HomeMy WebLinkAbout2006-08-15; City Council; 18697; AWARD OF CONTRACT: CONTRACT NO. PKS 06-02CITY OF CARLSBAD - AGENDA BILL
AB# 18,697
MTG. 8/15/06
DEPT. PW/GS
AWARDING THE CONTRACT TO REMODEL
TWO PARK RESTROOMS AND RE-ROOF A MAINTENANCE
BUILDING, CONTRACT NO. PKS 06-02,
PROJECT NOS. 38971 AND 39431
DEPT. HEAD' ^/jfi'
CITYATTY. Jl///
CITY MGR. f\ju*-~~
RECOMMENDED ACTION:
Adopt Resolution No. 2006-243
Blair Rasmussen Construction to
accepting the
Remodel Two
bid of $290,000 and awarding the contract to
Park Restrooms and Re-Roof a Maintenance
Building, Contract No. PKS 06-02, and Project Nos. 38971 and 39431.
ITEM EXPLANATION:
The eastern restroom facility in Holiday Park and the restroom facility at Laguna Riviera Park are
structures that were constructed approximately twenty years ago. The existing facilities are in need of
new plumbing and electrical systems. Structural and roofing issues with the buildings need to be
corrected. Both facilities need extensive refurbishing of interior and exterior walls and ceilings.
Path of travel issues must be addressed by modifying existing pedestrian ramps and installing ADA
compliant sidewalks to access the restroom at Holiday Park. The interior of both restroom facilities
must be upgraded to comply with the requirements of the Americans with Disabilities Act.
The original project anticipated complete replacement of both restrooms. Escalating construction costs
led staff to consider other cost saving alternatives, including remodeling of the existing structures
rather than complete replacement. Staff met with our consulting architect and determined that it would
be feasible and cost-effective to remodel the existing structures rather than replace them entirely.
On June 6, 2006, the City Council adopted Resolution 2006-139 approving contract documents and
special provisions, and authorized the City Clerk to advertise for bids for this project. Three bids were
received, opened, witnessed and recorded on July 19, 2006. The bid amounts ranged from $290,000
to $427,410. The bids were reviewed by the Public Works Department and were as follows:
Blair Rasmussen Construction
COM Construction
Telaco
<
<
V
5290,000
5302,110
$427,410
Blair Rasmussen Construction submitted the lowest responsive bid. Therefore, staff recommends the
contract be awarded to Blair Rasmussen Construction, the lowest responsive bidder, in the amount of
$290,000. The contractor's registration and bonds are in order and references are satisfactory.
Contract documents are on file in the General Services offices of Public Works.
The Engineer's Estimate for these improvements is $325,000.
This project will address the Council Goal as described below.
"Ensure the effective and efficient delivery of top-quality services to our community."
DEPARTMENT CONTACT: Dale A. Schuck, (760) 434-2949, dschu(o)ci.carlsbad.ca.us
FOR CITY CLERKS USE ONL Y. .
COUNCIL ACTION: APPROVED ST
DENIED D
CONTINUED D
WITHDRAWN D
AMENDED D
CONTINUED TO DATE SPECIFIC D
CONTINUED TO DATE UNKNOWN D
RETURNED TO STAFF D
OTHER - SEE MINUTES D
PAGE 2
ENVIRONMENTAL IMPACT:
This project has been determined to be exempt from environmental review per CEQA (14 Cal Code
Reg §15301) - minor alteration of an existing facility.
FISCAL IMPACT:
TWO PARK RESTROOM REMODELS
AND RE-ROOF OF MAINTENANCE BUILDING
PROJECT SUMMARY
Construction Contract
Design and Inspection
Contingency
TOTAL ESTIMATED PROJECT COST
TOTAL APPROPRIATIONS
$290,000
$50,000
$40,000
$380,000
$906,866
The total project cost is estimated at $380,000, which includes $90,000 of contract costs for design,
inspection, hazardous materials surveys, hazardous materials abatement monitoring, and contingency
funds. Sufficient Infrastructure Replacement funds have been appropriated in the City's CIP Program
budget to complete the restroom remodels, and to install concrete surface improvements.
Sufficient funds are available in the General Fund, Parks Department, Capital Outlay budget for the
re-roof of the maintenance building.
EXHIBITS:
1. Resolution No. 2006-243 accepting the bid of $290,000 and awarding the contract to
Blair Rasmussen Construction to Remodel Two Park Restrooms and Re-Roof a Maintenance
Building, Contract No. PKS 06-02, Project Nos. 38971 and 39431.
Exhibit 1
1
RESOLUTION NO. ?nnft.9A3
2
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
3 CARLSBAD, CALIFORNIA, AWARDING THE CONTRACT TO
REMODEL TWO PARK RESTROOMS AND RE-ROOF A
4 MAINTENANCE BUILDING. CONTRACT NO. PKS 06-02,
PROJECT NOS. 38971 AND 39431.
5 WHEREAS, the City Council adopted Resolution No. 2006-139 approving contract
6
documents, special provisions and specifications, and authorized the City Clerk to advertise for
7
bids to Remodel Two Park Restrooms and Re-Roof a Maintenance Building, Contract No. PKS
8
06-02, Project Nos. 38971 and 39431, hereinafter referred to as the "Project;" and
9
WHEREAS, bids have been received by the City of Carlsbad, California to Remodel Two
10
Park Restrooms and Re-Roof a Maintenance Building; and
11
WHEREAS, the bids were opened, witnessed, and recorded on July 19, 2006; and
12
WHEREAS, the lowest responsive bid received was submitted by Blair Rasmussen
13
Construction in the amount of $290,000; and
14
WHEREAS, sufficient Infrastructure Replacement funds have been appropriated in the
15
City's CIP Program budget to complete the restroom remodels; and
16
WHEREAS, sufficient funds are available in the General Fund, Parks Department,
17
Capital Outlay budget for the re-roof of the maintenance building.
18
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carlsbad,
California, as follows:
20
1. That the above recitations are true and correct.21
2. The bid of $290,000 by Blair Rasmussen Construction to Remodel Two Park22
Restrooms and to Re-Roof a Maintenance Building, and a contingency account of $40,000 is
hereby accepted.
3. That the Mayor of the City of Carlsbad is hereby authorized and directed to execute
_ _ a contract to Remodel Two Park Restrooms and Re-Roof a Maintenance Building, Contract No.26
PKS 06-02, Project Nos. 38971 and 39431 with Blair Rasmussen Construction.
28
1 4. That the award of this contract is contingent upon Blair Rasmussen Construction
2 executing the required contract and submitting the required bonds and insurance policies, as
described in the contract, within twenty (20) days of adoption of this resolution. The City Manager
4
may grant reasonable extensions of time.
5
6
7
9 ///
10 ///
11 ///
12 ///
14
15
16
17
I"
.19 ///
20 ///
21 ///
22 ,„
III
24
25
26
27
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
PASSED, APPROVED AND ADOPTED at a Regular Meeting of the City Council
of the City of Carlsbad on the 15th day of August, 2006, by the following vote:
AYES: Council Members Lewis, Hall, Kulchin, Packard, Sigafoose
NOES: None
ABSENT: None
ATTEST: