Loading...
HomeMy WebLinkAbout2006-04-04; City Council; 18511; Award Contract El Camino Real/Faraday Avenue Intersection Faraday Avenue/Orion Street Traffic Signal Faraday Avenue/Priestly Drive Traffic Signal FundsCITY OF CARLSBAD - AGENDA BILL 8 18,511AB# MTG. 4/04/06 DEPT. ENG TITLE: AWARD OF CONTRACT FOR CONSTRUCTION OF THE EL CAMINO REAL/FARADAY AVENUE INTERSECTION IMPROVEMENTS, FARADAY AVENUE/ORION STREET TRAFFIC SIGNAL, AND FARADAY AVENUE/PRIESTLY DRIVE TRAFFIC SIGNAL, PROJECT NOS. 36071, 36211, AND 63041, AND APPROPRIATION OF FUNDS RECOMMENDED ACTION: Adopt Resolution No. the construction of the 2006-083 El accepting bids and awarding a contract for Camino Real/Faraday Avenue Intersection Improvements, Faraday Avenue/Orion Street Traffic Signal, and Faraday Avenue/Priestly Drive Traffic Signal, Project Nos. 36071, 36211, and 63041, and appropriation of funds. ITEM EXPLANATION: The subject project consists of the construction of new traffic signals at the Faraday Avenue/ Orion Street and Faraday Avenue/Priestly Drive intersections, as well as intersection widening and signal improvements at El Camino Real and Faraday Avenue. These improvements will accommodate the traffic volumes and patterns that will occur as a result of the extension of Faraday Avenue from Orion Street to the easterly city limit, which is currently being constructed by the developer of the Carlsbad Oaks North project. On December 20, 2005, through the adoption of Resolution No. 2005-375, City Council approved plans and specifications and authorized the advertisement for bids for construction of El Camino Real/Faraday Avenue intersection improvements, Faraday Avenue/Orion Street traffic signal, and Faraday Avenue/Priestly Drive Traffic Signal Project Nos. 36071, 36211, and 63041. Eight (8) bids were received on February 9, 2006, which are summarized as follows: CONTRACTOR 1. 2. 3. 4. 5. 6. 7. 8. Hillcrest Contracting Whitson CM Sierra Pacific West HTA Engineering & Construction Romero General Heffler Company, Inc. 3-D Enterprises Wier Construction BID TOTAL $1,239,141.00 $1,272,291.00 $1,278,780.16 $1,343,500.00 S1, 361 ,946.60 J51 ,399,735.00 $1,413,605.00 $1,514,250.70 The Engineer's Estimate for this project is $1,115,019. The apparent lowest responsive bidder is Hillcrest Contracting in the amount of $1,239,141, which is 10.7% higher than the Engineer's Estimate. Material suppliers indicate that costs for materials continue to increase significantly. Therefore, requesting new bids will not result in a lower construction cost. Staff has completed its review of all documents and finds that they are in order. Therefore, staff recommends that Hillcrest Contracting be awarded the contract. To accommodate the construction of the improvements of the right-turn lane along southbound El Camino Real, the City acquired public road and public utility easements from the property owners. Staff has obtained a right of entry from the property owners on the east side of El Camino Real to facilitate some relatively minor reconstruction of driveway and utility features associated with their properties. The right-of-way acquisitions were previously approved by Resolution Nos. 2006-064 and 2006-067. Staff is in the process of acquiring an additional 34 square feet of public road and public utility easement, valued at less than $2,000, at the southeast corner of El Camino Real and Faraday Avenue for the installation of a signal light. Staff is in discussion with the property owner. However, if agreement cannot be reached before contract approval, the signal location will be adjusted in the field to be within the City's current right-of-way. Page 2 ENVIRONMENTAL REVIEW: Carlsbad Municipal Code Section 19.040.060 directs the Planning Director to determine whether a public project is exempted from the environmental review process of the California Environmental Quality Act (CEQA). The Planning Director has determined that this project will not have a significant environmental effect. Accordingly, this project is exempt under Section 15061(b)(3) of the California Code of Regulations. This section states that CEQA only applies to projects that have the potential for causing a significant effect on the environment. This project will have no significant effect because it involves only negligible expansion of existing facilities and impacts no sensitive plants or animal life. FISCAL IMPACT: Following is a summary of estimated project costs. Cost Item Design Right-of-Way Acquisition Construction (Hillcrest Contracting) Construction Contingency (1> Project Administration and Inspection <2> Total Costs Funding Appropriated Funding Source Additional Appropriation Needed 36211 Faraday / Priestly $10,000 $0 $254,750 $25,500 $12,800 $303,050 $210,000 Gas Tax $93,050 63041 Faraday / Orion $0 $0 $251,750 $25,200 $12,600 $289,550 $240,000 TIF $49,550 36071 EGR / Faraday $170,000 $150,000 $732,641 $146,600 $36,700 $1,235,941 $1,141,000 TIF $94,941 Total $180,000 $150,000 $1,239,141 $197,300 $62,100 $1,828,541 $1,591,000 $237,541 Notes: 1) Construction contingency is 10% for signal construction (36211 and 63041) and 20% for widening (36071) based on construction bid. 2) Project administration and inspection is 5% of construction bid. Staff is recommending that an additional $237,541 be appropriated from the Traffic Impact Fee (TIF) and Gas Tax fund, as shown in the above table, to fully fund the improvements included in the project. The increase in total project costs is attributed to a $124,122 increase in the construction bid over Engineer's Estimate, a recommended $58,419 increase for contingency, administration, and inspection costs, and $55,000 for miscellaneous engineering costs. EXHIBITS: 1. Location Map. 2. Resolution No.2006-083 accepting bids and awarding construction contract for the construction of the El Camino Real/Faraday Avenue Intersection Improvements, Faraday Avenue/Orion Street Traffic Signal, and Faraday Avenue/Priestly Drive Traffic Signal, Project Nos. 36071, 36211, and 63041, and appropriation of funds. DEPARTMENT CONTACT: Eva Plajzer, (760) 602-2787, eplai@ci.carlsbad.ca.us LOCATION MAP PROJECT AREA NOT TO SCALE PROJECT NAME EL CAMINO REAL /FARADAY INTERSECTION IMPROVEMENTS, FARADAY / ORION AND FARADAY/PRIESTLY TRAFFIC SIGNALS PROJECTNUMBER 3607-1 3621-1 EXHIBIT 1 DRAWN BY: SCOTT EVANS, CARLSBAD ENGINEERING DEPT. 11/17/05 C:\CAPITAL\PLANT2\X07-3621.DWG 1 RESOLUTION NO. 2006-083 2 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF 3 4 5 36071. 36211. AND 63041. AND APPROPRIATION OF FUNDS. 6 WHEREAS, the City Council of the City of Carlsbad, California, has determined it 7 necessary, desirable, and in the public interest to construct intersection and traffic signal Q improvements at the El Camino Real/Faraday Avenue intersection and traffic signal improvements 9 at the Faraday Avenue/Orion Street, and Faraday Avenue/Priestly Drive intersections; and 10 11 12 13 20 21 22 23 CARLSBAD, CALIFORNIA, ACCEPTING BIDS AND AWARDING CONTRACT FOR THE CONSTRUCTION OF THE EL CAMINO REAL/ FARADAY AVENUE INTERSECTION IMPROVEMENTS, FARADAY AVENUE/ORION STREET TRAFFIC SIGNAL, AND FARADAY AVENUE/PRIESTLY DRIVE TRAFFIC SIGNAL, PROJECT NOS. WHEREAS, the project is exempt from the California Environmental Quality Act pursuant to CEQA Section 15061 (b)(3); and WHEREAS, a Notice of Exemption has been filed by the Planning Director in compliance with Section 21152b of the Public Resources Code (California Environmental Quality Act); and WHEREAS, on December 20, 2005, through the adoption of Resolution No. 2005-375, the City Council approved plans and specifications for furnishing of all labor, materials, tools, \ O equipment, transportation, and other expenses necessary or incidental to the El Camino 16 Real/Faraday Avenue Intersection Improvements, Faraday Avenue/Orion Street Traffic Signal, 17 and Faraday Avenue/Priestly Drive Traffic Signal Project, Project Nos. 36071, 36211, and 63041; 18 and 19 WHEREAS, eight (8) sealed bids were received on February 9, 2006 for the project; and WHEREAS, the lowest responsive, responsible bid for the project was submitted by Hillcrest Contracting in the amount of $1,239,141; and WHEREAS, on March 21, 2006, through the adoption of Resolution Nos. 2006-064 and 2006-067, the City Council authorized the acquisition of public street and public utility easements from BTINV, LLC and KW Fund l-Carlsbad 1, LP/Sunrise property associates, LLC, for the intersection improvements at El Camino Real and Faraday Avenue, Project No. 36071; and 25 WHEREAS, additional Traffic Impact Fee funds need to be appropriated in order to 26 construct the ECR/Faraday Avenue Intersection Improvements and the Faraday Avenue/ 27 Orion Street Traffic Signal; and 28 1 2 3 4 5 6 7 8 1. That the above recitations are true and correct. 2. That the bid submitted by Hillcrest Contracting in the amount of $1,239,141 for the9 project, is hereby accepted and the Mayor is here authorized to execute the contract for10 the construction of the El Camino Real/Faraday Avenue Intersection Improvements, 11 Faraday Avenue/Orion Street Traffic Signal, and Faraday Avenue/Priestly Drive Traffic Signal 12 Project, Project Nos. 36071, 36211, and 63041, in accordance with the plans, specifications, and 13 contract documents referred to herein. 14 16 WHEREAS, there are sufficient Traffic Impact Fee funds available for the additional appropriation; and WHEREAS, additional Gas Tax funds need to be appropriated in order to construct the Faraday Avenue/Priestly Traffic Signal; and WHEREAS, there are sufficient Gas Tax funds available for the additional appropriation. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carlsbad, California, as follows: 3. That the Finance Director is hereby authorized to appropriate $144,491 from the 15 Traffic Impact Fee fund for the project. 4. That the Finance Director is hereby authorized to appropriate $93,050 from the 17 Gas Tax fund for the project. 18 5. That the City Manager is hereby authorized to approve construction change orders 19 up to $197,300 for Hillcrest Contracting for the El Camino Real/Faraday Avenue Intersection 20 Improvements, Faraday Avenue/Orion Street Traffic Signal, and Faraday Avenue/Priestly Drive 21 Traffic Signal Project, Project Nos. 36071, 36211, and 63041. 22 /// 23 24 25 26 27 28 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 6. That the award of this contract is contingent upon Hillcrest Contracting executing the required contract and submitting the required bonds and insurance policies, as described in the contract, within twenty (20) calendar days of adoption of this resolution. The City Manager may grant reasonable extensions of time. PASSED, APPROVED AND ADOPTED at a regular meeting of the Carlsbad City Council held on the 4th day of April , 2006 by the following vote, to wit: AYES: Council Members Lewis, Hall, Kulchin, Packard, Sigafoose NOES: None ABSENT: ^^i^n/ / / „ /^ .vuiu/,, CLAUDE A. LEWIS, May ATTEST: LORRAI^EJ/L^OOD, CUV Clerk (SEAL) G? El Camino Real and El Camino Real and Faraday Avenue Faraday Avenue Intersection Intersection ImprovementsImprovements Project LocationProject LocationTo Melrose Dr. Project OverviewProject Overview„„ImprovementsImprovements„„El Camino Real and Faraday Avenue IntersectionEl Camino Real and Faraday Avenue IntersectionÖÖEastbound Faraday Avenue Eastbound Faraday Avenue ––additional thru laneadditional thru laneÖÖWestbound Faraday Avenue Westbound Faraday Avenue ––additional right turn laneadditional right turn laneÖÖSouthbound El Camino Real Southbound El Camino Real ––additional right turn laneadditional right turn laneÖÖSignalSignal„„New traffic signalsNew traffic signalsÖÖFaraday Avenue and Orion StreetFaraday Avenue and Orion StreetÖÖFaraday Avenue and Priestly DriveFaraday Avenue and Priestly Drive Existing Intersection ConfigurationExisting Intersection ConfigurationEl Cam ino R ealFaraday Avenue ImprovementsImprovementsEl Cam ino R ealFaraday Avenue Work ExecutionWork Execution„„Work hoursWork hours„„8:30 AM to 3:30 PM or night work (9 PM to 5 AM)8:30 AM to 3:30 PM or night work (9 PM to 5 AM)„„Phasing of workPhasing of work„„Eight phasesEight phases„„Phases do not occurPhases do not occurat the same timeat the same time„„Contractor to develop detail traffic control plansContractor to develop detail traffic control plans Phasing of Work at IntersectionPhasing of Work at IntersectionPhase IIPhase IV & VPhase IVPhase IIIEl Cam ino R ealFaraday Avenue Traffic ControlTraffic Control„„Contractor will develop and submit traffic Contractor will develop and submit traffic control plans to the City for review and approvalcontrol plans to the City for review and approval„„Transportation Division will provided final Transportation Division will provided final approvalapproval Conceptual Traffic ControlConceptual Traffic ControlPhase IIPhase IIEl Cam ino R ealFaraday Avenue Conceptual Traffic Control Conceptual Traffic Control Phase IIIPhase IIIWater meter replacement work onlyEl Cam ino R ealFaraday Avenue Conceptual Traffic ControlConceptual Traffic ControlPhase IVPhase IVWater meter replacement work onlyEl C am ino RealFaraday Avenue Conceptual Traffic ControlConceptual Traffic ControlPhase VPhase VEl Cam ino R ealFaraday Avenue Project ScheduleProject Schedule„„Award of contract Award of contract ––April 2006April 2006„„Begin construction Begin construction --June/July 2006June/July 2006„„Complete construction Complete construction ––December December 2006/January 20072006/January 2007 Questions?Questions?