AUTHORIZATION TO APPROPRIATE FUNDS FOR
BUENA VISTA LIFT STATION FORCEMAIN (VC4)
S^
DEPT. HEAD S) ®v$-
CITYATTY. l^>
CITY MGR. <r~l^>T*V
RECOMMENDED ACTION:
Adopt Resolution No. 2007-235 authorizing the appropriation of funds for the Buena Vista Lift
Station Forcemain (VC4).
ITEM EXPLANATION:
Background - The forcemain, originally constructed in 1963, conveys wastewater from the
Buena Vista Lift Station to a gravity interceptor sewer located west of Interstate 5. This forcemain is
part of the Vista/Carlsbad Interceptor Sewer system, and is referred to as Reach VC4. The forcemain
is jointly owned by the City's of Vista and Carlsbad. Through an agreement with the City of Vista,
dated February 26, 2003, Carlsbad is responsible for operation and maintenance.
The original forcemain was 16-inch diameter asbestos cement pipe (ACP) located entirely within
Jefferson Street. When Interstate 5 was constructed around 1968, a new bridge overpass was built for
Jefferson Street and a two barrel pipeline, consisting of 16-inch diameter ACP, was constructed in the
bridge. The original forcemain was connected to one pipe barrel in the bridge.
Around 1970, two 16-inch diameter reinforced plastic mortar pipes (RPMP) were constructed
to replace the easterly-most portion of the original ACP forcemain because of a realignment of
Jefferson Street. One of the RPMP pipes was connected to the original 16-inch diameter ACP
forcemain.
In 1975, a 24-inch diameter ductile iron pipe (DIP) was constructed in Jefferson Street in parallel to
the original ACP forcemain. On one end, the 24-inch DIP connected to the other 16-inch RPMP pipe
and the other end connected to the remaining 16-inch pipe barrel located in the bridge crossing
Interstate 5. At that point in time, the forcemain consisted of two pipelines with one operating as a
standby forcemain.
Around 1982, the RPMP pipes were abandoned and a 24-inch diameter DIP was extended from the
lift station west to the existing 24-inch DIP installed in 1975. A final modification to the forcemain
occurred in 1996 with the installation of a wye connection with a plug valve to allow wastewater to be
conveyed into the original 16-inch diameter ACP line.
Forcemain Break - On April 1, 2007, a break occurred on the DIP portion of the forcemain
constructed in 1982. The location of the pipe break is not in the lagoon, but follows the original
alignment of Jefferson Street.
FOR CITY CLERKS USE ONLY
COUNCIL ACTION:APPROVED
DENIED
CONTINUED D
WITHDRAWN D
AMENDED D
CONTINUED TO DATE SPECIFIC D
CONTINUED TO DATE UNKNOWN D
RETURNED TO STAFF D
OTHER-SEE MINUTES D
Page 2
The material specified for the pipe where the break occurred is 24-inch diameter ductile iron pipe
(DIP) cement mortar lined, thickness class 51, with an 8-mil polyethylene encasement.
An investigation into the pipeline break by a corrosion consultant indicates that the most probable
cause of the break was due to external corrosion of the pipe at a hole in the polyethylene encasement
which most likely existed at the time of construction. The iron corroded over a period of time,
measured in years, down to the cement liner. The exposed area of the liner continued to grow in size
as the supporting iron receded. The sewage was discharged when the membrane of cement liner,
corrosion product, and supporting fill could not contain the pressure.
Recommendation - Cathodic protection can be installed to halt further corrosion of the exterior of the
existing forcemain. Although this would prevent further metal loss, there is still the possibility that
there are similar areas along the forcemain where only the cement liner remains and, therefore,
staff is recommending that the forcemain be replaced. The City has a future Capital Improvement
Project (CIP) which calls for a parallel forcemain to be constructed to replace this existing pipeline.
It is recommended that this CIP project be moved forward and staff begin the engineering design
process. The project would consist of a parallel forcemain and also improvements to the existing
forcemain including a slip liner, valve improvements, and redundancy features to enhance reliability of
the forcemain delivery system.
ENVIRONMENTAL IMPACT:
This project is a Class 6 categorical exemption (information collection) and is therefore exempt from
environmental review pursuant to Section 15306 of the California Environmental Quality Act (CEQA).
A Notice of Exemption will be filed by the Planning Director upon project approval.
FISCAL IMPACT:
The Engineer's Estimate for the first phase costs of the Buena Vista Lift Station Forcemain
Improvement Project is shown in Table 1.
TABLE 1
?V . - ' -:_, PROJECT
Preliminary Design Report, Environmental Review and Permits
Final Design, Plans and Specifications
PROJECT .TOTAL, COST
CURRENT APPROPRIATION
ADDITIONAL APPROPRIATION REQUIRED
ESTIMATED
COSTS
$200,000
$300,000
$500,000
-4&NONE
$500,000*
FUNDING
SOURCE
Sewer
Replacement
Funds
*. s " -
The actual cost will be split between the Cities of Vista and Carlsbad; 89.6% and 10.4%, respectively.
Carlsbad will invoice Vista for their share of the work.
The budget includes only the cost for the preliminary design report, environmental review, permits and
final design. This project is not in the current Fiscal Year 2007-2008 CIP Program. Staff is requesting
that an appropriation from the Sewer Replacement Fund be approved at this time to perform the work
listed above. Sufficient funds are available in the Sewer Replacement Fund to accommodate the cost
for the first phase of this project. Any recommended improvements for construction will be
appropriated in the future based on the results of the preliminary design report.
PageS
From the agreement with the City of Vista, their share of the Preliminary Design Report for Reach VC4
of the Vista Carlsbad Interceptor Sewer system is 89.6 percent and Carlsbad's share is 10.4 percent.
In accordance with Section 6.1 of the agreement between Vista and Carlsbad, a Preliminary Design
Report is first required on a project detailing the improvements to be made and their associated cost.
Upon acceptance of the findings in the Preliminary Design Report, a Project Agreement shall be
prepared to identify specific improvements, including cost sharing. The Project Agreement must be
approved and accepted by each agency before final design can begin. Staff at the City of Vista has
indicated that they are in agreement with proceeding on this project at this time and will be making a
recommendation to their City Council for full project funding. A Request for Proposal has been
prepared for preparation of the Preliminary Design Report
EXHIBITS:
1. Location Map.
2. Resolution No. 2007-235 authorizing the appropriation of funds for the Buena Vista
Lift Station Forcemain (VC4).
DEPARTMENT CONTACT: William Plummer, (760) 602-2768, bplum@ci.carlsbad.ca.us
LOCATION MAP
SITE
NOT TO SCALE
SITE
PROJECT NAME
BUENA LIFT STATION FORCE MAIN (VC 4)
EXHIBIT
1
DRAWN BY: SCOTT EVANS. CARLSBAD ENGINEERNG DEPT. 8/30/07 C:\CAPITAL\AHLES\BUENA LIFT STATION FORCE UAIN.DWG
1
RESOLUTION NO. 2007-235
2
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
3 CARLSBAD, CALIFORNIA, AUTHORIZING THE APPROPRIATION OF
FUNDS FOR THE BUENA VISTA LIFT STATION FORCEMAIN (VC4).
4
WHEREAS, the City Council has determined it necessary and in the public interest to
5
prepare a preliminary design report, and appropriate funds for the Buena Vista Lift Station
6
Forcemain Improvement Project; and
7
WHEREAS, funds totaling $500,000 are needed at this time to begin this project.
8 WHEREAS, funds in the Sewer Replacement Fund are sufficient for the project; and
9
WHEREAS, an Agreement dated February 26, 2002, titled "Agreement for Ownership,
10 Operation and Maintenance of the Vista/Carlsbad Interceptor Sewer" calls for the City of Vista's
share in the cost of the Preliminary Design Report to be 89.6 percent and Carlsbad's share to be
10.4 percent.
13 NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carlsbad,
California, as follows:
1. That the above recitations are true and correct.
A O
2. That the Finance Director is authorized to appropriate $500,000 from the
17 Sewer Replacement Fund to cover the cost of a Preliminary Design Report, Environmental
1ft Review, Permits and Plans and Specifications for the Buena Vista Lift Station Forcemain
19 Improvement Project.
20 ///
21 ///
22 ///
23 ///
24 ///
25 ///
26 ///
27
28
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
PASSED, APPROVED AND ADOPTED at a Regular Meeting of the City Council
of the City of Carlsbad on the 11th day of September 2007, by the following vote to wit:
AYES: Council Members Lewis, Kulchin, Hall, Packard, Nygaard
NOES: None
ABSENT: None
ATTEST:
LORRAINE
(SEAL) /
, City Clerk