Adopt Resolution No.2007-285 accepting bids and awarding the contract to Don Hubbard
Contracting Company for the construction of the Calle Gavanzo Drainage Improvements and
appropriating funds, Project No. 6605, Bid No. PWS08-06ENG.
ITEM EXPLANATION:
The Calle Gavanzo Drainage Improvement project includes the installation of a subdrain connection
to an existing access hole and pavement repairs.
On September 18, 2007, eleven (11) sealed bids were received for construction of this project.
The bids submitted by Bonsall Construction Services, Excel Commercial Constructors, and
Miller Construction had minor math errors resulting in the need to revise their bid totals. Following is a
summary of the corrected bid totals:
,,,,,,. ;_';.. --'jjaiifBACTOi*. ............. ...
1 . Don Hubbard Contracting Company
2. Tri-Group Construction & Development
3. MJC Construction
4. Southwest Civil Contracting
5. Rangel Development Group
6. Burtec Pipeline
7. Zondiros Corporation
8. Bonsall Construction Services
9. Excel Commercial Constructors
10. Primetime Construction
11. Miller Construction
CITWSTAT1
San Marcos, CA
Poway, CA
Bonita, CA
San Diego, CA
Temecula, CA
Encinitas, CA
San Marcos, CA
Bonsall, CA
San Marcos, CA
El Cajon, CA
Santee, CA
TOTAL
$51,555.00
$53,980.00
$58,060.00
$59,624.00
$60,245.00
$68,768.00
$68,564.00
$74,066.16
$83,028.00
$95,554.25
$129,920.04
All bid documents submitted by Don Hubbard Construction Company have been reviewed by staff
and found to be in order. Staff recommends awarding the construction contract to Don Hubbard
Contracting Company in the amount of $51,555.
ENVIRONMENTAL IMPACT:
This project is categorically exempt from the environmental review process under Section 15303(d)
and 15304(f) of Title 14 of the California Code of Regulations. The project is a utility extension that
requires minor trenching and backfilling.
FOR CITY CLERKS USE ONLY.
COUNCIL ACTION: APPROVED
DENIED
CONTINUED
WITHDRAWN
AMENDED
D
Dn
D
CONTINUED TO DATE SPECIFIC
CONTINUED TO DATE UNKNOWN
RETURNED TO STAFF
OTHER - SEE MINUTES
n
nn
n
Page 2
FISCAL IMPACT:
The estimated construction costs associated with this project are summarized in the following table.
Construction Contract
Construction Contingency
Project Administration, Testing & Inspection
TOTAL ESTIMATED PROJECT COST
AVAILABLE FUNDS
ADDITIONAL APPROPRIATION ANTICIPATED FOR CONSTRUCTION
$51,555
$7,750
$5,000
$64,305
$51,774
$12,531
Additional funds in the amount of $12,531 are needed to complete the project. Sufficient funds are
available in the Gas Tax Fund.
EXHIBITS:
1. Location Map.
2. Resolution No. 2007-285 accepting bids and awarding the contract to Don Hubbard
Contracting Company for the construction of the Calle Gavanzo Drainage Improvements and
appropriating funds, Project No. 6605, Bid No. PWS08-06ENG.
DEPARTMENT CONTACT: Sherri Howard, (760) 602-2756, showa@ci.carlsbad.ca.us
- I
LOCATION MAP
CITY OF OCEANSIDE
HIGHWAY.'*
SITE
VICINITY
MAP
NOT TO
SCALE
NOT TO SCALE
SITE
PROJECT NAME
CALLE GAVANZO DRAINAGE IMPROVEMENTS
PROJECT
NUMBER
66051
APPENDIX
1
DRAWN BY: SCOTT EVANS. CARLSBAD ENGINEERING DEPT. 6/20/07 C: \CAPITAL\HOWARD\66051.DWG 3
1
RESOLUTION NO.
2
3
4
5
6 WHEREAS, the City Council of the City of Carlsbad, California, has determined it
necessary, desirable, and in the public interest to construct drainage improvements and pavement
repairs on Calle Gavanzo; and
Q0 WHEREAS, the project is categorically exempt from the California Environmental Quality
7
9
10 „
City of Carlsbad for the construction of said project; and
WHEREAS, the lowest responsive, responsible bid was submitted by Don Hubbard
12 Contracting Company in the amount of $55,555; and
13
14
fecl/u b/l
2007-285
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
CARLSBAD, CALIFORNIA, ACCEPTING BIDS AND
AWARDING A CONTRACT FOR THE CONSTRUCTION
OF THE CALLE GAVANZO DRAINAGE IMPROVEMENTS
AND APPROPRIATION OF FUNDS, PROJECT NO. 6605,
BID NO. PWS08-06ENG.
Act pursuant to CEQA Section 15303(d) and 15304(f); and
WHEREAS, eleven (11) sealed bids were received on September 18, 2007 by the
WHEREAS, additional Gas Tax Funds need to be appropriated in the amount of
$12,531; and
WHEREAS, there are sufficient funds available in the Gas Tax Fund to complete the15
project.
16 NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carlsbad,
California, as follows:17
18
19 „
Company, for the construction of Calle Gavanzo Drainage Improvements, Project No. 6605, is
20 accepted and the Mayor is hereby authorized to execute a contract with Don Hubbard Contracting
1. That the above recitations are true and correct.
2. That the bid in the amount of $51,555 submitted by Don Hubbard Contracting
Company.
3. That the Finance Director is hereby authorized to appropriate an additional
$12,531 from the Gas Tax Fund for the project.
22
23 n
4. That the City Manager is hereby authorized to approve construction change
24
orders up to $7,750.
25 5. That the award of this contract is contingent upon the bidder submitting the
26
27 ii
resolution. The City Manager may grant reasonable extensions of time.28
lowest responsible bid executing the required contract and submitting the required bonds and
insurance policies, as described in the contract, within twenty (20) days of adoption of this
M
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
PASSED, APPROVED AND ADOPTED at a Regular Meeting of the City Council
of the City of Carlsbad on the 6th day of November, 2007, by the following vote to wit:
AYES: Council Members Lewis, Kulchin, Hall, Packard and Nygaard.
NOES: None.