CITY OF CARLSBAD - AGENDA BILL 13
AB# 18,572
MTG. 05/16/06
DEPT. FIN
TITLE:
PROPOSED 2006-2007 TO BUILDOUT
CAPITAL IMPROVEMENT PROGRAM
eJJf
DEPT. HD. -^ """"-
CITYATTY. US^
OITV HflOn \ f 1 -^OIT Y IVHjn *3^ y
RECOMMENDED ACTION:
Accept report. Set public hearing for June 20, 2006.
ITEM EXPLANATION:
The Preliminary Capital Improvement Program (CIP) is a planning document as well as a budget
document. It incorporates the current status of all of the City's capital funds with the capital
construction budgets and development projections for the upcoming years, and then projects future
revenues and expenditures for all known projects until the buildout of the City. The CIP is a
financial planning document, not a commitment for spending. All construction costs are estimates
and are reviewed and further refined each year. The information shown in subsequent years is to
provide the most comprehensive snapshot of all the known future facilities the City of Carlsbad
plans to construct.
Project Ranking Criteria
Health and Safety
Legal Mandates
Operating Cost Impacts
Growth Management Standards
Other Standards
Completion of Basic Infrastructure Linkage
Public Opinion/Surveys
Funding & Timing Opportunity
Overview - Fiscal Year 2006-2007
This year the CIP process was reviewed
and improvements were implemented. Staff
began by evaluating the construction
schedules for City facilities in conjunction
with the workload of the staff needed to
complete the projects. Whenever
reasonable, projects were moved into the
appropriate year or eliminated if no longer
needed. In the 2006-07 CIP there are
approximately 123 planned projects to
buildout. All projects were prioritized using the criteria shown in the table. An evaluation of the
availability of capital construction funds as well as operating funds was then factored into the
process. Finally, this year additional work was done in analyzing some of the larger projects. These
projects were reviewed in detail and compared to similar projects in the public sector to determine
the most accurate cost estimates. In several cases costs were increased to reflect the comparable
actual cost results of similar facilities as well as higher construction costs.
We are continuing to see the cost of construction materials escalate. Over the past year building
costs have risen by 4.6%. This has continued to
push up the cost of all of the City's construction
projects. With the exception of one funding
source, there are sufficient revenues projected to
build the projects listed in the CIP. The recent
cost escalation has increased the projected
shortfall in the Public Facilities Fees (PFF) Fund at
build out of the City from the $4.8 million projected
last year to $5.0 million this year. While this is not
an immediate problem, it is an indication that the
City may not have the money to build all of the
projects listed under the PFF program.
Building Cost Index
10.0%
8.0% -
6.0% -
4.0% -
2.0% -
0.0%
1998 1999 2000 2001 2002 2003 2004 2005
PAGE 2
Several adjustments are recommended in this year's CIP to keep the deficit in PFF from increasing
further. The recommended adjustments, as reflected in the accompanying documents, include:
• Loaning the PFF Fund $4.9 million from the Gas Tax Fund. There is approximately $4.9
million of traffic signals and medians currently in the PFF Fund that are eligible to be funded
by Gas Tax revenues.
• Loaning the PFF Fund $3.6 million from the General Capital Construction Fund (GCC).
There is approximately $3.6 million currently in PFF Fund for the Tennis Courts at Poinsettia
Park that could be funded by the GCC. The tennis courts were approved by a vote of the
people in 1989.
• Loaning the PFF Fund $2.5 million from the GCC. The pool at Alga Norte Park was approved
by a vote of the people through Prop. C in 2002.
• Loaning the PFF Fund $1.0 million from the GCC. There is approximately $1.0 million
currently in PFF Fund for land acquisition for Fire Station #3 that could be funded by the
GCC.
These adjustments allow the PFF fund to remain balanced until sometime after 2016. During this
time an evaluation of the remaining projects in this fee program can occur and Council will have an
opportunity to revise the future construction plans of PFF funded projects and potentially obtain
additional funding.
Major Projects For Fiscal Year 2006-07
Some of the major projects scheduled to receive new or additional funding in the 2006-07 CIP are
summarized below. More information on all the projects can be found in the accompanying CIP
report.
• Alga Norte Park and Aquatic Center - This park site consists of 30 acres in the Southeast
Quadrant with planned amenities including ball fields, soccer fields, picnic areas, tot lots, a skate
park, a dog park, restrooms and parking facilities, and an aquatic center. The aquatic center will
include a 50-meter competition pool, a 12-lane instructional pool and a therapy pool as well as a
water play area complete with a lazy river and 2 water slides. The total cost of the Park and
Aquatic Center will be approximately $40 million.
• Library Learning Center - This project is to provide a permanent location for the Adult Learning
and the Centre de Informacion programs. The existing building adjacent to Holiday Park will be
remodeled and a second story, approximately 5,000 square feet, will be added.
• Senior Center Expansion - The 1st floor area of the existing Senior Center will be remodeled to
include additional amenities for the senior community. The 2nd floor will be remodeled to house
City offices.
• Public Works Center - The project is for the construction of the Public Works Center and
associated improvements. It includes offices, shops, a yard, warehouse and parking to
accommodate the Public Works department.
• Fire Station No. 3 - A new 6,200 square foot permanent facility is scheduled to be built in 2009-
10. The total cost is projected to be approximately $6.6 million. This fire station is required to help
ensure a five-minute response time within the northeast part of the City as development in that
area occurs.
• Vista/Carlsbad Interceptor - Reaches 13 to 15 of the project, extending from the Encina Facility
to the Agua Hedionda Lift Station, are scheduled in the next five years. This project is required
to handle buildout flows and replace deteriorated pipeline, and is partially funded by the City of
PAGES
Vista. The current estimates for this project are approximately $14 million.
• Pavement Management - A street can last a lifetime if it is properly maintained. Part of that
maintenance program is the sealing and overlay of the existing street surface. Carlsbad's local
streets are maintained on a regular cycle to ensure a good riding surface and to extend the life of
the street. In addition, any problem areas are addressed as they are identified.
• Concrete Repair - This is a new companion program to the pavement management program. It
will insure that curbs, gutters and sidewalks are also properly maintained. By allocating the
funding both pavement and concrete replacements can be accomplished at the same time. This
will help maximize efficiencies and reduce inconvenience to the citizens.
Future Facilities
The CIP for 2006-2007 to Build-out outlines approximately 123 future projects at a cost of
approximately $415 million as shown below.
CIP Projects - All Future Projects
Type of Project
Streets/Circulation
Civic Projects
Parks
Sewer
Water
Drainage
Other (loans)
Total Future
Quantity
51
8
10
19
26
9
N/A
123
Total Cost
102,200,754
94,81 1 ,698
72,325,053
54,287,436
36,016,971
16,153,800
39,249,931
$415,045,643
Specific timing and cost estimates for all planned capital projects are identified in the
accompanying report and schedules.
There are several projects identified in the CIP for which there is no identifiable funding source.
The City will investigate obtaining possible outside funding such as Federal and State grants,
loans, or other financing sources. These projects are:
El Camino Real Widening from Cassia Road to Camino Vida Roble
Palomar Airport Road Widening and Bridge Reconstruction
Poinsettia Lane - Reach "E"
Cannon Road - Reach 4 - College to City Limits
Cannon Lake Park (6.7 Acres)
Hosp Grove/Buena Vista Lagoon Improvement
The proposed Capital Improvement Program for fiscal year 2006-07 is an exhibit to this report.
Staff is requesting that Council set the public hearing for the adoption of the CIP as well as for the
City's Operating budget for the meeting of June 20, 2006. During this meeting, comments from
interested citizens and others is welcomed.
FISCAL IMPACT:
Upon adoption of the Capital Improvement Program budget on June 20, 2006, the total new
appropriations on July 1, 2006 will be $43,958,938 from the CIP funds shown on the attached
schedules. Existing expenditures and appropriations shown in the attached schedules are through
April 30, 2006. In addition, revenue projections are provided to show the cash flows and balances
for each of the funds.
PAGE 4
EXHIBITS:
1. 2006-2007 Preliminary Capital Improvement Program.
DEPARTMENT CONTACT: Lisa Irvine; (760) 602-2430 Lirvin@ci .carlsbad. ca.us
2006-2007 CAPITAL IMPROVEMENT PROGRAM
OVERVIEW
The City of Carlsbad Preliminary Capital Improvement Program (CIP) is a planning document that
outlines the expenditure plan for future capital projects and the corresponding revenues to pay for
those expenditures. The CIP is a financial planning document, not a commitment for spending.
All construction costs are estimates and are reviewed and further refined each year. Spending
authorization is given only at the time the City Council formally adopts the proposed budget, and,
at that time, funds are only appropriated for the following fiscal year. The information shown in
subsequent years is to provide the most comprehensive snapshot of all the known future facilities
the City of Carlsbad plans to construct.
The 2006-2007 Preliminary Capital Improvement Program outlines
approximately $44.0 million in new appropriations to provide additional
funding for the continuation of existing projects as well as funding for
new projects. Projected revenues during the fiscal year are estimated at
$70.8 million. Revenues are collected as building permits are issued,
and as the need for facilities arises, the money is used to fund the new
facilities. As the City continues to grow and develop, there is a
corresponding increase in the demand for development-related services
and new facilities. To ensure that the necessary infrastructure and
facilities are built on a schedule that meets or exceeds this demand, the citizens of Carlsbad
adopted a Growth Management Plan in 1986. The Growth Management Plan states that unless a
standard level of facilities is available to meet new demands resulting from the City's growth,
development cannot proceed. This Plan is the foundation for making decisions about the timing
and prioritization of the capital projects under consideration. A discussion of the City's Growth
Management Plan is located at the end of this report.
The remainder of the report explains the process and the results of the City's plans for its capital
facilities. With the exception of one funding source, there are sufficient revenues projected to
build the projects listed in the CIP. A large increase in the cost of construction materials has
occurred over the past 3 years pushing up the cost of all of the City's projects. This cost
escalation has raised the projected shortfall in the Public Facilities Fees (PFF) Fund at build out of
the City from the $4.8 million projected last year to approximately $5.0 million this year. It is also
important to note that as the City approaches build out there are fewer available units that can be
charged PFF. While this is not an immediate problem, it is an indication that the City may not
have the money to build all of the projects listed under the PFF program or will need to pursue
other funding options.
Several adjustments are recommended in this year's CIP to keep the deficit in PFF Fund from
increasing any further. The recommended adjustments, as reflected in the accompanying
documents, include:
• Loaning the PFF Fund $4.9 million from the Gas Tax Fund. There is approximately $4.9
million of traffic signals and medians currently in the PFF Fund that are eligible to be
funded by Gas Tax revenue.
• Loaning the PFF Fund $3.6 million from the General Capital Construction Fund (GCC).
There is approximately $3.6 million currently in PFF Fund for the Tennis Courts at
Poinsettia Park that could be funded by the GCC. The tennis courts were approved by a
vote of the people in 1 989.
• Loaning the PFF Fund $2.5 million from the GCC. The pool at Alga Norte Park was
approved by a vote of the people through Prop. C in 2002.
• Loaning the PFF Fund $1.0 million from the GCC. There is approximately $1.0 million
currently in PFF Fund for land acquisition for Fire Station #3 that could be funded by the
GCC.
-*
2006-2007 CAPITAL IMPROVEMENT PROGRAM
These recommended adjustments allow the PFF Fund to remain balanced until sometime after
2016. It is important to remember that the projections attempt to estimate revenues for over 15
years into the future. The actual revenues may be more or less depending on many factors
including the rate of development, building valuations, interest rates and construction costs. If the
projections are accurate, it means that the City may have to either cut back on the proposed
projects or find alternative funding sources for the projects.
It is still anticipated that the City will meet all of its growth management standards. This reflects
the Council's continued commitment to construct the facilities as needed to serve the current and
anticipated development occurring throughout the City.
PROJECT EVALUATION
What is the definition of a CIP project? Projects that are shown in the CIP are generally
defined as any construction (or reconstruction/replacement) of major infrastructure such as
streets, libraries, parks, fire stations and administrative facilities, water, sewer and drainage
facilities, and other facilities that are located on or in the ground. In most cases, the total
construction cost of each of these assets is recorded and tracked as part of the City's inventory of
capital infrastructure assets and other City-owned property.
The CIP and the Operating Budget are integral parts of the total City financing plan. This year the
CIP review process was analyzed and process improvements were implemented. Staff began by
evaluating the construction schedules for City facilities in conjunction with the workload of the staff
needed to complete the projects. Whenever reasonable, projects were pushed out into the
appropriate year or eliminated if no longer needed. In 2006-07 CIP there are approximately 123
planned projects. All projects were analyzed using the criteria shown in the table. An evaluation
of the availability of capital construction funds as well as operating funds was then factored into
Project Ranking Criteria
1 . Is the project required to ensure the health and safety of the citizens, as the result of a legal
mandate, or to maintain compliance with the City's Growth Management Plan? Are
operating funds available to operate the facility?
2. Is the project needed soon for growth management compliance?
3. Is the project needed now for other City standards (example: ball field standards)?
4. Does the project complete or provide part of the basic infrastructure (example: a linking road
segment)?
5. Are there other reasons to construct the project (example: timing or funding opportunity,
public demand)?
the evaluation process. Finally, this year additional work was done in analyzing some of the larger
projects. These projects were reviewed in detail and compared to similar projects in the public
sector to determine the most accurate cost estimates. In several cases costs were increased to
reflect comparable actual costs results of similar facilities as well as the higher construction costs.
Rildng Cost Index
£
V
19981999200020012002200820042005
Due to the recent volatility in construction costs, all
capital projects costs were updated to reflect the
latest increases in materials costs. This was done
through either a detailed review of the cost
components, or, in cases where the project is only in
its conceptual stages, by increasing the total cost by
the Engineering News Record (ENR) index. As seen
in the chart, building cost increases have increased
over the past several years with a 3.2% increase in
2003, a 9.7% increase in 2004 and a 4.6% increase
2006-2007 CAPITAL IMPROVEMENT PROGRAM
in 2005. The ENR is forecasting that annual inflation for building costs could dip back to the 3%-
4% range in 2006.
CAPITAL PROJECTS
The following two sections provide information about the major capital projects. The first section
focuses on projects planned in the next five years, and the second section contains an overview
of the entire expenditure plan through the buildout of the City. All construction costs are estimates
and only 2006-07 is appropriated. The information shown in the future years reflects the most
comprehensive snapshot of the known future facilities and their associated cost at this point in
time.
THE NEXT FIVE YEARS...
PARK PROJECTS
Trie City has planned a number of park projects over the next 5 years which will enhance the
recreational opportunities for Carlsbad's residents and allow the City to meet the standards for
park acreage as set forth in the growth management plan. Some of the more significant projects
are listed below.
• Alga Norte Park and Aquatic Center - This park site consists of 30 acres in the Southeast
Quadrant with planned amenities that include ball fields, soccer fields, picnic areas, tot lots, a
skate park, a dog park, restrooms, parking facilities, and an aquatic
center. The aquatic center will include a 50-meter competition pool,
a 12-lane instructional pool and a therapy pool as well as a water
play area with slides. A swimming pool complex was one of the
projects approved by the voters through Proposition C in 2002.
Construction is scheduled to begin in Fiscal Year 07-08. The park is
expected to cost approximately $16 million and the aquatic center is
estimated at $23.3 million.
• Senior Center Expansion - The 1st floor area of the existing Senior Center will be remodeled
to include additional amenities for the senior community. These may include items such as an
exercise rooms, art room, TV room, multi-purpose room, game room, health screening room and
a computer room. The 2nd floor will be remodeled to house City offices.
• Pine Park Community Center - The plan is to construct a 20,000 square foot community
facility and gymnasium. The facility will include basketball, volleyball, gymnastics, multi-purpose
rooms, meeting rooms, a teen center and office space. Design of this $9.1 million facility is
expected to begin in the 2009-10 fiscal year.
• Poinsettia Tennis Courts - Plans are currently underway to build seven tennis courts with
lighting at the Poinsettia Park.
• Poinsettia Park Community Center - Phase II of this 42-acre park includes amenities such as
a community facility, gymnasium, enclosed soccer field, tot lot, picnic areas, tennis complex,
clubhouse, stadium court and additional parking. The cost is expected to be approximately $13
million and design will begin in Fiscal Year 2010-11.
CIVIC FACILITIES
Civic facilities include a variety of facilities from which the City can offer its services to the public.
Many of these are still in the preliminary design stage and will be further defined over the next
several years.
• Civic Center - The Civic Center will consolidate City administrative operations and facilities
into a more centralized location. It also may include a variety of other services and recreational
7
2006-2007 CAPITAL IMPROVEMENT PROGRAM
opportunities for citizens and visitors. Council, citizens and members of the business community
have been participating in a visioning process to determine the anticipated needs for the citizens
and for the City. Once the process is complete, a site will be chosen and design and construction
can begin.
• Public Works Center - The project is for the construction of the Public Works Center and
associated improvements. It includes offices, shops, a yard, warehouse and parking to
accommodate the Public Works department. Initial estimates put the cost at approximately $26.4
million without any land acquisition costs.
• Safety Training Center - It is necessary to relocate the Police Department's shooting range
which was located on the new golf course property. In addition, there is a need for specialized
training facilities for other public safety purposes. This project was authorized under Proposition
C, which was approved in 2002. Preliminary design work is currently underway. In addition to
shooting range, the facility may include a fire training tower, residential training prop, outdoor
seating pavilion, fire administration building with classroom and storage facilities.
• Library Learning Center - This project is to provide a permanent location for the Adult
Learning and the Centra de Information programs. The existing building adjacent to Holiday Park
will be remodeled and a second story will be added.
• Fire Station No. 6 Relocation - Fire Station No. 6 is
currently located in a temporary facility in the southeast
quadrant of Carlsbad. Relocation of this station to a 6,200
square foot permanent facility along the east side of
Rancho Santa Fe Road is scheduled to occur concurrent
with the road alignment project. Total cost is projected at
$5.4 million. This fire station is required to help ensure a
five-minute response time within the southeast part of the
City as development in that area occurs.
• Fire Station No. 3 Relocation - Fire Station No. 3 is currently located at the corner of Chestnut
and Catalina. As the City grows eastward, relocation of this station is needed to help ensure the
five-minute response time. The new station is budgeted as a 6,200 square foot facility and the
current proposed site is next to Calavera Hills Community Park. The suitability of this location is
currently under review. Total cost is projected at $6.6 million and includes $1 million for land
acquisition.
STREET PROJECTS
Traffic congestion continues to be one of the top concerns among citizens. To help improve the
flow of traffic throughout Carlsbad and to keep the City's streets in top condition, there are a
number of street projects expected to be completed in the next five years. Some of the larger
streets include:
• Faraday Avenue and Melrose Drive Extensions east of El Camino Real - This project
encompasses the extension of Melrose Drive from Palomar Airport Road to the Carlsbad/Vista
city limits and the extension of Faraday Avenue from Orion Way to Melrose Drive in Vista. The
project would include the reconstruction of a portion of existing Melrose Drive in the City of Vista
and the construction of a bridge over the Agua Hedionda Creek along Faraday Avenue. This
project is being built by the developers in the area and reimbursed from the proceeds of a bond
issue. The formation of a Community Facilities District has been completed and will be the
mechanism for the issuance and repayment of the debt.
2006-2007 CAPITAL IMPROVEMENT PROGRAM
• Pavement Management - A street can last a lifetime if it is properly maintained. Applying seals
and overlays when roadways are beginning to show signs of distress can minimize the more
expensive repair/reactive maintenance activities. The proactive approach consists of the
scheduled application of a seal or overlay once every seven years. By using the proactive
approach the City can efficiently maintain over 330 miles of public roadways at an annual cost of
approximately $3.3 million dollars.
• Concrete Repair - This is a new companion program to the pavement management program.
It will insure that curbs, gutters and sidewalks are also properly maintained. By allocating the
funding both pavement and concrete replacements can be accomplished at the same time. This
will help maximize efficiencies and reduce inconvenience to the citizens.
WATER/ SEWER PROJECTS
The City's water and sewer projects are a vital component to the continued health and welfare of
it's' citizens. Most new lines are built and paid for by developers. As the City ages, the number of
these projects will grow as it becomes necessary to repair and replace the lines that are being
built today.
• Vista/Carlsbad Interceptor - Reaches 3, 11, 13 to 15 and the Agua Hedionda lift station are
scheduled in the next five years. This project is required to handle buildout flows and replace
deteriorated pipeline. It is partially funded by the City of Vista and the total estimated costs are
currently $28.9 million.
• Water Lines - Several major water lines are scheduled for construction
within the next five years:
- Cannon Road east of El Camino Real
Carlsbad Boulevard - south of Avenida Encinas
College Boulevard - various sections
Faraday Avenue extension
Melrose Drive from Palomar Airport Road to Faraday
CAPITAL PROJECTS THROUGH BUILDOUT
The CIP for 2006-2007 to buildout outlines approximately 123 future projects at a cost of
approximately $415 million.
CIP Projects - All Future Projects
Type of Project
Streets/Circulation
Civic Projects
Parks
Sewer
Water
Drainage
Other (loans)
Total Future
Quantity
51
8
10
19
26
9
N/A
123
Total Cost
102,200,754
94,811,698
72,325,053
54,287,436
36,016,971
16,153,800
39,249,931
$415,045,643
One of the largest expenditure categories is for park and recreational facility construction and
acquisition projects, which total approximately $72.3 million. Park projects planned within all
quadrants of the City are listed below in addition to the fiscal year design and/or construction is
expected to begin. More detail follows on specific projects not discussed earlier in this report.
2006-2007 CAPITAL IMPROVEMENT PROGRAM
PARK PROJECTS BY QUADRANT
Northwest Quadrant
Pine Avenue Park Community Building: 2009-10
Southwest Quadrant
Poinsettia Park Community Building: 2010-11
Aviara Community Building: 2016-21
Northeast Quadrant
Park Site Development: 2016-21
Southeast Quadrant
Alga Norte Park: 2006-07
Alga Norte Aquatic Center: 2006-07
Leo Carrillo Park Phase III: 2016-21
Citywide Park and Recreational Projects
Municipal Golf Course: 2006-07
Business Park Recreational Facility: 2016-2021
Veteran's Memorial Park: 2011-2016
• Aviara Community Facility - Located in the southwest quadrant of the city, this project includes
the construction of an 18,000 square foot community facility that would include meeting and
activity rooms, as well as park offices.
• Leo Carrillo Park Phase III - This park was once part of the original
2,538 acre working rancho, home to actor Leo Carrillo, his wife Edith, and
their daughter Antoinette. It is located in the southwest quadrant,
approximately one mile south of Palomar Airport Road. Initial restoration
was completed and the park opened to the public in 2003. Future work
includes renovation of the barn into a small theatre, restoration of the
Cantina, Equipment Shed, Blacksmith Shop, Carriage House, and Water
Tank. A botanical garden, picnic areas, and trails will also be added to
enhance the visitor's experience of the ranch.
• Veterans Memorial Park - This project is located south and east of Agua Hedionda Lagoon
adjacent to the future City Golf Course. The Master Plan includes the following improvements:
community leisure needs, open space interpretive area, parking and maintenance facility. Other
suggested uses for this park include an amphitheater complex, sports complex, conference center
and numerous other active/passive recreation amenities.
Construction of Civic facilities such as libraries, administrative facilities, police and fire facilities are
currently estimated at $94.8 million of the total planned capital expenditures to buildout.
Approximately 24.6% of future expenditures are planned for street and traffic signal construction
projects. Included in this category is construction of major roadways that will add east to west and
north to south connections and provide additional routes to the neighboring cities of Oceanside,
Vista, and San Marcos. Sections of these roads are already under construction by developers.
Additional roadway projects include replacement of the Carlsbad Boulevard Encinas Creek
Bridge, several road-widening projects, $3.8 million for concrete repair work and over $53 million
for future pavement overlay. Additional traffic signals are expected to cost approximately $5.3
million.
Sewer and drainage projects are expected to cost over $70 million, which includes over $20
million in sewer replacement projects. Funding is also provided for the repayment of bonds for
the expansion of the Encina Wastewater Facility, and the Encina Water Pollution Control Facility
projects.
o
2006-2007 CAPITAL IMPROVEMENT PROGRAM
Future water projects include construction of new waterlines, both potable and recycled,
concurrent with new development. Some of the major areas in which these installations or
upgrades are planned include segments of College Boulevard and El Fuerte, and along El
Camino Real. Replacement of existing potable and recycled waterlines is also included in this
category, and additional reservoirs are planned to increase storage for ultimate demands.
Specific timing and cost estimates for all capital projects are identified in the Detail Schedule of
Capital Projects (2006-2007 to Buildout) following this narrative.
UNFUNDED PROJECTS
The City has identified the following projects, which at this time have no identifiable funding
sources. The City will investigate obtaining possible outside funding such as federal and State
grants, loans, or other financing sources.
• El Camino Real Widening from Cassia Road to Camino Vida Roble
• Palomar Airport Road Widening and Bridge Reconstruction
• Poinsettia Lane - Reach "E"
• Cannon Road - Reach 4 - College to City Limits
• Cannon Lake Park (6.7 Acres)
• Hosp Grove/Buena Vista Lagoon Improvements
FUTURE GROWTH AND DEVELOPMENT
There are a variety of revenues that are used to fund the capital
projects. In order to estimate future revenues from development,
several assumptions about the rate and type of future development
need to be made. These assumptions can change from year to
year and correlate with the economic climate.
Every year, City staff evaluates all existing and future private development projects and compares
this information to the buildout capacity of the City using adopted general plans. Information about
existing development activity combined with estimates of how remaining net developable land
might develop are then summarized to prepare future projections about when and where
residential and non-residential development will occur. Finance Department staff prepare cash
flow schedules using current fund balances combined with future estimated fees paid by those
developments, then compares the available funds to the expenditure plan to ensure that funding
will be sufficient for construction of the capital projects as planned in the CIP. In addition to
evaluating whether or not capital funds are sufficient, significant operating cost impacts and
availability of staff resources are also used to evaluate the timing of projects. Where funding
discrepancies occur, alternative financing methods and project timing are again evaluated and
recommendations are made to resolve the discrepancies.
Residential development is expected to taper off in the future. The number of annual building
permits issued is projected to decline compared to the previous five-year period. The
development schedules of the remaining vacant parcels is driving the timing of the future units,
rather than economic or market conditions. There are less then 5,300 units remaining before the
City is predominantly built out.
Residential development for 2006-2007 is projected at 479 units with an average about 517 units
per year over the next five years. This is compared to an average of over 1,063 units per year for
the previous five-year period. The decline is due to the dwindling supply of developable land,
rather than a lack of demand.
2006-2007 CAPITAL IMPROVEMENT PROGRAM
Residential Units Trend 2000 to 2010
Permits Issued
2000-ryl
1500
1000
50CH
Actual Estimated
Minim
2000 2002 2004 2006 2008 2010
In contrast to the residential trends, the amount of non-residential development is projected to
increase over the next five years. The average annual square feet of non-residential development
for the past 5 years was about 793,000. For Fiscal Year 2006-07, the estimate is for 839,137
square feet, and the average annual development for the next 5-year period is approximately
817,000 square feet per year. Projects include several neighborhood commercial/retail
developments located in or near the areas where most of the residential development has
occurred or where new development is planned over the next several years. In the southeast
quadrant, commercial projects include retail and restaurants, a theater, and a daycare and church.
Sunny Creek Plaza is a planned commercial development located east of El Camino Real at
College Boulevard next to the Sunny Creek residential neighborhood, and the Bressi Ranch area
will include 130,000 square feet of commercial development. Other commercial developments
are planned at Calavera Hills and at Poinsettia Shores; at the La Costa Resort plans include
construction of 302,000 square feet of commercial living units. Industrial development consists of
various new office and industrial projects, as well as expansion of existing projects at Kelly
Corporate Center, Gemological Institute of America, and Legoland. Development estimates
provide the data and basis for estimating future fee revenues, which are calculated by multiplying
each applicable development fee by the estimated number of dwelling units and/or square feet of
construction expected during each year. The following table shows the number of residential
units and non-residential square feet of development used in calculating estimated revenues for
2006-2007 and subsequent years to buildout.
Projected Development
Residential and Non-Residential Construction
Residential Non-Residential
Year
2005-2006 current
2006-2007
2007-2008
2008-2009
2009-2010
2010-2011
Years 6-10
Years 11 -buildout
Total Future
Units Square Feet
676
479
909
663
397
136
1,914
785
5,283
1,667,667
839,137
1 ,077,082
939,495
627,209
604,524
4,399,124
3,302,319
1 1 ,788,890
2006-2007 CAPITAL IMPROVEMENT PROGRAM
REVENUES
Revenues for Capital Projects from now until buildout are estimated to be approximately $529
million and are segregated into five major categories: (1) fees generated by development in
Carlsbad, (2) special district fees and taxes (Community Facilities Districts and Bridge and
Thoroughfare Benefit Districts), (3) Water and Sewer replacement reserves, (4) infrastructure
replacement funds (other than sewer and water), and (5) other sources including grants, bond
issues, and contributions from other agencies.
Funding Sources 2006-2007 to Buildout
Total Revenue = $529 million
In Millions
175/1
Approximately 28% of all capital revenue is received as a result of development, and is dependent
upon assumptions made about the City's annual growth in dwelling units and commer-
cial/industrial square feet. Development revenues include Public Facilities Fees (PFF), Traffic
Impact Fees (TIF), Park-ln-Lieu Fees (PIL), Planned Local Drainage (PLD) Fees, Water
Connection Fees (MFF), and Sewer Connection charges. Revenue from special districts, such as
Community Facilities Districts (CFD) and Bridge and Thoroughfare Benefit Districts (BTD)
comprise 11 % of the total. Water and Sewer replacement revenues generated by user fees equal
approximately 22% of total revenues, and are used to pay for replacement of existing water and
sewer facilities. Infrastructure Replacement revenues, equal to 19%, are transfers from the City's
General Fund which are being set aside to pay for replacement of major capital facilities other
than sewer and water facilities. The remaining 20% consists of revenues from other agencies and
includes federal and State grants, the County sales tax program (TransNet), Redevelopment
agency revenue, Golf Course funding, and contributions from cities and other agencies.
CALCULATION OF FUTURE FEES
The revenue projections of the Capital Improvement Program reflect the growth assumptions
identified in the previous section. The following information delineates how those assumptions
were applied to estimate future development revenues. The mix of multi-family and single-family
residential units is assumed to be 35% and 65% respectively and reflects the anticipated mix of
residential development for each Local Facilities Management Zone. The building permit valuation
used for computing Public Facilities Fees is $166,900 per multi-family dwelling unit, and $285,600
per single-family dwelling unit. A building permit valuation of $38 per square foot of construction
is used to calculate non-residential Public Facilities Fees.
In order to calculate estimated revenues for Traffic Impact Fees (TIF), the number of average
daily trips was computed for each type of development use. A multi-family residential dwelling unit
is assigned eight trips per day and a single-family unit is assigned ten trips per day. Each
residential trip is valued at the 2006-07 TIF of $107. The trips-per-day value for commercial and
industrial buildings are averaged at 30 trips per 1,000 square feet of development, although the
2006-2007 CAPITAL IMPROVEMENT PROGRAM
actual volume of trips generated by commercial/industrial building can vary widely depending on
the ultimate land use. The value assigned to each commercial/industrial trip is $43.
CFD No. 1 is a citywide district established to finance various civic facilities required under the
City's Growth Management Plan. CFD No. 2 is to fund Rancho Santa Fe Road and Olivenhain
Road, but has not yet been formally established. A prepayment program is in place to enable
development to proceed within this proposed district.
Park-in-Lieu Fees are collected for the purchase and development of
parkland within each quadrant of the City, and the fees are based on
the acquisition cost of parkland. Projects in the CIP funded with Park-
in-Lieu Fees include future park site acquisition, development and
restoration.
There are two existing Bridge and Thoroughfare Fee Districts (BTD), which were formed by
property owners to finance specific road construction projects located within each of the district
boundaries. Poinsettia Lane - Aviara Parkway (BTD No. 2) was formed to finance the
construction of Poinsettia Lane between Aviara Parkway and El Camino Real and Aviara Parkway
between Palomar Airport Road and Poinsettia Lane. BTD No. 3 (Cannon Road West) was
formed to fund portions of Cannon Road from Interstate 5 to El Camino Real. Although
construction of this project is complete, revenues collected from future development within the
district will be used to repay an advance that provided interim funding to complete the project.
SUMMARY
The proposed 2006-2007 to Buildout CIP is being driven by the City's commitment to ensure that
facilities are available to service the developing areas as well as the current residents. Carlsbad's
philosophy has been to build quality capital facilities, which meet, and at times exceed, Growth
Management standards. Phasing projects over a period of years to match funding availability for
construction and operations is often used to meet the needs of Growth Management. The 2006-
2007 to Buildout Capital Improvement Program reflects the commitment of Carlsbad's Council
and staff to continue providing its residents with a better quality of life.
2006-2007 CAPITAL IMPROVEMENT PROGRAM
GROWTH MANAGEMENT PLAN
The Growth Management Plan was developed and voted into law by the citizens of Carlsbad in
1986. The plan was established to manage development within the City by linking residential,
commercial, and industrial development directly to standards for availability of public services and
facilities.
The Growth Management Plan has established precise standards for eleven public facilities.
Standards must be met at all times as growth occurs. Facilities for which standards have been
established are as follows:
- City Administrative - Library
- Wastewater Treatment - Parks
- Circulation - Drainage
- Fire - Open Space
- Schools - Sewer Collection
- Water Distribution
The Plan requires that appropriate public facilities be available, in conformance with the adopted
performance standards, as development occurs. Unless all of the eleven public facility standards
have been met, no new development can occur.
The Growth Management Plan impacts both the Operating Budget and the Capital Improvement
Program. The detailed level of planning required by Growth Management has allowed Carlsbad's
Capital Improvement Program to anticipate the funding needed for capital improvements through
buildout of the City. The timing of construction of facilities is governed by the rate of development
and the eleven performance standards. New public facilities often require additional staffing and
other resources, which affects the Operating Budget. Facilities such as community centers,
parks, and fire stations have been constructed and opened to the public under this program.
The Capital Improvement Program has been designed to specifically address areas where new or
expanded facilities will be needed to maintain compliance with the adopted performance
standards. With the adoption of the 2006-2007 CIP, compliance with the Growth Management
Plan is continued.
l>
CITY OF CARLSBAD
CAPITAL FUNDS
PROJECTED FUND BALANCES FOR FY 2006-2007
FUND
BTD#2 - POINSETTIA LANE/AVIAHA PKWY
BTD#3 - CANNON ROAD WEST
CFD#1 -CITYWIDE
GAS TAX
GENERAL CAPITAL CONST.
GOLF COURSE
GRANTS - FEDERAL
GRANTS - STATE
INFRASTRUCTURE REPLACEMENT
OTHER
PARK FEE ZONES 5,1 3,1 6
PARK-IN-LIEU NE
PARK-IN-LIEU NW
PARK-IN-LIEU SE
PARK-IN-LIEU SW
PLANNED LOCAL DRAIN'G
PUBLIC FACILITIES FEE
RANCHO SANTA FE ROAD PROJECT
REDEVELOPMENT VILLAGE
REDEVELOPMENT SCCRDA
SEWER BENEFIT AREAS
SEWER CONNECTION
SEWER REPLACEMENT
TDA
TRAFFIC IMPACT FEE
TRANSNET/BIKE
TRANSNET/HIGHWAY
TRANSNET/LOCAL
TRANSNET/STP
WATER - MAJOR FACILITY
WATER - RECYCLED WATER
WATER - REPLACEMENT
TOTAL
JULY 1 , 2006
UNRESERVED
BALANCE
6,875,391
1,065,056
45,238,635
7,442,488
49,788,137
3,729,919
200,864
32,076
18,438,548
31,534,237
886,452
803,215
582,888
1 ,702,029
637,160
9,426,511
38,751,553
14,609,171
0
263,350
4,269,049
30,702,746
20,645,096
0
10,169,292
194,419
1,227,298
7,271 ,550
298,891
14,960,521
(1 ,488,882)
16,304,125
336,561 ,785
ESTIMATED
REVENUES
1,615,047
94,439
4,880,664
2,069,211
3,375,207
42,248,207
1,874,459
400,953
5,030,519
1,108,797
342,701
174,235
63,085
391,602
371,139
828,289
6,544,033
5,075,094
715,000
0
869,769
2,079,146
3,944,496
100,000
2,046,602
157,221
42,451
2,546,943
10,446
3,437,522
27,613,757
4,392,440
124,443,474
ESTIMATED
EXPENDITURES
116
0
59,437
3,420,456
5,423,855
42,239,391
1,767,787
31,701
1,457,343
5,879,180
0
606,751
0
0
0
1 ,729,637
8,352,408
8,289,628
41,810
257,206
844,931
(12,922)
2,534,863
0
1,092,602
227,747
82,882
5,285,181
0
833,933
10,941,771
3,297,142
104,684,836
ESTIMATED
DEBT SERVICE
LOANS & OTHER
0
65,480
278,621
277,698
0
166,103
0
400,738
0
746,780
0
0
0
0
0
426,305
0
7,317
0
0
0
2,508,438
350,600
0
3,405
0
4,814
35,843
228,369
0
0
0
5,500,511
JUNE 30, 2006
PROJECTED
BALANCE
8,490,322
1,094,015
49,781,241
5,813,545
47,739,489
3,572,632
307,536
590
22,011,724
26,017,074
1,229,153
370,699
645,973
2,093,631
1 ,008,299
8,098,858
36,943,178
11,387,320
673,190
6,144
4,293,887
30,286,376
21,704,129
100,000
11,119,887
123,893
1,182,053
4,497,469
80,968
17,564,110
15,183,104
17,399,423
350,819,912
CITY OF CARLSBAD
CAPITAL FUNDS
PROJECTED FUND BALANCES FOR FY 2006-2007
FUND
BTD#2 - POINSETTIA LANE/AVIARA PKWY
BTD#3 - CANNON ROAD WEST
CFD#1 -CITYWIDE
GAS TAX
GENERAL CAPITAL CONST.
GOLF COURSE
GRANTS - FEDERAL
GRANTS - STATE
INFRASTRUCTURE REPLACEMENT
OTHER
PARK FEE ZONES 5,13,16
PARK-IN-LIEU NE
PARK-IN-LIEU NW
PARK-IN-LIEU SE
PARK-IN-LIEU SW
PLANNED LOCAL DRAIN'G
PUBLIC FACILITIES FEE
RANCHO SANTA FE ROAD PROJECT
REDEVELOPMENT VILLAGE
REDEVELOPMENT SCCRDA
SEWER BENEFIT AREAS
SEWER CONNECTION
SEWER REPLACEMENT
TDA
TRAFFIC IMPACT FEE
TRANSNET/BIKE
TRANSNET/HIGHWAY
TRANSNET/LOCAL
TRANSNET/STP
WATER - MAJOR FACILITY
WATER - RECYCLED WATER
WATER - REPLACEMENT
TOTAL
JULY 1,2006
PROJECTED
BALANCE
8,490,322
1,094,015
49,781 ,241
5,813,545
47,739,489
3,572,632
307,536
590
22,011,724
26,017,074
1,229,153
370,699
645,973
2,093,631
1,008,299
8,098,858
36,943,178
11,387,320
673,190
6,144
4,293,887
30,286,376
21,704,129
100,000
11,119,887
123,893
1,182,053
4,497,469
80,968
17,564,110
15,183,104
17,399,423
350,819,912
ESTIMATED
REVENUES
277,574
0
3,135,130
1,857,654
1,750,000
0
297,682
0
4,483,000
0
123,026
0
142,767
133,645
133,645
422,023
10,735,237
11,816,045
100,000
0
161,250
6,795,882
2,460,000
0
1,009,139
0
0
6,734,568
0
845,911
0
17,410,723
70,824,902
06/30/2006
CONTINUING
APPROPR.
349,302
433,845
4,544,417
1,577,998
16,489,317
3,572,632
307,536
0
3,641 ,008
22,700,923
0
43,550
0
0
219,100
2,909,904
30,125,602
6,590,112
673,190
6,144
1,125,778
14,171,587
12,512,073
100,000
3,752,768
110,995
975,354
3,587,198
0
4,727,070
683,104
7,804,322
143,734,829
07/01/2006
NEW
APPROPR.
0
0
110,000
0
8,550,680
0
297,682
0
200,000
0
0
0
0
1,250,000
0
0
9,832,157
0
100,000
0
0
955,944
1,045,057
0
370,000
0
0
6,638,568
0
54,425
14,500,000
54,425
43,958,938
2006-2007
TOTAL CIP
APPROPR.
349,302
433,845
4,654,417
1,577,998
25,039,997
3,572,632
605,218
0
3,841,008
22,700,923
0
43,550
0
1,250,000
219,100
2,909,904
39,957,759
6,590,112
773,190
6,144
1,125,778
15,127,531
13,557,130
100,000
4,122,768
110,995
975,354
10,225,766
0
4,781,495
15,183,104
7,858,747
187,693,767
JUNE 30, 2007
PROJECTED
BALANCE
8,418,594
660,170
48,261,954
6,093,201
24,449,492
0
0
590
22,653,716
3,316,151
1,352,179
327,149
788,740
977,276
922,844
5,610,977
7,720,657
16,613,253
0
0
3,329,359
21,954,727
10,606,999
0
8,006,257
12,898
206,699
1 ,006,271
80,968
13,628,527
0
26,951,399
233,951,047
\7
CITY OF CARLSBAD
CAPITAL FUNDS
REVENUES ACTUAL AND ESTIMATED
FUND
BTD#2 - POINSETTIA LANE/AVIARA PKWY
BTD#3 - CANNON ROAD WEST
CFD#1 -CITYWIDE
GAS TAX
GENERAL CAPITAL CONST.
GOLF COURSE
GRANTS - FEDERAL
GRANTS - STATE
INFRASTRUCTURE REPLACEMENT
OTHER
PARK FEE ZONES 5,13,16
PARK-IN-LIEU NE
PARK-IN-LIEU NW
PARK-IN-LIEU SE
PARK-IN-LIEU SW
PLANNED LOCAL DRAIN'G
PUBLIC FACILITIES FEE
RANCHO SANTA FE ROAD PROJECT
REDEVELOPMENT VILLAGE
REDEVELOPMENT SCCRDA
SEWER BENEFIT AREAS
SEWER CONNECTION
SEWER REPLACEMENT
TDA
TRAFFIC IMPACT FEE
TRANSNET/BIKE
TRANSNET/HIGHWAY
TRANSNET/LOCAL
TRANSNET/STP
WATER - MAJOR FACILITY
WATER - RECYCLED WATER
WATER - REPLACEMENT
TOTAL CAPITAL FUNDS
2002-2003
ACTUAL
REVENUE
926,437
404,647
6,500,700
1,851,118
36,905,004
600,000
208,914
244,735
4,114,930
2,352,413
64,865
245,976
1,520,779
475,468
9,593
739,807
6,436,638
14,050,018
18,552
146,305
1,308,913
4,855,445
3,115,527
302,968
1,762,612
113,689
1,205,103
2,878,396
15,933
2,192,288
6,869,702
4,667,424
107,104,899
2003-2004
ACTUAL
REVENUE
2,082,421
-
4,724,143
1 ,785,785
558,927
0
361,048
52,028
3,946,110
11,111,949
47,366
125,004
514,627
30,554
35,582
1,241,432
5,224,343
4,691 ,448
7,547
245,691
557,429
1,813,446
4,198,825
78,572
975,812
110,471
14,861
4,120,403
1,479
3,064,296
9,009,877
2,877,307
63,608,783
2004-2005
ACTUAL
REVENUE
1,998,341
44,911
7,100,722
1,955,691
2,459,316
354,593
667,538
1,852
4,405,430
29,398,816
99,420
48,251
50,048
1,186,959
462,471
1,711,440
10,023,947
5,191,343
1 ,445,277
584,004
801,202
2,416,264
1,641,162
5,325
2,014,264
2,797
47,046
2,873,656
8,576
5,164,198
4,678,829
1 ,393,946
90,237,635
2005-2006
ESTIMATED
REVENUE
1,615,047
94,439
4,880,664
2,069,211
3,375,207
42,248,207
1,874,459
400,953
5,030,519
1,108,797
342,701
174,235
63,085
391,602
371,139
828,289
6,544,033
5,075,094
715,000
0
869,769
2,079,146
3,944,496
100,000
2,046,602
157,221
42,451
2,546,943
10,446
3,437,522
27,613,757
4,392,440
124,443,474
2006-2007
ESTIMATED
REVENUE
277,574
0
3,135,130
1,857,654
1,750,000
0
297,682
0
4,483,000
0
123,026
0
142,767
133,645
133,645
422,023
10,735,237
11,816,045
100,000
0
161,250
6,795,882
2,460,000
0
1,009,139
0
0
6,734,568
0
845,91 1
0
17,410,723
70,824,902
Note: Revenues include interfund loans and transfers in.
CITY OF CARLSBAD
CAPITAL FUNDS
BUDGET EXPENDITURE SCHEDULE
FUND
BTD#2 - POINSETTIA LANE/AVIARA PKWY
BTD#3 - CANNON ROAD WEST
CFD#1 -CITYWIDE
GAS TAX
GENERAL CAPITAL CONST.
GOLF COURSE
GRANTS - FEDERAL
GRANTS - STATE
INFRASTRUCTURE REPLACEMENT
OTHER
PARK FEE ZONES 5,13,16
PARK-IN-LIEU NE
PARK-IN-LIEU NW
PARK-IN-LIEU SE
PARK-IN-LIEU SW
PLANNED LOCAL DRAIN'G
PUBLIC FACILITIES FEE
RANCHO SANTA FE ROAD PROJECT
REDEVELOPMENT VILLAGE
REDEVELOPMENT SCCRDA
SEWER BENEFIT AREAS
SEWER CONNECTION
SEWER REPLACEMENT
TDA
TRAFFIC IMPACT FEE
TRANSNET/BIKE
TRANSNET/HIGHWAY
TRANSNET/LOCAL
TRANSNET/STP
WATER - MAJOR FACILITY
WATER - RECYCLED WATER
WATER - REPLACEMENT
TOTAL CAPITAL FUNDS
2003-2004
ACTUAL
1,089,644
366,929
563,394
3,069,646
702,114
93,341
208,510
475,336
1,290,712
597,594
14,447
59,593
366,504
4,379,059
0
574,220
3,758,660
6,849,077
53,069
0
1,219,939
2,337,279
955,688
136,933
402,01 1
70,104
128,474
1,030,601
486,421
1,839,043
8,325,047
3,155,390
44,598,779
2004-2005
ACTUAL
1 ,371 ,674
1,228,385
385,960
509,878
1,959,899
394,043
361 ,452
291 ,454
336,293
593,270
452
18,626
704,000
0
0
957,271
2,885,404
11,832,529
877,633
0
937,912
2,212,199
1,604,260
160,780
147,986
45,776
64,266
4,180,696
69,533
2,720,043
10,516,313
501 ,338
47,869,325
2005-2006
ESTIMATED
116
65,480
338,058
3,698,154
5,423,855
42,405,494
1,767,787
432,439
1 ,457,343
6,625,960
0
606,751
0
0
0
2,155,942
8,352,408
8,296,945
41,810
257,206
844,931
2,495,516
2,885,463
0
1,096,007
227,747
87,696
5,321,024
228,369
833,933
10,941,771
3,297,142
110,185,347
2005-2006
CONTINUING
APPROPR. .
349,302
433,845
4,544,417
1,577,998
16,489,317
3,572,632
307,536
0
3,641,008
22,700,923
0
43,550
0
0
219,100
2,909,904
30,125,602
6,590,112
673,190
6,144
1,125,778
14,171,587
12,512,073
100,000
3,752,768
110,995
975,354
3,587,198
0
4,727,070
683,104
7,804,322
143,734,829
2006-2007
NEW
APPROPR.
0
0
110,000
0
8,550,680
0
297,682
0
200,000
0
0
0
0
1,250,000
0
0
9,832,157
0
100,000
0
0
955,944
1,045,057
0
370,000
0
0
6,638,568
0
54,425
14,500,000
54,425
43,958,938
2006-2007
TOTAL CIP
APPROPR.
349,302
433,845
4,654,417
1,577,998
25,039,997
3,572,632
605,218
0
3,841,008
22,700,923
0
43,550
0
1 ,250,000
219,100
2,909,904
39,957,759
6,590,112
773,190
6,144
1,125,778
15,127,531
13,557,130
100,000
4,122,768
110,995
975,354
10,225,766
0
4,781,495
15,183,104
7,858,747
187,693,767
If
1Q
E2
t
a
Ia.
a.au
oo(M
£a
a. X
~>
o £
5S?o: *-
$ 8
«
2OlIsVI
B'a.3
ISO
«Os
£•ID
£Q.
U) £DC o23
n
D.
.nurso
<oo3
n
£Q.
s §
fQ
E
2
I
f
Q.reU
ooIS
Q.
ill Qni$CL§
o 25 ~a: ^Sg
E
2
0)
Ia
.reu
p»o
«0§fM
£•ra
£n.
5 On a
o £s so: ~-
S3
^ ?s
Io
I
E2
I
I
£a
5
rso
re
£a.
I
PS
*~ 5
3*
0 »
S S
(£ *~
g§
O ^
|la
•* o
M
Si
'1
£ MS
2 < CMUJ ^
? §
E
2
2 |S
M N
«E
i ll
IH
4"» O UJ'a. Ex
(QU
IX
? -&«o £go 2 §0CM
™c i
1 Z
£
Q.PROJECT TITLE§ 80.
Ico"
1
«
0
o"h-
«"
iUJ
i
0
m<jj
K
is
AGUA HEDIIm
iigu._
UJq0
S<n
o
Z
OQ:
I
s
REPLACEMEWATER CONNECTION TO WATER543,344f-
1
'
'
,
§i
sKin
,-
o>
18"SUBTOTAL LOAN REPAYMENTSg
«toos
s.
os
8~
CD
nR.
8
inin
5"
9
1
S
SOJ
3"
O)3
i?3
5
(N
(O
ig00
I
GRAND TOTAL ALL FUNDED PRIUNDED PROJECTSu.zD
o
o"
g
5
it-(0
P
IDGE REING AND BRPALOMAR AIRPORT ROAD WIDEN1N
CANNON LAKE PARK (6.7 ACRES)g
I
1—
ZUJ2
LU
0.)ON RECl IKHOSP GROVE/BUENA VISTA LAGCg
V
UJ
m§§CAMINOSSIA RD TOEL CAMINO REAL WIDENING - CAg
oj
POINSETTIA LANE - REACH "E"g
£
i
EGE TO CITV1
•*52o:
Q
\
I
0
5(M
S
TOTAL UNFUNDED PROJECTSE.
CAPITAL IMPROVEMENT PROGRAM FUND SUMMARY
BTD NO. 2 AVIARA PARKWAY - POINSETTIA LANE
BEGINNING FUND BALANCE (1)
REVENUES
DEVELOPER FEES
TOTAL REVENUES
CAPITAL PROJECTS
BTD#2 REPAYMENT TO GAS TAX FUND
BTD#2/POINSETTIA LANE - REACH E (PARTIAL FUNDING)
BTD#2/POINSETTIA LANE - REACHES A,B, C F & G & AVIARA PKWY
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
PRIOR
YEARS
N/A
N/A
350,000
350,000
N/A
YEAR1
2006-2007
8,141,020
277,574
277,574
8,418,594
YEAR 2 YEAR 3
2007-2008 2008-2009
8,418,594 8,706,648
288,054 584,328
288,054 584,328
1,600,000
1,600,000
8,706,648 7,690,976
YEAR 4
2009-2010
7,690,976
584,328
584,328
8,275,304
YEAR 5 BUILDOUT
2010-2011 2011++
8,275,304 8,850,856
575,552 6,316,160
575,552 6,316,160
2,643,344
9,100,000
1,320,729
13,064,073
8,850,856 2,102,943
BTD NO. 3 CANNON ROAD WEST
BEGINNING FUND BALANCE (1)
REVENUES
DEVELOPER FEES
TOTAL REVENUES
CAPITAL PROJECTS
BTD#3 CANNON ROAD - FROST TO FARADAY (REIMB.)
BTD#3 CANNON ROAD WEST TO GAS TAX FUND
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
PRIOR
YEARS
N/A
N/A
5,194,747
5,194,747
N/A
YEAR 1 YEAR 2
2006-2007 2007-2008
660,170 660,170
80,894
80,894
600,000
600,000
660,170 141,064
YEAR 3 YEAR 4
2008-2009 2009-2010
141,064 179,368
38,304
38,304
179,368 179,368
YEAR 5 BUILDOUT
2010-2011 2011++
179,368 179,368
3,758,622
3,758,622
400,000
1,000,000
1,400,000
179,368 2,537,990
(1) Equal to projected fund balance less any continuing appropriations.
CAPITAL IMPROVEMENT PROGRAM FUND SUMMARY
COMMUNITY FACILITIES DISTRICT NO. 1
BEGINNING FUND BALANCE (1)
REVENUES
DEVELOPER SPECIAL TAXES
TOTAL REVENUES
CAPITAL PROJECTS
CMC CENTER
PUBLIC WORKS CENTER
LIBRARY EXPANSION (COLE)
LIBRARY EXPANSION (LEARNING CENTER - ADVANCE)
CFD#1 ADMINISTRATION
VETERAN'S MEMORIAL PARK
1-5 AND LA COSTA AVENUE AUXILIARY LANES
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
(CFD 1)
PRIOR
YEARS
N/A
N/A
-
2,708,266
-
2,941,837
110,000
-
-
5,760,103
N/A
YEAR1
2006-2007
45,236,824
3,135,130
3,135,130
110,000
110,000
48,261,954
YEAR 2
2007-2008
48,261,954
4,459,013
4/459,013
110,000
110,000
52,610,967
YEAR 3
2008-2009
52,610,967
3,827,036
3,827,036
13,403,526
110,000
13,513,526
42,924,477
YEAR 4
2009-2010
42,924,477
2,586,078
2,586,078
25,157,346
110,000
25,267,346
20,243,209
YEARS
2010-2011
20,243,209
1,663,443
1,663,443
110,000
110,000
21,796,651
BUILDOITT
201 1++
21,796,651
14,491,860
14,491,860
-
-
4,580,016
-
440,000
21,672,785
2,000,000
28,692,800
7,595,710
RANCHO SANTA FE ROAD PROJECT
BEGINNING FUND BALANCE (1)
REVENUES
DEVELOPER SPECIAL TAXES/OTHER AGENCIES
TOTAL REVENUES
CAPITAL PROJECTS
RANCHO SANTA FE ROAD AND OUVENHAIN IMPROVEMENT?
RANCHO SANTA FE ROAD NORTH - PHASE I
RANCHO SANTA FE ROAD NORTH - PHASE II (BRIDGE)
RANCHO SANTA FE ROAD SOUTH
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
PRIOR
YEARS
N/A
N/A
3,800,000
26,406,243
18,641,000
1,350,000
50,197,243
N/A
YEAR1
2006-2007
4,797,208
11,816,045
11,816,045
16,613,253
YEAR 2 YEAR 3
2007-2008 2008-2009
16,613,253 22,123,853
5,510,600
5,510,600
22,123,853 22,123,853
YEAR 4 YEAR 5 BUILDOUT
2009-2010 2010-2011 2011++
22,123,853 22,123,853 22,123,853
-
22,123,853 22,123,853 22,123,853
(1) Equal to projected fund balance less any continuing appropriations.
CAPITAL IMPROVEMENT PROGRAM FUND SUMMARY
GAS TAX FUND
BEGINNING FUND BALANCE (1)
REVENUES
GAS TAXES
LOAN REPAYMENTS
TOTAL REVENUES
CAPITAL PROJECTS
GABIANO LANE STORM DRAIN MODIFICATION
GAS TAX LOAN BTD#2
GAS TAX LOAN TO BTD#3 CANNON ROAD WEST
MISCELLANEOUS ROAD SUBDRAINS
PAVEMENT MANAGEMENT PROGRAM
GAS TAX LOAN TO PFF - TRAFFIC SIGNALS AND MEDIANS
TRAP SIG - ALGA ROAD AND CAZADERO
TRAF SIG - FARADAY AVENUE AND PRIESTLY DRIVE
TRAP SIG - LA COSTA AVENUE AND ESFERA STREET
TRAF SIG - PASEO DEL NORTE AND CAR COUNTRY OR
TRAF SIG - POINSETT1A LANE AND SNAPDRAGON DR
VIDEO DETECTION CONVERSION
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
PRIOR
YEARS
N/A
N/A
35,000
2,643,344
1,000,000
485,000
4,701,088
-
303,050
-
210,000
190,000
517,000
10,084,482
N/A
YEAR 1 YEAR 2 YEAR 3
2006-2007 2007-2008 2008-2009
4,235,547 6,093,201 7,939,584
1,857,654 1,913,383 1,970,785
-
1,857,654 1,913,383 1,970,785
190,000
67,000 277,000
67,000 467,000
6,093,201 7,939,584 9,443,369
YEAR 4 YEAR 5 BUILDOUT
2009-2010 2010-2011 2011++
9,443,369 11,226,277 13,010,083
2,029,908 2,090,806 24,687,804
3,643,344
2,029,908 2,090,806 28,331,148
-
-
-
-
-
4,900,000
210,000
-
-
-
-
247,000 307,000 435,000
247,000 307,000 5,545,000
11,226,277 13,010,083 35,796,231
GOLF COURSE FUND
BEGINNING FUND BALANCE (1)
REVENUES
BOND PROCEEDS
ADVANCES
TOTAL REVENUES
CAPITAL PROJECTS
CARLSBAD MUNICIPAL GOLF COURSE
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
PRIOR
YEARS
N/A
N/A
48,723,681
48,723,681
N/A
YEAR1 YEAR 2 YEAR 3 YEAR 4 YEARS BUILDOUT
2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011++
.
-
(1) Equal to projected fund balance less any continuing appropriations.
CAPITAL IMPROVEMENT PROGRAM FUND SUMMARY
GENERAL CAPITAL CONSTRUCTION (GCC)
BEGINNING FUND BALANCE (1)
REVENUES
LOAN REPAYMENTS & OTHER
TOTAL REVENUES
CAPITAL PROJECTS
CITY ADMIN TRAINING FACILITY (PRE-DESIGN) - Prop C
POLICE CAD IMPLEMENTATION
FIRE STATION *5 STORAGE BUILDING/RESTROOMS
PUBLIC SAFETY TRAINING FACILITY - Prop C
LIBRARY EXPANSION (LEARNING CENTER - ADVANCE)
PROPOSITION C PROJECTS
PEDESTRIAN MASTER PLAN
COASTAL RAIL TRAIL - CORRIDOR ENHANCEMENT
PUBLIC WORKS INVENTORY AND FAC MAINT PROGRAM
REPAIR RECOATING GUARDRAIL PAR BRIDGE AT CARLSBAD BLVD
SENIOR CENTER COURTYARD LANDSCAPING
STAGECOACH PARK PICNIC SHELTER
STAGECOACH PARK SYNTHETIC TURF
SENIOR CTR EXPANSION - 2ND FLOOR
LAKE CALAVERA TRAILS MASTER PLAN/CONSTRUCTION
ALGA NORTE PARK - PHASE II (POOL) PROP C FUNDS
LEO CARRILLO PARK - EROSION CONTROL
LEO CARRILLO - HISTORIC BARN (50% GRANT)
CALLE GAVANZO DRAINAGE
HIGHLAND DRIVE - BETWEEN PINE & BASSWOOD
RIDGCREST DRAINAGE IMPROVEMENTS
ROMERIA DRAINAGE IMPROVEMENTS
TRAP SIG - AVIARA PARKWAY-POINSETTIA LANE TO EL CAMINO REAL
TRAF SIG - AVIARA PKWY AND CAMINO DE LAS ONDAS- REIMS
TRAF SIG - CALLE BARCELONA AND PASEO AVELLANO
TRAF SIG - CAMINO DE LOS COCHES AND CALLE ACERVO
TRAF SIG - CARLSBAD BOULEVARD AND CHERRY AVE
TRAF SIG • CARLSBAD VILLAGE DRIVE AND GLASGOW DR
TRAF SIG - EL FUERTE ST AND RANCHO PANCHO
TRAF SIG - FARADAY AVE. AND CAMINO HILLS DRIVE
TRAF SIG - FARADAY AVENUE AND RUTHERFORD ROAD
TRAF SIG - LA COSTA AVENUE AND LEVANTE
TRAF SIG - LA COSTA AVENUE/NUEVA CASTILLA
TRAF SIG - MONROE STREET AND HOSP WAY
TRAF SIG - POINSETTIA LANE AND BLACKRAIL ROAD
TRAF SIG - POINSETTIA LANE AND BRIGANTTNE ROAD
TRAF SIG - RANCHO SANTA FE ROAD AND QUESTHAVEN ROAD
TRAF SIG - TAMARACK AVE. AND PONTIAC DRIVE
TRAF SIG - TAMARACK AVE. AND VALLEY STREET
CARLSBAD BLVD BRIDGE CONCRETE BARRIER POWER PLANT
CARLSBAD BLVD BRIDGE CONCRETE BARRIER RAILROAD
CVD AND AVENIDA DE ANITA
PEDESTRIAN MASTER PLAN
CARLSBAD BOULEVARD PEDESTRIAN ACCESS STUDY
PALOMAR AIRPORT ROAD AND MELROSE BOULEVARD RIGHT TURN
PARK DRIVE, MARINA TO COVE
CONCRETE REPAIR WORK
SAN MARCOS ROAD PROJECT
TAMARACK AND ADAMS
UNDERGROUND DIST. 17 - HARDING, ROOSEVELT
GCC LOAN TO PFF - ALGA NORTE POOL
GCC LOAN TO PFF - POINSETTIA TENNIS COURTS
GCC LOAN TO PFF - FIRE STATION »3 LAND ACQUISITION
GCC LOAN TO FARADAY/MELROSE
GCC LOAN TO PIL-NW FOR MADISON ST PROPERTY PURCHASES
GCC LOAN TO PIL-NW FOR PINE SCHOOL ACQUISITION
GCC LOAN TO PIL-NW FOR PINE PARK PHASE II
GCC LOAN TO PIL-SE FOR ALGA NORTE LAND ACQUISITION
TOTAL PROJECT EXPENDITURES
PRIOR
YEARS
N/A
N/A
100,000
2,312,228
316,600
950,000
600,000
-
150,000
-
404,992
130,000
30,000
100,000
1,718,000
329,000
497,000
11,239,000
180,000
395,070
-
43,200
-
-
160,000
105,000
-
190,000
210,000
-
-
-
210,000
-
-
210,000
-
124,767
210,000
-
-
-
-
-
105,000
-
-
2,424,189
-
509,800
506,587
320,000
860,000
1,250,000
26,890,433
N/A
YEAR1
2006-2007
31,250,172
1,750,000
1,750,000
101,750
104,930
62,500
117,500
274,000
280,000
260,000
250,000
2.500.000
3.600.000
1,000,000
8,550,680
24,449,492
YEAR 2 YEAR 3 YEAR 4 YEARS BUILDOUT
2007-2008 2008-2009 2009-2010 2010-2011 2011++
24,449,492 24,774,779 24,249,152 24,649,152 24,699,152
1,256,587 750,000 750,000 750,000 3,935,000
1,256,587 750,000 750,000 750,000 3,935,000
22,711,000
196,800
100,000
210,000
190,000
190,000
190,000
190,000
190,000
210,000
190,000
190,000
140,000 880,000
191,000
105,000
145,627
250,000 250,000 250,000 250,000 2,500,000
48,500
450,000
931,300 1,275,627 350,000 700,000 26,961,000
24,774,779 24,249,152 24,649,152 24,699,152 1,673,152
(1) Equal to projected fund balance less any continuing appropriations.
CAPITAL IMPROVEMENT PROGRAM FUND SUMMARY
GRANTS - FEDERAL
BEGINNING FUND BALANCE (1)
REVENUES
CARLSBAD BOULEVARD ENdNAS CREEK BRIDGE REPLACEMENT
TOTAL REVENUES
CAPITAL PROJECTS
CARLSBAD BOULEVARD ENC1NAS CREEK BRIDGE REPLACEMENT
COASTAL RAIL TRAIL (CMAQ)
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
PRIOR
YEARS
N/A
N/A
-
4,413,784
4,413,784
N/A
YEAR1
2006-2007
-
297.682
297,682
297,682
297,682
-
YEAR 2 YEAR 3 YEAR 4 YEARS
2007-2008 2008-2009 2009-2010 2010-2011
-
1,667,020
1,667,020
1,667,020
1,667,020
.
BUILDOUT
2011++
-
-
-
-
-
.
GRANTS - STATE
PRIOR
YEARS
BEGINNING FUND BALANCE (1) N/A
REVENUES
GRANT REVENUE
TOTAL REVENUES N/A
CAPITAL PROJECTS
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE N/A
YEAR1 YEAR 2 YEAR 3 YEAR 4 YEARS BUILDOUT
2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011++
590 590 590 590 590 590
590 590 590 590 590 590
(1) Equal to projected fund balance less any continuing appropriations.
CAPITAL IMPROVEMENT PROGRAM FUND SUMMARY
INFRASTRUCTURE MAINTENANCE &
BEGINNING FUND BALANCE (1)
REVENUES
GENERAL FUND TRANSFER
TOTAL REVENUES
CAPITAL PROJECTS
BEACH ACCESS STAIRS REPLACEMENT
CARLSBAD BLVD STORM DRAIN REPLACEMENT
COLE LIBRARY HVAC REPLACEMENT
CYNTHIA LANE STORM DRAIN
HOLIDAY PARK - RESTROOM IMPROVEMENTS
KELLY DRIVE CHANNEL REPAIR
LA COSTA AVE STORM DRAIN REPLACEMENT
LACUNA RIVIERA PARK RESTROOM REPLACEMENT
TOT LOT IMPROVEMENTS
TRAP SIG - .ECR AND CHESTNUT SIGNAL REPAIRS
TRAF SIG - CARLSBAD BLVD & TAMARACK SIGNAL REPAIRS
TRAP SIG • ECR AND TAMARACK SIGNAL REPAIRS
VARIOUS FACILITY CONCRETE REPAIRS
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
REPLACEMENT (IM&R)
PRIOR
YEARS
N/A
N/A
517,500
80,000
1,319,790
100,000
530,808
-
492,150
260,000
327,260
206,000
230,000
141,000
1,050,000
5,254,508
N/A
YEAR1 YEAR 2 YEAR 3 YEAR 4 YEARS BUILDOUT
2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011++
18,370,716 22,653,716 27,164,716 32,940,716 39,500,716 46,430,716
4,483,000 4,751,000 6,231,000 6,560,000 6,930,000 69,300,000
4,483,000 4,751,000 6,231,000 6,560,000 6,930,000 69,300,000
200,000 240,000 455,000
200,000 240,000 455,000
22,653,716 27,164,716 32,940,716 39,500,716 46,430,716 115,730,716
OTHER
BEGINNING FUND BALANCE (1)
REVENUES
OTHER FINANCING SOURCES
TOTAL REVENUES
CAPITAL PROJECTS
LIBRARY EXPANSION (LEARNING CENTER)
COASTAL RAIL TRAIL
OPPORTUNISTIC SAND
TRAF SIG - AVIARA PARKWAY-POINSETTIA LANE TO EL CAMINO REAL
COLLEGE BLVD REACH A AND CANNON REACH 4A
COLLEGE/CANNON ASSESSMENT DISTRICT
FARADAY AVENUE AND MELROSE DRIVE EXTENSIONS
POINSETTTA LANE EAST OF EL CAMINO REAL FINANCING PROGRAM
FARADAY/MELROSE TO GCC
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
PRIOR
YEARS
N/A
N/A
958,163
184,176
57,240
602,649
1,754,519
10,143,518
945,574
28,931,541
43,577,380
N/A
YEAR! YEAR 2 YEAR 3 YEAR 4 YEARS BUILDOUT
2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011++
3,316,151 3,316,151 2,809,564 2,809,564 2,549,564 2,549,564
.
-
-
-
260,000
-
-
-
<* -
506,587
506,587 - 260,000
3,316,151 2,809,564 2,809,564 2,549,564 2,549,564 2,549,564
PARK FEE ZONES 5,13,16
PRIOR
YEARS
BEGINNING FUND BALANCE (1) N/A
REVENUES
DEVELOPER FEES
TOTAL REVENUES N/A
CAPITAL PROJECTS
BUSINESS PARK RECREATIONAL FACILITY
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE N/A
YEAR1
2006-2007
1,229,153
123,026
123,026
1,352,179
YEAR 2
2007-2008
1,352,179
149,926
149,926
1,502,106
YEAR 3
2008-2009
1,502,106
149,926
149,926
1,652,032
YEAR 4
2009-2010
1,652,032
83,790
83,790
1,735,822
YEARS
2010-2011
1,735,822
90,990
90,990
1,826,812
BUILDOLTT
2011++
1,826,812
1,277,090
1,277,090
3,103,900
3,103,900
1
(1) Equal to projected fund balance less any continuing appropriations."> \
CAPITAL IMPROVEMENT PROGRAM FUND SUMMARY
PARK-IN-LIEU NE
BEGINNING FUND BALANCE (1)
REVENUES
DEVELOPER FEES
TOTAL REVENUES
CAPITAL PROJECTS
HIDDEN CANYON PARK (22.3 ACRES)
PARK SITE DEVELOPMENT (15 ACRES)
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
PRIOR
YEARS
N/A
N/A
1,886,766
1,886,766
N/A
YEAR1
2006-2007
327,149
327,149
YEAR 2
2007-2008
327,149
2,132,974
2,132,974
2/460,123
YEAR 3
2008-2009
2,460,123
1,085,197
1,085,197
3,545,321
YEAR 4
2009-2010
3,545,321
796,524
796,524
4,341,845
YEARS
2010-2011
4,341,845
138,991
138,991
4,480,836
BUILDOUT
2011++
4,480,836
7,302,363
7,302,363
4,000,000
4,000,000
7,783,198
PARK-IN-LIEU NW
BEGINNING FUND BALANCE (1)
REVENUES
DEVELOPER FEES
TOTAL REVENUES
CAPITAL PROJECTS
PINE AVENUE PARK - PINE COMMUNITY BUILDING - PHASE n
PIL-NW TO GCC FOR MADISON ST PROPERTY PURCHASES
PIL-NW TO GCC FOR PINE SCHOOL ACQUISITION
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
PRIOR
YEARS
N/A
N/A
N/A
YEAR1
2006-2007
645,973
142,767
142,767
788,740
YEAR 2
2007-2008
788,740
306,949
306,949
1,095,689
YEAR 3
2008-2009
1,095,689
442,578
442,578
1,538,267
YEAR 4
2009-2010
1,538,267
149,905
149,905
1,688,172
YEARS
2010-2011
1,688,172
592,767
592,767
1,664,130
1,664,130
616,809
BUILDOUT
2011++
616,809
3,233,673
3,233,673
320,000
1,310,000
1,630,000
2,220/482
PARK-IN-LIEU SE
BEGINNING FUND BALANCE (1)
REVENUES
DEVELOPER FEES
TOTAL REVENUES
CAPITAL PROJECTS
LEO CARRILLO PARK - PHASE IH
PIL-SE TO GCC FOR ALGA NORTE LAND ACQUISITION
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
PRIOR
YEARS
N/A
N/A
N/A
YEAR1
2006-2007
2,093,631
133,645
133,645
2,227,276
YEAR 2
2007-2008
2,227,276
133,645
133,645
1,250,000
1,250,000
1,110,921
YEAR 3
2008-2009
1,110,921
80,187
80,187
1,191,108
YEAR 4
2009-2010
1,191,108
80,187
80,187
1,271,295
YEARS
2010-2011
1,271,295
21,383
21,383
1,292^78
BUILDOUT
2011++
1,292,678
836,800
836,800
455,878
PARK-IN-LIEU SW
BEGINNING FUND BALANCE (1)
REVENUES
DEVELOPER FEES
TOTAL REVENUES
CAPITAL PROJECTS
AVIARA COMMUNITY PARK COMMUNITY BUILDING
AVIARA REIMBURSEMENT AGREEMENT
PIL-SW TO GCC FOR AVIARA PARK
TOTAL PROJECT EXPENDITURES
PRIOR
YEARS
N/A
N/A
238,000
238,000
N/A
YEAR1
2006-2007
789,199
133,645
133,645
922,844
YEAR 2
2007-2008
922,844
160,374
160,374
1,083,218
YEAR 3
2008-2009
1,083,218
454,393
454,393
1,537,611
YEAR 4
2009-2010
1,537,611
454,393
454,393
1,992,004
YEARS
2010-2011
1,992,004
443,701
443,701
2,435,706
BUILDOUT
2011++
2,435,706
2,710,321
2,710,321
2,516,875
2,516,875
2,629,151
(1) Equal to projected fund balance less any continuing appropriations.? >
CAPITAL IMPROVEMENT PROGRAM FUND SUMMARY
PLANNED LOCAL DRAINAGE AREA FEES (PLDA)
BEGINNING FUND BALANCE (1)_
REVENUES
DEVELOPER FEES
TOTAL REVENUES
CAPITAL PROJECTS
AGUA HEOIONDA CHANNEL (PLDA "B")
AV1ARA PARKWAY STORM DRAIN REIMBURSEMENT (PLDA "C")
COLLEGE BLVD/CANNON RD (BJ AND CALAVERA CR. CHANNEL)
COLLEGE BLVD/CANNON RD (BASIN BJB - REIMB./PLDA "B") (FEMA + PLD)
COLLEGE BLVD. BRIDGE FACILITY BL (REIMB./PLDA "B")
FARADAY/MELROSE DRAINAGE FACILITIES (PLDA "B')
MASTER PLAN UPDATE
MISCELLANEOUS MASTER DRAINAGE FACILITIES
PARK DRIVE AND TAMARACK AVENUE STORM DRAIN (PLDA "B")
TAMARACK AND ECR STORM DRAIN AND SILT. BASIN (REIMB./PLDA "B")
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
PRIOR
YEARS
N/A
N/A
1,680,522
378,880
2,778,833
830,910
300,000
454,933
6,424,078
N/A
YEAR1 YEAR 2 YEAR 3 YEAR 4 YEARS BUILDOUT
2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011++
5,188,954 5,610,977 6,033,000 6,322,300 6,517,351 6,623,906
422,023 422,023 289,300 195,050 106,555 8,034,202
422,023 422,023 289,300 195,050 106,555 8,034,202
1,783,000
10,936,000
610,000
1,279,000
14,608,000
5,610,977 6,033,000 6,322,300 6,517,351 6,623,906 50,108
PUBLIC FACILITY FEE FUND (PFF)
BEGINNING FUND BALANCE (1)
REVENUES
DEVELOPER FEES
LOANS
PROP 12 AND PROP 40 GRANT FUNDS
TOTAL REVENUES
CAPITAL PROJECTS
FIRE STATION *3 RELOCATION
FIRE STATION #6 (PERMANENT)
LIBRARY EXPANSION (COLE)
PINE AVENUE PARK - PHASE I
PINE AVENUE PARK - PINE COMMUNITY BUILDING - PHASE II
PARK SITE ACQUISITION (15 ACRES) NE QUADRANT PARK
AVIARA COMMUNITY PARK (24.25 ACRES) *
AVIARA COMMUNITY PARK COMMUNITY BUILDING
POINSETTIA COMMUNITY PARK - PHASE II
ALGA NORTE PARK - PHASE I (30 ACRES)
ALGA NORTE PARK - PHASE II (POOL)
LEO CARRILLO PARK - PHASE III
CARRILLO BARN RESTORATION
TRAF SIG - CAMINO DE LOS COCHES AND LA COSTA AVENUE
TRAF SIG - CAMINO VIDA ROBLE AND YARROW DRIVE
TRAF SIG - CANNON ROAD AND AVENIDA ENCINAS
TRAF SIG - CANNON ROAD AND COLLEGE BOULEVARD
TRAF SIG - COLLEGE BOULEVARD AND CARLSBAD VILLAGE DR - Reimb
TRAF SIG - EL CAMINO REAL AND POINSETTIA LANE
TRAF SIG - MELROSE DRIVE AND LA COSTA AVENUE
TRAF SIG - PALOMAR AIRPORT ROAD AND MELROSE DRIVE
TRAF SIG - POINSETTIA LANE AND EL FUERTE STREET (REIMB)
TRAF SIG - RANCHO SANTA FE ROAD AND CALLE JUNIPERO
TRAF SIG - TAMARACK AVENUE AND GARFIELD STREET
CARLSBAD BOULEVARD MEDIAN-TAMARACK AVENUE TO PINE AVENUE
EL CAMINO REAL MEDIANS
EL CAMINO REAL MEDIANS - LA COSTA
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
PRIOR
YEARS
N/A
N/A
-
5,400,000
-
7,082,000
-
4,550,000
10,700,000
-
1,000,000
12,561,308
6,708,000
-
33,000
-
150,000
-
-
204,250
-
250,000
210,000
-
-
909,500
90,500
49,848,558
N/A
YEAR! YEAR 2 YEAR 3 YEAR 4 YEARS BUILDOUT
2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011++
6,817,576 7,720,657 12,977,143 16,555,290 13,672,651 7,047,613
2,891,237 5,017,742 3,799,855 2,334,155 1,154,202 18,952,316
7,100,000 4,900,000
744,000 238,745 238,292! 387,000
10,735,237 5,256,487 4,038,147 2,721,155 1,154,202 23,852,316
1,000,000 460,000 5,040,000 100,000
9,832,400
563,794 6,796,416
7,117,834
89,200 882,824 12,143,457
3,351,262
5,391,695 ^»
1,987,400
190,000
190,000
210,000
210,000
190,000
210,000
210,000
2,041,080
1,401,600
9,832,157 - 460,000 5,603,794 7,779,240 35,933,771
7,720,657 12,977,143 16,555,290 13,672,651 7,047,613 (5,033,842)
(1) Equal to projected fund balance less any continuing appropriations.
CAPITAL IMPROVEMENT PROGRAM FUND SUMMARY
REDEVELOPMENT - VILLAGE
BEGINNING FUND BALANCE (1)
REVENUES
TAX INCREMENT AND LOANS
TOTAL REVENUES
CAPITAL PROJECTS
VILLAGE PUBLIC PARKING ENHANCEMENT PROGRAM
SENIOR CTR EXPANSION - 1ST FLOOR
STREETSCAPE IMPROVEMENTS
CARLSBAD BLVD. AT STATE ST - INTERSECTION ENHANCEMENT DESIGN
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
PRIOR
YEARS
N/A
N/A
-
615,000
100,000
715,000
N/A
YEAR1
2006-2007
100,000
100,000
100,000
100,000
.
YEAR 2 YEAR 3
2007-2008 2008-2009
300,000
300,000
300,000
300,000
.
YEAR 4 YEAR 5 BUILDOUT
2009-2010 2010-2011 2011++
850,000
850,000
850,000
-
-
850,000
.
REDEVELOPMENT - SCCRDA
BEGINNING FUND BALANCE (1)
REVENUES
TAX INCREMENT AND LOANS
TOTAL REVENUES
CAPITAL PROJECTS
CARLSBAD BLVD. AT BREAKWATER ROAD - LEFT TURN LANE
CARLSBAD BOULEVARD ENCINAS CREEK BRIDGE REPLACEMENT
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
PRIOR
YEARS
N/A
N/A
243,150
41,453
284,603
N/A
YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 BUILDOUT
2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011++
(1) Equal to projected fund balance less any continuing appropriations.
CAPITAL IMPROVEMENT PROGRAM FUND SUMMARY
SEWER REPLACEMENT FUND
BEGINNING FUND BALANCE (1)
REVENUES
TRANSFER FROM OPERATING FUND
LOAN REPAYMENTS
TOTAL REVENUES
CAPITAL PROJECTS
PUBUC WORKS CENTER
BUILDING IMPROVEMENTS
CAPITAL ACQUISmONS/REPLACEMENT/REHAB
PUMP STATION INTERFACES
STAFFING/PROF. SERVICES AND MISC.
TECHNOLOGY ENHANCEMENT
AVENIDA ENCINAS GRAVITY SEWER
FARADAY AVENUE - ORION TO MELROSE SEWER
FOREST GRAVITY SEWER
HOME PLANT - PIPELINE REPLACEMENT
HOME PLANT LIFT STATION REHABILITATION
LA COSTA MEADOWS SEWER EXTENSION
LA GOLONDRIA SEWER EXTENSION
NORTH AGUA HEDIONDA INTERCEPTOR REHAB - EAST SEGMENT
NORTH AGUA HEDIONDA INTERCEPTOR - WEST SEGMENT
NORTH AGUA HEDIONDA TRUNK SEWER REACH NAHT1A
NORTH BATIQUrrOS INTERCEPTOR REHABILITATION
NORTH BATIQUITOS SEWAGE LIFT STATION MODIFICATIONS
POINSETTIA LANE SEWER RELOCATION - Reimb
POINSETTIA SEWAGE LIFT STATION ODOR/NOISE ABATEMENT
SEWER LIFT STATION REPAIRS AND UPGRADES
SEWER LINE REFURBISHMENTS/REPLACEMENT
SEWER MASTER PLAN/CONNECTION FEE UPDATE
VISTA/CARLSBAD INTERCEPTOR REHAB REACHES 1 AND 2
BUENA INTERCEPTOR SEWER IMPROVEMENTS
TERRAMAR LIFT STATION EMERGENCY GENERATOR
PHASE H LOAN TO RECYCLED WATER
SEWER REPL TO SEW BENEF A FOR CARLSBAD TRUNK SEWER
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
PRIOR
YEARS
N/A
N/A
-
4,099,190
1,125,033
-
-
110,200
900,000
440,000
-
210,000
654,000
620,000
4,177,751
-
1,199,000
647,193
50,000
580,380
930,000
-
830,975
460,000
25,000
5,270,000
22,328,722
N/A
YEAR 1 YEAR 2 YEAR 3
2006-2007 2007-2008 2008-2009
9,192,056 12,606,999 10,091,276
2,460,000 2,521,500 2,584,538
2,000,000
4,460,000 2,521,500 2,584,538
3,601,004
715,057 889,670 500,572
266,963
650,000
76,358
119,474 1,743,682
243,800
400,000 80,000
330,000 330,000 330,000
1,880,000
180,958
1,045,057 5,037,223 6,255,258
12,606,999 10,091,276 6/420,556
YEAR 4 YEAR 5 BUILDOUT
2009-2010 2010-2011 2011++
6,420,556 8,098,545 9,883,925
2,649,151 2,715,380 27,153,800
3,670,000
2,649,151 2,715,380 30,823,800
-
-
541,162 500,000 6,305,829
-
-
-
-
-
-
-
-
-
-
-
-
-
-
-
100,000 100,000 500,000
330,000 330,000 3,394,600
354,200
-
-
-
-
-
971,162 930,000 10,554,629
8,098,545 9,883,925 30,153,096
TDA - LOCAL TRANSPORATATION FUNDS
BEGINNING FUND BALANCE (1)
REVENUES
TDA GRANT
TOTAL REVENUES
CAPITAL PROJECTS
PEDESTRIAN MASTER PLAN
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
PRIOR
YEARS
N/A
N/A
100,000
100,000
N/A
YEAR1 YEAR 2 YEAR 3 YEAR 4 YEARS BUILDOUT
2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011++
^»
(1) Equal to projected fund balance less any continuing appropriations.
CAPITAL IMPROVEMENT PROGRAM FUND SUMMARY
TRAFFIC IMPACT FEES (TIP)
BEGINNING FUND BALANCE (1)
REVENUES
DEVELOPER FEES
MISC. REIMBURSEMENTS
TOTAL REVENUES
CAPITAL PROJECTS
SIDEWALK/STREET CONSTRUCTION PROGRAM
TRAP SIG - FARADAY AVENUE AND ORION STREET
AVENIDA ENCINAS WIDENING - SOLTTH OF PALOMAR AIRPORT ROAD
CARLSBAD BOULEVARD WIDENING - CANNON TO MANZANO
CARLSBAD VILLAGE DRIVE WIDENING
EL CAMINO REAL AND CARLSBAD VILLAGE DRIVE
EL CAMINO REAL AND FARADAY AVENUE
EL CAMINO REAL AT AVIARA PARKWAY/ ALGA ROAD
EL CAMINO REAL WIDENING - LA COSTA AVENUE TO ARENAL ROAD
EL CAMINO REAL WIDENING - TAMARACK AVENUE TO CHESTNUT AVE.
EL CAMINO REAL WIDENING - S CHESTNUT/S ALGA
MELROSE DRIVE AND ALGA ROAD
PALOMAR AIRPORT ROAD AND COLLEGE BOULEVARD
PALOMAR AIRPORT ROAD WIDENING AT PASEO DEL NORTE
POINSETTIA LANE WIDENING (PASEO DEL NORTE TO BATIQUITOS LN)
TRAFFIC MONITORING PROGRAM
VALLEY AND MAGNOLIA SIDEWALKS
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
PRIOR
YEARS
N/A
N/A
885,672
289,550
-
-
-
-
1,235,941
-
1,382,708
522,115
-
-
525,000
-
230,611
5,071,597
N/A
YEAR 1 YEAR 2
2006-2007 2007-2008
7,367,119 8,006,257
1,009,139 1,488,235
-
1,009,139 1,488,235
300,000 210,000
70,000 70,000
90,000
370,000 370,000
8,006,257 9,124,492
YEAR 3 YEAR 4 YEARS BUILDOUT
2008-2009 2009-2010 2010-2011 2011++
9,124,492 9,966,807 10,377,043 10,598,842
1,212,315 780,236 591,799 8,151,897
357,000
1,212,315 780,236 591,799 8,508,897
75,000 300,000 300,000 1,200,000
-
983,000
2,363,960
1,488,458
334,720
-
294,972
531,368
-
-
566,932
167,360
-
2,210,198
70,000 70,000 70,000 700,000
225,000
370,000 370,000 370,000 10,840,968
9,966,807 10,377,043 10,598,842 8,266,771
TRANSNET/ BICYCLE
BEGINNING FUND BALANCE (1)
REVENUES
TRANSNET REVENUE
TOTAL REVENUES
CAPITAL PROJECTS
BICYCLE MASTER PLAN
COASTAL RAIL TRAIL
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
PRIOR
YEARS
N/A
N/A
150,000
221,801
371,801
N/A
YEAR1 YEAR 2 YEAR 3 YEAR 4 YEARS BUILDOUT
2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011++
12,898 12,898 12,898 12,898 12,898 12,898
-
12,898 12,898 12,898 12,898 12,898 12,898
-^"
TRANSNET/ HIGH WAY
BEGINNING FUND BALANCE (1)
REVENUES
TRANSNET REVENUE
TOTAL REVENUES
CAPITAL PROJECTS
CANNON ROAD REACH 48
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
PRIOR
YEARS
N/A
N/A
1,722,303
1,722,303
N/A
YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 BUILDOUT
2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011++
206,699 206,699 206,699 206,699 206,699 206,699
206,699 206,699 206,699 206,699 206,699 206,699
(1) Equal to projected fund balance less any continuing appropriations.
I ~7
CAPITAL IMPROVEMENT PROGRAM FUND SUMMARY
TRANSNET-LOCAL
BEGINNING FUND BALANCE (1)
REVENUES
TRANSPORTATION TAXES
TOTAL REVENUES
CAPITAL PROJECTS
TRAP S1G - EL CAM. REAL/PLAZA/MARRON/HOSP WY
CARLSBAD BOULEVARD ENCINAS CREEK BRIDGE REPLACEMENT
CARLSBAD BOULEVARD RETROFIT OVER SDNR
EL CAMINO REAL WIDENING - USA STREET TO CRESTVIEW OR (LOAN)
EL CAMINO REAL WIDENING - NORTH OF COUGAR DRIVE (LOAN)
EL CAMINO REAL WIDENING - TAMARACK AVENUE TO CHESTNUT
PAVEMENT MANAGEMENT PROGRAM
PAVEMENT MANAGEMENT PROGRAM (NON-JURIS FEES)
VALLEY AND MAGNOLIA SIDEWALKS
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
PRIOR
YEARS
N/A
N/A
1,311,000
1,519,000
493,000
17,519,348
600,000
21,442,348
N/A
YEAR1
2006-2007
910,271
6,734,568
6,734,568
38,568
3,300,000
2,500,000
800,000
6,638,568
1,006,271
YEAR 2
2007-2008
1,006,271
3,647,610
3,647,610
215,980
959,000
2,500,000
800,000
4,474,980
178,901
YEAR 3
2008-2009
178,901
3,579,909
3,579,909
2,600,000
800,000
315,000
3,715,000
43,810
YEAR 4
2009-2010
43,810
3,587,856
3,587,856
2,648,000
952,000
3,600,000
31,666
YEARS
2010-2011
31,666
3,611,492
3,611,492
2,813,000
787,000
3,600,000
43,158
BUILDOUT
2011++
43,158
36,000,000
36,000,000
-
-
-
-
28,130,000
7,870,000
36,000,000
43,158
TRANSNET - SURFACE TRANSPORTATION
BEGINNING FUND BALANCE (1)
REVENUES
STP REVENUE
TOTAL REVENUES
CAPITAL PROJECTS
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
PROGRAM (STP)
PRIOR
YEARS
N/A
N/A
N/A
YEAR1 YEAR 2 YEAR 3 YEAR 4 YEARS BUILDOUT
2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011++
80,968 80,968 80,968 80,968 80,968 80,968
80,968 80,968 80,968 80,968 80,968 80,968
(1) Equal to the projected fund balance less any continuing appropriations.
CAPITAL IMPROVEMENT PROGRAM FUND SUMMARY
WATER - MAJOR FACILITY FEE FUND
BEGINNING FUND BALANCE (1)
REVENUES
DEVELOPER FEES
TOTAL REVENUES
CAPITAL PROJECTS
"D" RESERVOIR - PHASE n
CALAVERA HILLS WATER BOOSTER STATION STANDBY GENERATOR
CANNON ROAD EAST OF EL CAMINO REAL - Relmb
COLLEGE BOULEVARD - CANNON RD TO CARLSBAD VILLAGE DR - Reimb
COLLEGE BOULEVARD - CANNON TO BADGER LANE
COLLEGE BOULEVARD (ECRTO CANNON ROAD) - Reimb
EL CAMINO REAL BETWEEN COLLEGE AND JACKSPAR
EL CAMINO REAL CROSSING AT KELLY DRIVE
EL CAMINO REAL TRANSMISSION MAIN - USA STREET TO KELLY DRIVE
EL FUERTE - NORTH OF LOKER - Relmb
EL FUERTE - ALGA ROAD TO POINSETTIA LANE - Relmb
EL FUERTE - POINSETTIA LANE TO PALOMAR AIRPORT ROAD - Reimb
FARADAY AVENUE - ORION TO MELROSE WATERUNE - Relmb
FARADAY AVENUE EXTENSION - Reimb
MAERKLE PUMP STATION IMPROVEMENTS
MAERKLE RESERVOIR STORAGE (TAP #2)
MARRON ROAD - PRESSURE REGULATING STATION TO OCEANSIDE
MASTER PLAN UPDATE
MELROSE DRIVE - PALOMAR AIRPORT ROAD TO FARADAY - Reimb
PAR/ECR PUMP STATION
POINSETTIA LANE - EL CAMINO REAL TO SKIMMER CT (Reimb)
POINSETTIA LANE - SKIMMER CTTO CASSIA
POINSETTIA LANE EAST OF BLACK RAIL ROAD 12"
PRESSURE REDUCING STATION - SYCAMORE CREEK
PRESSURE REGULATING STATION - CANNON AND COLLEGE - Reimb
RANCHO CARRILLO OVERSEING/EXTENSION
WATER CONNECTION TO WATER REPLACEMENT
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
PRIOR
YEARS
N/A
N/A
-
760,800
700,000
-
-
691,600
104,000
470,000
148,750
2,000,000
1,141,000
97,210
-
-
-
-
-
-
997,350
-
-
-
-
250,000
93,700
7,454,410
N/A
YEAR1 YEAR 2 YEAR 3 YEAR 4 YEARS BUILDOUT
2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011++
12,837,040 13,628,527 15,710,867 15,353,947 1,942,857 2,617,084
845,911 2,082,340 1,728,889 1,036,890 674,227 10,660,310
845,911 2,082,340 1,728,889 1,036,890 674,227 10,660,310
5,978,099
52,300 416,517
-
-
746,949
487,436
-
-
-
-
-
-
-
749,773
54,425 692,675
13,284,514
715,464
47,800
796,300
-
235,141
357,732
214,953
117,257
-
-
-
54,425 - 2,085,809 14,447,980 - 8,359,121
13,628,527 15,710,867 15,353,947 1,942,857 2,617,084 4,918,273
WATER - RECYCLED WATER FUND
BEGINNING FUND BALANCE (1)
REVENUES
LOANS & GRANTS
CONNECTION FEES
TOTAL REVENUES
CAPITAL PROJECTS
RECYCLED WATER PH II - FACILITY
RECYCLED WATER PH II - FLOW EQUALIZATION
RECYCLED WATER PH II - MAHR RESERVOIR IMPROV.
RECYCLED WATER PH II - PIPELINES
RECYCLED WATER PH II - PUMP STATIONS
RECYCLED WATER TO WATER REPLACEMENT
TOTAL PROJECT EXPENDITURES
ENDING FUND BALANCE
PRIOR
YEARS
N/A
.*»
N/A
12,130,019
4,128,280
2,957,000
21,852,521
4,918,574
45,986,394
N/A
YEAR 1 YEAR 2 YEAR 3 YEAR 4 YEAR 5 BUILDOUT
2006-2007 2007-2008 2008-2009 2009-2010 2010-2011 2011++
14,500,000 .....
14,500,000
14,500,000 .....
(1) Equal to the projected fund balance less any continuing appropriations.
CAPITAL IMPROVEMENT PROGRAM FUND SUMMARY
WATER REPLACEMENT FUND
BEGINNING FUND BALANCE (1)
REVENUES
TRANSFER FROM OPERATING FUND
LOAN REPAYMENTS
TOTAL REVENUES
CAPITAL PROJECTS
ECR/TAMARACK PUMP STATION REMOVAL
1-5 RECYCLED WATER TRANSMISSION LINE
PUMP STATION REMOVAL
PUBLIC WORKS CENTER
"D" RESERVOIR - PHASE H
•0" RESERVOIR - BLACKRAIL ROAD IMPROVEMENTS
"D" RESERVOIR IMPROVEMENTS
AVIARA PARKWAY AT PLUM TREE
CARLSBAD BOULEVARD - SOUTH OF AVENIDA ENCINAS
COLLEGE BOULEVARD- MAERKLE RESERVOIR TO AGUA HEDIONDA CREEK
CRESTVIEW DRIVE TRANSMISSION MAIN
DEMOLITION OF WATER FACILITIES AT PAJAMA DRIVE
DESALINATION GROUNDWATER/SEAWATER STUDY
EL CAMINO REAL - PALOMAR AIRPORT ROAD SOUTH
EL CAMINO REAL TRANSMISSION MAIN FROM FARADAY TO COUGAR DRIVE
EL CAMINO REAMCARLSBAD VILL DR PIPELINE REPL.
EL FUERTE AND CORINTIA STREET
FOUSSAT ROAD WELL ABANDONMENT
LAKE CALAVERA RESERVOIR IMPROVEMENTS
MAERKLE PUMP STATION IMPROVEMENTS
MISCELLANEOUS PIPEUNE REPLACEMENT PR03ECTS
MISCELLANEOUS STORAGE TANK REPAIRS
MISCELLANEOUS WATER RESERVOIR FENCING
OCEANSIDE INTERTIE UPGRADE
PAR/ECR PUMP STATION
POINSETTIA LANE - SKIMMER CTTO CASSIA
POINSETTIA LANE EAST OF BLACK RAIL ROAD 12"
RANCHO SANTA FE RD PIPELINE REPLACEMENT
SAN MARCOS BOULEVARD WEST OF SDCWA
TANGLEWOOD PRESSURE REDUCING STATION REPLACEMENT
TAP RESERVOIR EXTERIOR PAINTING
WATER OPERATIONS WATER PUMP PROJECT
WATER SYSTEM INTERTIE CONNECTION
CHESTNUT AVENUE RECYCLED WATER LINE
PASEO DEL NORTE RECYCLED PIPELINE REPLACEMENT
WATER REPLACEMENT TO WATER CONNECTION
PHASE II LOAN TO RECYCLED WATER
TOTAL PROJECT EXPENDITURES ^
ENDING FUND BALANCE
PRIOR
YEARS
N/A
N/A
133,505
442,700
-
-
367,000
156,000
-
495,000
-
60,000
-
3,225,000
774,100
65,000
-
202,500
3,217,600
-
1,000,000
161,000
120,399
-
990,350
-
-
773,000
3,091,241
332,000
132,700
60,900
439,000
727,200
-
14,500,000
31,466,195
N/A
YEAR 1 YEAR 2 YEAR 3
2006-2007 2007-2008 2008-2009
9,595,101 26,951,399 28,381,326
2,910,723 3,210,660 3,557,165
14,500,000
17,410,723 3,210,660 3,557,165
80,019
6,686,407
376,560 2,886,960
549,673
54,425
418,400 428,651
110,700
436,100
54,425 1,780,733 10,192,737
26,951,399 28,381,326 21,745,754
YEAR 4 YEAR 5 BUILDOUT
2009-2010 2010-2011 201 1++
21,745,754 23,832,455 27,397,998
3,620,136 3,684,682 40,772,609
.
3,620,136 3,684,682 40,772,609
-
-
-
-
1,992,629
-
-
459,612
886,171
-
31,380 119,139
-
719,260
-
-
-
156,272
-
-
692,675
-
-
-
-
-
456,161
214,848
-
-
-
-
-
-
-
-
-
1,533,435 119,139 4,075,573
23,832,455 27,397,998 64,095,034
(1) Equal to the projected fund balance less any continuing appropriations.'Yd?
U)
CO
O
!
£
£
(0 .=>"**5 '5
< »ts2£. o
Ii
CL 3
o oM M
l
I
E S
3 12*5!g
3| 5
& -gBo « »§« s
#
8
§§.§.
Is- O O O
<o in CM »- ^ tN i
! ° 5) ^ !i in co CM <
S 8. i
o§
8
a
8
K
1 0
.-sin
in
£•f
#£<O h-ss
88 . §8 . §
i"i's"i s"
TJ
3
>•4-*
|
ot>£
o
73
I
VTJ
•o
ra
LUo:a.
i*
!e*g4?o
c £O IV5 E
f&8 &££
I-S'I?-*
2o
oo0.
(0
COQ.
JJa
oO
o
jra
£
ffOL
a.
o
oo<s
<oooes inal3 H °« J O0. ,» at
o S^
fe°z
1 *i <bmittalw 5 o
O. * 01
5^1«B U z
3,<5-0S
w 2 o
S: — «
O S "£
ff t «s s 8 aS R 8 8"
i II) O O »- i
ID T- r- Q &6ToS5S . 8828."',38&a
co «o n o o »-v^ rt T~ O O 0?5 Sis CD • e a. *«- u> Y IA u> r« oT- o r* M f*- <o uin ?- co in CM rt
psfta
S
^ 1^ to£83 -
» »- IV10
« « « « «83353
£:£££!£
in w) v) w w
I I 5 2 I
£
<
£
0)'w
t>0)
Q.
O
h»ooSooC4
i£
o o
32<2g 8«l CM CSs|Z <e £
If
|
Sia*i- O
9U>
g
</>
D.u
!§N
1
5l«
fti!10 U
f
8
Q joS!8 i o
Fof
1 1 I
I
S
I i to h- 5 o o en oCO 05 ' 10 O 5 (D O
S8SS a
O~ Q" W ttf
1A CO (D r-s:
I
MvS«J*ifi1i^S2 ?l2-8 "
UJcc.(L
z
UJ•5
<P•^r
5-
S
ssQ
OOQ.
Oz
(0
3>
£toI(0
u0)
Q.
Q.
O
!«-
OO«N
(D
OO01
8
CM
<
— *w ~~
9 ° aa <
S
JQ
in
C * i
u) U m
3 f
ra#•5
O
S° 2t ES a
s
$
s
i
OifsIi1
i
o u u
•*! *J *!U. U. U.
CO M (0
I5 JP ^O. O. Q.
c c c
2 2 2
f
§8 S R""" 8"
g
CO CM ' S ^ O (003 <•» n u>;c
3
in 'rJ •
r-.
9
^- <O C4' •* r*- in
§; e*
o
o_c
a.
ILLJ
io
o
O
Oo
(0
oQ.
tf)
I(S
t!0)
'2*
Q.
Q.
O
h.9toooCM
I
.1'
i
o
o: »
t
8 § I. *
Ol" «)" CO «f
T CN CO
5
? ? S 8T- t- r- i?>•^ 5" -*f (O"?5 S £ S
I
S" 8CO
§ §
g
8
I
5
in
^
ii1
01
i !s
&(0c1
1Q.
Q.o
S
IoO
2Q
I0o
E
o
O
2(01
•oc(0
o
0)•+*
I
3
O
n
X
0)
(0
oo>
2*
Q.
Q.
O
r-o
(O
Ife.
o
(BQ.
I
X
1 =
in £
c
Q.
O
I
|
o
'o
<0
<D
O
<o
8
of
s ?
8c»
O O
CMin
8
C4 CM <O »- •*1- T- •«— h- 1—tv cv ^r o oifi in (p in t-"
O5 O) I— CO
8
I"
8
S.ro"
i?
i- t- <D885
*
8
I u
^
Sil
CO1o.1£fa.
a.O
W
1E
1
a.
o
Q.
O
fm
u>
O .Q
ui -o o
|^8
5llO
o
*• £~ S£
I¥oI
a]
HI
i
I
!
Ii
<O (D W CN <0
8 O O io O '
1^* F"* 1O° IRSSI
Of CN
in in o to <o CD T-
S IO IO '
CD
8
s
O CN T-
88;) CO
r^ F: &> 5> So cT <D" ttT ^
rt co r»- h*- CO
CM" CN" CM"
188
!""*!CO i
8O
8
8
111or
OL
u
I
S
4A-%25»TT- N
wTO
*• ut**lIIs °ll•a.tt™ oo o^-g,«t 3O Ma) Q>£ o
*£UJ "•
1Proposed2006-2007 to BuildoutCapital Improvement ProgramProposed2006-2007 to BuildoutCapital Improvement Program
2ØBudget CalendarØCIP ProcessØDevelopment ProjectionsØRevenue ForecastØNew Appropriations – FY 06 - 07ØFuture ProjectsØFunding Issues2006 / 2007
3ØCIP Workshop●Set Public Hearing for June 20thØJune 6thOperating Budget WorkshopØJune 20thOperating Budget and CIPPublic Hearing and AdoptionCOUNCIL MEETINGSØJune 14Citizen’s Budget ForumOTHER PUBLIC MEETINGS
4ØWhen:Wednesday, June 14thØWhere:Faraday Center1635 Faraday AvenueRoom 173ØTime:5:00pmCall the Finance Department at(760) 602-2430 for additional informationCall the Finance Department at(760) 602-2430 for additional information
5ØExpenditures planØRevenue planØCIP Committee Review CriteriaEvaluates Projects based on:Evaluates Projects based on:●●Project Need and RankingProject Need and Ranking●●Construction cost analysisConstruction cost analysis●●Construction schedulesConstruction schedules●●Financing Financing ––Revenue SourcesRevenue Sources
6December 2005CIP Kickoff01/11/06CIP Project Submittals dueDecember 2005January 2006February 2006March2006April2006May2006June 200602/13/06Final Growth Projections due03/01/06CIP Status w /LT05/16/06TodayCIP Workshopw/Council04/05/06Final CIPReview w/LT06/20/06Council AdoptsOperating Budget ,CIP & AnnualSpending Limitation03/22/06Prelim CIP Review w/LT
7ØImprove Project Scoping and Accuracy of Project Estimates●Better analysis of major projects●Include 3rdParty estimates for projectsØAccurately Reflect Project Appropriation Timing
8ØHealth and SafetyØLegal MandatesØOperating Cost ImpactsØCompliance with Growth Management ØCompliance with Other StandardsØCompletion of Basic InfrastructureØPublic Opinion/SurveysØFunding or Timing Opportunity
9ØCouncil Appropriating 2006-07 CIP OnlyØAll Project Costs are Estimates●Cost, scope and need reviewed and updated annually●Future project costs are informational
10ØEngineering News Record (ENR) Index ØDetailed Costs Analysis●Fire Station #3●Public Works Facility●Alga Norte Park & Aquatic Complex●Pine, Aviara and Poinsettia Community CentersØIndependent 3rdParty Cost Estimating Firms
11Description Line Item Cost % of Constr Line Item Cost % of Constr Line Item Cost % of Constr Line Item Cost % of ConstrBuilding Construction2,151,000$ 68%2,250,000$ 42%2,363,655$ 36%2,294,000$ 34%Building Per Sq. Ft. CostsBuilding Site Work50,000$ 2%515,000$ 10%538,690$ 8%680,000$ 10%Building Site Work Per Sq. Ft. CostsOff-Site, Signal & Access Construction942,500$ 17%1,000,000$ 15%1,154,764$ 17%Total Construction Costs2,201,000 70%3,707,500 69%3,902,345 59%4,128,764 61%Design264,120 8%450,000 8%468,000 7%538,940 8%Change Order Allowance220,100 7%375,000 7%390,000 6%315,570 5%FFE- 100,000 2%104,000 2%107,351 2%Demo Existing Station85,000 3%75,000 1%78,000 1%79,214 1%Construction Management264,120 8%350,000 6%364,000 6%265,000 4%Environmental- 152,500 3%158,600 2%152,500 2%Inspection 132,060 4%130,000 2%135,200 2%130,000 2%Property Acq*- 60,000 1%1,000,000 15%1,000,000 15%Special Equipment- - - - Miscellaneous- - - - ESTIMATED PROJECT TOTAL3,166,400 100%5,400,000 100%6,600,145 100%6,717,339 100%Comparable2005/06 CIP Submittal Carlsbad Fire Station #66,200Sq. Ft @ $363psft17,000Sq. Ft @ $30psft est. 17,000Sq. Ft @ $40psft est.17,000Sq. Ft @ $30psft est.6,200Sq. Ft @ $370psftTurbo Peer Review of Carlsbad Fire Station #36,200Sq. Ft @ $347psft2006/07 CIP Submittal Carlsbad F/S #3 ENR Applied2005/06 CIP Submittal Carlsbad Fire Station #317,000Sq. Ft @ $3psft est.<10% Design30%-50% Design<10% Design6,200Sq. Ft @ $381psft
12Projects were indexed by either:ØKnown increasesØENR index – 4.6% Engineering News RecordBuilding Cost Index0%2%4%6%8%10 %1998 1999 2000 2001 2002 2003 2004 2005
13ØØWhen will development occur?When will development occur?ØØSufficient revenues for Sufficient revenues for capital construction?capital construction?
14(total units to buildout)25,00030,00035,00040,00045,00050,0001990 1995 2000 2005 2010 2015 2020+Future Units = 5,273Total Units = 48,266Current 42,993*89%*Current units are an estimate*Current units are an estimate
15(in units)05001,0001,5002,000200020012002200320042005200620072008200920102011FutureExisting89%Projected Projected 94%94%
16Villages of La Villages of La CostaCostaLa Costa La Costa GreensGreensRobertson Robertson RanchRanchSunny CreekSunny CreekPoinsettia Poinsettia PropertiesPropertiesThompson Thompson TabataTabataLevatino/ Levatino/ Poinsettia Poinsettia PlacePlace716543273216452,584 Units – Next 5 years
17(square feet)0250,000500,000750,0001,000,0001,250,0001,500,0001,750,000200020012002200320042005200620072008200920102011ProjectedActual
18HotelsHotelsRestaurantsRestaurantsTimesharesTimesharesAssisted LivingAssisted LivingChurchesChurchesTheaterTheaterRetailRetailGIA ExpansionGIA ExpansionCorporate Corporate CentersCentersIndustrialIndustrial4.1 million sq ft – next 5 years928,4101,419,6161,238,020501,401
19(through buildout)$0$20$40$60$80$100$120$140$160DevelopmentFeesSpecialDistrictsWater/SewerReplacementInfrastructureReplacementOther SourcesIN MILLIONSIN MILLIONSReplacement Revenues = 41%
20Water & Sewer Connection FeesPublic Facilities Fees Park In Lieu Fees$0$20$40$60$80$100$120$140$160DevelopmentFeesSpecialDistrictsWater/SewerReplacementInfrastructureReplacementOther SourcesIN MILLIONSTraffic Impact FeesPlanned Local Drainage Fees
21CFD#1 - CitywideBTD#2 - Aviara Parkway-Poinsettia Lane$0$20$40$60$80$100$120$140$160DevelopmentFeesSpecialDistrictsWater/SewerReplacementInfrastructureReplacementOther SourcesIN MILLIONSIN MILLIONSCFD#3 – Faraday/MelroseBTD#3 - Cannon Road West
22Annual transfers from operating funds Used for replacement of existing facilities$0$20$40$60$80$100$120$140$160DevelopmentFeesSpecialDistrictsWater/SewerReplacementInfrastructureReplacementOther SourcesIN MILLIONSIN MILLIONS
23TransNet allocationGas TaxRedevelopment$0$20$40$60$80$100$120$140$160DevelopmentFeesSpecialDistrictsWater/SewerReplacementInfrastructureReplacementOther SourcesIN MILLIONSIN MILLIONSFederal and State grantsOther agencies
24Sewer/Drainage17%Parks18%Civic23%Loans8%Water9%Streets25%
25InfrastructureReplacement7%Water/SewerReplacement8%SpecialDistricts9%Other Sources49%Development27%
26Sewer/Drainage7%Parks18%Civic 3%Loan Repayments36%Water1%Streets19%Advances to Other Funds16%
27ØPine Avenue ParkØØAlga Norte Park & Alga Norte Park & Aquatic ComplexAquatic ComplexØØGolf CourseGolf CourseØØEncina ProjectsEncina ProjectsØØVista Carlsbad Vista Carlsbad InterceptorInterceptorØØFire Station #6Fire Station #6ØØRecycled Water SystemRecycled Water SystemØØPavement ManagementPavement ManagementØØLibrary Learning Library Learning CenterCenter
28ØNew Appropriations $ 44 MillionØContinuing Projects $144 Million____________________________________________________________TOTALTOTAL$188 Million$188 Million2006 2006 --2007 Capital Program 2007 Capital Program
29ØØCivic FacilitiesCivic FacilitiesØØFacility MaintenanceFacility MaintenanceØØPark DevelopmentPark DevelopmentØØDrainage ProjectsDrainage ProjectsØØSewer ProjectsSewer ProjectsØØWater ProjectsWater ProjectsØØStreet ProjectsStreet Projects
30The next 5 Years…FY 2006 through 2010
31ØParking and Landscape study for Village Redevelopment AreaØ$400,000 for study and design only●Implementation program will be proposed in future CIP budget process
32ØKelly Drive Channel RepairØCalle Gavanzo StreetØRidgecrest DriveØRomeria Street$895,000$62,500$117,500$274,000
33ØRequest by NCTDØReconstruct NW quadrant of intersectionØ$105,000
34ØCarlsbad Blvd Bridge over railroad tracks at State StreetØCarlsbad Blvd Bridge over outlet channel at Encina Power Plant$191,000$1,300,000
35ØEastbound Palomar Airport Road to Southbound Melrose DriveØEstimated cost - $260,000Ø25% contribution by Carlsbad
36ØComplement Pavement Management ProgramØ$250,000 Annual AppropriationØ$3,500,000 total appropriation
37ØConstruct missing sidewalks to improve safety for children attending adjacent schoolsØ$630,000
38The next 5 Years…FY 2006 through 2010
39ØReplace aging Oak Street FacilityØCentralize all maintenance equipment and personnelØ64,000 square feet ●maintenance building ●office building●warehouse facility
40Ø6,200 Square Foot FacilityØExisting site adjacent to Calavera Park ØPotential location within Robertson RanchØ$1,000,000 included for property acquisition
41ÃAlga Norte ParkÃNorthPine Avenue Park ÃGolf CourseÃPoinsettia Community ParkÃAviara Community Park
42Championship Golf CourseOpening 2007Clearing and grubbing2004-05 2005-06 2006-07 2007-08Grading/Construction
43Ø50 meter competition poolØ12 lane instructional poolØTherapy poolØWater play area●Lazy river●2 water slides
44ØBall fieldsØPicnic areasØTot lotsØSkate parkØDog park2004-052005-062006-072007-08Planning & Design Construction
45ØAviara Park Community BuildingØPine Park Community BuildingØPoinsettia Park Community Building●Enclosed Soccer Field●Tennis Complex●Additional Parking$9,700,000$9,100,000$14,120,000
46Ø$1,000,000 appropriated in FY 2005-06 for construction of 7 tennis courtsØRequest an additional $89,200
47ØEncina Water Pollution Control FacilityØSewer Collection System Projects
48ØVC 1-3: $ 3,520,000ØVC 11: $ 3,550,000ØVC 12: $ 9,130,000ØVC 13-15: $ 13,520,000PROJECT COSTSCannon RoadI-5Tamarack AveCarlsbadVillage DriveOCEANSIDEPacific OceanNEncinaLift Station
49ØCannon RdØCarlsbad BlvdØCollege BlvdØFaraday/MelroseWater Enterprise Funds
50ØPavement ManagementØFaraday Ave/Melrose DrØCollege Blvd – Reach AØCannon Road – Reach 4AØPoinsettia LaneØCarlsbad Blvd Bridge Replacement
51ØSewer/WaterØDrainageØStreetsØBuildings and parks
52ØPublic Facility Fees (PFF)ØUnfunded Projects
53-$5$0$5$10$152007 2008 2009 2010 2011 2011++MillionsØØStaff Recommending the Following AdjustmentsStaff Recommending the Following Adjustments●●Loaning the PFF Fund $4.9 Million from Gas Tax for Gas Tax Loaning the PFF Fund $4.9 Million from Gas Tax for Gas Tax appropriate projects appropriate projects ●●Loaning the PFF Fund $7.1 Million from GCC for:Loaning the PFF Fund $7.1 Million from GCC for:●●Tennis CourtsTennis Courts●●Alga NorteAlga Norte●●Land Acquisition for Fires Station #3Land Acquisition for Fires Station #3
541.Palomar Airport Road Widening and Bridge reconstruction2.El Camino Real Widening from Cassia to Camino Vida Roble3.Poinsettia Lane – Reach “E”4.Cannon Road – College Blvd to city limits5.Cannon Lake Park6.Hosp Grove/Buena Vista Lagoon Improvements
551.Set Public Hearing for 2006 - 2007 Operating and Capital Budgets for June 20, 2006.
56ØCIP Workshop●Set Public Hearing for June 20thØJune 6thOperating Budget WorkshopØJune 20thOperating Budget and CIPPublic Hearing and AdoptionCOUNCIL MEETINGSØJune 14Citizen’s Budget ForumOTHER PUBLIC MEETINGS
57ØWhen:Wednesday, June 14thØWhere:Faraday Center1635 Faraday AvenueRoom 173ØTime:5:00pmCall the Finance Department at(760) 602-2430 for additional informationCall the Finance Department at(760) 602-2430 for additional information
58
59ProjectsAllocationOriginal Set Aside$35,000,000Aquatic Complex$11,239,000City / Safety Training Facility$ 1,050,000Cannon Road – Reach 4Trails/Open SpaceRemaining Allocation$22,711,000
60D/UGrowth Management Plan54,599 City Council Reduction(3,350)Revised Cap51,249 Existing Bank (Policy 43)2,800 Maximum Currently Allowed 48,449 Current Build-Out Estimate48,266 Current Estimate Under Maximum183
61Description Line Item Cost % Total Line Item Cost % Total Line Item Cost % IncreaseBuildingsMechanical Building1,299,185 7%1,269,387 5%(29,797) -2%Building Per Sq. Ft. CostsAdministration Building1,124,170 6%1,452,348 6%328,178 29%Building Per Sq. Ft. CostsLocker/Meeting Room2,129,529 12%2,387,099 10%257,570 12%Building Per Sq. Ft. CostsTicket Booths and Turnstiles165,353 1%188,196 1%22,843 14%Building Per Sq. Ft. CostsTotal Building Costs Subtotal4,718,236$ 26%5,297,030$ 23%578,794$ 12%Pools55 Meter Pool w/Bulkhead (Competition Component)1,635,780 2,134,210 498,430 30%Pool Per Sq. Ft. Costs25 Yard Pool (Instructional Component)867,240 1,143,180 275,940 32%Pool Per Sq. Ft. CostsLazy River w/Rockwork (Recreational Component)1,594,600 1,938,520 343,920 22%Pool Per Sq. Ft. CostsWaterslides w/Pool (Recreational Component)358,370 375,040 16,670 5%Activity Pool (Recreational Component)396,000 528,000 132,000 33%Pool Per Sq. Ft. CostsChildren's Pool (Recreational Component)62,200 87,080 24,880 40%Pool Per Sq. Ft. CostsWet Play Area (Recreational Component)395,000 415,000 20,000 5%Therapy Pool (Therapy Component)97,250 101,140 3,890 4%Pool Per Sq. Ft. CostsLandscape/Miscellaneous1,649,630 1,756,061 106,431 6%Total Pool Costs Subtotal7,056,070$ 39%8,478,231$ 36%1,422,161$ 20%Site Work2,948,166 16%3,401,095 15%452,929 15%Total Construction Costs14,722,472$ 82%17,176,356$ 74%2,453,884$ 17%Contingency, Design, FF&E, Proj. Man. And Misc.736,123 4%2,576,453 11%1,840,330 250%ESTIMATED PROJECT TOTAL17,947,000$ 100%23,338,694$ 100%5,391,694$ 30%Alga Norte Pool 2005-06 vs 2006-07 Difference240Sq. Ft @ $784 psft389Sq. Ft @ $260 psft3,071Sq. Ft @ $473 psft5,005Sq. Ft @ $477 psft2006-07 CIP Submittal Carlsbad Alga Norte Pool4,755Sq. Ft @ $267 psft240Sq. Ft @ $688 psft389Sq. Ft @ $250 psft2005-06 CIP Submittal Carlsbad Alga Norte Pool4,755Sq. Ft @ $273 psft3,071Sq. Ft @ $366 psft5,005Sq. Ft @ $425 psft14,098Sq. Ft @ $145 psft14,098Sq. Ft @ $110 psft7,884Sq. Ft @ $110 psft7,884Sq. Ft @ $145 psft4,400Sq. Ft @ $90 psft4,400Sq. Ft @ $120 psft14,946Sq. Ft @ $100 psft 14,946Sq. Ft @ $120 psft1,244Sq. Ft @ $50 psft1,244Sq. Ft @ $70 psft
62234Description#REF!% Total Line Item Cost % Total Line Item Cost % IncreaseMaintenance Building198,863$ 2%252,591$ 2%53,728$ 27%Building Per Sq. Ft. CostsConcession/Restroom298,636$ 2%374,051$ 2%75,415$ 25%Building Per Sq. Ft. CostsBasketball Restroom204,536$ 2%255,361$ 2%50,825$ 25%Building Per Sq. Ft. CostsTot Lot/Skatepark Restroom204,536$ 2%255,361$ 2%50,825$ 25%Building Per Sq. Ft. CostsSite Work9,293,629$ 74%10,432,405$ 65%1,138,776$ 12%Total Construction Costs10,200,200 81%11,569,769 72%1,369,569 13%Cont, Design, FF&E, Proj. Man. & Misc.2,360,800 19%4,517,493 28%1,981,693 59%ESTIMATED PROJECT TOTAL12,561,000$ 100%16,087,262$ 100%3,351,262$ 28%597Sq. Ft @ $343 psft597Sq. Ft @ $427 psft967Sq. Ft @ $309 psft967Sq. Ft @ $387 psft1,231Sq. Ft @ $161 psft1,231Sq. Ft @ $205 psft597Sq. Ft @ $343 psft597Sq. Ft @ $427 psft2006-07 CIP Submittal Carlsbad Alga Norte ParkAlga Norte Park 2005-06 vs 2006-07 Difference2005-06 CIP Submittal Carlsbad Alga Norte Park
63234Description Line Item Cost % Total Line Item Cost % Total Line Item Cost % IncreaseMechanical Building1,299,185$ 4%1,269,387$ 3%(29,797)$ 0%Building Per Sq. Ft. CostsAdministration Building1,124,170$ 4%1,452,348$ 4%328,177$ 4%Building Per Sq. Ft. CostsLocker/Meeting Room2,129,529$ 7%2,387,099$ 6%257,570$ 3%Building Per Sq. Ft. CostsTicket Booths and Turnstiles165,353$ 1%188,196$ 0%22,843$ 0%Building Per Sq. Ft. CostsPools7,056,070$ 23%8,478,231$ 22%1,422,161$ 16%Pool Per Sq. Ft. CostsSite Work2,948,166$ 10%3,401,095$ 9%452,929$ 5%Total Pool Construction14,722,473 48%17,176,356 44%2,453,883 Maintenance Building198,863 1%252,591 1%53,728$ 1%Building Per Sq. Ft. CostsConcession/Restroom298,636 1%374,051 1%75,415$ 1%Building Per Sq. Ft. CostsBasketball Restroom204,536 1%255,361 1%50,825$ 1%Building Per Sq. Ft. CostsTot Lot/Skatepark Restroom204,536 1%255,361 1%50,825$ 1%Building Per Sq. Ft. CostsSite Work9,293,629 30%10,432,405 34%- 0%Total Park Construction10,200,200 33%11,569,769 38%1,369,569 15%Total Construction Costs24,922,673 82%28,746,125 81%3,823,452 43%Construction Contingency5,585,327 18%10,679,830 27%5,094,504 57%PROJECT TOTAL30,508,000$ 100%39,425,956$ 109%8,917,956$ 100%902005-06 CIP Submittal Carlsbad Alga Norte Complex2006-07 CIP Submittal Carlsbad Alga Norte ComplexAlga Norte Complex 2005-06 vs 2006-07 Difference4,755Sq. Ft @ $273 psft4,755Sq. Ft @ $281 psft3,071Sq. Ft @ $366 psft3,071Sq. Ft @ $473 psft5,005Sq. Ft @ $425 psft5,005Sq. Ft @ $477 psft240Sq. Ft @ $688 psft240Sq. Ft @ $784 psft1,231Sq. Ft @ $205 psft1,231Sq. Ft @ $205 psft597Sq. Ft @ $427 psft597Sq. Ft @ $427 psft1,231Sq. Ft @ $161 psft967Sq. Ft @ $309 psft597Sq. Ft @ $343 psft597Sq. Ft @ $343 psft
64
65