity would occur. Therefore the project qualifies as a minor alteration of an existing facility and is exempt from environmental review pursuant to Section 15301(c) of the State CEQA Guidelines. Total Project Cost FISCAL IMPACT: $198,281 The funds needed to complete the project are estimated at $198,281. The project cost breakdown is as follows: I Total Amount Appropriated for this Project I $155,000 I The funds appropriated in the South Carlsbad Coastal Redevelopment Area tax fund may not be sufficient to complete this project. After bids are received and analyzed, staff may need to request additional funds at the time of contract award. EXHIBITS: 1. Location Map. 2. Resolution No. XX5035 approving plans and specifications and authorizing the City Clerk to advertise for bids for the construction of the Carlsbad Boulevard Left-Turn Lane at Breakwater Road, Project No. 3947-1. DEPARTMENT CONTACT: John Kim, (760) 602-2757, jkim@ci.carlsbad.ca.us i Carlsbad Boulevard Left Turn Lane at Breakwater Road Project No. 39474 EXHIBIT I 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 EXHIBIT 2 RES0 LU T ION NO. 2035 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD, CALIFORNIA, APPROVING PLANS AND SPECIFICATIONS AND AUTHORIZING THE CITY CLERK TO ADVERTISE FOR BIDS FOR THE CONSTRUCTION OF THE CARLSBAD BOULEVARD LEFT-TURN LANE AT BREAKWATER ROAD, PROJECT NO. 3947-1. WHEREAS, the City Council of the City of Carlsbad, California, has determined it necessary, desirable, and in the public interest to construct the Carlsbad Boulevard Left-Turn Lane at Breakwater Road; and WHEREAS, the construction of the left-turn lane will facilitate northbound U-turns at the intersection to proceed south; and WHEREAS, the plans and specifications for furnishing of all labor, materials, tools, equipment, transportation, and other expenses necessary or incidental of said project have been prepared and are on file in the Engineering Department of the City of Carlsbad and are incorporated by reference herein; and WHEREAS, said project was included in the 200412005 Capital Improvement Program; NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carlsbad, California, as follows: 1. 2. That the above recitations are true and correct. That the plans, specifications and contract documents on file in the Engineering Department of the City of Carlsbad are hereby approved. 3 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 3. The City Clerk of the City of Carlsbad is hereby authorized and directed to publish, in accordance with State law, a Notice to Contractors Inviting Bids for the construction of the Carlsbad Boulevard Left-Turn Lane at Breakwater Road, Project No. 3947-1, in accordance with the plans, specifications and contract documents referred to herein. PASSED, APPROVED AND ADOPTED at a regular meeting of the Carlsbad City Council held on the 8th day of FEBRUARY , 2005 by the following vote, to wit: AYES: Council Members Lewis, Hall, Kulchin, Packard, Sigafoose NOES: None 4TTEST: (SEAL)