Loading...
HomeMy WebLinkAbout2007-07-24; City Council; 19100; Poinsettia Ln / Black Rail Rd traffic signalCITY OF CARLSBAD - AGENDA BILL 6 AB# 19,100 MTG. 7/24/07 DEPT. ENG AUTHORIZATION TO ADVERTISE FOR BIDS FOR A TRAFFIC SIGNAL AT POINSETTIA LANE AND BLACK RAIL ROAD, PROJECT NO. 3939-1 DEPT. HEAD 'im CITY ATTY. <^< CITYMGR. *\X>£>~TS\ RECOMMENDED ACTION: Adopt Resolution No.2007-193 approving plans and specifications and authorizing the City Clerk to advertise for bids for the construction of the traffic signal at Poinsettia Lane and Black Rail Road, Project No. 3939-1. ITEM EXPLANATION: The intersection of Poinsettia Lane and Black Rail Road is currently controlled by an ALL-WAY STOP. Private development projects directly adjacent to the intersection have been completed and were conditioned to enter into secured agreements with the City to provide a pro-rated share of the cost of the future traffic signal. The City of Carlsbad has collected $49,582 from developers as a result of these agreements. Staff has determined that the construction of the traffic signal at Poinsettia Lane and Black Rail Road would be beneficial for several reasons. The intersection is the only ALL-WAY STOP controlled intersection along the Poinsettia Lane corridor, which is less than desirable from a traffic operations standpoint. A traffic signal at this intersection will ensure efficient traffic operations and safety in light of the increasing traffic volumes on Poinsettia Lane and the recent opening of Aviara Community Park to the east. This project was approved in the 2006/2007 Capital Improvement Program for design and construction, and funding for this project is available in the GCC fund. Plans and specifications to construct the traffic signal at this location have been completed. ENVIRONMENTAL IMPACT: This project is a Class 1 categorical exemption (minor alteration of existing structure or facilities) and is, therefore, exempt from the environmental review process under provisions of the California Environmental Quality Act (CEQA), Section 15301 (c). A Notice of Exemption has been issued by the Planning Director. FISCAL IMPACT: The funds needed to complete the project are $188,183. The project cost breakdown is as follows: Design/Administration Engineer's Estimate for Construction Construction, Inspection, & Administration (7.5%) Construction Contingencies (15%) TOTAL PROJECT COST TOTAL AMOUNT APPROPRIATED FOR THIS PROJECT $4,433 $150,000 $11,250 $22,500 $188,183 $210,000* Of which $49,582 has been collected from private developers FOR CITY CLERKS USE ONLY COUNCIL ACTION: APPROVED DENIED CONTINUED WITHDRAWN AMENDED uS D D D D CONTINUED TO DATE SPECIFIC CONTINUED TO DATE UNKNOWN RETURNED TO STAFF OTHER -SEE MINUTES D D D D Page 2 EXHIBITS: 1. Location Map. 2. Resolution No. 2007-193 authorizing the City Clerk to advertise for bids for the construction of the traffic signal at Poinsettia Lane and Black Rail Road. DEPARTMENT CONTACT: John Kim at (760) 602-2757, ikim@.ci.carlsbad.ca.us LOCATION MAP PROJECT LOCATION NOT TO SCALE LEGEND S ) EXISTING TRAFFIC SIGNAL (V) TRAFFIC SIGNAL UNDER CONSTRUCTION Traffic Signal at Poinsettia Lane and Black Rail Road Project No. 3939-1 EXHIBIT 1 I 3 1 RESOLUTION NO. 2007-193 2 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF 3" 4 5 6 7 8 10 11 12 13 CARLSBAD, CALIFORNIA, APPROVING PLANS AND SPECIFICATIONS AND AUTHORIZING THE CITY CLERK TO ADVERTISE FOR BIDS FOR THE CONSTRUCTION OF THE POINSETTIA LANE AND BLACK RAIL ROAD TRAFFIC SIGNAL, PROJECT NO. 3939-1. WHEREAS, the City Council of the City of Carlsbad, California, has determined it necessary, desirable, and in the public interest to construct a traffic signal at the intersection of Poinsettia Lane and Black Rail Road; and WHEREAS, the plans and specifications for furnishing of all labor, materials, tools, equipment, transportation, and other expenses necessary or incidental of said project have been prepared and are on file in the Engineering Department of the City of Carlsbad and are incorporated by reference herein; and WHEREAS, said project was included in the 2006/2007 Capital Improvement Program; 14 and 1 s10 WHEREAS, the GCC fund includes sufficient funds to construct this project; and 16 WHEREAS, $49,582 has been collected from private developers and deposited into the 17 GCC fund. 18 NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carlsbad, 19 California, as follows: 20 1. That the above recitations are true and correct. 21 2. That the plans, specifications and contract documents on file in the Engineering 22 Department of the City of Carlsbad are hereby approved. 23 3. The City Clerk of the City of Carlsbad is hereby authorized and directed to 24 publish, in accordance with State law, a Notice to Contractors Inviting Bids for the construction of 25 the Poinsettia Lane and Black Rail Road Traffic Signal, Project No. 3939-1, in accordance with the 26 plans, specifications, and contract documents referred to herein. 27 " 28 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 PASSED, APPROVED AND ADOPTED at a Regular Meeting of the City Council of the City of Carlsbad on the 24th day of July, 2007, by the following vote to wit: AYES: Council Members Kulchin, Hall, Packard and Nygaard. NOES: None. ABSENT: Council Member Lewis. . ^ n /c/C4,tfA^i^Nt^^^^Vi^>f JLS' J^^TI \ Xj *} I/ j *-^~* * ^ / CTAUDE A LE^fe; Mayor ATTEST: l/i (J nolfcLoJL AL 1/ORRAlXife M. WOq5/City Cl^n (SEAL) U ^?2 £ OV\viH ~ «• '^.^~°;fi^- > ••*.*• j2-^.•lfe|"c-tb^H-^ •?$#£ <-<=^ •o^P ^ Q^'^*-t''-rv,'c. fiX&x "^ -p§i MF/^'5 PP'^x"ffp -v