HomeMy WebLinkAbout2008-04-08; City Council; 19387; 2008 Concrete and repairs projectCiSSv CITY OF CARLSBAD - AGENDA BILL ^Ql^ AB# 19,387 MTG. 4/08/08 DEPT. PW/GS AUTHORIZATION TO ADVERTISE FOR BIDS TO PERFORM THE SUMMER 2008 CONCRETE AND REPAIRS - AL-1 PROJECT NO. 6021 , CONTRACT NO. STS 08-02 AND APPROPRIATION OF FUNDS 1 DEPT. HEAD ^^ CITY ATTY. (^^ CITY MGR. ( {/--- RECOMMENDED ACTION: Adopt Resolution No. 2008-099 approving contract documents, special provisions and specifications, and authorizing the City Clerk to advertise for bids to perform the Summer 2008 Concrete and Hardscape Repairs - AL1, Project No. 6021, Contract No. STS 08-02 and appropriating funds. ITEM EXPLANATION: The Streets Maintenance division is responsible for performing repair and replacement of concrete improvements including curbs, gutters, sidewalks, pedestrian ramps and other concrete surface improvements. As infrastructure ages, these surface improvements become cracked, broken, raised or settle creating conditions that could result in a tripping hazard if not addressed. General Services performs periodic inspections of these items and has developed an annual program to identify and repair the most seriously damaged areas. These repairs have traditionally been performed by a combination of City maintenance crews and outside contractors. Staff has inspected various concrete improvements in the City, identified and quantified the most serious deficiencies, and is recommending that City Council approve an agreement to repair the most seriously damaged items. The types of repairs and improvements noted above are expected to continue to be in demand for the foreseeable future. Staffing levels make it impractical for City maintenance crews to perform all of the needed repairs. Future projects will be performed pending budgetary approval. Plans and specifications are on file at the office of the General Services division. ENVIRONMENTAL IMPACT: This project has been determined to be exempt from environmental review per CEQA (14 Cal Code Reg §15301) - minor alteration of an existing facility. FISCAL IMPACT: SUMMER 2008 CONCRETE REPAIRS - AL-1 PROJECT SUMMARY Construction Contract Contingency TOTAL ESTIMATED PROJECT COST $399,000 $41,000 $450,000 Currently, $100,000 is programmed in the Capital Improvement Program, Project No. 6021. The total project cost is estimated at $450,000, which includes $41,000 of contract costs for contingency. As such, additional funds in the amount of $350,000 are needed to complete the project. There are sufficient funds available in the Gas Tax Fund for the additional appropriation necessary to complete the project. FOR CITY CLERKS USE ONLY. COUNCIL ACTION: APPROVED DENIED CONTINUED WITHDRAWN AMENDED $nnn CONTINUED TO DATE SPECIFIC CONTINUED TO DATE UNKNOWN RETURNED TO STAFF OTHER -SEE MINUTES Dnnn Page 2 EXHIBITS: 1. Resolution No. 2008-099 approving contract documents, special provisions and specifications, and authorizing the City Clerk to advertise for bids to perform the Summer 2008 Concrete and Hardscape Repairs - AL1, Project No. 6021, Contract No. STS 08-02 and appropriating funds. 2. Estimated Work Quantities. 3. Work Location List. DEPARTMENT CONTACT: Dale A. Schuck, (760) 802-5788, dschu@ci.carlsbad.ca.us 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 £yti<fyr RESOLUTION NO. 2008-099 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD, CALIFORNIA, APPROVING CONTRACT DOCUMENTS, SPECIAL PROVISIONS AND SPECIFICATIONS, AND AUTHORIZING THE CITY CLERK TO ADVERTISE FOR BIDS TO PERFORM THE SUMMER 2008 CONCRETE REPAIRS - AL-1, PROJECT NO. 6021, CONTRACT NO. STS 08-02 AND APPROPRIATING FUNDS. 11 WHEREAS, the contract documents, special provisions and specifications for the furnishing of all labor, material, and equipment necessary to perform the Summer 2008 Concrete Repairs - AL-1, Project No. 6021, Contract No. STS 08-02, have been prepared and are on file in the Public Works/General Services office and are incorporated by reference herein; and WHEREAS, additional funds in the amount of $350,000 are needed to complete the project; and WHEREAS, sufficient funds are available for this project in the Gas Tax Fund. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of California, as follows: 1 . That the above recitations are true and correct. 2. That the contract documents, special provisions, and specifications are on Public Works/General Services office are hereby approved. 3. That the Finance Director is authorized to appropriate an additional $350 the Gas Tax Fund to Project No. 6021 (Summer 2008 Concrete Repairs). 4. That the City Clerk is authorized to advertise for bids to perform 2008 Concrete Repairs -AL-1, Project No. 6021, Contract No. STS 08-01. /// /// /// /// /// /// Carlsbad, file in the ,000 from Summer 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 PASSED, APPROVED AND ADOPTED at a Regular Meeting of the City Council of the City of Carlsbad on the 8th of April, 2008, by the following vote to wit: AYES: Council Members Lewis, Kulchin, Hall, Packard and Nygaard. NOES: None. ABSENT: None. , Mayor ATTEST: V) I (D I0) 3 oS- Olo COr> D ro _*. 'to O> COjQ O3COCO O 1 enen*^J C/)•°Pedestrian RampsN -00 .-*• 00 00 — * tO — ^4^ CO 00 OO 00CO -^ -^ CD CO JS CO CO ~ — — —^j JD 5' D' 5' 5"Curb & GutterGutterCurbRolled CurbSidewalkDriveway ApproachO -<GRAND TOTALDESCRIPTIONCO c 3 (D•n 10Oos oo r? • 0 !•* ^B ^D TJ82. CO 00 o toct> LOCATION STS 08-02 Summer 2008 Concrete Repairs "AL-1" CONCRETE REPAIRS GUTTER SIDEWALK APPROACH TYPE AMOUNT WIDTH LENGTH TOTAL WIDTH LENGTH TOTAL COMMENTS Acacia @ 295 Adams S/o Camino del Sol Alondra a/f 4896 Alondra @ 4896 Ann @ 3475 AuraCir @ 2015 Aura Cir @ 2019 Avenida Encinas @ 6100 Avondale @ 3515 Basswood @ 2035 Basswood @ 2105 Basswood E/o Valley 50' Beach Bluff @ 4104 Beach Bluff @ 4104 Beach Bluff @ 4104 Bedford @ 3501 Black Rail Ct @ Aviara Dr Bonita a/f 1708 Bonita @ 1740 Camino del Parque @ 6460 Camino del Parque @ 6460 Camino del Parque @ 6460 Camino Vida Roble W/o Corte del Abeto 50' N/S Camino Vida Roble S/o Corte del Nogal 1 50' Camino Vida Roble S/o Corte del Nogal 150' Camino Vida Roble @ Palomar Airport Rd Camino Vida Roble S/o Palomar Airport Rd 200' W/S C&G C&G C&G C&G RC RC C&G C&G C&G G G 16 15 16 36 10 77 13 8 22 15.5 207 5 x 5 4 x 34 5 x 33 5 x 12 5 x 15 5 x 56 5 x 11 4 x 16 5 x 55 5 x 35 5 x 6 5 x 13 5.3 x 5.1 4 x 18 4 x 26 5 x 5 1.3 x 11.5 5 x 5 11.6 x 4 5.4 x 4.1 88 x 10 25 136 165 60 75 280 55 64 275 175 30 65 27.03 72 104 25 14.95 25 46.4 22.14 880 5 x 12 5 x 27 9.6 x 18 8 x 16 5 x 8 60 135 172.8 128 40 D-25 palm tree growing over sidewalk 1/2 of approach and 2 squares 2 locations pipe under sidewalk @ storm drain @ drain box rebar needed behind drain box rebar needed part of approach rebar needed entrance to The Landing modified @ storm drain triangle shaped g \uscrapps\contract administratioruSTS C8-0? Summer 7008 Concrete Repairs, AL-1 Scope of Work xls Page ; of 10 STS 08-02 Summer 2008 Concrete Repairs "AL-1" LOCATION CONCRETE REPAIRS GUTTER SIDEWALK TYPE AMOUNT WIDTH LENGTH TOTAL APPROACH WIDTH LENGTH TOTAL COMMENTS Camino Vida Roble S/o Palomar Airport Rd 75' W/S Carlsbad Bl @ 3638 Carlsbad Bl a/f Army Navy Academy Carlsbad Bl @ Army Navy Academy crosswalk Carlsbad Bl @ Beech NW Carlsbad Village Dr W/o Celinda 100' Carlsbad Village Dr W/o Celinda 100' Carlsbad Village Dr W/o Celinda 100' Carlsbad Village Dr W/o Donna 100' Carlsbad Village Dr W/o Donna 300' Carlsbad Village Dr W/o Monroe 100' Carlsbad Village Dr E/o Valley 50' Carlsbad Village Dr E/o Valley 50' Celinda @ 3301 Charleen @ 2034 Chestnut @ 1123 Chestnut @ 2145 Chestnut E/o Highland 20' Chestnut a/f Tyler Chestnut @ Woodland Chinquapin @ 1000 Cordoba @ 2040 Cordoba @ 2044 Corte del Cedro @ 6054 @ entrance Cove @ 4529 Cresent Point @ 4007 Cresent Point @ 4017 C&G C&G C&G C&G C&G C&G 21 18 16 8 18 12.4 15 x 5 5 x 5 5 x 21 8 x 1.4 1 x 5 1 x 5 5 x 16 5 x 14 5 x 11 5 x 35 5 x 20 7 x 9 5 x 5 5 x 10 5 x 5 5 x 10 5 x 16 5 x 50 4 x 8 5 x 26 5 x 23 5 x 11 5 x 10 5 x 25 75 25 105 112 5 5 80 70 55 175 100 63 25 50 25 50 80 250 32 130 115 55 50 125 6 x 23 138 cold mix bend bolted down/trash can on work area bend bolted down/trash can on work area @ 2nd storm drain/rebar needed bell system vault in middle too wet to mark out heavy roots water box needs to be raised/square is cold mixed g '.userapps'-contract administration'>STS 08-02. Summer 2008 Concrete Repairs, AL-1 Scope o! Work xls Page 2 of 10 STS 08-02 Summer 2008 Concrete Repairs "AL-1" LOCATION GUTTER TYPE AMOUNT CONCRETE REPAIRS SIDEWALK APPROACH COMMENTS WIDTH LENGTH TOTAL WIDTH LENGTH TOTAL Dana @ 2332 Dana @ 2332 Donna @ 3205 Donna @ 3205 Donna @ 3215 Donna @ 3220 Donna @ 3225 Donna @ 3230 Donna @ 3250 Donna @ 3255 Donna @ 3265 Donna a/f 3275 Donna @ 3309 EastPointe @ 1998 EastPointe @ 1998 EastPointe @ 1998 East Pointe N/o Tamarack 20' El Camino Real @ 6451 El Camino Real S/o 6451 approx 150' El Camino Real S/o 6451 approx 150' El Camino Real S/o Camino Vida Roble 500' El Camino Real @ Carlsbad Village Dr El Camino Real @ Carlsbad Village Dr El Camino Real N/o Carlsbad Village Dr 100', W/S El Camino Real N/o Carlsbad Village Dr 100', W/S El Camino Real S/o Carlsbad Village Dr 1130' El Camino Real S/o Carlsbad Village Dr 1560' C&G C&G RC C&G C&G 40 21 59 20.3 7 29 48 5 x 13 1 x 5 4 x 30 4 x 5 4 x 50 4 x 23 4 x 36 4 x 25 5 x 29 4 x 40 4 x 40 5 x 6 1 x 5 2 x 4 5 x 57 5 x 14.5 5 x 18.8 1.5 x 6.4 5 x 21 5 x 29 2 x 17 5 x 7 2 x 11 5 x 10 5 x 79 65 5 120 20 200 92 144 100 145 160 160 30 5 8 285 72.5 94 9.6 105 145 34 35 22 50 395 @ storm drain/rebar needed drain under sidewalk rebar needed rebar needed rebar needed @ storm drain/rebar needed rebar needed @ storm drain/rebar needed @ st It - mono @ chain link fence Page 3 of 10 LOCATION STS 08-02 Summer 2008 Concrete Repairs "AL-1" CONCRETE REPAIRS GUTTER SIDEWALK TYPE AMOUNT WIDTH LENGTH TOTAL APPROACH COMMENTS WIDTH LENGTH TOTAL El Camino Real S/'o Carlsbad Village Dr 2050' El Camino Real S/o Carlsbad Village Dr 2050' El Camino Real S/o Carlsbad Village Dr 2420' El Camino Real S/o Carlsbad Village Dr 2500' El Camino Real N/o Chestnut El Camino Real S/o Haymar, W/S El Camino Real S/o Haymar, W/S El Camino Real S/o Hosp 100', W/S El Camino Real S/o Marron 50', W/S Falcon E/o Westwood 100' Garfield @ 3319 Garfield @ Walnut Grecourt @ 3759 Harding @ 3482 Havens Point @ 1 733 Havens Point @ 1734 Havens Point @ 1734 Haymar @ S Vista Wy Haymar @ S Vista Wy Hibiscus @ 3965 Highland @ 2285 Highland a/f 2325 Highland @ 3420 Highland @ 3420 Highridge @ 1896 Highridge @ 1978 C&G C&G C&G C C&G G C&G C&G C&G C&G 5 8 25 9 50 4 17 28 15 6 5 x 10 2 x 17 5 x 28 5 x 10 5 x 21 2 x 9 5 x 8 5 x 9 5 x 11 4 x 12 5 x 10 5 x 5 5 x 10 5 x 59 5 x 28 2 x 9 4 x 20 4 x 17 4 x 5 1 x 5 1 x 5 5 x 8 50 34 140 50 105 18 40 45 55 48 50 25 50 295 140 18 80 68 20 5 5 40 5 x 12 5 x 24 5 x 8 60 120 40 @ storm drain/rebar needed/mono rebar needed rebar needed rebar needed @ storm drain/rebar needed @ green elec box 2 locations @ storm drain/rebar needed @ storm drain/rebar behind storm drain @ storm drain/rebar needed @ storm drain/rebar needed g:\userapps\contract adrtnnislrulion\STS 08-02. Summer 2008 Concrete Repairs. AL-1 Scope of Work xls Pngel ol 10 STS 08-02 Summer 2008 Concrete Repairs "AL-1" LOCATION GUTTER TYPE AMOUNT CONCRETE REPAIRS SIDEWALK WIDTH LENGTH TOTAL APPROACH COMMENTS WIDTH LENGTH TOTAL Highridge @ 1978 Highridge @ 1978 Highridge @ 1986 Hillside @ 4793 Hillside a/f 4866 Hillside @ 4867 Hillside @ 4868 Hillside E/o Beach Bluff, 100' Hillside @ Valencia, SW Hillside @ Valencia, SW Hope a/f 2820 Hosp a/f 2245 Hosp @ Brentwood Hosp @ El Camino Real NW Hosp @ Pinecrest N/S Hosp @ Pinecrest S/S Hosp E/o Wintergreen 150' N/S Hosp E/o Wintergreen 200' S/S Isle @ 4008 Isle a/f 4223 James @ 1660 James @ 1660 James @ 1660 James @ 1660 Jefferson @ 2601 Jefferson @ 2685 C&G C&G C&G 23 6 15 1 x 5 5 x 5 5 x 7 5 x 11 5 x 11 5 x 5 5 x 53 5 x 6 2 x 9 5 x 10 5 x 11 5 x 50 5 x 57 5 x 21 5 x 76 5 x 12 5 x 21 5 x 15 5 x 25 5 x 20 1 x 5 3 x 4 5 x 5 5 25 35 55 55 25 265 30 18 50 55 250 285 105 380 60 105 75 125 100 5 12 25 11 x 23 10 x 11 253 110 @ storm drain/rebar needed @ storm drain/rebar needed @ storm drain/rebar needed @ storm drain/rebar needed fence right @ SW 3 locations @ storm drain/rebar needed drain pipe under sidewalk @ storm drain/rebar sunk g \userappsscontract administratiomSTS 08-02. Summer 2008 Concrete Hepans. AL-1 Scope of VVoik xl;Page b of 10 LOCATION STS 08-02 Summer 2008 Concrete Repairs "AL-1" CONCRETE REPAIRS GUTTER SIDEWALK APPROACH TYPE AMOUNT WIDTH LENGTH TOTAL WIDTH LENGTH TOTAL COMMENTS Kelly @ 4815 Kelly @ 4819 Kelly @ 4835 Laguna @ 972 Larkspur @ 1156 LasFlores @ 1277 Las Flores @ 1278 Las Flores @ 1291 Las Flores E/o Highland Las Flores @ Highland @ vacant lot Las Flores a/f Highland @ vacant lot Las Flores a/f I-5 SB on ramp Las Flores a/f Morning Glory Lincoln a/f 3112 Lincoln a/f 3345 Linda @ 2036 Magnolia @ Harding Marron @ 1860 Marron W/o 1st National Bank N/S Marron E/o Monroe 1 00' N/S Marron @ Monroe NE Marron @ Monroe NE Marron next to 1st National Bank Marron @ Sears Marron @ Sears Marron @ Sears Monroe @ 3130 Monroe @ 3676 C&G C&G G C&G C&G C&G C&G 21 23 20 12 18 21 16 5 x 4 5 x 34 5 x 19 5 x 7 4 x 10 5 x 11 4 x 34 5 x 20 5 x 21 5 x 20 5 x 17 5 x 5 5 x 20 5 x 21 5 x 6 5 x 16 3 x 3 5 x 58 5 x 16 5 x 36 5 x 20 5 x 5 5 x 11 20 170 95 35 40 55 136 100 105 100 85 25 100 105 30 80 9 290 80 180 100 25 55 5 x 13 10 x 10 5 x 14 5 x 8 5 x 13 65 100 70 40 65 drain pipe under sidewalk gutter is 3' wide @ storm drain/rebar needed @ storm drain/rebar needed bell system vault g iiiserapps'contract administration'STS 08-02. Summer 2008 Concrete Repairs, AL-1 Scope of Woik xls Pofle fi of 10 LOCATION STS 08-02 Summer 2008 Concrete Repairs "AL-1" GUTTER TYPE AMOUNT CONCRETE REPAIRS SIDEWALK WIDTH LENGTH TOTAL APPROACH WIDTH LENGTH TOTAL COMMENTS Monroe a/f Hosp Monroe N/o Hosp100'W/S Monroe N/o Hosp100'W/S Monroe N/o Hosp150'E/S Monroe N/o Hosp 50' W/S Monroe N/o Hosp 75' E/S Monroe @ Hosp NE Monroe S/o Marron 100' E/S Monroe S/o Marron 200' Monroe S/o Marron 600' Monroe S/o Marron 600' Monroe S/o Marron 650' Monroe @ Marron SW Monroe N/o Wickham 75' Monroe N/o Wickham 75' Neblina a/f Endeavor Nob Hill @ 2210 Oak @ 1810 Palm a/f 920 Palm @ 930 Palm E/o Harding 50' Palm @ Madison Pannonia @ 4676 Park a/f 4208 Park @ 4610 Park @ 4900 Park @ 4903 Park @ 4905 Park @ 4909 C&G C&G C&G C&G 27 9 14 7 5 x 30 5 x 11 1 x 5 5 x 15 5 x 31 5 x 29 6 x 15 5 x 15 5 x 15 5 x 5 4 x 4 5 x 35 5 x 25 5 x 10 1 x 5 5 x 19 5 x 12 5 x 5 4 x 14 5 x 4 5 x 10 5 x 30 5 x 40 5 x 5 5 x 20 5 x 33 150 55 5 75 155 145 90 75 75 25 16 175 125 50 5 95 60 25 56 20 50 150 200 25 100 165 5 x 9 5 x 23 45 115 @ storm drain/rebar needed @ storm drain/rebar needed/mono @ storm drain/rebar needed rebar needed rebar needed rebar/two locations @ storm drain/rebar needed mono sunken sidewalk rebar/void under sidewalk @ storm drain/rebar needed g '\user;spps''Contracl ndministration'STS 08-02 Summer 2008 Concrete Repairs, AL-1 Scope of Work xls Page 7 c(10 LOCATION STS 08-02 Summer 2008 Concrete Repairs "AL-1" CONCRETE REPAIRS GUTTER SIDEWALK TYPE AMOUNT WIDTH LENGTH TOTAL APPROACH COMMENTS WIDTH LENGTH TOTAL Park @ 4942 Park N/o WhiteyDMOO' ParkCt @ 4918 Paseo del Norte @ 6117 Paseo del Norte a/f 6571 Paseo del Norte a/f 6575 Paseo del Norte S/o 6575 approx 100' Paseo del Norte a/f Camino del Parque (6500 blk) Pine a/f 630 Pine @ 945 Pine @ 983 PioPico @ 2515 Pio Pico @ 2880 PioPico @ 3150 Pio Pico @ 3780 PioPico S/o Basswood 100' Pio Pico N/o Knowles 200' Pio Pico @ Oak Pio Pico S/o Pine 200' Poinsettia Ln S/o Ambrosia 200' E/S Poinsettia Ln @ Cassia @ end Ridgecrest @ Camden Rogue Isle Ct @ 1730 Rogue Isle Ct @ 1733 Roosevelt @ 3222 Roosevelt @ Pine SE Roosevelt @ Pine SW Sandlewood @ 1561 Schooner Wy @ 1723 Schooner Wy @ 1728 Sea view @ 3601 C&G C&G RC C&G C&G 30 27 35 32 12 5 x 5 5 x 10 5.5 x 5.5 5 x 36 5 x 16.1 5 x 18 5 x 10 5 x 5 5 x 20 5 x 8 5 x 15 5 x 21 5 x 5 5 x 31 5 x 42 5 x 15 15.2 x 5 5.3 x 5 5 x 5 5 x 16 5 x 50 5 x 5 5 x 18 5 x 19 5 x 5 25 50 30.25 180 80.5 90 50 25 100 40 75 105 25 155 210 75 76 26.5 25 80 250 25 90 95 25 5 x 20 13 x 15 10 x 31 4 x 38 100 195 310 152 crushed @ storm drain/rebar neded big palm tree growing over sidewalk @ bus stop @ trash can @ dead end @ storm drain/rebar needed gAuserapps'contract administralion\STS 08-02, Summer 2008 Concrete Repairs. Al -1 Scope ol Work xis Page 8 of 10 LOCATION STS 08-02 Summer 2008 Concrete Repairs "AL-1" CONCRETE REPAIRS GUTTER TYPE AMOUNT SIDEWALK WIDTH LENGTH TOTAL APPROACH WIDTH LENGTH TOTAL COMMENTS Sevilla @ 4861 Spanish @ 3435 Spanish @ 3460 Spyglass @ 1854 State @ 2333 State @ 2501 Sunnyhill @ 4285 Sunnyhill @ 4285 Sunnyhill @ 4285 Tamarack @ 1529 Tamarack @ 1559 Tamarack @ 1 559 Tamarack E/o 1649 Tamarack W/o Adams Tamarack W/o East Pointe 300' Tamarack W/o East Pointe 300' Tamarack @ East Pointe NE Tamarack E/o Hibiscus E/B Tamarack @ I -5 bridge Tamarack @ I-5 NB Off Tamarack @ I-5 NB Off Tamarack @ I-5 NB Off Tamarack W/o Skyline 100' Telescope @ 4628 Telescope @ 4670 Tyler a/f 3235 Tyler a/f 3327 Valencia @ 1870 Valley @ 3228 Valley a/f 3431 & 3435 Valley @ Bonita Valley @ Oak SE C&G C&G C&G G C&G G C&G C&G C&G 17 13 66 18 7 18 28 98 48 5 x 23 5 x 37 5 x 13 4 x 7 5 x 11 3 x 5 1 x 5 4 x 11 4 x 32 4 x 31 5 x 56 1 x 5 2 x 3 5 x 6 5 x 10 6 x 5 5 x 11 5 x 10 5 x 5 5 x 5 5 x 5 5 x 10 5 x 37 6 x 12 115 185 65 28 55 15 5 44 128 124 280 5 6 30 50 30 55 50 25 25 25 50 185 72 5 x 11 5 x 6 6 x 6 8 x 10 55 30 36 80 1/2 approach raised in approach fire hydrant & 2 pillars in way @ storm drain / rebar needed / drain pipe under sidewalk heaving - very bad @ storm drain rebar needed @ beginning of bridge cold mix cold mix w/water box gAiisi?rapps\contract adininistration\STS 08-02. Summer 2008 Concrete Repairs, AL-1 Scope of Wotk xls Page S of 10 LOCATION STS 08-02 Summer 2008 Concrete Repairs "AL-1" CONCRETE REPAIRS GUTTER SIDEWALK TYPE AMOUNT WIDTH LENGTH TOTAL APPROACH WIDTH LENGTH TOTAL COMMENTS Via Hinton @ Via Marta Via Marta @ 4994 Washington @ Chestnut NW Westhaven @ 3700 Westwood @ 3285 Wickham @ Monroe Wintergreen a/f 2940 Yvette @ 3720 Yvette @ 3730 C&G C&G C&G Total 11 10 34 1,656.20 5 x 5 6 x 11 5 x 5 3 x 6 4 x 16 5 x 10 5 x 6 5 x 40 Total 25 66 25 18 64 50 30 200 18,830.87 8 x 16 Total 128 2,842.80 meter box/cold mix sunk @ storm drain heaving @ storm drain g \usf>rapps\r;ontrar,t ariministralion'STS 08-0?, Summer 2008 Concrete Repairs. Al -1 Scope of Work xls>Page 10 of 10 LOCATION STS 08-02 Summer 2008 Concrete Repairs "AL-1" PEDESTRIAN RAMP REPAIRS PEDESTRIAN RAMP WIDTH LENGTH TOTAL SQ FT COMMENTS Chestnut @ Woodland Monroe @ Carlsbad Village Dr Monroe a/f Hosp Pio Pico @ 2880 Valley @ Oak SE Via Marta @ 4994 Wickham @ Monroe 5 x 12 7 x 11 8 x 8 8x 8 7 x 17 8x 12 7 x 11 Total 60 77 64 64 119 96 77 557 water box & utility pole in ramp f:\hheis\cnt\concrete repairs\STS 08-0? Summer 2008 Concrete Repairs. AL-1 Scope ofWork.xls Pago 1 of 1 .OCATION STS 08-02 Summer 2008 Concrete Repairs "AL-1" CROSS GUTTER REPAIRS CROSS GUTTER WIDTH LENGTH TOTAL SQ FT COMMENTS donroe )ak 'aim Carlsbad Bl .oma Wy rfonroe 'aim Jidgecrest 'alley Vickham a/f Hosp @ Harding @ Madison @ Beech NW @ 4928 a/f Hosp @ Madison @ Camden @ Oak SE @ Monroe 10 x 6 x 6 x 1 x 20 x 1 x 1 x 1 x 1 x 1 x 10 14 7 84 30 75 105 295 500 91 Total 100 84 42 84 600 75 105 295 500 91 1,976 rebar needed ORIGINAL f:\hheiconcrete repairs\STS 08-02, Summer 2008 Concrete Repairs, AL-1 Scope of Work.xls Page 1 of 1 STS 08-02 Summer 2008 Concrete Repairs "AL-1" UNDER SIDEWALK DRAIN (D-27) REPAIRS LOCATION D-27 COMMENTS WIDTH LENGTH TOTAL SQ FT Acacia @ 295 Aura Cir @ 2024 5 x 5 5 x 5 Total 25 25 50 D-25 D-25 f:\hheis\cnt\concrete repairs\STS 08-02, Summer 2008 Concrete Repairs, AL-1 Scope ofWork.xls Page 1 of 1