Loading...
HomeMy WebLinkAbout2007-03-06; City Council; 18915; Senior Center Improvements Construction ContractCITY OF CARLSBAD - AGENDA BILL MTG. DEPT. 18,915 3/6/07 REC SENIOR CENTER IMPROVEMENTS CONSTRUCTION AWARD OF CONTRACT DEPT. HEAD M&&S CITY ATTY. diS? CITY MGR. ^Sp RECOMMENDED ACTION: Adopt Resolution No. 2007-043 accepting bids and awarding a contract to Good & Roberts, Inc. for the construction.of Senior Center Improvements, Project No. 45001-2. ITEM EXPLANATION: On October 17, 2006, the City Council approved plans and specifications and authorized the advertisement of bidding for the construction of the Senior Center Improvements. The project includes tenant improvements to approximately 14,245 square feet within the existing Senior Center (an area formerly owned by the Carlsbad Unified School District. The first floor (approx. 8,475 square feet) is designed to augment senior activities and includes: • Fitness center • Computer lab « Multi-purpose / conference room • Arts and crafts room • Bathroom and changing room (including a shower) • Several small office rooms (for tax preparation assistance, blood pressure testing, etc.) • Game room • Lunch area The second floor will house Recreation Administration offices. Ten bids were received on January 23, 2007. The following is the breakdown of the bids: 1 2 3 4 5 6 7 8 9 10 Contractor Good & Roberts, Inc. Stevens Construction Randall Construction APC, Inc. HCH Construction Fardyce Construction EC Construction Newman Midland Corp. HAR Construction Inc. 3-D Construction Engineer's Estimate Price $631,500 $717,000 $723,281 $798,525 $839,000 $890,479 $949,000 $988,749 $1,100,000 $1,113,000 $1,172,000 DEPARTMENT CONTACT: Mark Steyaert 760-434-2855 mstev@ci.carlsbad.ca.us FOR CITY CLERKS USE ONLY. COUNCIL ACTION: APPROVED DENIED CONTINUED WITHDRAWN AMENDED J*nnn . n CONTINUED TO DATE SPECIFIC CONTINUED TO DATE UNKNOWN RETURNED TO STAFF OTHER -SEE MINUTES nnnn Page 2 The apparent low bidder is Good & Roberts, Inc. at $631,500. The second low bidder, Stevens Construction, alleged that Good & Roberts did not send in their subcontractor's prices within the required time limits as specified in California Public Contracting Code. The Public Works Buyer and City Attorney's Office have reviewed the allegation and have determined that Good and Roberts did indeed send in the required information within the allocated time limits. Stevens Construction has subsequently decided not to pursue their objections. FISCAL IMPACT: Current funds of $1,535,229 are available in the 2006-2007 Fiscal Year Capital Improvement Program to cover the cost of the project. These include Redevelopment Agency funds ($1,027,017 allocated for the first floor improvements) and $508,212 from General Capital Construction fund (for second floor improvements). Summary of Project Funding Total Appropriation Spent to date (Design) Available Funds Construction (Good & Roberts bid) Construction Contingency (30%) Construction Management, Inspection, and Testing Construction Phase Architectural Support IT Improvements FF&E Remaining Funds $1,611,206 -$75,977 $1,535,229 -$631,500 -$190,000 -$63,000 -$10,000 -$180,000 -$350,000 $110,729 * 30% is used due to the nature of the project being essentially a retrofit tenant improvement. This type of project has a greater chance of experiencing potential change orders due to encountering unknown pre-existing conditions (e.g. cracked slabs under existing flooring, wiring within walls that are now sub-standard, etc). Redevelopment Fund contribution to project are restricted to use on first floor construction; the Senior Center programming expansion portion. The first floor is estimated to cost approximately 70% of the total project or $997,150 which can be covered by the $1,027,017 in Redevelopment funds already appropriated to the project. ENVIRONMENTAL IMPACT: Because the project is not increasing the floor area or intensity of use, it is exempt under CEQA, "Minor Alterations of Existing Structures", Section 15301. EXHIBITS: 2007-0431. Resolution No. _ Improvement Project, Contract No. 45001-2. 2. Location Map 3. First Floor Plan 4. Second Floor Plan awarding the contract for construction of the Senior Center 1 RESOLUTION MO. 2007-043 2 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD, CALIFORNIA, AWARDING A CONTRACT 3 FOR CONSTRUCTION OF THE SENIOR CENTER 4 IMPROVEMENT PROJECT, PROJECT NO. 45001-2. 5 WHEREAS, the City Council of the City of Carlsbad, California, has previously 6 appropriated funds in the Fiscal Year 2006-2007 Capital Improvement Program for 7 improvements to the existing Carlsbad Senior Center, hereafter referred to as the8 9 "Project"; and 10 WHEREAS, on October 17, 2006, the City Council approved plans and 11 specifications and authorized the advertisement of bidding for the construction of the 12 Senior Center Improvements. 13 WHEREAS, on January 23, 2007, bids were opened for the Project and the 14 apparent low bidder is Good & Roberts, Inc. at $631,500; and 15 WHEREAS, the second low bidder, Stevens Construction, alleged that Good & 16 Roberts did not send in their subcontractor's prices within the required time limits as 17 specified in California Public Contracting Code; and18 ,g WHEREAS, City staff reviewed the document and have determined that Good & 20 Roberts did timely submit the documentation; and 21 WHEREAS, Stevens Construction has informed staff that they have decided not 22 to pursue their objections; and 23 WHEREAS, the City Council of the City of Carlsbad hereby finds it necessary, 94 desirable, and in the public interest to provide improvements to the Senior Center; and 25 WHEREAS, adequate funds are available in the Fiscal Year 2006-2007 Capital 26 Improvement Program for the project in the amount of $1,535,229. 27 28 1 NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of 2 Carlsbad, California, as follows: 3 1. That the above recitations are true and correct. 4 2. That the bids received by the City and opened on January 23, 2007 are 5 hereby accepted and the lowest responsive, responsible bid received is 6 hereby determined to be that which was submitted by Good & Roberts, Inc., g in the amount of $631,500. 9 3. That said bid received by City from Good & Roberts, Inc. is accepted, the 10 contract is hereby awarded to this firm, and the Mayor is authorized to execute said contract on behalf of the City. 12 4. That the City Manager is hereby given the authority to approve 13 construction change orders, singly or in aggregate, for the Project, up to the 14 amount of the specified construction contingency. 16 " 17 18 // 19 // 20 // 21 // 22 // 23 24 25 26 27 28 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 PASSED, APPROVED AND ADOPTED at a Regular Meeting of the City Council of the City of Carlsbad on the 6th day of March, 2007, by the following vote: AYES: Council Members Lewis, Kulchin, Hall, Packard NOES: None ABSENT: Council Member Sigafoose , ayor ATTEST: (SEAL) z O (0 = EXHIBIT 2 LAJ FIRST FLOOR - SENIOR ACTIVITIES Senior Ctr. Improvements EXHIBITS 1 SECOND FLOOR - ADMINISTRATIVE OFFICES Senior Ctr. Improvements EXHIBIT 4