Loading...
HomeMy WebLinkAbout2005-05-17; City Council; 18133; Proposed 2005-06 to Buildout CIPAB# 18,133 MTG. 0511 7/05 DEPT. FIN +- 16 CITY OF CARLSBAD - AGENDA BILL c- , TITLE: PROPOSED 2005-2006 TO BUILDOUT CAPITAL IMPROVEMENT PROGRAM RECOMMENDED ACTION: Accept report. Set public hearing for June 21, 2005. ITEM EXPLANATION: The Capital Improvement Program (CIP) is a planning document as well as a budget document. It incorporates the current status of all of the City's capital funds with the capital construction budgets and development projections for the upcoming years, and then projects future revenues and expenditures for all known projects until buildout of the City. This document is reviewed and updated every year during the budget process. Overview - Fiscal Year 2005-2006 During the CIP review process, staff evaluated the construction schedules for City facilities in conjunction with the workload of the staff needed to complete the projects. In addition, new projects were prioritized and ranked using the criteria shown in the table. An evaluation of the availability of capital construction funds as well as operating funds were also part of the evaluation and scheduling process. Project Ranking Criteria Health and Safety Legal Mandates Operating Cost Impacts Growth Management Standards Other Standards Completion of Basic Infrastructure Linkage Public Opinion/Surveys Funding & Timing Opportunity A large increase in the cost of construction materials has occurred over the past 2 years pushing Building Cost Index """ 60%- 5 0%- 4 0% - 3 0%- 2 0% - 10%- 0 0% t 1998 1999 2000 2001 2002 2003 2004 2005 up the cost of all of the City's projects. With the exception of one funding source, there are sufficient revenues projected to build the projects listed in the CIP. However, the recent cost escalation has increased the projected shortfall in the Public Facilities Fees (PFF) at build out of the City from the $1.5 million projected last year to $4.8 million this year. While this is not an immediate problem, it is an indication that the City may not have the money to build all of the projects listed under the PFF program. Several changes were required in this year's CIP to keep the deficit in PFF from increasing any further. The recommended changes, as reflected in the accompanying documents, include: Move the Hosp GroveIBuena Vista Lagoon improvements project to the unfunded list. This action will free up $1.3 million of Park-in-Lieu funds that can be used towards the Pine Street Park community center; Move the Cannon Lake Park project to the unfunded project list. This relieves the PFF fund of $2.1 million in obligations; Use all undesignated Park-in-Lieu funds (a total of $4.1 million) as a funding source for park projects rather than using PFF as originally planned; PAGE 2 OF AGENDA BILL NO. 18,133 Move the estimated construction date for Aviara Park community center out into the 2015 to build-out time frame. These changes allow the PFF fund to remain balanced until sometime after 2015. During this time an evaluation of the remaining projects in this fee program can occur, and Council will have an opportunity to revise the future construction plans of PFF-funded projects and/or obtain additional funding. Major Proiects For Fiscal Year 2005-06 Some of the major projects scheduled to receive new or additional funding in fiscal year 2005-06 are summarized below. More information on all the projects in the CIP can be found in the accompanying report. Alga Norte Park and Aquatic Center - This park site consists of 30 acres in the Southeast Quadrant and planned amenities include ball fields, soccer fields, picnic areas, tot lots, a skate park, a dog park, restrooms and parking facilities, and an aquatic center. The aquatic center will include a 50-meter competition pool, a 12-lane instructional pool and a therapy pool as well as a water play area complete with a lazy river and 2 water slides. Carlsbad Municipal Golf Course - The City has plans to construct an 18-hole championship golf course on property located north of Palomar Airport Road along College Boulevard. Librarv Learning Center - This project is to provide a permanent location for the Adult Learning and the Centro de Informacion programs. The existing building adjacent to Holiday Park will be remodeled and a second story, approximately 5,000 square feet, will be added. Senior Center Expansion - The 1'' floor area of the existing Senior Center will be remodeled to include additional amenities for the senior community. The Znd floor will be remodeled to house City offices. Public Works Center - The project is for the construction of the Public Works Center and associated improvements. It includes offices, shops, a yard, warehouse and parking to accommodate the Public Works department. Initial estimates put the cost at approximately $22 million. Fire Station No. 6 Relocation - Fire Station No. 6 is currently located in a temporary facility in the southeast quadrant of Carlsbad. Relocation of this station to a 6,200 square foot permanent facility along the east side of Rancho Santa Fe Road is scheduled to occur concurrent with the road alignment project. Total cost is projected at $5.4 million. This fire station is required to ensure a five-minute response time within the southeast part of the City as development in that area occurs. Vista/Carlsbad Interceptor - Reaches 13 to 15 of the project, extending from the Encina Facility to the Agua Hedionda Lift Station, are scheduled in the next five years. This project is required to handle buildout flows and replace deteriorated pipeline, and is partially funded by the City of Vista. Pavement Management - A street can last a lifetime if it is properly maintained. Part of that maintenance program is the sealing and overlay of the existing street surface. Carlsbad's local streets are maintained on a regular cycle to ensure a good riding surface and to extend the life of the street. In addition, any problem areas are addressed as they are identified. PAGE 3 OF AGENDA BILL NO. 18,133 Future Facilities The CIP for 2005-2006 to Build-out outlines approximately 154 future projects at $445 million as shown below. CIP Projects - All Future Projects Type of Project Quantity Total Cost Civic Facilities 16 $92,983,484 Streets/Circulation 47 92,671,786 Parks 15 108,000,080 Sewer 24 61,142,365 Water 44 39,494,765 Drainage 8 15,805,150 Other (loans) N/A 35,284,198 Total Future 154 $445,381,828 Specific timing and cost estimates for all planned capital projects are identified in the accompanying report and schedules. There are several projects identified in the CIP for which there is no identifiable funding source. The City will investigate obtaining possible outside funding such as federal and State grants, loans, or other financing sources. These projects are: El Camino Real Widening from Cassia Road to Camino Vida Roble Palomar Airport Road Widening and Bridge Reconstruction Poinsettia Lane - Read “E” Cannon Road - Reach 4 - College to City Limits Cannon Lake Park (6.7 Acres) Hosp Grove/Buena Vista Lagoon Improvement The proposed Capital Improvement Program for fiscal year 2005-06 is an exhibit to this report. Staff is requesting that Council set the public hearing for the adoption of the CIP as well as for the City’s Operating budget for the meeting of June 21, 2005. During this meeting, comments from interested citizens and others is welcomed. FISCAL IMPACT: Upon adoption of the Capital Improvement Program budget on June 21, 2005, the total new appropriations on July 1, 2005 will be $87,696,728 from the CIP funds shown on the attached schedules. Existing expenditures and appropriations shown in the attached schedules are through April 30, 2005. In addition, revenue projections are provided to show the cash flows and balances for each of the funds. EXHIBITS: 1. 2005-2006 Preliminary Capital Improvement Program. DEPARTMENT CONTACT: Lisa Hildabrand; (760) 602-2430 Exhibit 1 2005-2006 PRELIMINARY CAPITAL IMPROVEMENT PROGRAM OVERVIEW The City of Carlsbad Preliminary Capital Improvement Program (CIP) is a planning document that outlines the expenditure plan for future capital projects and the corresponding revenues to pay for those expenditures. The CIP is a financial planning document, not a commitment for spending. Spending authorization is given only at the time the City Council formally adopts the proposed budget, and, at that time, funds are only appropriated for the following fiscal year. The information shown in subsequent years is to provide the most comprehensive snapshot of all the known future facilities the City of Carlsbad plans to construct. The 2005-2006 Preliminary Capital Improvement Program outlines $87.7 million in new appropriations to provide additional funding for the continuation of existing projects as well as funding for new projects. Projected revenues during the fiscal year are estimated at $120 million. Revenues are collected as building permits are issued, and as the need for facilities arises, the money is used to fund the new facilities. As the City continues to grow and develop, there is a corresponding increase in the demand for development-related services and new facilities. To ensure that the necessary infrastructure and facilities are built on a schedule that meets or exceeds this demand, the citizens of Carlsbad adopted a Growth Management Plan in 1986. The Growth Management Plan states that unless a standard level of facilities is available to meet new demands resulting from the City’s growth, development cannot proceed. This Plan is the foundation for making decisions about the timing and prioritization of the capital projects under consideration. A discussion of the City’s Growth Management Plan is located at the end of this report. The remainder of the report explains the process and the results of the City’s plans for its capital facilities. With the exception of one funding source, there are sufficient revenues projected to build the projects listed in the CIP. A large increase in the cost of construction materials has occurred over the past 2 years pushing up the cost of all of the City’s projects. This cost escalation has raised the projected shortfall in the Public Facilities Fees (PFF) at build out of the City from the $1.5 million projected last year to $4.8 million this year. While this is not an immediate problem, it is an indication that the City may not have the money to build all of the projects listed under the PFF program. Several changes were required in this year’s CIP to keep the deficit in PFF from increasing any further. The recommended changes, as reflected in the accompanying documents, include: Move the Hosp GrovelBuena Vista Lagoon improvements project to the unfunded list. This action will free up $1.3 million of Park-in-Lieu funds that can be used towards the Pine Street Park community center; Move the Cannon Lake Park project to the unfunded project list. This relieves the PFF fund of $2.1 million in obligations; Use all undesignated Park-in-Lieu funds (a total of $4.1 million) as a funding source for park projects rather than using PFF as originally planned; Move the estimated construction date for Aviara Park community center out into the 2015 to build-out time frame. These changes allow the PFF fund to remain balanced until sometime after 2015. It is important to remember that the projections attempt to estimate revenues for over 15 years into the future. The actual revenues may be more or less depending on many factors including the rate of development, building valuations, interest rates and construction costs. The $4.8 million deficit represents approximately 10% of all the future PFF revenue to be collected. If the projections are accurate, it means that the City may have to either cut back on the proposed projects or find alternative funding sources for the projects. Exhibit 1 the latest increases in materials costs. detailed review of the cost components, or, in cases where the project is only in its conceptual stages, by increasing the total cost by the Engineering News Record (ENR) index. As seen in the chart, building cost increases have risen over the past several years with a 3.2% increase in 2003 and an amazing 9.7% increase in 2004. The ENR is forecasting that This was done through either a annual inflation for building costs will slip back to 3.5% in 2005, although the cost of certain materials may grow 2005-2006 PRELIM1 NARY CAPITAL IMPROVEMENT PROGRAM Engineering News Record Annual Building Percentage Increases 120% - 10 0% ~ ~ ~ ~ ~~ ~ 60% - o% - 0.0% I ,99* ,9q5 ,99” ,9.’ ,%@ +Q‘ 2.0’ %Q$@ p’ Despite the changes in the Parks programs, it is still anticipated that the City will meet all of its growth management standards. This reflects the Council’s continued commitment to construct the facilities as needed to serve the current and anticipated development occurring throughout the City. PROJECT EVALUATION What is the definition of a CIP project? Projects that are shown in the CIP are generally defined as any construction (or reconstruction/replacement) of major infrastructure such as streets, libraries, parks, fire stations and administrative facilities, water, sewer and drainage facilities, and other facilities that are located on or in the ground. In most cases, the total construction cost of each of these assets is recorded and tracked as part of the City’s inventory of capital infrastructure assets and other City-owned property. In addition to prioritizing projects based on growth management, projects are continuously evaluated and prioritized to ensure the City will have the funds to operate the facilities as well as construct them. Thus, the CIP and the Operating Budget are integral parts of the total City financing plan. Projects are reviewed on an annual basis by a staff Review Committee and subsequently by the City’s executive management and City Council. The Review Committee begins the process by determining the need of a project based on the following criteria: Project Ranking Criteria 1. Is the project required to ensure the health and safety of the citizens, as the result of a legal mandate, or to maintain compliance with the City’s Growth Management Plan? Are operating funds available to operate the facility? 2. Is the project needed soon for growth management compliance? 3. Is the project needed now for other City standards (example: ball field standards)? 4. Does the project complete or provide part of the basic infrastructure (example: a linking road segment)? 5. Are there other reasons to construct the project (example: timing or funding opportunity, public demand)? If the project meets the criteria listed above, then it is subject to additional review including an analysis of engineering cost estimates, a review of the funding availability, the overall timing of project, and the availability of City resources. Exhibit 1 2005-2006 PRELIMINARY CAPITAL IMPROVEMENT PROGRAM CAPITAL PROJECTS The following two sections provide information about the major capital projects. The first section focuses on projects planned in the next five years, and the second section contains an overview of the entire expenditure plan through buildout of the City. THE NEXT FIVE YEARS ... PARK PROJECTS The City has planned a number of park projects over the next 5 years which will enhance the recreational opportunities for Carlsbad's residents and allow the City to meet the standards for park acreage as set forth in the growth management plan. Some of the more significant projects are listed below. 0 Alqa Norte Park and Aquatic Center - This park site consists of 30 acres in the Southeast Quadrant with planned amenities that include ball fields, soccer fields, picnic areas, tot lots, a skate park, a dog park, restrooms and parking facilities, and an aquatic center. The aquatic center will include a 50-meter competition pool, a 12-lane instructional pool and a therapy pool as well as a water play area complete with a lazy river and 2 water slides. A swimming pool complex was one of the projects approved by the voters through Proposition C in 2002. Construction is scheduled to begin in Fiscal Year 05-06. The park is expected to cost $12.6 million and the aquatic center is estimated at $17.9 million. 0 Carlsbad Municipal Golf Course - The City has plans to construct an 18-hole championship golf course on property located north of Palomar Airport Road along College Boulevard. Formal grading is expected to begin in September 2005. The targeted opening is Spring 2007. An additional $36.8 million is appropriated in this year's CIP for the construction of the course that includes a 26,000 square foot clubhouse. Senior Center Expansion - The 1'' floor area of the existing Senior Center will be remodeled to include additional amenities for the senior community. These may include items such as an exercise rooms, art room, TV room, multi-purpose room, game room, health screening room and a computer room. The Znd floor will be remodeled to house City offices. The estimated cost for the renovation is just under $1 million. 0 Pine Park Communitv Center - Plans are to construct a 20,000 square foot community facility/gymnasium. The facility will include basketball, volleyball, gymnastics, multi-purpose rooms, meeting rooms, a teen center and office space. Design of this $6.2 million facility is expected to begin in the 2008-09 fiscal year. Poinsettia Park Communitv Center - Phase II of this 42-acre park includes amenities such as a community facility/gymnasium, enclosed soccer field, tot lot, picnic areas, tennis complex including a clubhouse and stadium court and additional parking. The cost is expected to be approximately $1 1.6 million and will begin design in fiscal year 2009-10. 0 Lake Calavera Trails Construction - Funds for the construction of .a public multi-use, recreational trail system are planned on property located at Lake Calavera in the northeast quadrant of the City. The project expects to use volunteers to construct approximately 2.5 miles of the proposed 5 miles of trails. Exhibit 1 2005-2006 PRELIMINARY CAPITAL IMPROVEMENT PROGRAM CIVIC FACILITIES Civic facilities include a variety of facilities from which the City can offer its services to the public. Many of these are still in the preliminary design stage and will be further defined over the next year or two. 0 Civic Center - Preliminary planning for a Civic Center has begun. The Civic Center will consolidate City administrative operations and facilities into a more centralized location. It also may include a variety of other services and recreational opportunities for citizens and visitors. Council, citizens and members of the business community have been participating in a visioning process to determine what the needs are - for the citizens and for the City as an organization. Once the process is complete, a site will be chosen, and design and construction can begin. 0 Public Works Center - The project is for the construction of the Public Works Center and associated improvements. It includes offices, shops, a yard, warehouse and parking to accommodate the Public Works department. Initial estimates put the cost at approximately $22 million. 0 Safetv Training Center - With the construction of the City’s municipal golf course in the next year, it is necessary to relocate the Police department’s shooting range, which is currently located on the golf course property. In addition, there is a need for specialized training facilities for other public safety purposes. This project was authorized under Proposition C, which was approved in 2002. Preliminary design work is underway. The facility may include a fire training tower, residential training prop, outdoor seating pavilion, fire administration building with classroom and storage facilities, in addition to the shooting range. 0 Libraw Learning Center - This project is to provide a permanent location for the Adult Learning and the Centro de Informacion programs. The existing building adjacent to Holiday Park will be remodeled and a second story, approximately 5,000 square feet, will be added for a total cost of $3.1 million. 0 Fire Station No. 6 Relocation - Fire Station No. 6 is currently located in a temporary facility in the southeast quadrant of Carlsbad. Relocation of this station to a 6,200 square foot permanent facility along the east side of Rancho Santa Fe Road is scheduled to occur concurrent with the road alignment project. Total cost is projected at $5.4 million. This fire station is required to ensure a five-minute response time within the southeast part of the City as development in that area occurs. Fire Station No. 3 Relocation - Fire Station No. 3 is currently located at the corner of Chestnut and Catalina. As the City grows eastward, relocation of this station is needed to ensure the five-minute response time. The new station is budgeted as a 6,200 square foot facility sited next to Calavera Hills Community Park. The suitability of this location is currently under review. STREET PROJECTS Traffic congestion is one of the top concerns among citizens according to the City’s latest public opinion survey. To help improve the flow of traffic throughout Carlsbad and to keep the City’s streets in top condition, there are a number of street projects expected to be completed in the next five years. Some of the larger ones include: 0 Faraday Avenue and Melrose Drive Extensions east of El Camino Real - This project encompasses the extension of Melrose Drive from Palomar Airport Road to the CarlsbadNista 7 Exhibit 1 2005-2006 PRELIMINARY CAPITAL IMPROVEMENT PROGRAM city limits and the extension of Faraday Avenue from Orion Way to Melrose Drive in Vista. The project would include the reconstruction of a portion of existing Melrose Drive in the City of Vista and the construction of a bridge over the Agua Hedionda Creek along Faraday Avenue. This project is being built by the developers in the area and reimbursed from the proceeds of a bond issue. The formation of a Community Facilities District is underway and will be the mechanism for the issuance and repayment of the debt. 0 Poinsettia Lane East of El Camino Real - This project, located along the future alignment of Poinsettia Lane from El Camino Real east to El Fuerte Street, will complete another eastlwest arterial linkage from Melrose Drive to Interstate 5. The project is expected to be complete and open to the public in mid-2005. It was funded through an assessment district which issued debt and will be repaid from assessments placed on the property. College Boulevard and Cannon Road - Ultimate construction of the missing link of College Boulevard from Cannon Road south to El Camino Real is the goal of this project. It also includes a 1,200-foot section of Cannon Road east of the College/Cannon intersection. The financing program for this section of road is under discussion and will need to be resolved before construction can begin. Pavement Management - A street can last a lifetime if it is properly maintained. Part of that maintenance program is the sealing and overlay of the existing street surface. Carlsbad’s local streets are maintained on a regular cycle to ensure a good riding surface and to extend the life of the street. In addition, any problem areas are addressed as they are identified. The pavement management program is budgeted at about $3.3 million per year. WATER/ SEWER PROJECTS Although the City’s water and sewer projects may not be the most discussed projects in the community, they are vital to the health and welfare of its citizens. Most new lines are built and paid for by developers. As the City ages, the number of these projects will grow as it becomes necessary to repair and replace the lines that are being built today. 0 VistalCarlsbad Interceptor - Reaches 13 to 15 of the project, extending from the Encina Facility to the Agua Hedionda Lift Station, are scheduled in the next five years. This project is required to handle buildout flows and replace deteriorated pipeline, and is partially funded by the City of Vista. Water Lines - Several major water lines are scheduled for construction within the next five years: - - - - Faraday Avenue extension - Recvcled Water Program - Construction of the Recycled Water Cannon Road east of El Camino Real Carlsbad Boulevard - south of Avenida Encinas College Boulevard - various sections Melrose Drive from Palomar Airport Road to Faraday 0 Facility is complete. This $45 million project included construction of a four-million-gallons-per- day treatment plant, distribution pipelines, a flow equalization storage facility, and pump stations. Although the construction of the treatment plant is complete, timing of the plant operations is dependent upon completion of Encina’s Flow Equalization project. The facility will be tested during the last few months of fiscal year 2004-05 and should begin operations shortly thereafter. The pipelines will also be completed by that time, and the pump stations and Mahr Reservoir will become operational around July 2006. Exhibit 1 2005-2006 PRELIMINARY CAPITAL IMPROVEMENT PROGRAM CAPITAL PROJECTS THROUGH BUILDOUT The CIP for 2005-2006 to buildout outlines approximately 154 future projects at $445 million. CIP Projects -All Future Projects [Type of Project Quantity Total Cost1 Civic Facilities Streets/Circulation Parks Sewer Water Drainage Other (loans) Total Future 16 47 15 24 44 8 N/A 154 $92,983,484 92,671,786 108,000,080 61,142,365 39,494,765 15,805,150 The largest expenditure category is for park and recreational facility construction and acquisition projects, which total $108 million, or 24%. Park projects planned within all quadrants of the City are listed below in addition to the fiscal year design and/or construction is expected to begin. More detail follows on specific projects not discussed earlier in this report. PARK PROJECTS BY QUADRANT Northwest Quadrant Northeast Quadrant Pine Avenue Park: 2005 Pine Avenue Park Community Building: 2008-09 Hidden Canyon Park: 2005 Southwest Quadrant Southeast Quadrant Poinsettia Park Community Building: 2009-1 0 Aviara Community Building: 201 5-20 Alga Norte Park: 2005-06 Alga Norte Aquatic Center: 2005-06 Leo Carrillo Park Phase Ill: 2015-20 Citywide Park and Recreational Proiects Municipal Golf Course: 2005-06 Business Park Recreational Facility: 201 5-2020 Veteran’s Memorial Park: 201 0-2020 0 Aviara Community Facility - Located in the southwest quadrant of the city, this project includes the construction of an 18,000 square foot community facility that would include meeting and activity rooms, as well as park offices. Leo Carrillo Park Phase Ill - This park was once part of the original 2,538 acre working rancho, home to actor Leo Carrillo, his wife Edith, and their daughter Antoinette. It is located in the southwest quadrant, approximately one mile south of Palomar Airport Road. Initial restoration was completed and the park opened to the public in 2003. Future work includes renovation of the barn into a small theatre, restoration of the Cantina, Equipment Shed, Blacksmith Shop, Carriage House, and Water Exhibit 1 2005-2006 PRELIMINARY CAPITAL IMPROVEMENT PROGRAM Tank. A botanical garden, picnic areas, and trails will also be added to enhance the visitor’s experience of the ranch. 0 Veterans Memorial Park - This project is located south and east of Agua Hedionda Lagoon adjacent to the future City Golf Course. The Master Plan includes the following improvements: community leisure needs, open space interpretive area, parking and maintenance facility. Other suggested uses for this park include an amphitheater complex, sports complex, conference center and numerous other active/passive recreation amenities. Construction of Civic facilities such as libraries, administrative facilities, police and fire facilities total $93 million of the total planned capital expenditures to buildout. Approximately 21% of future expenditures are planned for street and traffic signal construction projects. Included in this category is construction of major roadways that will add east to west and north to south connections and provide additional routes to the neighboring cities of Oceanside, Vista, and San Marcos. Sections of these roads are already under construction by developers. Additional roadway projects include replacement of the Carlsbad Boulevard Encinas Creek Bridge, several road-widening projects, and over $53 million for future pavement overlay. Additional traffic signals are expected to cost approximately $6 million. Sewer and drainage projects are expected to cost $77 million, which includes over $26 million in sewer replacement projects. Funding is also provided for the repayment of bonds for the expansion of the Encina Wastewater Facility, and the Encina Water Pollution Control Facility projects. Future water projects total about $39 million (9%) and include construction of new the major areas in which these installations or upgrades are planned include waterlines, both potable and recycled, concurrent with new development. Some of segments of College Boulevard and El Fuerte, and along El Camino Real. Replacement of existing potable and recycled waterlines is also included in this category, and additional reservoirs are planned to increase storage for ultimate demands. I 151 Specific timing and cost estimates for all capital projects are identified in the Detail Schedule of Capital Projects (2005-2006 to Buildout) following this narrative. UNFUNDED PROJECTS The City has identified the following projects which at this time have no identifiable funding sources. The City will investigate obtaining possible outside funding such as federal and State grants, loans, or other financing sources. 0 0 0 0 0 0 El Camino Real Widening from Cassia Road to Camino Vida Roble Palomar Airport Road Widening and Bridge Reconstruction Poinsettia Lane - Read “E” Cannon Road - Reach 4 - College to City Limits Cannon Lake Park (6.7 Acres) Hosp Grove/Buena Vista Lagoon Improvements FUTURE GROWTH AND DEVELOPMENT There are a variety of revenues that are used to fund the capital projects. In order to estimate future revenues from development, several assumptions about the rate and type of future development need to be made. These assumptions can change from year to year and correlate with the economic climate. Exhibit 1 2005-2006 PRELIMINARY CAPITAL IMPROVEMENT PROGRAM Every year, City staff evaluates all existing and future private development projects and compares this information to the buildout capacity of the City using adopted general plans. Information about existing development activity combined with estimates of how remaining net developable land might develop are then summarized to prepare future projections about when and where residential and non-residential development will occur. Finance Department staff prepare cash flow schedules using current fund balances combined with future estimated fees paid by those developments, then compares the available funds to the expenditure plan to ensure that funding will be sufficient for construction of the capital projects as planned in the CIP. In addition to evaluating whether or not capital funds are sufficient, significant operating cost impacts and availability of staff resources are also used to evaluate the timing of projects. Where funding discrepancies occur, alternative financing methods and project timing are again evaluated and recommendations are made to resolve the discrepancies. Residential development is expected to taper off in the future. The number of annual building permits issued is projected to decline compared to the previous five-year period. The development schedules of the remaining vacant parcels is driving the timing of the future units, rather than economic or market conditions. An additional 5,700 units are remaining before the City is predominantly built out. Residential development for 2004-2005 is projected at 1,350 units with an average about 665 units per year over the next five years. This is compared to an average of over 1,230 units per year for the previous five-year period. The decline is due to the dwindling supply of developable land, rather than a lack of demand. Residential Units Trend 2000 to 2010 Permits Issued 2000 1500 1000 500 0 2000 2001 2002 2003 2004 2005 2006 2007 2008 2009 2010 In contrast to the residential trends, the amount of non-residential development is projected to increase over the next five years. The average annual square feet of non-residential development for the past 5 years was about 671,000. This year, the estimate is for 936,000 square feet, and the average annual development for the next 5-year period is approximately 900,000 square feet per year. Projects include several neighborhood commercial/retail developments located in or near the areas where most of the residential development has occurred or where new development is planned over the next several years. In the southeast quadrant, commercial projects include retail and restaurants, a theater, and a daycare and church. Sunny Creek Plaza is a planned commercial development located east of El Camino Real at College Boulevard next to the Sunny Creek residential neighborhood, and the Bressi Ranch area will include 130,000 square feet of commercial development. Other commercial developments are planned at Calavera Hills and at 1, Exhibit 1 2005-2006 PRELIMINARY CAPITAL IMPROVEMENT PROGRAM Poinsettia Shores; at the La Costa Resort plans include construction of 302,000 square feet of commercial living units. Industrial development consists of various new ofice and industrial projects, as well as expansion of existing projects at Kelly Corporate Center, GIA, and Legoland. Development estimates provide the data and basis for estimating future fee revenues, which are calculated by multiplying each applicable development fee by the estimated number of dwelling units and/or square feet of construction expected during each year. The following table shows the number of residential units and non-residential square feet of development used in calculating estimated revenues for 2005-2006 and subsequent years to buildout. Projected Development Residential and Non-Residential Construction Residential Non-Res= Year Units Square Feet 2004-2005 current 1352 6 72,630 2005-2006 920 936,596 2006-2007 537 774,304 2007-2008 257 1,186,177 2008-2009 81 0 950,782 2009-201 0 800 649,112 Years 6-1 0 1,324 4,963,632 Years 11 -buildout 1,019 5,235,508 Total Future 5,667 14,696,111 REVENUES Revenues for Capital Projects from now until buildout total $558 million and are segregated into five major categories: (1) fees generated by development in Carlsbad, (2) special district fees and taxes (Community Facilities Districts and Bridge and Thoroughfare Benefit Districts), (3) Water and Sewer replacement reserves, (4) infrastructure replacement funds (other than sewer and water), and (5) other sources including grants, bond issues, and contributions from other agencies. Funding Sources 2005-2006 to Buildout Total Revenue = $558 million In Millions 175 150 125 100 75 50 25 0 ta- Exhibit 1 2005-2006 PRELIMINARY CAPITAL IMPROVEMENT PROGRAM Approximately 29% of all capital revenue is received as a result of development, and is dependent upon assumptions made about the City’s annual growth in dwelling units and commerciaVindustria1 square feet. Development revenues include Public Facilities Fees (PFF), Traffic Impact Fees (TIF), Park-In-Lieu Fees (PIL), Planned Local Drainage (PLD) Fees, Water Connection Fees (MFF), and Sewer Connection charges. Revenue from special districts, such as Community Facilities Districts (CFD) and Bridge and Thoroughfare Benefit Districts (BTD) comprise 10% of the total. Water and Sewer replacement revenues generated by user fees equal approximately 22% of total revenues, and are used to pay for replacement of existing water and sewer facilities. Infrastructure Replacement revenues, equal to 16%, are transfers from the City’s General Fund which are being set aside to pay for replacement of major capital facilities other than sewer and water facilities. The remaining 23% consists of revenues from other agencies and includes federal and State grants, the County sales tax program (TransNet), Redevelopment agency revenue, Golf Course funding, and contributions from cities and other agencies. CALCULATION OF FUTURE FEES The revenue projections of the Capital Improvement Program reflect the growth assumptions identified in the previous section. The following information delineates how those assumptions were applied to estimate future development revenues. The mix of multi-family and single-family residential units is assumed to be 35% and 65% respectively and reflects the anticipated mix of residential development for each Local Facilities Management Zone. The building permit valuation used for computing Public Facilities Fees is $1 66,900 per multi-family dwelling unit, and $257,600 per single-family dwelling unit. A building permit valuation of $38 per square foot of construction is used to calculate non-residential Public Facilities Fees. In order to calculate estimated revenues for Traffic Impact Fees (TIF), the number of average daily trips was computed for each type of development use. A multi-family residential dwelling unit is assigned eight trips per day and a single-family unit is assigned ten trips per day. Each residential trip is valued at the 2005-06 TIF of $107. The trips-per-day value for commercial and industrial buildings are averaged at 23 trips per 1,000 square feet of development, although the actual volume of trips generated by commercial/industrial building can vary widely depending on the ultimate land use. The value assigned to each commerciaVindustria1 trip is $43. CFD No. 1 is a citywide district established to finance various civic facilities required under the City’s Growth Management Plan. CFD No. 2 is to fund Rancho Santa Fe Road and Olivenhain Road, but has not yet been formally established. A prepayment program is in place to enable development to proceed within this proposed district. Park-in-Lieu Fees are collected for the purchase and development of parkland within each quadrant of the City, and the fees are based on the acquisition cost of parkland. Projects in the CIP funded with Park-in-Lieu Fees include future park site acquisition, development and restoration. There are two existing Bridge and Thoroughfare Fee Districts (BTD), which were formed by property owners to finance specific road construction projects located within each of the district boundaries. Poinsettia Lane - Aviara Parkway (BTD No. 2) was formed to finance the construction of Poinsettia Lane between Aviara Parkway and El Camino Real and Aviara Parkway between Palomar Airport Road and Poinsettia Lane. BTD No. 3 (Cannon Road West) was formed to fund portions of Cannon Road from Interstate 5 to El Camino Real. Although construction of this project is complete, revenues collected from future development within the district will be used to repay an advance that provided interim funding to complete the project. Exhibit 1 2005-2006 PRELIMINARY CAPITAL IMPROVEMENT PROGRAM SUM MARY The proposed 2005-2006 to Buildout CIP is being driven by the City’s commitment to ensure that facilities are available to service the developing areas as well as the current residents. Carlsbad’s philosophy has been to build quality capital facilities, which meet, and at times exceed, Growth Management standards. Phasing projects over a period of years to match funding availability for construction and operations is often used to meet the needs of Growth Management. The 2005-2006 to Buildout Capital Improvement Program reflects the commitment of Carlsbad’s Council and staff to continue providing its residents with a better quality of life. Exhibit 1 2005-2006 PRELIMINARY CAPITAL IMPROVEMENT PROGRAM GROWTH MANAGEMENT PLAN The Growth Management Plan was developed and voted into law by the citizens of Carlsbad in 1986. The plan was established to manage development within the City by linking residential, commercial, and industrial development directly to standards for availability of public services and facilities. The Growth Management Plan adopted has established precise standards for eleven public facilities. Standards must be met at all times as growth occurs. Facilities for which standards have been established are as follows: - City Administrative - Wastewater Treatment - Circulation - Fire - Water Distribution - Schools - Library - Parks - Drainage - Open Space - Sewer Collection The Plan requires that appropriate public facilities be available, in conformance with the adopted performance standards, as development occurs. Unless each of the eleven public facility standards have been met, no new development can occur. The Growth Management Plan impacts both the Operating Budget and the Capital Improvement Program. The detailed level of planning required by Growth Management has allowed Carlsbad’s Capital Improvement Program to anticipate the funding needed for capital improvements through buildout of the City. The timing of construction of facilities is governed by the rate of development and the eleven performance standards. New public facilities often require additional staffing and other resources, which affects the Operating Budget. Facilities such as community centers, parks, and fire stations have been constructed and opened to the public under this program. The Capital Improvement Program has been designed to specifically address areas where new or expanded facilities will be needed to maintain compliance with the adopted performance standards. With the adoption of the 2005-2006 CIP, compliance with the Growth Management Plan is assured. CITY OF CARLSBAD CAPITAL FUNDS PROJECTED FUND BALANCES FOR FY 2004-2005 JULY 1,2004 ESTIMATED JUNE 30,2005 UNRESERVED ESTIMATED ESTIMATED DEBT SERVICE PROJECTED FUND BALANCE REVENUES EXPENDITURES LOANS & OTHER BALANCE BTD#2 - POINSETTIA LANWAVIARA PKWY BTDM - CANNON ROAD WEST CFD #1 -CITYWIDE CFD #2 - RANCHO SANTA FE ROAD GAS TAX GENERAL CAPITAL CONST. GOLF COURSE GRANTS - FEDERAL GRANTS - STATE INFRASTRUCTURE REPLACEMENT OTHER PARK FEE ZONES 5,13.16 PARK-IN-LIEU NE PARK-IN-LIEU NW PARK-IN-LIEU SE PARK-IN-LIEU SW PLANNED LOCAL DRAING PUBLIC FACILITIES FEE REDEVELOPMENT VILLAGE REDEVELOPMENT SCCRDA SEWER BENEFIT AREAS SEWER CONNECTION SEWER REPLACEMENT TDA TRAFFIC IMPACT FEE T R ANSN ETlBl KE TRANSNETlHlGHWAY TRANSNETlLOCAL TRANSNETETP WATER - MAJOR FACILITY WATER - RECYCLED WATER 5,832,411 1,157,268 38,080,792 19,930.878 6,903,575 48,073,313 1,600,000 0 84,540 14,716,199 13,040,113 783,731 1,894,709 1,142,313 51 1,094 721,969 8,420,796 36,602,314 0 254,995 6,466,942 32,217,913 20,482,974 78.467 8,793,432 108,094 1,875.529 8,189.943 299,076 9,675,797 6,826,292 1,402,844 46,190 6,314.839 5,396.033 1.849.277 3,887,920 1,474,322 2,520,000 1,394 4,393,744 31,321,290 100,601 52,352 107,035 754,780 404,776 2,159,031 7,463,545 0 199,425 634,443 2,157,370 3,003,410 0 1,503,512 2,763 51,771 3,354,282 8,447 3,380,811 13,059,000 140,112 156,867 80.078 16,761,325 2,029,704 2,716,952 2,596,691 ,877.622 83,780 746,368 591,288 0 ,695,972 0 0 0 792,498 15,545,770 0 24,462 3,734.51 1 2,553,151 1,244,460 0 651,303 24,628 733,843 5,686,380 22,633 (597,444) 16,959,058 840,000 0 99.289 2,177,379 0 0 95,893 0 0 0 84,660 0 0 0 0 550,000 0 39,699 0 169,144 0 939,581 0 73,792 39,130 0 0 0 0 0 2,384,429 6,255,143 1,046,591 44,216,264 4,388,207 6,723,148 49,244,281 381,738 642,378 2,154 18,363,575 43,685,455 884,332 251,089 1,249.348 1.265.874 576.745 9,787,329 28.480.390 0 260,814 3,366.874 30,882,551 22,241,924 4,675 9,606.51 1 86.229 1,193,457 5,857.845 284.890 13,654.052 (1,458,195) WATER - REPLACEMENT 16,777,433 2,613,109 3,553,052 0 16,037,490 TOTAL 31 1,542,902 99,818,316 84,405,064 7,492,996 319,463,158 CITY OF CARLSBAD CAPITAL FUNDS PROJECTED FUND BALANCES FOR FY 2005-2006 JULY 1,2005 PROJECTED ESTIMATED FUND BALANCE REVENUES BTD#2 - POINSETTIA LANWAVIARA PKWY 6,255,143 BTD#3 - CANNON ROAD WEST CFD #1 - CITYWIDE CFD #2 - RANCHO SANTA FE ROAD GAS TAX GENERAL CAPITAL CONST. GOLF COURSE GRANTS - FEDERAL GRANTS - STATE INFRASTRUCTURE REPLACEMENT OTHER PARK FEE ZONES 5,13,16 PARK-IN-LIEU NE PARK-IN-LIEU NW PARK-IN-LIEU SE PARK-IN-LIEU SW PLANNED LOCAL DRAING PUBLIC FACILITIES FEE REDEVELOPMENT VILLAGE REDEVELOPMENT SCCRDA SEWER BENEFIT AREAS SEWER CONNECTION SEWER REPLACEMENT TDA TRAFFIC IMPACT FEE TRANSNET/BIKE TRANSNET/HIGHWAY TRANSNET/LOCAL TRANSNETETP WATER - MAJOR FACILITY WATER - RECYCLED WATER 1,046,591 44,216,264 4,388,207 6,723,148 49,244,281 381,738 642,378 2,154 18,363,575 43,685,455 884.332 251,089 1,249,348 1,265,874 576,745 9,787,329 28,480,390 0 260.814 3,366,874 30,882,551 22,241,924 4.675 9,606,511 86,229 1,193,457 5,857,845 284,890 13,654,052 (1.458.1 95) 1,178,922 36,608 4,215.847 10,970,579 1,650,000 790,854 36,803,000 0 0 4,250,000 791,986 96,910 8.889 62,273 588,870 295,546 1,419,895 6,250,768 815.000 0 591.569 7,500.148 2,460,000 250,000 1,377.861 150,000 0 2,528.000 0 2,061,334 22,730.894 WATER - REPLACEMENT 16,037,490 10,160,723 TOTAL 319,463,158 120,036,476 2004-2005 CONTINUING NEW APPROPR APPROPR. 9,079,649 2,773,005 140,200,145 87,696.728 349,884 137,862 5,329,093 3,161,248 10,462,590 24,358 565,240 0 960,845 39,425,840 0 99.892 0 0 219.100 4,096,796 22,096,142 0 260,350 1,257,113 1 1.726,268 1 1,382,471 0 3,108.099 81,293 1,024,189 3,401,142 0 4,215,821 7,249,413 485,447 0 0 3,079,362 0 992,000 7,759,200 36,803,000 0 0 2,999,850 2,890,840 0 0 0 0 0 0 8,007,500 715,000 0 0 5,687,615 3,098.326 250,000 1,288,430 150,000 0 2,600.000 0 1,352,600 7,250,000 2005-2006 TOTAL CIP APPROPR. 349,884 485.447 3,217,224 5,329,093 4,153,248 18,221,790 36,827,358 565,240 0 3,960,695 42,316,680 0 99,892 0 0 21 9,100 4,096,796 30,103.642 71 5,000 260,350 1,257.1 13 17,413,883 14,480,797 250,000 4,396,529 231,293 1,024,189 6,001,142 0 5,568,421 14,499,413 1 1,852,654 227,896,873 JUNE 30,2006 PROJECTED BALANCE 7,084,181 597,752 45,214,887 10,029,693 4,219,900 31,813,345 357,380 77,138 2,154 18,652,880 2,160,761 981,241 160,086 1,311,621 1,854,743 653,191 7,110,428 4,627,517 100,000 464 2,701,330 20.968.815 10,221,127 4,675 6,587,843 4,936 169,268 2,384,703 284,890 10,146,965 6,773,286 14,345,559 21 1,602,761 CITY OF CARLSBAD CAPITAL FUNDS REVENUES ACTUAL AND ESTIMATED 2001 -2002 2002-2003 2003-2004 2004-2005 2005-2006 ACTUAL ACTUAL ACTUAL ESTIMATED ESTIMATED FUND REVENUE REVENUE REVENUE REVENUE REVENUE BTD#2 - POINSETTIA LANUAVIARA PKWY BTD#3 - CANNON ROAD WEST CFD #1 - CITYWIDE CFD #2 - RANCHO SANTA FE ROAD GAS TAX GENERAL CAPITAL CONST. GOLF COURSE GRANTS - FEDERAL GRANTS - STATE INFRASTRUCTURE REPLACEMENT OTHER PARK FEE ZONES 5,13,16 PARK-IN-LIEU NE PARK-IN-LIEU NW PARK-IN-LIEU SE PARK-IN-LIEU SW PLANNED LOCAL DRAING PUBLIC FACILITIES FEE REDEVELOPMENT VILLAGE REDEVELOPMENT SCCRDA SEWER BENEFIT AREAS SEWER CONNECTION SEWER REPLACEMENT TDA TRAFFIC IMPACT FEE TRANSNETBIKE TRANSNETlHlGHWAY TRANSNEnLOCAL TRANSNETETP WATER - MAJOR FACILITY WATER - RECYCLED WATER 3,850,521 200,151 8,150,245 3,268,565 2,078,795 4,278,498 0 342,827 1,070,012 3,676,384 146,865 106,709 532,417 282,916 538,255 979,445 1,177,836 6,741,413 130.71 8 0 800,554 9,472,325 3,171,976 7,941 1,242,674 0 52,570 2,508,640 70,313 2,546,628 16,722,716 926,437 404,647 6,500,700 14,050,018 1,851,118 36,905,004 600,000 208.914 244,735 4,114,930 1,098,283 64,865 245,976 1,520,779 475,468 9,593 739,807 6,436,638 18,552 146,305 1,308,913 4,855,445 3,115,527 302,968 1,762,612 11 3,689 1,205.1 03 2,878,396 15,933 2,192,288 6,869,702 2,082,421 4,724.143 4,691.448 1,785.785 558,927 0 361.048 52,028 3,946,110 10,915,062 47,366 125,004 514,627 30,554 35.582 1,241.432 5,224,343 7,547 245,691 557,429 1,813.446 4,198,825 78.572 975,812 11 0,471 14,861 4,120,403 1.479 3,064,296 9,009,877 1,402,844 46,190 6,314,839 5,396,033 1.849.277 3,887,920 1,474,322 2,520,000 1,394 4,393,744 31,321,290 100,601 52,352 107,035 754,780 404,776 2,159,031 7,463,545 0 199,425 634,443 2,157,370 3,003,410 0 1,503,512 2,763 51,771 3,354,282 8,447 3,380,811 13,059,000 1,178,922 36,608 4,215,847 10,970,579 1,650,000 790,854 36,803,000 0 0 4,250,000 791,986 96,910 8,889 62,273 588,870 295,546 1,419,895 6,250,768 815,000 0 591,569 7,500,148 2,460,000 250,000 1,377,861 150,000 0 2,528,000 0 2,061,334 22,730,894 10,160,723 WATER - REPLACEMENT 3,457,473 4,667,424 2,877,307 2,813,109 TOTAL CAPITAL FUNDS 79,153,030 106,047,656 63.41 1,896 99,818,316 120,036,476 Entered by Barbara Note: Revenues include interfund loans and transfers in. CITY OF CARLSBAD CAPITAL FUNDS BUDGET EXPENDITURE SCHEDULE 2002-2003 2003-2004 2004-2005 FUND ACTUAL ACTUAL ESTIMATED BTD#2 - POINSETTIA LANUAVIARA PKWY 1,089,644 1,371,674 980.1 12 BTD#3 - CANNON ROAD WEST CFD #1 - CITYWIDE CFD #2 - RANCHO SANTA FE ROAD GAS TAX GENERAL CAPITAL CONST. GOLF COURSE GRANTS - FEDERAL GRANTS - STATE INFRASTRUCTURE REPLACEMENT OTHER PARK FEE ZONES 5,13.16 PARK-IN-LIEU NE PARK-IN-LIEU NW PARK-IN-LIEU SE PARK-IN-LIEU SW PLANNED LOCAL DRAING PUBLIC FACILITIES FEE REDEVELOPMENT VILLAGE REDEVELOPMENT SCCRDA SEWER BENEFIT AREAS SEWER CONNECTION SEWER REPLACEMENT TDA TRAFFIC IMPACT FEE TRANSNETBIKE TRANSNET/HIGHWAY TRANSNEnLOCAL TRANSNETETP WATER - MAJOR FACILITY WATER - RECYCLED WATER 366,929 563,394 6,849,077 3,069,646 702,114 93,341 208,510 475,336 1,290,712 199,220 14,447 59,593 366,504 4,379,059 0 574,220 3,758,660 53,069 0 1,219,939 2,337,279 955,688 136,933 402,011 70,104 128,474 1,030,601 486,421 1,839,043 9,973,773 1,228,385 385,960 11,832.529 509,878 1,959.899 394,043 361,452 291,454 336,293 593,270 452 18,626 704,000 0 0 957,271 2,885,404 877,633 0 937,912 2,212,199 1,604,260 160,780 147,986 45,776 64,266 4,180,696 69,533 2,720,043 13,880,955 156,867 179,367 20,938,704 2,029,704 2,716,952 2,692,584 1,877,622 83,780 746,368 675,948 0 1,695,972 0 0 550,000 792,498 15,585,469 0 193,606 3,734,511 3,492,732 1,244,460 73,792 690,433 24,628 733.843 5.686.380 22,633 (597,444 21,343.487 WATER - REPLACEMENT 3,155,390 501,338 3,553,052 TOTAL CAPITAL FUNDS 46,247,505 51,233,967 91,898.060 2005-2006 2004-2005 2005-2006 CONTINUING NEW TOTAL CIP APPROPR. APPROPR. APPROPR. 349.884 485.447 137,862 5,329,093 3,161.248 10,462,590 24,358 565,240 0 960,845 39,425,840 0 99,892 0 0 219,100 4,096,796 22,096,142 0 260,350 1,257,113 11,726,268 11,382,471 0 3,108,099 81,293 1,024,189 3,401.1 42 0 4,215,821 7,249,413 0 0 3,079,362 0 992,000 7,759,200 36,803,000 0 0 2,999,850 2,890,840 0 0 0 0 0 0 8,007,500 71 5,000 0 0 5,687,615 3,098,326 250,000 1,288,430 150,000 0 2,600,000 0 1,352,600 7,250,000 349,884 485,447 3,217,224 5,329,093 4,153,248 18,221,790 36,827.358 565,240 0 3,960,695 42,316,680 0 99,892 0 0 219,100 4,096,796 30,103,642 71 5,000 260,350 1,257,113 17,413,883 14,480,797 250.000 4,396,529 231,293 1,024.1 89 6,001,142 0 5,568,421 14,499,413 9,079,649 2,773,005 11,852,654 140,200,145 87,696,728 227,896,873 h N N L 3 m P d a P Lp 8 * a i c a i n a U E- P l!: Y E$ Ez Bn .- I.$ -E a 8 ? m 0 0 N E .- T P a d T 5 t 2 : 3 1 i c c g U 5 i i I i 1 1 2 c ? i ! i f ! , ! , ! 9 f i B c 1 e J j ! ! I ! I I I E 2 : t r Y ; c ? i ! j i I , I 'I U c Y C 8 a i U L L LI E E n F Y C E E 3 .- H a rD Y) 0 9 9 a T E n .- $1 CAPITAL IMPROVEMENT PROGRAM FUND SUMMARY PRIOR YEARS BEGINNING FUND BALANCE (1) NIA YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR5 BUILDOUT 2005-2006 2006-2007 2007-2008 2008-2009 2009-2010 2010++ 5,905,259 7,oa4,iai a,oi9,~3 a,oi9,443 a,oi9,~3 aI551,7a7 REVENUES DEVELOPER FEES TOTAL REVENUES NIA 1,178,922 935,262 532,344 4,516,584 i,i7aI922 935,262 532,344 4,516,584 - BTD#2 REPAYMENT TO GAS TAX FUND BTD#2/POINS€lTIA LANE - REACH E (PARTIAL FUNDING) 350,000 BTD#2/POINSElTlA LANE - REACHES A,B, C F & G & AVIARA PKWY TOTAL PROJECT EXPENDITURES 354000 ENDING FUND BALANCE NIA 2,643,344 9,100,000 1,320,729 - 13,064,073 7,omIi8i 8,019,443 8,019,443 a,oi9,443 al55i,7a7 4,298 (1) Equal to projected fund balance less any continuing appropriations. PRIOR YEARS BEGINNING FUND BALANCE (1) NIA RNENUES GAS TAX LOAN TO BTD#3 CANNON ROAD WEST DEVELOPER FEES TOTAL REVENUES NIA CAPTTALPR03ECTS BlD#3 CANNON ROAD - FROST TO FARADAY (REIMB.) 5,260,226 BlD#3 CANNON ROAD WEST TO GAS TAX FUND TOTAL PROJECT EXPENDITURES 5,260,226 ENDING FUND BALANCE NIA YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR5 BUILWUT 2005-2006 2006-2007 2007-2008 2008-2009 2009-2010 2010++ 561,144 597,752 411,192 502,500 502,500 1,751,660 ~,oQo 36,608 13,440 91,308 1,249,160 2,212,729 36,6oa 413,440 9il3oa 1,249,160 2,212,729 600,000 400,000 1,400,OOO 600,000 - 1,800,000 597,752 411,192 502,500 502,500 1,751,660 2,164,389 CAPITAL IMPROVEMENT PROGRAM FUND SUMMARY COMMUNITY FACILITIES DISTRICT NO. 1 (CFD 1) PRIOR YEARS BEGINNING FUND BALANCE (1) NlA EEYEcuS DEVELOPER SPECIAL TAXES TOTAL REVENUES cMmummm CIVIC CEhmR PUBUC WORKS CENTER LIBRARY EXPANSION (COLE) LIBRARY EXPANSION (LEARNING CENTER -ADVANCE) CFD#l ADMINISRJITION VETERAN'S MEMORIAL PARK FARADAY AVENUE MITIGATION - WJTH OF CANNON 1-5 AND LA COSTA AVENUE AUXILIARY LANES TOTAL PROJECT EXPENDITURES 1,236,302 5,500,000 6,736,302 ENDING FUND BALANCE N/A YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR5 BUILDOUT 44,078,402 45,214,887 37,947,210 40,433,721 18,638,316 21,272,700 2005-2006 2006-2007 2007-2008 2008-2009 2009-2010 2010++ 4,215,847 3,459,807 2,596,510 2,365,595 2,744,384 6,378,003 4,215,847 3,459,807 2,596,510 2,365,595 2,744,384 6,378,003 24,051,000 1,471,964 10,617,484 1,497,398 4,378,600 110,000 110,000 110,000 110,000 110,m 550,000 20,719,680 2,000,000 3,079,362 10,727,404 110,000 24,161,000 110,000 27,648,280 45,214,887 37,947,210 40,433,721 18,638,316 21,272,700 2,422 RANCHO SANTA FE ROAD PROJECT (CFD 2) PRIOR YEARS BEGINNING FUND BALANCE (1) N/A ReVENUES DEVELOPER SPECIAL TAXES/OTHER AGENCIES TOTAL REVENUES N/A - RANCHO SANTA FE ROAD AND OLIVENHAIN IMPROVEMENTS RANCHO SANTA FE ROAD NORM - PHASE I RANCHO SANTA FE ROAD NORM - PHASE I1 (BRIDGE) RANCHO SANTA FE ROAD Socrm 3,800,000 26,406,243 18,419,000 1,350,000 TOTAL PROJECT EXPENDITURES 49,975,243 ENDING FUND BALANCE N/A YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR5 BUILDOUT (940,886) 10,029,693 17,112,443 20,035,489 21,599,639 21,978,889 2005-2006 2006-2007 2007-2008 2008-2009 2009-2010 2010++ 10,970,579 7,082,750 2,923,046 1,564,150 379,250 615,000 10,970,579 7,0a2,750 2,923,046 1,564,150 379,250 615,000 10,029,693 17,112,443 20,035,489 21,599,639 21,978,889 22,593,889 (1) Equal to projected fund balance less any continuing appropriations. CAPITAL IMPROVEMENT PROGRAM FUND SUMMARY GAS TAX FUND PRIOR YEARS BEGINNING FUND BALANCE (1) NIA PRIOR YEARS BEGINNING FUND BALANCE (1) NIA YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR5 8UILDOUT 357,300 357,300 357,300 357,300 357,300 357,300 2005-2006 2006-2007 2007-2008 2008-2009 2009-2010 2010++ RRlENUES GAS TAXES LOAN REPAYMENTS TOTAL REVENUES TOTALPROJECTEXPENDITURES 2,901,200 ENDING FUND BALANCE NIA - GABIANO LANE STORM DRAIN MODIFICATION GAS TAX LOAN BTD#2 GAS TAX LOAN TO BTD#3 CANNON ROAD WEST MLSCELIANEOUS ROAD SUBDRAINS PAVEMENT MANAGEMENT PROGRAM TRAF SIG - ALGA ROAD AND CAZADERO TRAF SIG - FARADAY AVENUE AND PRIESnY DRIVE TRAF SIG - LA COSTA AVENUE AND ESFERA STREET TRAF SIC - PASEO DEL NORTE AND CAR COUNTRY DR TRAF SIG - POINSE'ITIA LANE AND SNAPDRAGON DR VIDEO DETECTION CONVERSION TOTAL PROJECT EXPENDITURES 36,003,000 357,300 357,300 357,300 357,300 357,300 357,300 35,000 2,643,344 L000,000 10,000 4,701,088 210,000 210,000 190,000 0,999,432 ENDING FUND BALANCE YEAR5 BUILDW 3,561,900 4,219,900 5,452,900 6,735,900 0,200,900 9,031,900 YEAR 1 YEAR 2 YEAR 3 YEAR 4 2005-2006 2006-2007 2007-2008 2008-2009 2009-2010 2010++ 1,650,000 1,700,000 1,750,000 1,800,000 1,850,000 19,250,000 1,650,000 1,700,000 1,750,000 1,000,000 1,050,000 22,893,344 3,643,344 400,000 475,000 190,000 210,000 517,000 67,000 277,000 247,000 307,000 435,000 992,000 467,000 467,000 247,000 307,000 645,000 4,219,900 5,452,900 6,735,900 0,200,900 9,031,900 32,000,244 RRleNUCS BOND PROCEEDS ADVANCES TOTAL REVENUES - CARLSBAD MUNICIPAL GOLF COURSE NIA 2,981,200 15,000,000 21,803,000 36,003,000 36,803,000 (1) Equal to projected fund balance less any continuing appropriations, CAPITAL IMPROVEMENT PROGRAM FUND SUMMARY GENERAL CAPITAL CONSTRUCTION (GCC) PRIOR YEARS BEGINNING FUND BALANCE (1) N/A RRlERUES LOAN REPAYMENTS & OMER TOTAL REVENUES - CITY ADMIN TRAINING FACIW (PRE-DESIGN) POLICE & FIRE CAD IMPLEMENTATION FIRE STATION #5 STORAGE BUILDINWRESIROOMS WBUC SAFETY TRAINING FACIW LIBRARY EXPANSION (LEARNING CENTER - ADVANCE) PROPOSITION C PROIECTS COASTAL RAIL TRAIL - CORRIDOR ENHANCEMENT PUBUC WORKS INVENTORY AND FAC MAIM PROGRAM REPAIR RECOATING GUARDRAIL PAR BRIDGE AT CARLSBAD BLVD SAFETY CENTER - BUILDING IMPROVEMENTS SAFETY CENTER - CONFERENCE CENTER REFURBISHMENT SENIOR CENTER COURTYARD LANDSCAPING STAGECOACH PARK PICNIC SHELTER STAGECOACH PARK SYNTHITIC TURF SENIOR CTR EXPANSION - 2ND FLOOR LAKE CALAVERA TRAILS MASTER PLAN/CONSTRUCTION AbGA NORTE PARK - PHASE II (POOL) PROP C FUNDS LEO CARRILLO PARK - EROSION CONTROL LEO CARRILLO - HISTORIC BARN (5Wa GRANT) HIGHLAND DRIVE STORM DRAIN HIGHLAND DRIVE - BETWEEN PINE & BASSWOOD TRAF SIG - AVIARA PARKWAY-WINSElTIA LANE TO EL CAMINO REAL TRAF SIG - AVIARA PKWY AND CAMINO DE LAS ONDAS- REIMB TRAF SIG - CALLE BARCELONA AND PASEO AVELIANO TRAF SIG - CAMINO DE LOS COCHES AND CALLE ACERVO TRAF SIG - CARLSBAD BOULEVARD AND CHERRY AVE TRAF SIG - CARLSBAD VILLAGE DRIVE AND GLASGOW DR TRAF SIG - FARADAY AVE. AND CAMINO HILLS DRIVE TRAF SIG - FARADAY AVENUE AND RLiTHERFORD ROAD TRAF SIG - LA COSTA AVENUE AND LEVANTE TRAF SIG - LA COSTA AVENUE/NUEVA UISnLLA TRAF SIG - MONROE -ET AND HOSP WAY TRAF SIG - WINSETTIA LANE AND BLACKRAIL ROAD TRAF SIG - POINSEmA LANE AND BRIGANTINE ROAD TRAF SIG - RANCHO SANTA FE ROAD AND QUESTHAVEN ROAD TRAF SIG - TAMARACK AVE. AND PONTIAC DRIVE TRAF SIG - TAMARACK AVE. AND VALLEY STREET CARLSBAD BOULEVARD PEDESTRIAN ACCESS SNDY PARK DRIVE, MARINA TO COVE UNDERGROUND DIST. 17 - HARDING, ROOSEVELT GCC LOAN TO FARADAY/MELROSE GCC LOAN TO PIL-NW FOR MADISON ST PROPERTY PURCHASES GCC LOAN TO PIL-NW FOR PINE SCHOOL AcQUISlTION GCC LOAN TO PIL-SE FOR ALGA NORTE LAND ACQUISITION NIA 2,312,228 316,600 950,000 110,000 404,992 157,540 200,000 30,000 100,000 1,600,000 100,000 5,364,000 395,070 199,000 160,000 190,000 210,000 210,000 210,000 125,000 210,000 105,000 509,800 790,854 320,000 860,000 1,250,000 GCC LOAN TO PIL-SW FOR AVIARA PARK TOTALPROJECTEXPENDITURES 17,390,084 N/A YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR5 BUILDOUT 2005-2006 2006-2007 2007-2008 2008-2009 20092010 2010++ 38,781,691 31,813,345 32,866,545 32,720,918 32,620,918 32,400,918 790,854 1,250,000 1,400,000 790,854 100,ooO 600,m 130,000 329,000 397,000 5,875,000 180.000 43,200 105,000 1,250,000 - 1,400,000 22,711,000 196,800 100,000 210,000 185,000 185,000 185,000 185,000 210,000~ 185,000 185,000 145,627 220,000 305,000 7,759,200 196,800 145,627 100,000 220,000 24,546,000 )1,813,345 32,866,545 32,720,918 32,620,918 32,400,918 9,2!%,918 (1) Equal to projected fund balance less any continuing appropriations. CAPITAL IMPROVEMENT PROGRAM FUND SUMMARY GRANTS - FEDERAL PRIOR YEARS BEGINNING FUND BALANCE (1) N/A ROlCNUES TEA 21 TEA (COASTAL RAIL TRAIL) TEA 21 CMAQ (COASTAL RAIL TRAIL) HBBR GRANT (RANCHO SANTA FE ROAD) TOTAL REVENUES N/A UPITAI Pm CARLSBAD BOULEVARD ENCINAS CREEK BRIDGE REPLACEMENT COASTAL RAIL TRAIL (CMAQ) 4,113,784 TOTAL PROJECT EXPENDITURES 4,113,784 ENDING FUND BALANCE YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 BUILDOUT 2005-2006 2006-2007 2007-2008 2008-2009 2009-2010 2010++ 77,138 77,138 77,138 77,138 77,138 77,138 1,804,000 1,804,000 1,804,000 1,804,000 77,138 77,138 77,138 77,138 77,138 77,138 GRANTS - STATE PRIOR YEARS BEGINNING FUND BALANCE (1) RCVENUES GRANT REVENUE TOTAL REVENUES CAPTTALPR<UECTS TOTAL PROJECT EXPENDITURES ENDING FUND BALANCE YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEARS BUILDOUT 2005-2006 2006-2007 2007-2008 2008-2009 2009-2010 2010++ 2,154 2,154 2,154 2,154 2,154 2,154 2,154 2,154 2,154 2,154 2,154 2,154 (1) Equal to projected fund balance less any continuing appropriations. 33 CAPITAL IMPROVEMENT PROGRAM FUND SUMMARY NIA INFRASTRUCTURE MAINTENANCE & REPLACEMENT (IM&I PRIOR YEARS BEGINNING FUND BALANCE (1) NIA 791,986 800,000 8M),000 952,000 787,000 7,870,000 791,986 800,000 800,000 952,000 787,000 7,870,000 REVENUES GENERAL FUND TRANSFER TOTAL REVENUES 42,284,693 CAPITAL PROJECTS BEACH ACCESS STAIRS REPLACEMENT CARLSBAD BLVD STORM DRAIN REPLACEMENT CHASE FIELD LIGHTING IMPROVEMENTS COLE LIBRARY HVAC REPLACEMENT CYNTHIA LANE STORM DRAIN HOLIDAY PARK - RESTROOM IMPROVEMENTS LA COSTA AVE STORM DRAIN REPLACEMENT LAGUNA RIVIERA PARK RESTROOM REPLACEMENT TOT LOT IMPROVEMENTS TRAF SIG - .ECR AND CHESTNUT SIGNAL REPAIRS TRAF SIG - CARLSBAD BLVD &TAMARACK SIGNAL REPAIRS TRAF SIG - ECR AND TAMARACK SIGNAL REPAIRS VARIOUS FACIUTY CONCRETE REPAIRS TOTAL PROJECT EXPENDITURES 2,890,840 800,000 800,000 1,212,000 787,000 7,870,000 NIA ENDING FUND BALANCE NIA 300,000 80,000 300,000 63,900 305,808 170,000 162,000 256,265 1,637,973 2,160,761 2,160,761 2,160,761 1,900,761 1,900,761 1,900,761 ENDING FUND BALANCE NIA YEARS BEGINNING FUND BALANCE (1) NIA I I YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 BUILDOUT 2005-2006 2006-2007 2007-2008 2008-2009 2009-2010 2010++ 884,332 981,241 1,070,664 1,263,315 1,359,390 1,443,869 2005-2006 2006-2007 2007-2008 2008-2009 2009-2010 2010+ t 17,402,730 18,652,880 23,150,880 27,823,880 32,765,880 38,001,880 NIA 4,250,000 4,498,000 4,673,000 4,942,000 5,236,000 64,336,000 4,250,000 4,498,000 4,673,000 4,942,000 5,236,000 64,336,000 217,500 96,910 89,423 192,651 96,075 84,479 1,639,649 96,910 89,423 192,651 96,075 84,479 1,639,649 1,200,700 100,000 225,000 492,150 90,000 97,500 206,000 230,000 141,000 CAPITAL PROJECTS BUSINESS PARK RECREATIONAL FACILITY TOTAL PROJECT EXPENDITURES 2,999,850 18,652,880 23,150,880 27,823,880 32,765,880 38,001,880 102,337,880 2,967,400 2,967,400 OTHER PRIOR I YEARl YEAR 2 YEAR 3 YEAR 4 YEAR 5 BUILDOUT YEARS - BEGINNING FUND BALANCE (1) NlA 2005-2006 2006-2007 2007-2008 2008-2009 2009-2010 2010++ 4,259,615 2,160,761 2,160,761 2,160,761 1,900,761 1,900,761 REVENUES GENERAL FUND TRANSFERS/LOANS TOTAL REVENUES CAPITAL PROJECTS LIBRARY EXPANSION (LEARNING CENTER) COASTAL RAIL TRAIL OPPORTLINImC SAND TRAF SIG - AVIARA PARKWAY-POINSETTIA LANE TO EL CAMINO REAL COLLEGE BLVD REACH A AND CANNON REACH 4A COLLEGE/CANNON ASSESSMENT DISTRICT FARADAY AVENUE AND MELROSE DRIVE EXTENSIONS PAVEMENT MANAGEMENT PROGRAM POINSETTIA LANE EAST OF EL CAMINO REAL FINANCING PROGRAM FARADAY/MELROSE TO GCC TOTAL PROJECT EXPENDITURES 766,177 184,176 57,240 603,000 405,000 10,314,481 1,021,826 28,932,793 191,986 260,000 1,308,000 600,000 800,000 800,000 952,000 787,000 7,870,000 PARK FEE ZONES 5,13,16 PRIOR I YEARl YEAR 2 YEAR 3 YEAR 4 YEAR 5 BUILDOUT I ENDING FUND BALANCE NIA I 981,241 1,070,664 1,263,315 1,359,390 1,443,869 116,118 (1) Equal to projected fund balance less any continuing appropriations. 33 CAPITAL IMPROVEMENT PROGRAM FUND SUMMARY PRIOR YEARS BEGINNING FUND BALANCE (1) NIA YEAR5 BUILDOUT YEAR 1 YEAR 2 YEAR 3 YEAR 4 151,197 160,086 391,190 533,407 1,173,386 1,653,371 2005-2006 2006-2007 2007-2008 2008-2009 2009-2010 2010++ ReVeNUeS DEVELOPER FEES TOTAL REVENUES NIA 1,886,766 - HIDDEN CANYON PARK (22.3 ACRES) 8,889 231,104 142,218 639,979 479,984 2,688,802 8,889 231,104 142,218 639,979 479,984 2,688,802 PARK Sm DMLOPMENT (15 ACRES) TOTAL PROJECT EXPENDITURES 1,886,766 4,000,000 - 4,000,000 ENDING FUND BALANCE NIA I 160,086 391,190 533,407 1,173,386 1,653,371 342,172 YEARS BEGINNING FUND BALANCE (1) N/A PARK-IN-LIEU NW PRIOR YEARS BEGINNING FUND BALANCE (1) N/A 2005-2006 2006-2007 2007-2008 2008-2009 2009-2010 2010++ 1,265,874 1,854,743 822,514 822,514 822,514 822,514 ReVeNUeS DEMLOPER FEES LOAN FROM GCC TOTAL REVENUES NIA - PARKLAND ACQUISlTION PINE AVENUE PARK - PINE COMMUNITY BUILDING - PHASE I1 PIL-NW TO GCC FOR MADISON ST PROPERM PURCHASES 588,870 217,771 588,870 217,771 PIL-NW TO GCC FOR PINE SCHOOL ACQuISITION TOTAL PROJECT EXPENDITURES - LEO CARRIUO PARK - PHASE I11 PIL-SE TO GCC FOR ALGA NORTE LAND ACQUISITION TOTAL PROJECT EXPENDmRES ENDING FUND BALANCE NIA 800,000 - 1,250~000 800,000 1,250,000 YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR5 BUILDOUT YEARS BEGINNING FUND BALANCE (1) NIA I 2005-2006 2006-2007 2007-2008 2008-2009 2009-2010 2010++ 1,249,348 1,311,621 1,418,376 1,605,196 1,664,504 6,085 2005-2006 2006-2007 2007-2008 2008-2009 2009-2010 2010++ 357,645 653,191 853,185 913,183 948,737 950,960 62,273 106,754 186,820 59,308 121,581 1,467,873 N/A 220,000 62,273 106,754 186,820 59,308 341,581 1,467,873 295,546 199,994 59,998 35,554 2,222 1,291,635 295,546 199,994 59,998 35,554 2,222 1,291,635 600,000 1,400,000 320,000 PIL-SW TO GCC FOR AW PARK TOTAL PROJECT EXPENDITURES 238,000 I 1,080,000 - 2,000,000 1,400,000 305,000 - 2,230,000 1,311,621 1,418,376 1,605,196 1,664,504 6,085 73,958 PARK-IN-LIEU SE PRIOR I YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 BUILDOUT ReVeNUeS DEVELOPER RES TOTAL REVENUES ENDING FUND BALANCE N/A I 1,854,743 822,514 822,514 822,514 822,514 22,514 PARK-IN-LIEU SW YEAR5 BUILDOUT PRIOR I YEAR1 YEAR 2 YEAR 3 YEAR 4 REY€w!s DEVELOPER FEES TOTAL REVENUES - AVIARA COMMUNITY PARK COMMUNIW BUILDING AVIARA REIMBURSEMENT AGREEMENT 238,000 1,925,000 1 N/A I 653,191 853,185 913,183 948,737 950,960 12,595 (1) Equal to projm3ed fund balance less any continuing approprlationr. CAPITAL IMPROVEMENT PROGRAM FUND SUMMARY PLANNED LOCAL DRAINAGE AREA FEES (PLDA) PRIOR YEARS BEGINNING FUND BALANCE (1)- NIA DNELOPER FEES TOTAL REVENUES NIA AGUA HEDIONDA CHANNEL (PLDA "6") AVIARA PARKWAY STORM DRAIN REIMBURSEMENT (PLDA "C") COLLEGE BLVD/CANNON RD (El AND CALAVERA CR. CHANNEL) COLLEGE BLVD. BRIDGE FACILITY BL (REIMBJPLDA "B") FARADAY/MELROSE DRAINAGE FACILITIES (PLDA "B") 300,000 HIGHLAND DRIVE STORM DRAIN 450,600 MmR PLAN UPDATE 454,933 MISCELLANEWS MASER DRAINAGE FACILITIES PARK DRIVE AND TAMARACK AVENUE STORM DRAIN (PLDA "6") 1,260,500 290,000 2,778,833 COLLEGE BLVD/CANNON RD (WIN BIB - REIMBJPLDA "B') (FEMA + P 830,910 TAMARACK AND ECR STORM DRAIN AND SILT. BASIN (REIMBJPLDA "B TOTAL PROJECT EXPENDITURES 6,365,776 ENDING FUND BALANCE NIA YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 BUILDOUT 2005-2006 2006-2007 2007-2008 2008-2009 2009-2010 2010++ 5,690,533 7,110,428 8,295,588 8,742,642 9,295,394 9,800,058 1,419,895 1,185,160 447,054 552,752 504,664 6,447,264 1,419,895 1,185,160 447,054 552,752 504,664 6,447,264 1,783,000 10,936,000 500,000 1,279,000 - 14,498,000 7,110,428 8,295,588 8,742,642 9,295,394 9,800,058 1,749,322 PUBLIC FACILrrY FEE FUND (PFF) PRIOR YEARS BEGINNING FUND BALANCE (1) NIA BlxEWEs DMLOPER FEES PROP 12 AND PROP 40 GRANT FUNDS TOTAL REVENUES NIA FIRE STATION #3 RELOCATION FIRE STATION #6 (PERMANENT) LIBRARY EXPANSION (COLE) PINE AVENUE PARK - PHASE I PINE AVENUE PARK - PINE COMMUNrrY BUILDING - PHASE I1 PARK SITE ACQuISlTfON (15 ACRES) NE QUADRANT PARK AVIARA COMMUNrPl PARK (24.25 ACRES) * AVIARA COMMUNITY PARK COMMUNITY BUILDING WINSETnA COMMUNITY PARK - PHASE I1 ALGA NORTE PARK - PHASE I (30 ACRES) ALGA NORTE PARK - PHASE I1 (POOL) LEO CARRILLO PARK - PHASE I11 TRAF SIG - CAMINO DE LOS COCHES AND LA COSTA AVENUE TRAF SIG - CAMIN0 VIDA ROBLE AND YARROW DRIVE TRAF SIG - CANNON ROAD AND AVENIDA ENCINAS TRAF SIG - CANNON ROAD AND COLLEGE BOULEVARD TRAF SIG - COLLEGE BOULEVARD AND CARLSBAD VILLAGE DR - Reimb TRAF SIG - EL CAMIN0 REAL AND POINSE'ITA LANE TRAF SIC - MELROSE DRIVE AND LA COSTA AVENUE TRAF SIG - PALOMAR AIRPORT ROAD AND MELROSE DRIVE TRAF SIG - POINS€ITIA LANE AND EL FUERTE STREET (REIMB) TRAF SIG - RANCHO SANTA FE ROAD AND CALLE JUNIPER0 TRAF SIG - TAMARACK AVENUE AND GARFIELD STREET CARLSBAD BOULEVARD MEDIAN-TAMARACK AVENUE TO PINE AVENUE EL CAMINO REAL MEDIANS 3,600,500 7,082,000 4,550,000 10,700,000 12,561,308 500,000 150,000 204,250 250,000 210,000 909,500 EL CAMINO REAL MEDIANS - LA COSTA 90,500 TOTAL PROJECT EXPENDITURES 4Q,808,058 ENDING FUND BALANCE NIA YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 BUILDOLJT 2005-2006 2006-2007 2007-2008 2008-2009 2009-2010 2010++ 6,384,248 4,627,517 7,539,505 9,411,220 10,164,706 7,546,847 4,634,018 2,911,988 2,135,835 4,194,766 3,879,141 18,912,262 1,616,750 6,m,768 2,9iiI9aa 2,135,835 4,194,766 3,879,141 18,912,262 264,120 2,902,280 1,799,500 6,208,000 9,400,000 539,000 5,653,000 5,444,000 844,000 10,801,000 1,900,000 185,000 185,000 210,000 210,000 185,000 210,000 210,000 1,398,000 960,000 8,007,500 264,120 3,441,280 6,497,000 31,298,000 4,627,517 7,539,505 914111220 1011641706 7,546,847 (4,830,892) I* 5 mm=l tn nmiartmi fiinrl halmrp less anv mntinuina aaamariations. CAPITAL IMPROVEMENT PROGRAM FUND SUMMARY YEARS BEGINNING FUND BALANCE (1) NIA I I REDEVELOPMENT - VILLAGE 2005-2006 2006-2007 2007-2008 2008-2009 2009-2010 2010++ 100,000 325,000 325,000 325,000 325,000 PRIOR I YEAR1 YEAR 2 YEAR 3 YEAR 4 YEAR5 BUILDOUT N/A 815,000 225,000 850.000 815,000 225,000 850,000 REYEcUs TAX INCREMENT AND LOANS TOTAL REVENUES Nf A 451,000 451,000 - VILLAGE PUBUC PARKING ENHANCEMENT PROGRAM SENIOR CIR EXPANSION ~ 1ST FLOOR CARLSBAO ELM). AT STATE ST - INTERSMION ENHANCEMEKT DESIGN TOTAL PROJECT MPENDINRES 850,000 615,000 lo0,Oao 715,000 850,000 I ENDING FUND BALANCE N/A I 100,000 325,000 325,000 325,000 325,000 325,000 I REDEVELOPMENT - SCCRDA PRIOR I YEAR1 YEAR 2 YEAR 3 YEAR 4 YEAR5 BUILDOUT YEARS Nf A BEGINNING FUND BALANCE (1) I 2005-2006 2006-2007 2007-2008 2008-2009 2009-2010 2010++ 464 464 464 464 464 464 REVENUES TAX INCREMENT AND LOANS TOTALREVENUES I - I CARLSBAD BLlrD. AT BRW(WATER ROAD - LEFT TURN LANE 243,150 tARLsBAD BOULEVARD ENCINAS CREEK WDGE RCPLACEMEKT 41,453 TOTAL PROJECT MPENDINRES 284,603 I ENDING FUND BALANCE 464 464 464 464 464 451,464 SEWER BENEFIT AREA FEES (SBA) PRIOR YEARS Nf A BEGINNING FUND BALANCE (1) REVENUES TOTAL REVENUES WA - DEVELOPER FEES CARLSBAD TRUM SMRI REACHES VCTlA, VCTlB, W31C (Sen 'A") S8A AT0 SEWER REPLACEMENT FOR UIRLSBADTRUNK SEWER SM C,D,E,F TO SEW REPL FOR S AGUA HEDIONDA INTERCEPTOR XWM AGUA HEDIONDA LIFT STATION AND FORCE MAIN 8,827,415 TOTAL PROJECT EXPENDITURES 8,827,415 ENDING FUND BALANCE NfA YEAR 1 YEAR2 YEAR 3 YEAR 4 YEAR5 BUILDOUT 2005-2006 2006-2007 2007-2008 2008-2009 2009-2010 2010++ 2,109,761 2,701,330 1,551,679 1,961,133 2,528,121 2,998,726 591,569 850,349 509,454 970,588 470,605 4,222,500 591,569 850,349 509,454 970,588 470,605 4,222,500 100,000 403,600 400,000 2,000,000 3,270,000 - 2,000,000 100,000 403,600 - 3,670,000 2,701,330 1,551,679 1,961,133 2,528,121 2,998,726 3,551,226 SEWER CONNECTION FEE FUND PRIOR YEARS BEGINNING FUND BALANCE (1) NfA B€wi!m DWELOPER FEES OTHER AGENCf CONTRIBUTIONS (VETA) TOTAL REVENUES NfA - FLOW EQUALIZATION PROJM 2,557,571 PHASE N MPANSION - DEBT SERVICE PHASE V EXPAFEjION 8,358,849 TECHNou)(jy ENHANCEMENT 633,717 WENA VISTA LIFT STATION FORCE MAIN BUENA VISTA LIFT STATION 632,132 SEWER MONITORING mRAM VISTNCAR!5BAD INTERCEPTOR AGUA HEDIONDA LIFT STATION (VC12) 1,119,360 VISTNCARLSBAD INTERCEPTOR REAcn VCllE 2,924,000 VISTNCAWBAD INTERCEPTOf? REACH VC13 TO VC15 500,000 VISTB&MLSW IFmRcEPTOR RERACEMEKT R€ACH 3 TOTAL PROJECT MPENDINRES 16,725,629 YEAR1 YEAR2 YEAR3 YEAR 4 YEAR5 BU1UX)UT 2005-2006 2006-2007 2007-2008 2008-2009 2009-2010 2010++ 19,156,283 20,968,815 16,369,988 11,202,306 10,433,916 11,458,374 1,147,789 795,994 813,062 1,039,418 828,104 7,553,841 6,352,359 6,931,762 3,031,763 1,151,360 1,151,360 1,233,613 7,500,148 7,727,756 3,844,825 2,190,778 1,979,464 8,787,454 936,394 933,944 935,506 937,169 933,006 4,651,966 2,804,221 1,376,800 22,000 22,000 22,000 22,000 22,000 220,000 100,640 7,555,000 625,000 1,300,000 11,200,000 70,000 500,000 2,000,000 5,687,615 12,326,584 9,012,506 2,959,169 955,006 6,248,766 ENDING FUND BALANCE NfA 20,968,815 16,369,988 11,202,306 10,433,916 11,458,374 13,997,062 (1) Equal to pmjected fund balance less any continuing appropriations. CAPnAL IMPROVEMENT PROGRAM FUND SUMMARY YEARS BEGINNING FUND BALANCE (1) N/A SEWER REPLACEMENT FUND PRIOR YEARS BEGINNING FUND BALANCE (1) N/A 2005-2006 2006-2007 2007-2008 2008-2009 2009-2010 2010++ 4,675 4,675 4,675 4,675 4,675 4,675 5!i!mus TRANSFER FROM OPERATING FUND LOAN REPAYMENTS TOTAL REVENUES RIA CAPTTALPR03ECTS PUBLIC WORKS CENTER BUILDING IMPROVEMENTS CAPITAL ACQUISITIONS/REPLACEMENT/REHAB PUMP STATION INTERFACES STAFFING/PROF. SERVICES AND MISC. TECHNOLOGYENHANCEMENT AVENIDA ENCINAS GRAVITY SEWER FOREST GRAVITY SEWER HOME PLANT LIFT STATION REHABILITATION LA COSTA MEADOWS SEWER EXTENSION LA GOLONDRIA SEWER EXENSION NORTH AGUA HEDIONDA INTERCEPTOR REHAB - EAST SEGMENT NORTH AGUA HEDIONDA INTERCEPTOR - WEST SEGMENT FARADAY AVENUE - ORION TO MELROSE SEWER HOME PLANT - PIPELINE REPLACEMENT NORTH AGUA HEDIONDA TRUNK SEWER REACH NAHTlA NORTH BATIQUITOS INTERCEPTOR REHABILITATION NORTH BATIQUITOS SEWAGE LIFT STATION MODIFICAnONS POINS€ITIA LANE SEWER RELOCATION - Reimb POINS€ITIA SEWAGE LIFT STATION ODOWNOISE ABATEMENT SEWER LIFT STATION REPAlRS AND UPGRADES SEWER LINE REFURBISHMENTWREPLACEMENT SEWER MASER PLAN/CONNECTION FEE UPDATE VISrNCARLSBAD INTERCEPTOR REHAB REACHES 1 AND 2 BUENA INTERCEPTOR SEWER IMPROVEMENTS TERRAMAR LIFT STATION EMERGENCY GENERATOR PHASE I1 LOAN TO RECYCLED WATER 250,000 250,000 N/A 3,046,9 2 6 2,540,404 30,836 351,898 110,200 900,000 50,000 620,000 3,630,000 1,100,000 607,000 400,000 40,000 580,380 600,000 7 5 2,O 7 5 14,500,000 CAPTTALPR03ECTS PEDEmN MASER PLAN TOTAL PROJECI EXPENDITURES ENDING FUND BALANCE N/A SEWER REPL TO SEW BENEF A FOR CARLSBAD TRUNK SEWER 5,270,000 TOTAL PROJECT EXPENDITURES 35,569,719 ENDING FUND BALANCE N/A 250,000 250,000 4,675 4,675 4,675 4,675 4,675 4,675 YEAR 1 YEAR 2 YEAR3 YEAR 4 YEAR5 BUILDOUT 2005-2006 2006-2007 2007-2008 2008-2009 2009-2010 2010++ 10,859,453 10,221,127 7,504,867 7,122,735 8,441,314 10,185,532 2,460,000 2,521,500 2,584,538 2,649,151 2,715,380 27,153,800 2,m,000 3,670,000 2,460,000 4,521,500 2,584,538 2,649,151 2,715,380 30,823,800 467,273 276,403 160,000 654,000 547,750 99,000 330,000 78,900 460,000 25,000 2,810,000 442,474 254,303 266,963 650,000 73,000 114,220 243,800 330,000 1,880,000 173,000 738,974 150,696 1,667,000 80,OoO 330,000 385,187 423,803 5,563,828 115,385 117,359 1,242,001 100,OOO 100,000 500,000 330,000 330,000 3,394,600 354,200 400,000 3,098,326 7,237,760 2,966,670 1,330,572 971,162 11,054,629 10,221,127 7,504,867 7,122,735 8,441,314 10,185,532 29,954,703 TDA - LOCAL TRANSPORATATION FUNDS PRIOR I YEAR1 YEAR 2 YEAR 3 YEAR 4 YEAR5 BUILDOUT REVENUES TDA GRANT TOTAL REVENUES (1) Equal to projected fund balance less any continuing approprbtlonr. CAPITAL IMPROVEMENT PROGRAM FUND SUMMARY ~ TRANSNET/BICYCLE PRIOR I YEAR1 YEAR 2 YEAR 3 YEAR 4 YEAR5 BUILDOUT TRAFFIC IMPACT FEES (TIF) PRIOR YEARS BEGINNING FUND BALANCE (1) N/A COASTAL RAILTRAIL 221,801 TOTAL PROJECT EXPENDITURES 221,801 ReVENUES DEVELOPER FEES MIX. REIMBURSEMENlS TOTAL REVENUES 150,000 - SIDEWALWSTREET CONSTRUCTION PROGRAM TRAF SIG - FARADAY AVENUE AND ORION STREF AVENIDA ENUNAS WIDENING - SOUM OF PALOMAR AIRPORT ROAD CARLSBAD BOULEVARD WIDENING - CANNON TO MANZANO CARLSBAD VILLAGE DRIVE WIDENING EL CAMINO REAL AND CARLSBAD VILLAGE DRM EL CAMINO REAL AND FARADAY AVENUE EL CAMINO REAL AT AVIARA PARKWAY/ALGA ROAD EL CAMINO REAL WIDENING - LA COSTA AVENUE TO ARENAL ROAD EL CAMINO REAL WIDENING - TAMARACK AVENUE TO CHESTNUT AVE. EL CAMINO REAL WIDENING - S CH€STNUT/S ALGA MELROSE DRIVE AND ALGA ROAD PALOMAR AIRPORT ROAD AND COLLEGE BOULEVARD PALOMAR AIRPORT ROAD WIDENING AT PASEO DEL NORTE POINSEmA LANE WIDENING (PASEO DEL NORTE TO BATIQUITOS LN) YEARS BEGINNING FUND BALANCE (1) N/ A 1,134,259 172,570 1,382,708 522,115 525,000 2005-2006 2006-2007 2007-2008 2008-2009 2009-2010 2010++ 169,268 169,268 169,268 169,268 169,268 169,268 TRAFFIC MONITORING PROGRAM 160,611 TOTAL PROJECT EXPENDITURES 3,897,263 ENDING FUND BALANCE YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR5 BUILDOUT 2005-2006 2006-2007 2007-2008 2008-2009 2009-2030 2010++ 6,498,412 6,587,843 7,210,879 7,996,013 8,943,980 9,634,711 1,377,861 993,035 1,155,135 1,317,967 1,060,731 10,008,825 357,000 1,377,861 993,035 1,155,135 1,317,967 1,060,731 10,365,825 300,000 300,000 300,000 300,000 300,000 1,200,000 210,000 983,000 2,260,000 1,423,000 320,000 282,000 508,000 708,430 542,000 160,000 2,113,000 70,000 70,000 70,000 70,000 70,000 700,000 1288,430 370,000 370rOOO 370,000 370,000 l0~91,OOO 6,587,843 7,210,879 7,996,013 0,943,980 9,634,711 9,509,536 YEARS BEGINNING FUND BALANCE (1) NIA RRlENUES TRANSNET REVENUE TOTAL REVENUES CAPTTALPR03ECTS BICYCLE MASlER PLAN 2005-2006 2006-2007 2007-2008 2008-2009 2009-2010 2010++ 4,936 4,936 4,936 4,936 4,936 4,936 150,000 150,000 - 1 150,m ENDING FUND BALANCE NIA I 4,936 4,936 4,936 4,936 4,996 4,936 TRANSN ET/ HIG HWAY YEAR5 BUILDOUT PRIOR I YEAR1 YEAR 2 YEAR 3 YEAR 4 RMNUES TRANSNET REVENUE TOTAL REVENUES - CANNON ROAD REACH 48 1,761,000 TOTAL PROJECT EXPENDITURES 1,761,000 ENDING FUND BALANCE 169,268 169,268 169,268 169,268 169,268 169,268 (1) Equal to projected fund balance less any continuing appropriations. CAPITAL IMPROVEMENT PROGRAM FUND SUMMARY YEARS BEGINNING FUND BALANCE (1) N/A TRANSNET- LOCAL PRIOR YEARS BEGINNING FUND BALANCE (1) NIA 2005-2006 2006-2007 2007-2008 2008-2009 2009-2010 2010++ 2a4,aso 2m,ago 2a4,ago 2.~4~890 2a4,ago 2~~890 ReVENUCS TRANSPORTATION TAXES TOTAL REVENUES - TRAF SIC - EL CAM. REAL/PWMARRON/HOSP WY CARLSBAD BOULEVARD RElROFXT OVER SDNR EL CAMINO REAL WIDENING - USA SmEET TO CRESMEW DR (LOAN) EL CAMINO REAL WIDENING - NORM OF COUGAR DRIVE (LOAN) 1,311,000 1,100,000 493,000 PAVEMENTMANAGEMENTPROGRAM 14,919,348 TOTAL PROJECT EXPENDITURES i7,a23,34a ENDING FUND BALANCE NlA YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR5 BUILDOUT 2005-2006 2006-2007 2007-2008 2008-2009 2009-2010 2010++ 2,456,703 2,3a4,703 1,6a9,703 2,004,703 2,004,703 2,004,703 2,528,000 2,764,000 2,915,000 2,648,000 2,813,000 28,130,000 z,52a,oo0 2,7ij4,~)0 2,9is,ooo 2,64a,000 z,ai3,000 2a,i301000 959,000 TRANSNET - SURFACE TRANSPORTATION PROGRAM (STP) PRIOR I YEAR1 YEAR 2 YEAR 3 YEAR 4 YEAR5 BUILDOUT REVENUCS SIP REVENUE TOTAL REVENUES I N/A CAPTTALPR<UECTS TOTAL PROJECT EXPENDITURES (1) Equal to the projected fund balance less any continuing appropriations. CAPITAL IMPROVEMENT PROGRAM FUND SUMMARY YEARS BEGINNING FUND BALANCE (1) N/A WATER - MAJOR FACILITY FEE FUND PRIOR YEARS BEGINNING FUND BALANCE (1) NIA BE!mLm DEVELOPER FEES 2005-2006 2006-2007 2007-2008 2008-2009 2009-2010 2010++ (8,707,608) 6,773,286 1,866,542 1,866,542 1,866,542 1,866,542 TOTAL REVENUES RECYCLED WATER TO WATER REPLACEMENT TOTAL PROJECT EXPENDITURES 45,375,392 - "D" RESERVOIR - PHASE I1 CALAVERA HILLS WATER BOOSTER STATION STANDBY GENERATOR CANNON ROAD EAST OF EL CAMINO REAL - Reimb COLLEGE BOULEVARD - L4NNON RD TO CARLSBAD VILLAGE DR - Reimb COLLEGE BOULEVARD (ECR TO CANNON ROAD) - Reimb EL CAMINO REAL BEMlEEN COLLEGE AND IACKSPAR EL CAMINO REAL CROSSING AT KELLY DRIVE EL CAMINO REAL TRANSMISSION MAIN - USA SIREI3 TO KELLY DRIVE EL FUERTE - NORTH OF LOKER - Reimb EL FUERTE - POINSETTIA LANE TO PALOMAR AIRPORT ROAD - Reimb FARADAY AVENUE - ORION TO MELROSE WATERLINE - Reimb FARADAY AVENUE EXTENSION - Reimb COLLEGE BOULEVARD - CANNON TO BADGER LANE EL FUERTE - ALGA ROAD TO POINS€ITIA LANE - Reimb MAERKLE WMP STATION IMPROVEMENTS MAERKLE RESERVOIR STORAGE (TAP #2) MASER PLAN UPDATE MARRON ROAD - PRESSURE REGULATING STATION TO OCEANSIDE MELROSE DRIVE - PALOMAR AIRPORT ROAD TO FARADAY - Reimb PALOMAR AIRPORT - NORTH OF OWENS PAWECR PUMP STATION POINSm LANE - EL CAMINO REAL TO SKIMMER CT (Reimb) POINSETTIA LANE EAST OF BLACK RAIL ROAD 12" PRESSURE REGULATING STATION - CANNON AND COLLEGE - Reimb RANCHO CARRILLO OVERSIZING/D(TENSION POINSElTIA LANE - SKIMMER CT TO CASSIA PRESSURE REDUCING STATION - SYCAMORE CREEK 7,250,000 7,250,000 7,250,000 7,250,000 WATER CONNECTION TO WATER REPLACEMENT TOTAL PROJECT EXPENDITURES 5,560,210 ENDING FUND BALANCE NIA N/A 700,000 50,000 148,750 2,000,000 1,141,000 97,210 150,000 933,250 250,000 90,000 YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR5 BUILDOUT 2005-2006 2006-2007 2007-2008 2008-2009 2009-2010 2010++ 9,438,231 10,146,965 10,897,087 9,383,668 1,460,640 2,940,520 2,061,334 1,266,123 1,111,980 4,777,273 1,479,880 10,734,075 2,061,334 1,266,123 1,111,980 4,777,273 1,479,880 10,734,075 50,000 398,200 760,800 714,100 466,000 104,OOO 420,000 716,800 12,700,300 796,300 64,100 3,700 5,715,200 691,600 747,100 684,000 47,800 224,800 342,000 205,500 112,100 3,000,00o 1,352,600 516,000 2,625,400 12,700,300 - 11,770,100 10,146,965 10,897,087 9,383,668 1,460,640 2,940,520 1,904,495 WATER - RECYCLED WATER FUND YEAR5 BUILDOUT PRIOR I YEAR1 YEAR 2 YEAR 3 YEAR 4 RRlENUES LOANS & GRANTS . CONNECnON FEES TOTAL REVENUES - RECYCLED WATER PH I1 - FACIUM RECYCLED WATER PH I1 - FLOW EQUALIZATION RECYCLED WATER PH I1 - MAHR RESERVOIR IMPROV. RECYCLED WATER PH I1 - PIPELINES RECYCLED WATER PH I1 - WMP STATIONS 12,165,018 4,093,279 2,346,000 21,852,521 4,918,574 20,336,144 634,146 2,394,750 1,709,110 22,730,894 2,343,256 ENDING FUND BALANCE NIA I 6,773,286 1,866,542 1,866,542 1,866,542 1,866,542 1,866,542 (1) Equal to the projeetfxl fund balance less any continuing appropriations. CAPITAL IMPROVEMENT PROGRAM FUND SUMMARY WATER REPLACEMENT FUND PRIOR YEARS BEGINNING FUND BALANCE (1) NIA REVENUES TRANSFER FROM OPERATING FUND LOAN REPAYMENTS TOTAL REVENUES NIA ECWAMARACK PUMP STATION REMOVAL 1-5 RECYCLED WATER TRANSMISSION LINE LA COSTA GOLF COURSE RW SERVICE PUMP STATION REMOVAL WBUC WORKS CENTER "D" RESERVOIR - PHASE I1 "D" RESERVOIR - BLACKRAIL ROAD IMPROVEMENTS "D" RESERVOIR IMPROVEMENTS AVIARA PARKWAY AT PWM TREE CARLSBAD BOULEVARD - solml OF AVENIDA ENCINAS COLLEGE BOULEVARD- MAERKLE RESERVOIR TO AGUA HEDIONDA CREE CRESNIEW DRIVE TRANSMISSION MAIN DEMOLITION OF WATER FACILITIES AT PAlAMA DRIVE DESALINATION CROUNDWATEWSEAWATER SNDY EL WINO REAL TRANSMISSION MAIN FROM FARADAY TO COUGAR DR EL WINO REAL/CARLSBAD VILL DR PIPEUNE REPL. EL FUERTE AND CORINTIA STREET FOUSSAT ROAD WELL ABANDONMENT LAKE C4LAVERA RESERVOIR IMPROVEMENTS MAERKLE PUMP STATION IMPROVEMENTS MISCELLANEOUS PIPELINE REPLACEMENT PROJECTS MISCELLANEOUS STORAGE TANK REPAIRS MISCELLANEOUS WATER RESERVOIR FENCING OCEANSIDE INTERTIE UPGRADE PAWECR PUMP STATION POINWTIA LANE EAST OF BLACK RAIL ROAD 12" RANCHO SANTA FE RD PIPELINE REPLACEMENT SAN MARCOS BOULEVARD WEST OF SDCWA TANGLEWOOD PRESSURE REDUCING STATION REPLACEMENT TAP RESERVOIR EXTERIOR PAINTING WATER OPERATIONS WATER WMP PROJECT WATER SYmM INTERTIE CONNECTION CHESMUT AVENUE RECYCLED WATER LINE PASEO DEL NORTE RECYCLED PIPEUNE REPLACEMENT EL WINO REAL - PALOMAR AIRPORT ROAD Solrm POINSE"+ LANE - SKIMMER CT TO WSIA WATER REPLACEMENT TO WATER CONNECTION TOTAL PROJECT EXPENDITURES 13,868,251 182,SC 156,OC 60.00 3,225,W 710,OO 50,OO 202,50 2,675,OO 600,OO 110,OO 933,25 773,oa 2,656,OO 300,OO 120,oo 55,OO 400,oo 660,OO ENDING FUND BALANCE NIA YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR5 BUILDOUT 2005-2006 2006-2007 2007-2008 2008-2009 2009-2010 2010++ 6,957,841 14,345,559 17,207,119 16,851,884 16,361,520 20,046,202 2,910,723 3,210,660 3,557,165 3,620,136 3,684,682 40,772,609 7,250,000 7,250,000 3,000,000 10,160,723 10,460,660 3,557,165 3,620,136 3,684,682 43,772,609 133,305 442,700 495,000 64,100 15,000 492,600 400,000 161,000 10,400 57,100 345,000 32,000 12,700 5,900 39,000 67,200 5,877,500 360,000 525,500 400,000 436,100 76,500 86,000 439,400 2,760,000 30,000 847,200 113,900 149,400 409,800 110,700 1,905,000 719,260 747,100 436,100 205,400 3,000,000 2,773,005 7,599,100 3,912,400 4,110,500 - 4,012,860 14,345,559 17,207,119 16,851,884 16,361,520 20,046,202 59,805,951 (1) Equal to the projected fund balance less any continuing appropriations. Kaplanek Greg.CSLHO7 ~r_.CIW.W.r.'.-r."*...,...~".. -.-u-..~4,.rr"-.-.....T-.".r ...... ..."...".. .-,-,-..VI".~.I.LI.- ..... I.,>.. U..*......l.l. * .,...... I,...,. %.,?, ~ ,."., % ......,..-. ..,.. ._,,.,..*,,.. ..,, ..,......... ._..,,, ~* .....,_ \ _1 ._ ~", _,_.._,,.. ~,~ __ __ From: Kaplanek Greg-CSLH07 Sent: Tuesday. May 17,2005 2:46 PM To: Ken Price cc: Coach Mlsha Buchel; Coach Bob HofC Doug Kamon; John Labeta; Steve Levy: Coach Mike Miller; Garry Thomton Su bJect! Alga Notte Community Park 8 Aquatics Complex-Letter Of Intent from La Costa Canyon High School Importance: High Attachments: LCC-Carlsbad City Council LOf-Alga Node Aquatics Compfex.pdf Ken Price, Ci of Carlsbad Recreation Director: The attached file is a Letter Of Intent prepared by the La Costa Canyon High School Administration to be presented at the Carlsbad City Cauncil Meeting tonight. The letter describes the request of LCCHS to be a year-Bund tenant of the planned Alga Node Aquatics Complex for all aquatics programs at the school. The purpose of this document is to help support the approval of the Alga Node Community Park & Aquatics Complex to be mnstruded as planned. Thank you for allowing LCCHS to be considered in the approval process for this project. Sincerely, Greg Kaplanek LCC Pool Committee Ps. 1- also copied the LCC staff involved witb the equatics programs that support this project; Steve Levy, Principal Doug Kamon, Assistant Principal Gary Thorntan, Assistant Principal John Labeta, Athletic Director Mike Miller, Water Polo Coach Misha Buchel, Water Polo Coach Bob Hoff, Swim Coach AGENDA ITEM # /b c: City Council Mayor city Msnager CityAttornbjr Qtr-k San Dieguito Union High kbl Districl 710 Encinitas Bhd. Ednh, 92024-3357 7536491 WWWdUhSd.net lBoerdOfTiusteeE Jcqm Daf€ssandro Linda Friedman BarbaraCmth Deanna Rid Bedl f-bgehdtllef Peggy Lymh, M.D. .. m-AQdemY Cannel Valley MS DiegvenoMs Earl Wamn MS COmcanyMl WS North GmtAltemative WS Oak CraMS San Diwito AdultMucatim San Dieguito HS/Zcademy Sunset HS Tomy Pine HS May 17,2005 ci cowrcil Mmbers: Thc purpose of this Letter Oflntent is to notify the City of Cdbad that La Cmte Canyon High SchooI requests to be an andior tenant of tbe ncw s\vi.uunkg pa01 upon completion of construction of the Alga Norte Chmmunij, Park Br Aquatics Complex Itow mest is granted, all year-round varsity and junior varsity aquatics programs at La Costa Canyon Hjgb School uwkl be considered to use the 50 meh pool at Alga Norte. The boys water polo tcm season is summer-Ml, th0 gklz water polo season is fdkwinter, axid thc co-ed swim team season is winkr-qring. Use of the pool would include daily practice and home-teeam meets, gamess and events tluoughout the year. It is OIW mdwstmding tllnt the svimnhs pool is planned to be avdabk by January 2008, La Costs Canyon High Scbool, tlmugh the San Dicgpito Union High School District, wndd entcr into contract negotiations with the City of Cwkbad Parks and Rqxeation Deparrmeut for aunual use of the stvirnmh~ pool fdi> asswnhg the fes are fait and reasonable. "'hank you for your crsnsidcmtion of use and approval of the Atga Nme Cmmnxunity Park 13 Aquatics Complex. La Costa Canyon High School Admjnistratiou One Maverick Way CarISbd, Cataornia A11 Receive-Agenda Item # t c> May 16,2005 TO: City Manager MAY 1 7 2005 e.*, U-rk s>q. CL VIA: Finance Director Re&4 w';zz fo: FROM: Finance Manager &%A- == POINSETTIA PARK TENNIS COURT PROGRAM OPTION SUMMARY Enclosed for your review and distribution is the Poinsettia Park Tennis Court Program Option. Also attached is a memo from the Recreation Director addressing the three tennis court options and the associated cost and revenue projections, and the PFF (Public Facility Fee) Fund Schedule. Seven copies have been enclosed for your convenience one for each Council member, the City Attorney and yourself. Please contact me at 602-2422 if you have any questions regarding this summary. DAVID BARNUM Finance Manager DB: kd Enclosures cc: Administrative Services Director - PROGRAM OPTIONS 1 POINSETTIA PARK TENNIS COURTS Background In 1988, voters were asked to approve Proposition M to increase the Transient Occupancy Taxes (TOT) tax to pay for a regulation length and executive golf course, a tennis complex, and other recreational facilities. The Proposition failed to gain the necessary 2/3rd vote for passage. In January ‘89, the “Recreational Facilities Financing Committee” (citizens) was appointed by the City Council to review alternative options for how to fund these facilities. Regarding tennis, the Committee recommended “development of a multi-court tennis facility, adequate for tournament play beginning in 1989, utilizing primarily Public Facilities Fees (PFF) funds currently designated for parks tennis projects”. The Council adopted this recommendation in March of ’89. Also, as part of the Committee’s recommendation, Propositions F & G were put to the voters in November ’89 and approved. Proposition F increased the TOT tax from 8 to 10%. Proposition G authorized (but did not require) the City to spend more than $1 million for “two public golf courses, one regulation and one short course, a multi-court tennis complex, two multi-purpose adult size fields, and an enclosed soccer field”. As a result of the Committee’s recommendation, a tennis complex (IO courts, one stadium court, and a club house/pro shop) was integrated into the Poinsettia Community Park Master Plan and approved by the City Council in August ’92. Implementation of the park master plan has been phased and to date, 3 of the 11 tennis courts have been built. The proposed Capital Improvement Program (CIP) has the remainder of the tennis court complex scheduled for construction in Phase II of the park with design beginning in fiscal year 2009-10 and construction following in the next year. Phase II also includes a community center/gymnasium, enclosed soccer field, tot lots, picnic areas, and additional parking. The first phase of Poinsettia Park provided 3 lighted tennis courts along with the other park amenities which included 3 ball fields, 1 soccer field, 2 basketball courts, a tot lot, 2 restrooms, open play area, picnic areas, temporary maintenance facility, and parking. There has been limited demand for new tennis facilities in the past years. The number of tennis classes being offered by the Recreation Department has remained fairly constant. Attendance in most classes is below the recommended maximum number of participants and, in a few cases, classes have been cancelled due to low enrollment. Last year, during the budget preparation, a request was made of Council to move up the funding for at least some of the planned tennis courts at Poinsettia Park. Council requested that staff do some more research into how other cities have funded and managed their tennis courts as well as what other projects would be delayed if funding for the tennis courts was advanced. This program option statement will provide the additional information for Council on the tennis complex options. Options The attached memo dated October 15,2004 (Attachment 1) provides the Council with 3 options for constructing additional tennis courts as well as two different ways in which they can be managed. The options are summarized below. Please refer to the memo for more information. Construction Maintenance Estimate* costs** Construction Options 2. Three options for the expansion of the tennis courts are shown below. $24,500 per year Build 7 additional courts (total 10 courts) $1,000,000 3’ I 1. 1 Build 3 additional courts (total of 6 courts) Full Complex adding 7 lighted courts plus the clubhouse, and additional parking per the $3,000,000 $60,000 Poinsettia Park Master Plan per year “stadium court” (total 11 courts), 3,000 sq ft $50,000- $10,500 per year I $450,000 1 * Construction costs are based on master plan level design and are preliminary and subject to change. **Maintenance is estimated at $3,380 per court/per year and includes lights, cleaning, net repair, etc. For the full complex, facility maintenance costs are included as well as additional amounts for the maintenance of the grounds and parking lot. Does not include recreation programming. Construction Fundinq The remaining phase of the Park is funded with Public Facilities Fees (PFF) and is scheduled in the CIP with design beginning in fiscal year 2009-10 and construction in the following year. If Council chooses to build some, or all, of the tennis complex, it would require moving the funding up from the current projected time frame to the present. Under either scenario (moving up the project or leaving it as currently shown in the CIP), revenue projections in the CIP anticipate the PFF fund going into a deficit of approximately $4.8 million sometime after 2015. Moving up this project locks in the use of PFF funds for this project rather than giving Council options on what projects may need to be delayed if future revenues are not sufficient. The projections for the PFF fund and the scheduled projects as proposed in the 2005- 06 CIP are shown in Attachment 2. Recreation Programming The costs shown in the table above are for the basic maintenance of the facility and do not include any recreational programming. If Council chooses to accelerate the construction of any portion of the tennis complex, it would provide an opportunity for additional recreational options for the citizens. This could range from simply adding additional instructional classes (if only courts are constructed) to creating a full membership-based tennis program including a pro shop and full time contractual tennis professional (if full complex is constructed). All of these options can serve to generate revenues that may help offset the maintenance costs of the facilities. If the full complex is constructed, it could be managed by either the City or by a private group. Both of these options are discussed in the memo (Attachment 1). COUNCIL OPTIONS In summary, staff would like direction from the City Council on which of the following options they would like to pursue: 1. Make no change in the Capital Improvement Program for Poinsettia Park. 2. Move up the construction of 3 tennis courts at a cost of $450,000 3. Move up the construction of 7 tennis courts at a cost of $1,000,000. 4. Move up the construction of 7 tennis courts, a stadium court, a 3,000 square foot clubhouse, and additional parking per the Poinsettia Park Master Plan at a cost of $3,000,000. Moving up any of the funding would take the PFF funds from fiscal year 2010-1 1 and move it to fiscal year 2005-06. Attachment 1 October 15,2004 TO: CITY MANAGER VIA: RECREATION DIRECTOR FROM: MANAGEMENT ASSISTANT - RECREATION RE: POINSETTIA TENNIS COURT OPTIONS BACKGROUND During the review of the June 2004-05 proposed budget, several citizen’s appeared before the City Council to request that the City consider building additional tennis courts at Poinsettia Park. This request came about in large part due to the citizen’s difficulty in playing tennis at their preferred time (a.m.), as well as not having enough courts at one location. Up until recently, the tennis groups have been able to use the 9 tennis courts at Carlsbad High School. However, due to the priority use of Carlsbad High School, the local groups were not able to play tennis on these courts. Today, it is our understanding that the situation has been corrected. Council directed staff to investigate and bring back to them options in building additional courts at Poinsettia Park and to investigate alternatives for managing a tennis complex. Currently, Poinsettia Park has three (3) tennis courts with plans to develop a complete tennis complex including 7 more courts, a center court and a clubhouse. The tennis complex is part of Phase II of Poinsettia Park, scheduled to be constructed in FY 2010-14. The 3 existing courts at the park are available both for the public citizens’ use on a first come, first serve basis, and for the City’s instructional tennis program. The peak time to play is in the morning and early evenings. FISCAL IMPACT ON PFF FUNDS At the City Council budget meeting in June 2004, Finance commented that presently there is not enough money in the Public Facility Fee (PPF) to fund all the projects in the CIP timeline and move the tennis courts up in the CIP schedule. Finance further noted that if construction of the tennis courts was moved up, it would take priority over other projects proposed during that same time frame. The attached matrix identifies the construction costs, maintenance and programming costs, and revenue estimate projections for Poinsettia Park tennis courts. The option that Council selects will affect the fiscal impact to the City. DISCUSSION Staff has identified the following options for the expansion of additional tennis courts at Poinsettia Park. They are: 1) Build 3 courts, 2) Build 7 courts, 3) Construct the entire tennis complex. OPTION #I - BUILD 3 ADDITIONAL COURTS The construction of 3 additional tennis courts will help alleviate some of the demand during peak playing times. However, based on discussions with the local tennis groups, they did not feel that a total of 6 courts would meet the needs of all of the tennis groups. This option would not allow the opportunity for the City to enter any type of public/private collaboration. The courts would be City operated, and available on a first come, first serve basis. It is estimated that the construction cost for 3 additional courts would be $450,000, with an annual park maintenance cost to be approximately $10,500 per year. Minimum revenue would come from tennis classes, or public reservations. OPTION 2 - BUILDING 7 ADDITIONAL COURTS The second option for the Council to consider is building an additional 7 tennis courts for a total of 10 courts. This option would provide time for local groups, as well as allow opportunities for tennis tournaments, special events, and tennis classes. As in Option 1, the City would operate and schedule the courts for the public use. The construction cost for the additional 7 courts is estimated to be $1,000,000, with the on-going annual park maintenance costs to be approximately $24,500. A minimum increase in revenue would come from tennis classes, or reservations. OPTION 3 - BUILDING ENTIRE TENNIS COMPLEX The third option is for the City to construct a tennis complex including 7 additional courts, the center court and clubhouse, at a cost of approximately $3,000,000. A tennis complex design lends itself to a wider range of activities and a higher level of potential use resulting from organized tennis groups using the facility. It would allow the opportunity to generate revenue from classes, clinics, tennis meets, tournaments, tennis academies, memberships and retail sales. These tennis events will also generate local tax money from guests and spectators that would eat, shop and enjoy the local entertainment venues. TENNIS COMPLEX MANAGEMENT ALTERNATIVES Staff was also asked to investigate alternatives to manage and operate the tennis complex. In an effort to optimize City revenues, staff explored both a privately managed as well as a City managed tennis complex. CITY MANAGED TENNIS COMPLEX Staff completed in-depth research throughout the state to locate a City owned and City operated tennis complex. Based on our investigation staff was unable to find a City that was exclusively managing a facility. This is primarily due to the high costs of staffing a tennis complex and the expenses associated with maintaining a tennis complex. If the Recreation Department were to staff a tennis complex, they would take a conservative approach with an annual operational cost to the City estimated at $350,000 - $380,000. The revenue is estimated to be $310,000 - $330,000 with a net loss of approximately $40,000 - $50,000. The primary revenue source would be from tennis classes and reservations with a small amount from the pro-shop and concessions. Based on our research, it appears that a City managed tennis complex would not provide the City an opportunity to maximize the full potential of revenue. PRIVATELY MANAGED TENNIS COMPLEX The final option for Council to consider is a privately managed tennis complex. The terms of the management arrangement would be established in the contract. The contract could be offered to a private tennis management group that is either set up as a non-profit, a not-for-profit organization or a company. Based on staffs research, the responsibitities for management and the level of costs and revenue received by a city, varies based on their management priorities and current contract negotiations. These ranges also tend to vary based on the difference in the age of the facility and the target market they are trying to reach. As listed in our attachment of estimated city costs and revenue projections, we have select two different privately managed tennis facilities. The first example, the City of San Diego Balboa Tennis Complex is managed by the Balboa Tennis Club a not-for-profit private company. They have 24 courts, one stadium court, a clubhouse with pro-shop, concessions, a meeting room and locker facilities. The Balboa Tennis Club assumes all the operational responsibilities including daily maintenance. The Balboa Tennis Club also pays for 50% of the major repairs with the City of San Diego covering the other 50%. The Tennis Complex generates $292,000 in gross revenue per year. The City of San Diego currently receives net revenue of $12,000 per year from rent. At this time they are not collecting a percentage of the revenue from classes or concessions. The rental fee is extremely low due to their emphasis on having an affordable tennis program and expanding their junior tennis programs. The second example, the City of Sunnyvale is managed by the Sunnyvale Tennis Club a non- profit community organization. They have 16 courts, a pro-shop, concessions, lockers and a meeting room. The Sunnyvale Tennis Club pays for all costs associated with managing the reservations, classes, marketing and concessions but they do not pay for either the daily maintenance or the major repairs. The City collects an annual rent in the amount of $75,000 and in addition collects 5% of gross revenue over $51 5,000. The Tennis Complex generates over $780,000 in gross revenue per year. At this time the City is collecting over $1 00,000 less annual M&O costs of $40,000 per year for a net revenue of $60,000. They are focusing on expanding their memberships and their fees are in the mid to upper range for a City owned facility. Lolly Sangster Management Assistant Attachment cc: Assistant City Manager Finance Director Recreation Services Manager Park Development Manager .. e 0 0 0 0 cr) 69 0- 9 i/j c u) 8 t 0 0 u) K .- c. 2 c s 0 0 0 (D 64 0 0 te 9 c. v, c v) 8 8 c m C a, c E 2 9 3 3 i9 0 3 3 3 n i9 c! c. ? i/j c. u) 8 8 P K m t a, c.' E 0 0 N m EF) 0 0 0 0 0 m Le x - 9 i/j 4- u) 8 E e 2 0 1 0 0 0 m m k9 0 0 0 0 m * 0- c 9 r hj 3 K P 2 Attachment 2 0 0 00 00 0 0 0 0 00 r( R Ln 0- 2 zg 2 N m, m rl 0 cn 0 z- 2 0 N -- 5 0 00 0 00 2 NN 0.0. 2 22 0 0 2 Pi J 5 u W 5 THELMA .I. HAYES PO Box 1366 Carlsbad, CA 92018 760-434-3 580 May 9,2005 AGENDAITEM I Ice CI Mayor City Coundl City Manager City Attorney City Clerk Mayor Lewis and Members of the Council City of Carlsbad 1200 Carlsbad Village Drive Cadsbad, CA 92008 Beg' cc Dear Mayor and Council Members Re: City Budget As the two fine condo developments on Laguna Drive near completion, please remember the request made at the Budget Hearing concerning the provision for Pedestrian Circulation, including sidewalks, at the two intersections on Laguna at Madison and Roosevelt Streets. Sincerely, Thelma Hayes City of CarlsbadCity of CarlsbadProposed2005-2006 to BuildoutCapital Improvement Program 20052005--20062006Capital Improvement ProgramCapital Improvement Program9Budget Calendar9CIP Process9Development Projections9Revenue Forecast9New Appropriations –FY 05-069Future Projects9Funding Issues Budget CalendarCOUNCIL MEETINGSCOUNCIL MEETINGS••TodayToday––CIP WorkshopCIP Workshop––Set Public Hearing for June 21Set Public Hearing for June 21thth••June 7June 7––Operating Budget WorkshopOperating Budget Workshop••June 21June 21––Operating Budget and CIPOperating Budget and CIP––Public Hearing and AdoptionPublic Hearing and AdoptionOTHER PUBLIC MEETINGSOTHER PUBLIC MEETINGS••June 15June 15––Citizen’s Budget ForumCitizen’s Budget Forum Citizen’s Budget Forum•When:Wednesday,June 15th•Where:Faraday Center1635 Faraday Avenue•Time:5:00pmCall the Finance Department at(760) 602-2430 for additional information. CIP –Planning Document•Expenditures plan•Revenue plan•CIP Review Committee Project ReviewEvaluation of:Evaluation of:••Project NeedProject Need••Construction cost analysisConstruction cost analysis••Construction schedulesConstruction schedules••Financing Financing ––Revenue Revenue SourcesSources Project Ranking Criteria•Health and Safety•Legal Mandates•Compliance with Growth Management •Compliance with Other Standards•Completion of Basic Infrastructure•Funding or Timing Opportunity•Operating Cost Impacts Construction Cost Analysis•Actual Cost Increases•Engineering News Record (ENR) Index•Cost Estimating Firms Construction Cost AnalysisProjects were indexed by either:•Known increases•ENR indexReview of some project costs by 3rdparty firmEngineering News RecordBuilding Cost Index0%2%4%6%8%10%19981999200020012002200320042005 2005-2006Capital Improvement ProgramDevelopment Projections Development ProjectionsƒƒWhen will development occur?When will development occur?ƒƒSufficient revenues for Sufficient revenues for capital construction?capital construction? Residential ConstructionTotal Units to Buildout25,00030,00035,00040,00045,00050,0001990199520002005201020152020+Future Units = 5,667Future Units = 5,667Current 42,000Current 42,00088%88% Residential Construction(in Units)05001,0001,5002,00020002001200220032004200520062007200820092010FutureExisting88%Projected Projected 95%95% Villages of La Villages of La CostaCostaCalavera HillsCalavera HillsRobertson Robertson RanchRanchSunny CreekSunny CreekPoinsettia Poinsettia PropertiesPropertiesThompson Thompson TabataTabataBressi RanchBressi Ranch73216453,300 Units –Next 5 years1234567 Non-Residential Construction(Square Feet)0250,000500,000750,0001,000,0001,250,0001,500,00020002001200220032004200520062007200820092010ProjectedActual 4.5 million sq ft –next 5 years333,848333,8481,407,8911,407,8911,674,5571,674,5571,080,6751,080,675HotelsHotelsRestaurantsRestaurantsTimesharesTimesharesAssisted LivingAssisted LivingChurchesChurchesTheaterTheaterRetailRetailGIA ExpansionGIA ExpansionCorporate Corporate CentersCentersIndustrialIndustrial Funding SourcesTotal Revenue = $558 Million(Through Buildout)$0$20$40$60$80$100$120$140$160$180DevelopmentFeesSpecialDistrictsWater/SewerReplacementInfrastructureReplacementOther SourcesIn MillionsIn MillionsReplacement Revenues = 37% Development Revenues$163 Million$0$20$40$60$80$100$120$140$160$180DevelopmentFeesSpecialDistrictsWater/SewerReplacementInfrastructureReplacementOther SourcesIn MillionsIn Millions•Water and Sewer Connection Fees•Public Facilities Fees •Park In Lieu Fees•Traffic Impact Fees•Planned Local Drainage Fees Special Districts$56 MillionƒCFD#1 -CitywideƒBTD#2 * -Aviara Parkway-Poinsettia Lane$0$20$40$60$80$100$120$140$160$180DevelopmentFeesSpecialDistrictsWater/SewerReplacementInfrastructureReplacementOther SourcesIn MillionsIn MillionsƒCFD#2 –Rancho Santa Fe Rd.ƒBTD#3 -Cannon Road West* Proposed District Replacement Funds$209 Million$0$20$40$60$80$100$120$140$160$180DevelopmentFeesSpecialDistrictsWater/SewerReplacementInfrastructureReplacementOther SourcesIn MillionsIn Millions•Annual transfers from operating funds •Used for replacement of existing facilities Other Revenues$130 Million$0$20$40$60$80$100$120$140$160$180DevelopmentFeesSpecialDistrictsWater/SewerReplacementInfrastructureReplacementOther SourcesIn MillionsIn Millions•TransNet allocation•Gas Tax•Redevelopment•Federal and State grants•Other agencies Project ExpendituresProject Expenditures20052005--06 to Buildout06 to Buildout$445 Million$445 MillionParks24%Civic21%Loans8%Water9%Streets21%Sewer/Drainage17% 2005-06 Revenue Sources$120 Million4%36%14%11%35%DevelopmentSpecialDistrictsWater/SewerReplacementInfrastructureReplacementOther Sources 2005-06 New Appropriations$88 MillionParks21%Golf Course38%Civic9%Water4%Streets8%Sewer/Drainage11%Loans9% Revenues / AppropriationsFY 2005-2006•Revenue Sources $120 Million•New Appropriations $ 88 Million•Carry Forward Projects $140 Million____________________________________________________________Total 05Total 05--06 Capital Program 06 Capital Program $228 Million$228 Million Continuing Projects$140 Million•Pine School Park•Aviara Community Park•Alga Norte Park and Aquatic Complex•Park Site Acquisition –NE Quadrant•Encina Projects•Vista-Carlsbad Interceptor•Rancho Santa Fe Road Construction•Recycled Water System•Pavement overlay •New Traffic Signals Review of Projects••Prop C ProjectsProp C Projects••Civic FacilitiesCivic Facilities••Park DevelopmentPark Development••Sewer ProjectsSewer Projects••Water ProjectsWater Projects••Street ProjectsStreet Projects “PROP C” ProjectsTrails/Open Space$22,711,000Remaining AllocationCannon Road –Reach 4$ 1,050,000City / Safety Training Facility$11,239,000Aquatic Complex$35,000,000Original Set AsideAllocationProjects Alga Norte Park Aquatic Complex$18 Million•50 meter competition pool•12 lane instructional pool•Therapy pool•Water play area–Lazy river–2 water slides City / Safety Training Facility•Police Training–Shooting Range–Evidence Storage Room•Fire Training–Administration Building–2 & 4 Story Burn Props•City Employee Training Facility Review of ProjectsThe next 5 Years…FY 2006 through 2010 Civic Projects•Civic Center•Public Works Center•Safety Training Center•Library Learning Center•Fire Station #6•Fire Station #3 Civic Center & Public Works Center$46.1 million•What are the needs of…..–Citizens–City organization•Visioning process:–Citizens–Business community–City workers•Funding–CFD No. 1 -$37,377,000–Water Repl. -$5,878,000–Sewer Repl. -$2,810,000 Library Learning Center$3.1 Million•Remodel existing structure–10,711 square foot building•Relocate:–Adult Learning Center–Centro de Información•Accommodate Head Start Program Fire Station #6$5.4 Million•Public Facilities Fee Fund •Relocate Existing Station to site adjacent to Rancho Santa Fe Rd.•6,200 Square Foot Facility Fire Station #3$3.2 Million•Public Facilities Fee Fund •6,200 Square Foot Facility•Existing site adjacent to Calavera Park •Potential location within Robertson Ranch $150,000$250,000Civic Projects•Bicycle Master Plan•Pedestrian Master Plan Maintenance/Replacement ProjectsNew appropriations for:•Beach access improvements•Restroom improvements:–Holiday Park–Laguna Riviera Park•Holiday Park Tot Lot improvements •Cole Library HVAC replacement•Guardrail repair -Palomar Airport Road Bridge at Carlsbad Blvd Park DevelopmentProjects ÃAlga Norte Park Alga Norte Park ÃLake Calavera Lake Calavera TrailsTrailsÃnorthÃGolf CourseGolf CourseÃPoinsettia Poinsettia Community ParkCommunity ParkPark ProjectsPine Avenue Pine Avenue Park Park Carlsbad Municipal Golf Course$36.8 Million2004-052005-062006-072007-08Clearing and grubbingGrading/constructionChampionship Golf CourseOpening 2007 Alga Norte Park -$12.6 millionAquatic Complex-$18 Million2004-052005-062006-072007-08Construction •Ball fields•Picnic areas•Tot lots•Skate park•Dog park Pine Avenue Park Total Cost = $14.7 Million2004-052005-062006-072007-082008-092009-10ConstructionCommunity Bldg•Multi-use field•Basketball courts•Picnic areas•Tot lots•Ornamental garden Poinsettia Community ParkTotal Cost = $11.7 Million•Phase II of 42 acre park–Community facility/gymnasium–Enclosed soccer field–Tot lot–Picnic Areas–Tennis Complex–Additional Parking•Projected construction in 2010-2015 Lake Calavera TrailsTotal Cost = $497,000•Elements–Trail Head•Parking•Restrooms•Bike Racks–5 mile of trails•2.5 miles by volunteers•Funding:–General Capital Construction Fund2004-052005-062006-07ConstructionMaster PlanOpen for Use Senior Center Expansion1stFloor -$615,000•Expand Senior Programs–Exercise Room–Art Room–T.V. Room–Game Room–Multi-purpose room–Health Screening Room–Computer Room2ndFloor –$329,000•Tenant improvements to provide additional office space for Recreation Division Sewer Projects•Encina Water Pollution Control Facility•Sewer Collection System Projects Vista-Carlsbad Interceptor•VC 1-3:$ 3,400,975•VC 11:$ 3,549,000•VC 12:$ 8,775,000•VC 13-15:$ 13,000,000Cannon RoadI-5Tamarack AveCarlsbadVillage DriveOCEANSIDEPacific OceanNEncinaLift StationProject Costs North Agua Hedionda Interceptors Agua Hedionda LagoonEl Camino RealP a c if ic O c e a n Cannon RoadTamarack AveFaraday AveProject Costs•West Leg -$4,177,750•NAHT1A -$1,781,220 Buena InterceptorProject Costs$2,340,000 Sewer Projects•La Costa Meadows Sewer Extension•La Golondrina Sewer Extension•Home Plant Rehabilitation•Lift Station Repairs•Sewer Line Refurbishment & Replacement•Sewer Monitoring$283,000$654,000$650,000$1,360,000$5,645,000$330,000 Drainage Projects•La Costa Ave CMP Replacement•Highland Drive•Cynthia Lane$492,000$240,000$100,000 Water ProjectsWater Enterprise Funds•$26.6 million in new appropriations•Cannon Rd•Carlsbad Blvd•College Blvd•Faraday/Melrose Pipeline ReplacementMiscellaneous Pipelines•Downtown area•Increase Fire Protection•$1.8 millionSan Marcos Boulevard•Connection to SDCWA Pipeline•Existing pipeline is over 40 years old•$3.0 million Street Projects•Pavement Management•Faraday Ave/Melrose Dr•College Blvd –Reach A•Cannon Road –Reach 4A•Poinsettia Lane•Carlsbad Blvd Bridge Replacement Faraday Avenue and Melrose Drive ExtensionCannon RoadCollege BlvdPalomarAirport RoadIn te rs ta te marack Ave.Faraday Ave.Me lro s e D riv e Cannon Road / College Blvd.E l C a m in o R e a lCollege BlvdPalomarAirport RoadIn te rTamarack AveadVillage DriveM e Faraday Ave.C ol le g e B lv d .Cannons Poinsettia LaneNLA COSTA AVE.ALGA ROADPALOMAREL CAMINO REAL POINSETTIALANEA V IA R A PARKWAYI-5 BARCELONAC AR L S B AD B L VDAIRPORTROAD LA COSTA AVE.RANCHO SANTA FE ROADI-5 BLVD.OLIVENHAINROADLEUCADIAME LROSE DRIVECALLE Carlsbad Boulevard Encinas Creek Bridge Replacement•Located south of Palomar Airport Road•Constructed in 1913•Redevelopment Funds & Federal Grants Traffic Signals Total Cost = $2.9 MillionVideo DetectionNew SignalsRepair/Replacements Maintenance Projects•Sewer/Water•Drainage•Streets•Buildings and parks Funding Issues•Public Facility Fees (PFF)•Unfunded Projects Public Facility FeesProjected Fund Balance-$5$0$5$10$152006200720082009201020152020Millions••Used $4.1 Million undesignated ParkUsed $4.1 Million undesignated Park--inin--Lieu fundsLieu funds••Moved Aviara Community Center to 2015 Moved Aviara Community Center to 2015 --BuildoutBuildout••Moved 2 projects to unfunded listMoved 2 projects to unfunded list––Cannon Lake Park ($2.2 Million)Cannon Lake Park ($2.2 Million)––Hosp Grove/ Buena Vista Lagoon ($1.3 Million)Hosp Grove/ Buena Vista Lagoon ($1.3 Million) Unfunded Projects$ 34.3 million1.Palomar Airport Road Widening and Bridge reconstruction2.El Camino Real Widening from Cassia to Camino Vida Roble3.Poinsettia Lane –Reach “E”4.Cannon Road –College Blvd to city limits5.Cannon Lake Park6.Hosp Grove/Buena Vista Lagoon Improvements Budget CalendarCOUNCIL MEETINGSCOUNCIL MEETINGS••TodayToday––CIP WorkshopCIP Workshop––Set Public Hearing for June 21Set Public Hearing for June 21thth••June 7June 7––Operating Budget WorkshopOperating Budget Workshop••June 21June 21––Operating Budget and CIPOperating Budget and CIP––Public Hearing and AdoptionPublic Hearing and AdoptionOTHER PUBLIC MEETINGSOTHER PUBLIC MEETINGS••June 15June 15––Citizen’s Budget ForumCitizen’s Budget Forum Action Item1.Set Public Hearing for 2005 -2006 Operating and Capital Budgets for June 21, 2005. Conclusion .- Creating universally accessible playgrounds for children of all abilities shane*s CREATING UNIVERSLLLY lCCESSlBLE InspirationTM PLAYGROUNDS FOR CHILDREN OF ALL ABILITIES The mission of Shane’s Inspiration is to develop Universally Accessible Playgrounds and provide transportation, education, and community outreach programs. Shane’s Inspiration’s Playgrounds enhance a child’s emotional, physical and social development, as well as teach compassion and acceptance. Shane’s Inspiration In 1997, Catherine Curry-Williams and Scott Williams lost their son, Shane Alexander, to a degenerative spinal condition only a few weeks after his birth. Had Shane lived, he would have spent his life in a wheelchair. Because of a physical dis- ability, Shane would have been denied one of the most funda- mental rights of childhood: the right to play independently with friends and family at neighborhood and school play- grounds. This realization encouraged the Williams and their life-long friend Tiffany Harris to turn a tragedy into a vision that resulted in Shane’s Inspiration ... a non-profit organization dedicated to improving the lives of children with disabilities. Shane’s Inspiration gave a gift to thousands of Los Angeles children through the creation of an environment where all children can play together at the highest level of their ability. With the support of visionary community leaders, Shane’s Inspiration rallied Los Angeles to create the first and largest Universally Accessible Playground in the Western United States: “Shane’s Inspiration.“ Located in Griffith Park, it provides two acres of independ- ent play, sensory-rich and physically challenging equipment and the rare opportunity for disabled and able-bodied children to experience and accept one another. After “Shane’s Inspiration” opened in 2000, the organization was inundated with requests from families who wanted accessible play in their community. This prompted them to work with a family, who also suffered the loss of a son, to design and build the second Universally Accessible Playground in Los Angeles: “Aidan’s Place” located on Sepulveda Boulevard in West Los Angeles. Since that time, the organization has helped raise millions of dollars, initiated over 30 Universally Accessible Playground proj- ects throughout Southern California and beyond, and created community outreach programs that educate the public as well as help dissolve barriers for the disabled youth. This is not just another playground ... It is a symbol of hope and love and a beacon ofjoy for thousands of children in our ciw. - Former Mayor Richard Riordan speaking ai the opening of Sham’s Inspiration Playground Our playgrounds Most playgrounds provide equipment that is not easily accessible ... wheelchairs get trapped in sandpits and leg braces get caught in narrow pathways, This leaves disabled children sitting on the sidelines.. .watching as their able-bodied friends and siblings play. Because there are so few opportunities for children with disabilities to interact with their able-bodied peers, many children spend their lives isolated and stigmatized. Excluding them from play environments at an early age hinders their ability to develop emo- tionally, cognitively and physically. Studies have proven that integrated play helps disabled children develop: fine and gross motor skills; receptive communication skills; cerebral functions; physical strength; and social skills, including independence and self esteem. Integrated play also gives able-bodied children the opportunity to experience and accept disabled children as equals. At Shane’s Inspiration’s Universally Accessible Playgrounds the sensory-rich equipment is independently playable for children with disabilities while exciting and challenging for able-bodied children. Our playgrounds delight all children, providing a place where compassion and acceptance can flourish. Shane’s Inspiration Griffith Park, Los Angeles, CA Opened September 2000 Aidan’s Place Westwood, CA Opened December 2007 Corona-Norco Family YMCA Lincoln Park Corona, CA - Opened August 2003 Lincoln Heights, CA - Opened August 2004 Shane’s Inspiration’s Impact and Services Shane’s Inspiration raises the quality of life for children living with disabilities by building Universally Accessible Playgrounds and more ... Our Impact on the Community: WE BUILD BRIDGES for the disabled community by creating accessible, integrated play environments in all neighborhoods.. . regardless of socio-economic conditions. WE DISSOLVE THE BARRIERS of discrimination by working to educate children, parents, teachers, communities, municipalities and government agencies about the needs of special children. WE RAISE THE BAR on accessibility standards. Even the decade-old Americans with Disabilities Act only provides the mini- mum standards for integration. Our playground designs extend far beyond those guidelines into the future of what accessible play will become. WE FACILITATE PLAY! Each month, we bring together over a hundred children with disabilities and their families to our complet- ed playgrounds. The fun-filled day includes games, face painting, snacks, and making new friends while playing on the playground! Our Programs THE CATALYST PROGRAM: Shane’s Inspiration playground professionals guide families, communities and municipali- ties through the playground development process. Support includes guidance in such areas as; playground planning develop- ment meetings, creating and managing a budget, building community support, navigating government regulations, securing land for the site, choosing and negotiating with vendors, fundraising, and evaluating the success of each playground. The Catalyst Program has an average of twenty projects in development per year. COMMUNITY OUTREACH PROGRAM: This program increases the use of the playgrounds while building public uwureness of the tremendous benefits of integrated play for both disabled and able-bodied children and their families. Outreach services include: a free bussing/field trip program that brings 2,000 children annually to the existing playgrounds; public speaking engagements at local schools, Regional Centers, hospitals and communities; newsletters targeting disabled children and adults; a newsletter written by and for children with disabilities, their peers and siblings; and hospital research collaborations that identify existing disabilities and their corresponding needs. Another major component of this program is Shane’s Club, a monthly play date at one of our playgrounds that brings children of all abilities together to talk, make friends, and play together. .. TECHNICAL SUPPORT & DESIGN PROGRAM: Each playground has a unique, community-driven design. Through “Community Options & Priorities Sessions,” our Project Management Team works closely with the community and children to create a cohesive design that meets the needs of a variety of disabled children, able-bodied children and community mem- bers. Included in the design oversight process are special education teachers, rehabilitation therapists and other health-care professionals. Playgrounds opening in 2004 Los Angeles Zoo in Grifith Park, Lincoln Park amd Parque de 10s Suenos, both located in East Los Angeles, Temple Street-Beverly Park in Downtown Los Angeles and Wilshire Crest Elementary in the Los Angeles Unified School District. Playgrounds in development Santa Clarita, Los Angeles Orthopaedic Hopsital, San Bernardino, Santa Fe Springs, Playa Vista, Calabasas, Redondo Beach, Thousand Oaks, San Clemente, Hollywood, Sylmar, Hansen Dam, Valley Beth Shalom in Encino, Childrens Hospital Los Angeles, Ft. Collins, Colorado and New York City. An addi- tional 10 playgrounds are in development through a partnership with the City of Los Angeles Department of Recreation and Parks. Internationally, we are working with Bombay, India; as well as Jerusalem and Tel Aviv, Israel, providing assistance in the establish- ment of a Universally Accessible Playground. Our Friends 8 Collaborators Anne & Kirk Douglas Playground Award, California Park & Recreation Society, Los Angeles City Council, Cedars Sinai Hospital, Center for Healthy Aging Childrens Hospital Los Angeles, City of Los Angeles Department on Disability, City of Los Angeles Recreation & Parks Department, Congressman Henry Waxman, Corona-Norco Family YMCA, Easter Seals of Southern California, Down Syndrome Association of Los Angeles, The Honorable Mike Feuer, Foundation for the Junior Blind, Kiwanis Club of Woodland Hills, Los Angeles Business Council, Calfornia Regional Centers, L.A.U.S.D. serving children with disabilities, Muscular Dystrophy Association, San Clemente Junior Woman’s Club, Laura San Giacomo and the Chimes School, Universal Sunrise Rotary Club, Weingart Foundation, Ralph M. Parsons Foundation, Northrup Grumman, S. Mark Taper Foundation, Norris Foundation, Toyota, and most importantly ... each and every child that has crossed our paths and touched our lives. Accomplishment Highlights The City of Los Angeles passed a motion in support of establishing 21 Universally Accessible Playgrounds throughout Los Angeles. A recent Prop 40 allocation will support this motion through the development of Universally Accessible Playgrounds in every Los Angeles district which does not currently have one. Shane’s Inspiration was honored with the first “Heroes for Health Award” by Good Housekeeping Magazine and General Electric. A featured article in Good Housekeeping Magazine was followed by an interview with Matt Lauer on “The Today Show” and an awards ceremony at Camegie Hall in New York City. Shane’s Inspiration was the recipient of the 2003 Access Award from the Los Angeles County Commission on Disabilities. Our playgrounds have received numerous awards, including: “Best Playground” from Los Angeles Magazine’s “101 Things to Shout About.” the L.A. Parent Award for Outstanding Playgrounds and the Architectural Landscape Design Award from the L.A. Business Council. You Can Help ... Shane’s Inspiration’s message is simple: It is the birthright of every child to play in the park. The need is compelling because, unfortunately, chil- dren with disabilities continue to live on the fringe of society. The poten- tial of realizing our vision is extraordinary. There are hundreds of families, educators, healthcare professionals, corporations, foundations and civic leaders fighting for inclusion and integration. Please join them. Here are a few ways in which you can help: Become a Corporate Ambassador.. .You can connect Shane’s Inspiration with corporations that you or your loved ones work with. Once you open the door, we will step in and find a program that best fits their interest! Be an Individual Donor.. . the generous, tax-deductible support of indi- viduals like you is vital to our work. You can give throughout the year or support our special events. Each year, we host a black-tie dinner and 10K Walk, Run, Roll-A-Thon - both exhilarating, fun events! Volunteer! Throughout the year, we need helping hands at special events, in the office and at the play dates in a variety of capacities. You can also donate your professional services, join our fundraising efforts or join our community outreach team and speak at local venues. Become a member of our Professional Advisory Board. Do you know friends and colleagues who are capable of giving? Host a small gathering at your house and we will introduce them to the organization and our many projects. Bring your children to the park. All children are welcome every day of the week! Consider becoming a Legacy Donor with an annual commitment of $10,000 or more. FOR MORE INFORMATION, PLEASE CONTACT ... T$faany Harris, Executive Director, Shane b Inspiration 4804 Laurel Canyon Blvd., #542 - Valley Village, CA 91607 (818)752-5676 Fax: (818)506-1232 trSfany@shanesinspiration.org What makes our Universally Accessible Playgrounds Special? OUR STANDARDS: Our commitment is to create safe play environments that are enjoyable and challenging regradless of their physical or cognitive ability. The final objective is to create a fully integreated play environment so children will have an opportunity to socialize and develop friendships. To accomplish these objectives, we design playgrounds that meet the following standards: 1. 2. 3. 4. 5 6. 7. 8. 9. All materials used meet safety standards for cityktatelfederal requirements, such as American Society for Testing and Materials (ASTM), United States Consumer Product Safety Commission (USCPSC), NPSI (National Playground Safety Institute) and the Americans with Disabilities Act Accessibility Guidelines (ADAAG). Shane’s Inspiration’s equipment and designs provide the highest level of interactive play available for all children. Each of Shane’s Inspiration’s designs is unique and commu- nity-driven. We facilitate Community Options & Priority Sessions to ascertain a community’s needs and desires for multi-generational play environments. We collaborate with landscape architects to create a theme for each playground and its surrounding environment. We consult with our Professional Advisory Board (PAB), which consists of doctors, physical therapists, psychologists, child development specialists and occupational therapists, to help us determine the play environment needs of communi- ties that may have a high incidence of a particular disability. Our equipment is designed to be challenging, sensory-rich, age-appropriate and to encourage cerebral and physical development.. Shane’s Inspiration’s Director of Design, whose background is in landscape architecture and construction project manage- ment, provides a Design Review for all playgrounds. Shane’s Inspiration designs are environmentally-conscious. It is our commitment to incorporate and preserve each site’s natural surroundings. We make every effort to insure usage of the playgrounds by applying a community outreach model to each project. This helps connect families with Shane’s Inspiration’s resources, such as play dates, special transportation and educational programs. 10. All playgrounds receive the Shane’s Inspiration Design Seal of Approval when they have met our criteria. Our design commitment to you OUR COMMITMENT is to the spirit of the law: For over ten years, public facilities have been implementing the mandatory guidelines outlined in the Americans with Disabilities Act. However, most playgrounds fall short of achieving the true spirit of the law, which is full equality for dis- abled individuals in body, mind and heart. In the world of a special-needs child, full equality is essential, not optional. OUR DESIGN PROCESS: We recognize that equipment is only half of a playground.. . the other half is the rich, imaginative world of the children, their families and the community. The reason we turn to the community for design ideas is simple. Children know what they love to play on. Parents know what they need so that their families can play together. Senior Citizens know what elements serve their needs and allow them to play with their grandchildren. To build the best possible playground, we invite these community experts to participate in Community Options & Priorities Session. Other community participants include special education teachers, rehabilitation therapists and health pro- fessionals who fbrther shape the design from their perspectives. In the words of one physically-challenged child: 'W most playgrounds, I have to crawl out of my wheelchair if1 want toplq. It makes me feel like an ant, with all these giant kids running around me. My wheelchair is my legs. Would you want to take your legs osfto play?" OUR PROFESSIONAL ADVISORY BOARD: We combine real-world needs with proven therapeutic and child development theories plus exist- ing disability research. We have compiled a team of experts consisting of Physical Therapist, Childrens Hospital Los Angeles; Nursing Director, Childrens Hospital Los Angeles, USCRJAP; Parent Family Resource Director, Childrens Hospital Los Angeles, USC/UAP; Pediatric Physical Therapist; Child, Family and Adult Psychotherapist; Developer of Children's Programs for Alma Family Services; Parent Advocate for Children with Disabilities: Clinical Psychologist; Community Services Specialist, Eastern Los Angeles Regional Center; Occupational Therapist; L.A.U.S.D. Early Childhood Special Educator; Educational Director, Center for Disabilities Studies and Community Inclusion. These experts lend their expertise in the area of disabilities such as Autism, Down Syndrome, Cerebral Palsy, Sensory Development and Mobility Development. Their unique insight into the rehabilitative play process pro- vides an opportunity for our design team to integrate the needs of these children into fun, state-of-the-art equipment, which serves the needs of typically abled-bodied children as well. Our unique designs include.. . HORIZONTAL LADDERS / UPPER BODY PEDDLERS encourages multiple motor skills: reaching, pushing, pulling, releasing and grasping. Builds upper-body strength RUBBERIZED SURFACING encourages complex motor skills: walking, running and climbing, which is promoted through ambulatory games such as hide-and-go-seek or tag. Builds coordination and lower body strength. C 0 M M UN I CAT I ON ST RATE G 1 E S games and signage teach a variety of communication skills: following verbal instructions, learning non-verbal communication, practicing sign language or use of pictorial symbols PLAY AS THERAPY used for rehabilitation: children utilize play equipment to practice physi- cal therapy exercises, such as extending legs, trunk, arms or lifting / pulling to strengthen muscles and coordination. MAGICAL WATER AND SOUND WALLS EMBEDDED WITH SHELLS, ANIMAL SHAPES AND WHIMSICAL SOUND PUCKS which stimulate tactile senses for sight-impaired children SHADED, ENCLOSED STORY CIRCLES provides reduced stimuli for children with conditions such as Autism, Down Syndrome or Cerebral Palsy Shane’s Inspiration gathers all of these ideas and takes them back to our Director of Design, Virginia Hatley. Virginia Hatley is a professional Landscape Architect and holds a Bachelor of Science degree from California Polytechnic University, Pomona. She is a certified National Institute of Parks Safety Inspector and brings over 17 years of experience as a Landscape Architect and Project Manager to Shane’s Inspiration. Virginia has worked with the City of Los Angeles to revitalize recreational parks, trails, equestrian facilities and a variety of other projects. She is the primary Playground Designer for Shane’s Inspiration and has a tremendous amount of experience in creating community-driven collaborative designs. Our design team works with government agencies, landscape and architecture professionals to make sure these designs are both safe and feasible. The result is a high-quality, multi-generational Universally Accessible Playground built by and for the community. “I am from Richland Avenue Elemenlaiy School. I use crutches. We need more parks like these. Now we will be able toplay ball, go in the swing and play in the sand. Now we can do anything that we couldn Y do before!” - Anariqna Thomas, age 8 c c c Shane's Inspiration's Universally Accessible Playyounds allow children with disabilities to play side-by-side with their able-bodied peers and siblings. 70% of the equipment is independently playable for children with disabilities while in their support apparatus. At the same time, the equipment is fun and challenging for able-bodied children. What: Who: Why: How: When: When: Shane's Club is a free club that meets monthly for a Play Date at one of Shane's Inspiration's Universally Accessible Playgrounds.* Face Painting, Arts & Crafts, and Treats are provided (but please feel free to bring a sack lunch). Children will have a great time meeting new kids and playing on the playground. Children of all abilities who want to play together and make new friends. To give children with disabilities the opportunity to play with other kids, while giving their parents a chance to share experiences and advice with other parents/caregivers. Free, accessible transportation is available from a designated pick-up point for children with disabilities and their families. If you need accessible transportation, you must RSVP by the Monday prior to the Play Date. Space on the bus is limited. Shane's Club meets monthly on about the last Satwday from 10:30am-l:OOpm. Shane's Inspiration (SI): Griff ith Park in L.A. (park in Merry-&-Round Lot #3) Aidan's Place (AP): 1350 5. Sepulveda Blvd. in Westwood (between Wilshire &Ohio) Schedule for 2004: Schedule for 2005: September 18,2004 - SI October 30,2004 - AP November 20,2004 - SI December - Happy Holidays! January 29,2005 at SI March 8,2005 at SI April 30,2005 at AP May 21,2005 at SI June 25,2005 at AP July 30,2005 at SI September 24, 2005 - SI October 29,2005 - AP November 19, 2005 - SI December - Happy Holidays! *Save the Oate - Walk-FUN-Roll Februa 26,2005 at AP August 27,2005 - AP Sunday, October 10,2004 - SI PLEASE RSVP by the Wednesday prior to the Play Date. For more information, call Marjorie at (818) 752 -5676 or email marjorie@shancsinspiration. org It's about giving children of all abilities a chance to play togethcrl x 8 Sham's Inspiration - 4804 Laud Canyon Blvd. #542 - Valley Village, CA 91607 (618) 752-5676 - mnv.shanesinspiration.org Our School Transportation Program transported 2,197 students in 86 busses on 39 field trips in 2003. Our annual 5W10K Walk-FUN-Roll provides an opportunity for the community to support the mission of Shane’s Inspiration. Junior Design Parties give children of all abilities a chance to share their ideas for future playgrounds. ”- . ‘ .I* h 0 BOARD OF RECREATION AND PARK COMMISSIONERS MIKE ROOS Prddmt CHRISTOPHER C. PAK VigPIwidd CHRISTOPHER W. HAMMOND C”ASANCHEZ4AMNO USA SPECHT MpmHToF RECREATION AND PARKS 200 NORTH WIN STREET Cm OF Los ANGELES CALIFORNIA JAMES K. HAHN W4YOR 1Sm FLOOR LOS ANGEIES. CA WOl2 (213) 4738833 FAX (213) 976-0014 April 24,2003 Ms. Ti-y Harris, Executive Dimtor Ms. Catherine Curry-Williams, Executive Program Directot Shane’s Inspiration 4804 Laurel Canyon Blvd., #542 Los Angeles, CA 9 1607 Dear Tiffany and Catherine: I am writing to thank you for the honor of being presented with the Shane’s Inspikation Hem Award 2002. In the coming years, I will have the great pleasure of overseeing the application of $9.5 million designated by the State to develop Universalfy Accessible Playgrounds throughout the City of Los Angeles. This generous ddon was inspired by Shane’s InspMon’s extraordinary vision and community outreach, which lead to efforts by Assemblyman Tony Cardenas to champion this funding Program. The award ceremony and press conference which took place at Aidan’s Place provided a wonderful oppomity to meet the children with disabilities and their families who so fkdy played on this unique playground. I was especially moved by the father who spoke at the ceremony on the important role Shane’s Inspiration has played in his family’s life, allowing all of his children to finally have the opportunity to play together. It is my wmn&mt, through partnership with Shane’s ~nspiration, to make os Angeles the preeminmt leader in the area of Universally Accessible play. The $9.5 million will create a playground in each City Council district, making Los Angeles the first in the nation to establish a comprehensive recreational plan to serve children of all abilities through the medium of play. The collective work of the Los Angeles Reneation and Parks Department with the expertise and vision of Shaoe’s Iiwpiration will create a prototype to inspire other municipalities to create these extraordinary environments for the children of their community. I look forward to a long journey together on behalf of children of all abilities throughout Los Angeles. MANUEL A. MOLLINEDO General- AN EQUAL EMPLOYMENT OPPORTUNITY - AFFIRMATIVE ACTION EMPLOYER CITY OF LOS ANGELES CALIFORNIA JAMES K. HAHN MAYOR TRAVEL - MAKING A BETTER WEST Fun for all A California duo builds playgrounds for children of all abilities By Cw Taggart * Photograph by Todd Bielow l~ne’s Inspiration, a playground in Los Angel=’ Grif- fith Park, has just about everything a kid needs S to have a good time. There’s a play structure resem- bling a rocket ship. Swings, some with simple seats and others with straps, stand next to a sandpit that’s stocked with digging toys. Nearby, a panel spells out “I feel good” in English and braille. Feeling good is what Shane’s Inspiration is all about. It’s also revolutionary-the first universally accessible play- ground in the West. Opened in 2000, Shane’s Inspiration exists because of Catherine Cuny-williams and Tiffany Harris, friends and fellow actrcsscs who had produced plays togethcr. In 1997, Curry-Williams’s &st child, Shane Alexander, was born with spinal muscuIar atrophy. He lived only 14 days. A few months aftcr her son’s death, Curry-Williams read about a woman in West Hartford, Connecticut, whose child had the same disease as Shane. Amy Jaffe Barzach had built a playground in her child’s memory and startcd a nonprofit organization to promote universally accessible play cnvironments. “It felt like God saying, ‘Here’s something to get you out of your bed,’” Curry-Williams says today. She and Hank discovered that the city of Los Angela did not have a single fdy accessible playground, leading them to ponder how they might bring Banach’s concepts out West. ,. A place where everybody can play The difference between playgrounds equipped with a single whcclchair ramp and what Hams calls truly “playable” structures can brcak a child’s heart. “A ramp would lead to nowhere,” Harris says. ‘ijust getting kids closer to the things they can’t play on. Thai closcs the door on play- ing with other chddren.“ Togcrhcr, she and CurryWilliams raised $1 million to build Shane‘s Inspi- ration. forming a nonprofit by the same name along the way. The goal was to integrate able-bodicd and dis- abled kids in a 2-acre world of play trains, castles, ships, and dinosaurs. Visit the playground and you will see that their plan has worked. ail- drcn, says Harris. “are all just there playing at the park-there are no spccial scctions.” Curry-Williams and Harris had stumbled upon a vast need. After the opening, the nearby community of Westwood asked the duo for assis- tance in building anothcr playground. With help from the family of Aidan Gaffney, a local disabled boy, they raised $900,000. The playground was christened Aidan’s Place when it opened, months after its namcsake passed away. The two are now helping to build morc than 40 playgrounds, including 21 in Los Angela and others in cities from San Diego to Mumbai, India. Barzach describes the women’s efforts as “superhuman.” Today, Curry-Williams and Harris have 3-year-old daughters, born five weeks apart. When the girls play to- gether, they often pretend to bc moms going ofF to work. “Good-bye,” Curry-Wlliams’s Wi- ter, Grace, will tell her friend Jade. “I’m going to build playpmds.” + Accessible playgrounds For more information, contact the Shane’s Inspiration office: 4804 Laurel Canyon Btvd., Ste. 542, Valley Mllage, CA; (878) 752-5676. Aidan’s Place. Westwood Recreaton Com- pk, 7350 Sepuiveda Blvd., Las Aqe/es. Comna-Norco Family YMCA. 1331 River Shane’s Inspiration. 4800 Crystal Spriqs DL Gnftith Park, Los Angeies; (818) 752- 5676. Rd.. COKI~XX CA: pO9) 736-9622. 32 SUNSET SEPTEMBER 2003 33 (December 2002 Issue) The 2002 Heroes for Health Awards Call them angels of wellness, or saviors of the sick. These women have made other people's health their number one priority -- and we want to celebrate them for it. This year, Good Housekeeping teamed up with GE to present the first-ever Heroes for Health Awards. Meet our miracle workers. She lost a child -- and found a loving cause * Catherine Curry-Wllliams and Tiffany Harris (PHOTO: LARSEN AND TALBERT) In the summer of 1996, life seemed perfect for 37-year-old Catherine Curry-Williams of Los Angeles. Just wed, she discovered that her honeymoon had produced the most precious of souvenirs: a baby. On March 28, 1997, seven-pound Shane Alexander Williams entered the world. Then, suddenly, time stood still. Shane was born with the severest possible form of spinal muscular atrophy, a rare genetic neuromuscular disease that left him para- lyzed and unable to breathe without a respirator. There was no cure. A fleeting 14 days after baby Shane was born, he was removed from the respirator and placed in his parents' embrace. Within moments, he passed away. For months, Curry-Williams, an actress, felt completely drained. But as the one-year anniversary of her child's death approached, Curry-Williams and her husband sensed a need to honor their son. Around this time, Curry-Williams began hearing stories about another woman in Connecticut, who had lost her child to the same disease that took Shane. She was becoming known for creating a playground designed specifically to meet the needs of disabled youngsters -- as a tribute to her son. Inspired, Curry-Williams called her best friend, Tiffany Harris and the two watched a video about the Connecticut playground. "In that instant, I knew I'd found a new pur- pose in life," Curry-Williams says. And in Harris, she had a willing partner. After exten- sive research and many talks with parents of disabled kids, Curry-Williams and Harris created Shane's Inspiration, a nonprofit organization, in June 1998. For more than two years, the duo made their case for a Universally Accessible Playground to anyone who would listen. Word of the women's crusade reached then-Los Angeles City Councilman Mike Feuer, who helped secure two acres of land in Griffith Park in L.A. for their project. On September 21, 2000, Shane's Inspiration playground opened. Today, Shane's Inspiration has more visitors than any other playground in Los Angeles. The women have since opened a second Universally Accessible Playground in Westwood, and plans are in the works for some two dozen new sites. Curry-Williams and Harris refuse to take credit for these exceptional achievements. "We feel humbled by the opportunity to do this work. The challenged children we serve - and their families - are the heroes here." Of course, even heroes need their guardian angels to bravely lead the way. organizational spotlight development. But Shanc’s hwimtion also accomplished sonicthing no one planned BUILDING EXCEPTIONAL PLAYGROUNDS. .. on; they built cornmunities. Shane’s Inspiidtion’s first playground, GrifIith Park, providmg two acres of inde- E x c e p t i 0 n a I namwf after Shane is located irl pendent play, sensoly-nvh and physicaUy challengmg equpmcnt and the rare oppor- Corn m unities turuty for dsabled and able-hochetl clul- By Terry Marks ir losing their son, Shane Alexanaer. A’. to qiinal muscular atrophy in 1997, C‘alherincx (h-ry-Williams and Scott iVi&r~s hat1 a vision ulat Uiey, along with Uic!ir lift4ong friend ‘IllTaiy Hamis, turned into reality. IIad Shane lived, hc would have spent his life in a wheelctvak. Shane would have heen denied oiir of the most fun&uncntzll rights of chddtiooci: thr right to play indc- pondmtly with liiends and family at a nc,ighborhood playground. Shane’s In- spimfion, a non-profit. organi7ation dedi- cated to inipwving thr lives of chilciren with disabilities, was rreated to build wu- versallv acccsil~liblc playgroin& Uiat allow children or all abitilies to play alongside one anotlier. Five years haw pas& since Uic invep- tion of lhis vision, three playgrounds have been built and ovm twenty-one more m in drtin to experience and accept one anolhcr. After Shanc’s Inspiration was lormc?d in ZOOO, the organization was inundated with The organization has initiated 21 other Universally Accessible Playground projects throughout Southern California and beyond. requests from fdes who wanted acccs sible play in thcir commiinities. This prompted them to work with a family to design and build the second Universally Accessible Playground in Los ,411gc:Cl(~s, “Aidan’s Place.” located in Wrst Los Angeles. The third playground, in Corona, CA, was completed in Augwst of this year and that community jus1 recently celebrat- ed their opening day. The organization llas hutiatcd 30 other Universally Accessible Playgrowid projects across the country hni Sout.hern CXfornia to Sew York City; aid has rcccntly taken an inlcniational leap to Bombay, India. Dw-irig this process, the foimders realized that building a playgt.oiux1 w-as only the fmt hurdle; msuring its usage. particularly by childwn and families with speed needs, was Ihc k(y to snccm. The only way to emure usage aid “own- cmhip” of the playfirouncl wi~q to involve EP MAGAZINE - DECEMBER 2003 67 I I ~.o,,titru,d.r,~,,,, IHIo~ ti; community memhers on an intinuti? basis. Reaching out to hiiild community support became essential for rwry projrd under- taken. .4s a IPsnlt, Shane’s Inspiration cre- ated a comniimily numearh Pro@a~n lo bring their playground profbssionals in touch with families, conununity leaders and governmental partners. 68 DECEMBER 2003 EP MAGAZINE Excluding children with disabililities from play envlronments at an early age hinders their ability to develop emotionally, cognitlvely and physically. Guiding thw stakeholders lluuugh the development prows of phygruund plan- rhig are the Shane’s Inspiration design pro- fessionals. They assist in creating and iimmging a budget, hidcling coniniluiity support. naLigating govc.nmieiit regula- Lions. securing land for tlie sites, choosing arid Iiegoiiating with vrndors. providing guidance regarding raising financial sup port for each playgmiind and c~valuatiig the su(’ccss of every projert. This coniprehensi\e Pr0~r;un m-a the wed in buildhy: exceptional ctmmiunitirs. Added lo Ulis effort Wac a frrv t)ussing/ field trip program that bring? 2,MMJ chi- dren annually to the existing playgrnurids. In addition, Sharte‘s Inspiration outrwch incliides public speaking engagements ai local schools, rcgiotd centers. hospitAs and conununitics; newsletters targeting children and adulw with disabilitirs; 8 newsletter written by and for children with di.sahilities. their peer; and sihlingss; and hospital research collaborations that iden- ti& existing disabilities and thvir COI+C sponding needs. Bwaiise there have brcn so few opporiu- niiies for children -3th dkhilitirs tu UI~T- act with their ahlf-hndied peers. nuny cld- <ken have spent their lives isolated and stig- maiiaed. Excluding then1 from play cmiron- nients at an early agr hindcrs their ability lo cle\;elop eniorionauy, cogmtively and physi- cally. Studies have provrn that intcLgmted ylay helps children with disabilities cievelop hie and gross motor skills, rrrrptivr coni- niunication skills, cerebral fiinrtions, physi- cal strength arid wid skills, including incle- pendeirce arid sell esteem. hilegrated play also gives ahlr-bcxlird children the oppommiQ tn cxprriencc arid accept children with di.wt)ilitics as rqilals. At Shane‘s Jnspiration‘s I~nivrrsally Accessible Playgrounds, the .wnsn~y-rich rquipnieiil is independently playahlr for cM&rn wiLh disabiliries while extitq and ~:hall~~ngi~ig for able-bodied children. These pliLygoumIs delight all children, providirip a place where compasion arid at:cc’ptance can 1lOUriSll. The playgrounds not only crpate oppor- tunities for clddren of all ahilities to niert, but oppunuruties foI parents and sihlings as well. Thosc who were hesitant to take their child uit,h a tlisabilily 10 a public play- grnnnd for fear of tliscririiialion now have an opportunity to mnet’l orher I’aniilies who have similar lir rlr~eriences. This comniunity b growing by leaps aid hounds. kliendships are l’orniing. families are coining to !mow one another and sib- lings are playing alnngsidc. thek slmial needs brothers and sistrrj for ttie fits time. In addition, rvrry day Shane’s llspiration uihiesses new compassion and acceptatice as they watch their tonununily grow and the children floiuish. Shane’s Inspiration WAS rccrntly hon- ored with the first “Herors for Ileal111 Award’ by Good Hoiisekrrping hhg- mine and General Electric, fnl1owc.d by an interview with Matt 1mrr on “Thr Today Show.” Our playgrounds haw rc’- wived nunierous awards, inchiding: “Best Play-ground* from 1x1s Angrlcs .Magazine’s “101 Things to Shout Aboiit,” tlie L.A. Parent Award for Oiitsumding Playgrounds and t.he Architrrtural Landscape Design Award from thr LA. Business Council. EP ,- I l!aXlgdeS MAOAZINE Plaggmwnd The range and quantity of the equipment at SHANE’S INSPIRATION in Griffith Park and AIDAN’S PLACE in West L.A. (built by the same organization) are unparalleled - seesaws, swings, springy things, and contraptions creative enough to tempt parents. Most equipment sprouts from a thick rubberized surface and is handicap accessible. Internal Revenue Service Department of the Treasury P. 0. Box 2508 Cincinnati, OH 45201 Date: March 28, 2001 Shanes Inspiration % Catherine Curry-Williams 4804 Laurel Canyon Blvd 542 Valley Vlg, CA 91607-3717 Person to Contact: Mr. Mason 31-07424 Customer Service Specialist Toil Free Telephone Number: 8W IJR to ):SO pm. EST 877-829-5500 95-4760497 July 1999 June 30,2004 Federal Identification Number: Advance Ruling Period Begins: Advance Ruling Period Ends: Dear Sir or Madam: This is in response to your telephone inquiry of requesting a copy of your organization's determination letter. This letter will take the place of the copy you requested. Our records indicate that by a determination letter issued in November 1999, your organization was recognized as exempt from federal income tax under section 501 (c)(3) of the Internal Revenue Code. Because your.organiration was newly created, we did not at that time make a final determination of its foundation classification under section 509(a) of the Code. However, based on information submitted with the application, we classified your organization as one that is not a private foundation within the meaning of section 509(a) of the Code because it can reasonably expect to be a publicly supported organization described in sections 509(a)( and 170(b)( l)(A)(vi). According to this advance ruling, your organization will be treated as a publicly-supported organization and not as a private foundation until the end of the advance ruling period as shown above. Wjthin 90 days from the end of the advance ruling period, your organization must submit to us information needed to determine whether it has met the requirements of the applicable support test during the advance ruling period. This information is currently supplied on the Form 8734, Supporf Schedule for Advance Ruling Period. Grantors and contributors may rely on the determination that your organization is not a private foundation until 90 days after the end of its advance ruling period. If the organization submits the required information within 90 days, grantors and contributors may continue to rely on the advance determination until the Service makes a final determination of your organization's foundation status. The classification discussed in paragraph three (3) was based on the assumption that your organization's operations would continue as stated in its application. If your organization's sources of support, or its character, method of operations, or purposes have changed, please let us know so we can consider the effect of the change on your organization's exempt status and foundation status. Your organization is required to file Form 990, Return of Organization Exempt from Income Tax, only if its gross receipts each year are normally more than $25,000. If a return is required, it must be filed by the 15th day of the fifth month after the end of the organization's annual accounting period. The law imposes a penalty of $20 a day, up to a maximum of $lO,OOO, when a return is filed late, unless there is reasonable cause for the delay. c 7 c Founders Catherine Curry-Williams Scott Williams Tiffany Harris Our Board of Directors President, Anthony G Peyrot, CPA , Lagnese, Peyrot 62 Mucci, Inc. Vice President, Hope Bourman, Senior Loan Consultant, Mortgage Financial Planner Treasurer, Lucy Matsumoto, Prudential California Realty Secretary, J. Thomas Fagan, S.V.P./Sr. Bus. Exec., Bank of America Tiffany Harris, Executive Director, Shane's Inspiration Madelyn Alfano, Owner and CEO, Maria's Italian Kitchen Dan Hulbert, Executive Director, CAPC, Inc. Jeff Kossack, Professional Container Service, Inc. Joel Ring, Esq., MSR Management Judge David Sotelo, Los Angeles Superior Court Our Staff Tiffany Harris, Executive Director Virginia M. Hatley, Landscape Architect, Director of Design Brad Thornton, Director of Project Development Marci Moran, Director of Community Outreach & Special Events Michael Palozzolo, Director of Dream Fulfillment Mamie Noms Fisher, Program Associate Shirley Bresnick, Community Outreach Associate Marjorie Stark, Ofice Administrator CRIATIMG UYIVERSALLT lCCESSllLC FLAVGROUMPSJ FOR CHILOREM OF 111 ABILITIES 4804 Laurel Canyon Blvd., #542 Valley Village, CA 91 607 www. shanesinspi ratlon. org (818) 752-5676 Fax: (818) 506-1232