HomeMy WebLinkAbout2008-04-08; City Council; 19387; 2008 Concrete and repairs projectCiSSv CITY OF CARLSBAD - AGENDA BILL
^Ql^
AB# 19,387
MTG. 4/08/08
DEPT. PW/GS
AUTHORIZATION TO ADVERTISE FOR BIDS TO PERFORM THE
SUMMER 2008 CONCRETE AND REPAIRS - AL-1
PROJECT NO. 6021 , CONTRACT NO. STS 08-02 AND
APPROPRIATION OF FUNDS
1
DEPT. HEAD ^^
CITY ATTY. (^^
CITY MGR. ( {/---
RECOMMENDED ACTION:
Adopt Resolution No. 2008-099 approving contract documents, special provisions and
specifications, and authorizing the City Clerk to advertise for bids to perform the Summer 2008
Concrete and Hardscape Repairs - AL1, Project No. 6021, Contract No. STS 08-02 and appropriating
funds.
ITEM EXPLANATION:
The Streets Maintenance division is responsible for performing repair and replacement of concrete
improvements including curbs, gutters, sidewalks, pedestrian ramps and other concrete surface
improvements. As infrastructure ages, these surface improvements become cracked, broken, raised
or settle creating conditions that could result in a tripping hazard if not addressed. General Services
performs periodic inspections of these items and has developed an annual program to identify and
repair the most seriously damaged areas. These repairs have traditionally been performed by a
combination of City maintenance crews and outside contractors. Staff has inspected various concrete
improvements in the City, identified and quantified the most serious deficiencies, and is
recommending that City Council approve an agreement to repair the most seriously damaged items.
The types of repairs and improvements noted above are expected to continue to be in demand for the
foreseeable future. Staffing levels make it impractical for City maintenance crews to perform all of the
needed repairs. Future projects will be performed pending budgetary approval.
Plans and specifications are on file at the office of the General Services division.
ENVIRONMENTAL IMPACT:
This project has been determined to be exempt from environmental review per CEQA (14 Cal Code
Reg §15301) - minor alteration of an existing facility.
FISCAL IMPACT:
SUMMER 2008 CONCRETE REPAIRS - AL-1
PROJECT SUMMARY
Construction Contract
Contingency
TOTAL ESTIMATED PROJECT COST
$399,000
$41,000
$450,000
Currently, $100,000 is programmed in the Capital Improvement Program, Project No. 6021. The total
project cost is estimated at $450,000, which includes $41,000 of contract costs for contingency. As
such, additional funds in the amount of $350,000 are needed to complete the project. There are
sufficient funds available in the Gas Tax Fund for the additional appropriation necessary to complete
the project.
FOR CITY CLERKS USE ONLY.
COUNCIL ACTION: APPROVED
DENIED
CONTINUED
WITHDRAWN
AMENDED
$nnn
CONTINUED TO DATE SPECIFIC
CONTINUED TO DATE UNKNOWN
RETURNED TO STAFF
OTHER -SEE MINUTES
Dnnn
Page 2
EXHIBITS:
1. Resolution No. 2008-099 approving contract documents, special provisions and
specifications, and authorizing the City Clerk to advertise for bids to perform the Summer 2008
Concrete and Hardscape Repairs - AL1, Project No. 6021, Contract No. STS 08-02 and
appropriating funds.
2. Estimated Work Quantities.
3. Work Location List.
DEPARTMENT CONTACT: Dale A. Schuck, (760) 802-5788, dschu@ci.carlsbad.ca.us
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
£yti<fyr
RESOLUTION NO. 2008-099
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
CARLSBAD, CALIFORNIA, APPROVING CONTRACT
DOCUMENTS, SPECIAL PROVISIONS AND SPECIFICATIONS,
AND AUTHORIZING THE CITY CLERK TO ADVERTISE FOR BIDS
TO PERFORM THE SUMMER 2008 CONCRETE REPAIRS - AL-1,
PROJECT NO. 6021, CONTRACT NO. STS 08-02 AND
APPROPRIATING FUNDS.
11
WHEREAS, the contract documents, special provisions and specifications for the
furnishing of all labor, material, and equipment necessary to perform the Summer 2008 Concrete
Repairs - AL-1, Project No. 6021, Contract No. STS 08-02, have been prepared and are on file in
the Public Works/General Services office and are incorporated by reference herein; and
WHEREAS, additional funds in the amount of $350,000 are needed to complete the
project; and
WHEREAS, sufficient funds are available for this project in the Gas Tax Fund.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of
California, as follows:
1 . That the above recitations are true and correct.
2. That the contract documents, special provisions, and specifications are on
Public Works/General Services office are hereby approved.
3. That the Finance Director is authorized to appropriate an additional $350
the Gas Tax Fund to Project No. 6021 (Summer 2008 Concrete Repairs).
4. That the City Clerk is authorized to advertise for bids to perform
2008 Concrete Repairs -AL-1, Project No. 6021, Contract No. STS 08-01.
///
///
///
///
///
///
Carlsbad,
file in the
,000 from
Summer
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
PASSED, APPROVED AND ADOPTED at a Regular Meeting of the City Council
of the City of Carlsbad on the 8th of April, 2008, by the following vote to wit:
AYES: Council Members Lewis, Kulchin, Hall, Packard and Nygaard.
NOES: None.
ABSENT: None.
, Mayor
ATTEST:
V)
I
(D
I0)
3
oS-
Olo
COr>
D
ro
_*.
'to
O>
COjQ
O3COCO
O
1
enen*^J
C/)•°Pedestrian RampsN -00 .-*•
00 00 — * tO — ^4^ CO 00 OO 00CO -^ -^ CD CO JS
CO CO ~ — — —^j JD 5' D' 5' 5"Curb & GutterGutterCurbRolled CurbSidewalkDriveway ApproachO
-<GRAND TOTALDESCRIPTIONCO
c
3
(D•n
10Oos oo
r?
• 0
!•*
^B
^D
TJ82.
CO
00
o
toct>
LOCATION
STS 08-02
Summer 2008 Concrete Repairs "AL-1"
CONCRETE REPAIRS
GUTTER SIDEWALK APPROACH
TYPE AMOUNT WIDTH LENGTH TOTAL WIDTH LENGTH TOTAL
COMMENTS
Acacia @ 295
Adams S/o Camino del Sol
Alondra a/f 4896
Alondra @ 4896
Ann @ 3475
AuraCir @ 2015
Aura Cir @ 2019
Avenida Encinas @ 6100
Avondale @ 3515
Basswood @ 2035
Basswood @ 2105
Basswood E/o Valley 50'
Beach Bluff @ 4104
Beach Bluff @ 4104
Beach Bluff @ 4104
Bedford @ 3501
Black Rail Ct @ Aviara Dr
Bonita a/f 1708
Bonita @ 1740
Camino del Parque @ 6460
Camino del Parque @ 6460
Camino del Parque @ 6460
Camino Vida Roble W/o Corte del Abeto 50'
N/S
Camino Vida Roble S/o Corte del Nogal 1 50'
Camino Vida Roble S/o Corte del Nogal 150'
Camino Vida Roble @ Palomar Airport Rd
Camino Vida Roble S/o Palomar Airport Rd
200' W/S
C&G
C&G
C&G
C&G
RC
RC
C&G
C&G
C&G
G
G
16
15
16
36
10
77
13
8
22
15.5
207
5 x 5
4 x 34
5 x 33
5 x 12
5 x 15
5 x 56
5 x 11
4 x 16
5 x 55
5 x 35
5 x 6
5 x 13
5.3 x 5.1
4 x 18
4 x 26
5 x 5
1.3 x 11.5
5 x 5
11.6 x 4
5.4 x 4.1
88 x 10
25
136
165
60
75
280
55
64
275
175
30
65
27.03
72
104
25
14.95
25
46.4
22.14
880
5 x 12
5 x 27
9.6 x 18
8 x 16
5 x 8
60
135
172.8
128
40
D-25
palm tree growing over
sidewalk
1/2 of approach and 2
squares
2 locations
pipe under sidewalk
@ storm drain
@ drain box rebar needed
behind drain box rebar
needed
part of approach rebar
needed
entrance to The Landing
modified @ storm drain
triangle shaped
g \uscrapps\contract administratioruSTS C8-0? Summer 7008 Concrete Repairs, AL-1 Scope of Work xls Page ; of 10
STS 08-02
Summer 2008 Concrete Repairs "AL-1"
LOCATION
CONCRETE REPAIRS
GUTTER SIDEWALK
TYPE AMOUNT WIDTH LENGTH TOTAL
APPROACH
WIDTH LENGTH TOTAL
COMMENTS
Camino Vida Roble S/o Palomar Airport Rd 75'
W/S
Carlsbad Bl @ 3638
Carlsbad Bl a/f Army Navy Academy
Carlsbad Bl @ Army Navy Academy
crosswalk
Carlsbad Bl @ Beech NW
Carlsbad Village Dr W/o Celinda 100'
Carlsbad Village Dr W/o Celinda 100'
Carlsbad Village Dr W/o Celinda 100'
Carlsbad Village Dr W/o Donna 100'
Carlsbad Village Dr W/o Donna 300'
Carlsbad Village Dr W/o Monroe 100'
Carlsbad Village Dr E/o Valley 50'
Carlsbad Village Dr E/o Valley 50'
Celinda @ 3301
Charleen @ 2034
Chestnut @ 1123
Chestnut @ 2145
Chestnut E/o Highland 20'
Chestnut a/f Tyler
Chestnut @ Woodland
Chinquapin @ 1000
Cordoba @ 2040
Cordoba @ 2044
Corte del Cedro @ 6054 @ entrance
Cove @ 4529
Cresent Point @ 4007
Cresent Point @ 4017
C&G
C&G
C&G
C&G
C&G
C&G
21
18
16
8
18
12.4
15 x 5
5 x 5
5 x 21
8 x 1.4
1 x 5
1 x 5
5 x 16
5 x 14
5 x 11
5 x 35
5 x 20
7 x 9
5 x 5
5 x 10
5 x 5
5 x 10
5 x 16
5 x 50
4 x 8
5 x 26
5 x 23
5 x 11
5 x 10
5 x 25
75
25
105
112
5
5
80
70
55
175
100
63
25
50
25
50
80
250
32
130
115
55
50
125
6 x 23 138
cold mix
bend bolted down/trash
can on work area
bend bolted down/trash
can on work area
@ 2nd storm drain/rebar
needed
bell system vault in middle
too wet to mark out
heavy roots
water box needs to be
raised/square is cold
mixed
g '.userapps'-contract administration'>STS 08-02. Summer 2008 Concrete Repairs, AL-1 Scope o! Work xls Page 2 of 10
STS 08-02
Summer 2008 Concrete Repairs "AL-1"
LOCATION GUTTER
TYPE AMOUNT
CONCRETE REPAIRS
SIDEWALK APPROACH COMMENTS
WIDTH LENGTH TOTAL WIDTH LENGTH TOTAL
Dana @ 2332
Dana @ 2332
Donna @ 3205
Donna @ 3205
Donna @ 3215
Donna @ 3220
Donna @ 3225
Donna @ 3230
Donna @ 3250
Donna @ 3255
Donna @ 3265
Donna a/f 3275
Donna @ 3309
EastPointe @ 1998
EastPointe @ 1998
EastPointe @ 1998
East Pointe N/o Tamarack 20'
El Camino Real @ 6451
El Camino Real S/o 6451 approx 150'
El Camino Real S/o 6451 approx 150'
El Camino Real S/o Camino Vida Roble
500'
El Camino Real @ Carlsbad Village Dr
El Camino Real @ Carlsbad Village Dr
El Camino Real N/o Carlsbad Village Dr
100', W/S
El Camino Real N/o Carlsbad Village Dr
100', W/S
El Camino Real S/o Carlsbad Village Dr
1130'
El Camino Real S/o Carlsbad Village Dr
1560'
C&G
C&G
RC
C&G
C&G
40
21
59
20.3
7
29
48
5 x 13
1 x 5
4 x 30
4 x 5
4 x 50
4 x 23
4 x 36
4 x 25
5 x 29
4 x 40
4 x 40
5 x 6
1 x 5
2 x 4
5 x 57
5 x 14.5
5 x 18.8
1.5 x 6.4
5 x 21
5 x 29
2 x 17
5 x 7
2 x 11
5 x 10
5 x 79
65
5
120
20
200
92
144
100
145
160
160
30
5
8
285
72.5
94
9.6
105
145
34
35
22
50
395
@ storm drain/rebar
needed
drain under sidewalk
rebar needed
rebar needed
rebar needed
@ storm drain/rebar
needed
rebar needed
@ storm drain/rebar
needed
@ st It - mono
@ chain link fence
Page 3 of 10
LOCATION
STS 08-02
Summer 2008 Concrete Repairs "AL-1"
CONCRETE REPAIRS
GUTTER SIDEWALK
TYPE AMOUNT WIDTH LENGTH TOTAL
APPROACH COMMENTS
WIDTH LENGTH TOTAL
El Camino Real S/'o Carlsbad Village Dr
2050'
El Camino Real S/o Carlsbad Village Dr
2050'
El Camino Real S/o Carlsbad Village Dr
2420'
El Camino Real S/o Carlsbad Village Dr
2500'
El Camino Real N/o Chestnut
El Camino Real S/o Haymar, W/S
El Camino Real S/o Haymar, W/S
El Camino Real S/o Hosp 100', W/S
El Camino Real S/o Marron 50', W/S
Falcon E/o Westwood 100'
Garfield @ 3319
Garfield @ Walnut
Grecourt @ 3759
Harding @ 3482
Havens Point @ 1 733
Havens Point @ 1734
Havens Point @ 1734
Haymar @ S Vista Wy
Haymar @ S Vista Wy
Hibiscus @ 3965
Highland @ 2285
Highland a/f 2325
Highland @ 3420
Highland @ 3420
Highridge @ 1896
Highridge @ 1978
C&G
C&G
C&G
C
C&G
G
C&G
C&G
C&G
C&G
5
8
25
9
50
4
17
28
15
6
5 x 10
2 x 17
5 x 28
5 x 10
5 x 21
2 x 9
5 x 8
5 x 9
5 x 11
4 x 12
5 x 10
5 x 5
5 x 10
5 x 59
5 x 28
2 x 9
4 x 20
4 x 17
4 x 5
1 x 5
1 x 5
5 x 8
50
34
140
50
105
18
40
45
55
48
50
25
50
295
140
18
80
68
20
5
5
40
5 x 12
5 x 24
5 x 8
60
120
40
@ storm drain/rebar
needed/mono
rebar needed
rebar needed
rebar needed
@ storm drain/rebar
needed
@ green elec box
2 locations
@ storm drain/rebar
needed
@ storm drain/rebar
behind storm drain
@ storm drain/rebar
needed
@ storm drain/rebar
needed
g:\userapps\contract adrtnnislrulion\STS 08-02. Summer 2008 Concrete Repairs. AL-1 Scope of Work xls Pngel ol 10
STS 08-02
Summer 2008 Concrete Repairs "AL-1"
LOCATION GUTTER
TYPE AMOUNT
CONCRETE REPAIRS
SIDEWALK
WIDTH LENGTH TOTAL
APPROACH COMMENTS
WIDTH LENGTH TOTAL
Highridge @ 1978
Highridge @ 1978
Highridge @ 1986
Hillside @ 4793
Hillside a/f 4866
Hillside @ 4867
Hillside @ 4868
Hillside E/o Beach Bluff, 100'
Hillside @ Valencia, SW
Hillside @ Valencia, SW
Hope a/f 2820
Hosp a/f 2245
Hosp @ Brentwood
Hosp @ El Camino Real NW
Hosp @ Pinecrest N/S
Hosp @ Pinecrest S/S
Hosp E/o Wintergreen 150' N/S
Hosp E/o Wintergreen 200' S/S
Isle @ 4008
Isle a/f 4223
James @ 1660
James @ 1660
James @ 1660
James @ 1660
Jefferson @ 2601
Jefferson @ 2685
C&G
C&G
C&G
23
6
15
1 x 5
5 x 5
5 x 7
5 x 11
5 x 11
5 x 5
5 x 53
5 x 6
2 x 9
5 x 10
5 x 11
5 x 50
5 x 57
5 x 21
5 x 76
5 x 12
5 x 21
5 x 15
5 x 25
5 x 20
1 x 5
3 x 4
5 x 5
5
25
35
55
55
25
265
30
18
50
55
250
285
105
380
60
105
75
125
100
5
12
25
11 x 23
10 x 11
253
110
@ storm drain/rebar
needed
@ storm drain/rebar
needed
@ storm drain/rebar
needed
@ storm drain/rebar
needed
fence right @ SW
3 locations
@ storm drain/rebar
needed
drain pipe under sidewalk
@ storm drain/rebar
sunk
g \userappsscontract administratiomSTS 08-02. Summer 2008 Concrete Hepans. AL-1 Scope of VVoik xl;Page b of 10
LOCATION
STS 08-02
Summer 2008 Concrete Repairs "AL-1"
CONCRETE REPAIRS
GUTTER SIDEWALK APPROACH
TYPE AMOUNT WIDTH LENGTH TOTAL WIDTH LENGTH TOTAL
COMMENTS
Kelly @ 4815
Kelly @ 4819
Kelly @ 4835
Laguna @ 972
Larkspur @ 1156
LasFlores @ 1277
Las Flores @ 1278
Las Flores @ 1291
Las Flores E/o Highland
Las Flores @ Highland @ vacant lot
Las Flores a/f Highland @ vacant lot
Las Flores a/f I-5 SB on ramp
Las Flores a/f Morning Glory
Lincoln a/f 3112
Lincoln a/f 3345
Linda @ 2036
Magnolia @ Harding
Marron @ 1860
Marron W/o 1st National Bank N/S
Marron E/o Monroe 1 00' N/S
Marron @ Monroe NE
Marron @ Monroe NE
Marron next to 1st National
Bank
Marron @ Sears
Marron @ Sears
Marron @ Sears
Monroe @ 3130
Monroe @ 3676
C&G
C&G
G
C&G
C&G
C&G
C&G
21
23
20
12
18
21
16
5 x 4
5 x 34
5 x 19
5 x 7
4 x 10
5 x 11
4 x 34
5 x 20
5 x 21
5 x 20
5 x 17
5 x 5
5 x 20
5 x 21
5 x 6
5 x 16
3 x 3
5 x 58
5 x 16
5 x 36
5 x 20
5 x 5
5 x 11
20
170
95
35
40
55
136
100
105
100
85
25
100
105
30
80
9
290
80
180
100
25
55
5 x 13
10 x 10
5 x 14
5 x 8
5 x 13
65
100
70
40
65
drain pipe under sidewalk
gutter is 3' wide
@ storm drain/rebar
needed
@ storm drain/rebar
needed
bell system vault
g iiiserapps'contract administration'STS 08-02. Summer 2008 Concrete Repairs, AL-1 Scope of Woik xls Pofle fi of 10
LOCATION
STS 08-02
Summer 2008 Concrete Repairs "AL-1"
GUTTER
TYPE AMOUNT
CONCRETE REPAIRS
SIDEWALK
WIDTH LENGTH TOTAL
APPROACH
WIDTH LENGTH TOTAL
COMMENTS
Monroe a/f Hosp
Monroe N/o Hosp100'W/S
Monroe N/o Hosp100'W/S
Monroe N/o Hosp150'E/S
Monroe N/o Hosp 50' W/S
Monroe N/o Hosp 75' E/S
Monroe @ Hosp NE
Monroe S/o Marron 100' E/S
Monroe S/o Marron 200'
Monroe S/o Marron 600'
Monroe S/o Marron 600'
Monroe S/o Marron 650'
Monroe @ Marron SW
Monroe N/o Wickham 75'
Monroe N/o Wickham 75'
Neblina a/f Endeavor
Nob Hill @ 2210
Oak @ 1810
Palm a/f 920
Palm @ 930
Palm E/o Harding 50'
Palm @ Madison
Pannonia @ 4676
Park a/f 4208
Park @ 4610
Park @ 4900
Park @ 4903
Park @ 4905
Park @ 4909
C&G
C&G
C&G
C&G
27
9
14
7
5 x 30
5 x 11
1 x 5
5 x 15
5 x 31
5 x 29
6 x 15
5 x 15
5 x 15
5 x 5
4 x 4
5 x 35
5 x 25
5 x 10
1 x 5
5 x 19
5 x 12
5 x 5
4 x 14
5 x 4
5 x 10
5 x 30
5 x 40
5 x 5
5 x 20
5 x 33
150
55
5
75
155
145
90
75
75
25
16
175
125
50
5
95
60
25
56
20
50
150
200
25
100
165
5 x 9
5 x 23
45
115
@ storm drain/rebar
needed
@ storm drain/rebar
needed/mono
@ storm drain/rebar
needed
rebar needed
rebar needed
rebar/two locations
@ storm drain/rebar
needed
mono
sunken sidewalk
rebar/void under sidewalk
@ storm drain/rebar
needed
g '\user;spps''Contracl ndministration'STS 08-02 Summer 2008 Concrete Repairs, AL-1 Scope of Work xls Page 7 c(10
LOCATION
STS 08-02
Summer 2008 Concrete Repairs "AL-1"
CONCRETE REPAIRS
GUTTER SIDEWALK
TYPE AMOUNT WIDTH LENGTH TOTAL
APPROACH COMMENTS
WIDTH LENGTH TOTAL
Park @ 4942
Park N/o WhiteyDMOO'
ParkCt @ 4918
Paseo del Norte @ 6117
Paseo del Norte a/f 6571
Paseo del Norte a/f 6575
Paseo del Norte S/o 6575 approx 100'
Paseo del Norte a/f Camino del Parque
(6500 blk)
Pine a/f 630
Pine @ 945
Pine @ 983
PioPico @ 2515
Pio Pico @ 2880
PioPico @ 3150
Pio Pico @ 3780
PioPico S/o Basswood 100'
Pio Pico N/o Knowles 200'
Pio Pico @ Oak
Pio Pico S/o Pine 200'
Poinsettia Ln S/o Ambrosia 200' E/S
Poinsettia Ln @ Cassia @ end
Ridgecrest @ Camden
Rogue Isle Ct @ 1730
Rogue Isle Ct @ 1733
Roosevelt @ 3222
Roosevelt @ Pine SE
Roosevelt @ Pine SW
Sandlewood @ 1561
Schooner Wy @ 1723
Schooner Wy @ 1728
Sea view @ 3601
C&G
C&G
RC
C&G
C&G
30
27
35
32
12
5 x 5
5 x 10
5.5 x 5.5
5 x 36
5 x 16.1
5 x 18
5 x 10
5 x 5
5 x 20
5 x 8
5 x 15
5 x 21
5 x 5
5 x 31
5 x 42
5 x 15
15.2 x 5
5.3 x 5
5 x 5
5 x 16
5 x 50
5 x 5
5 x 18
5 x 19
5 x 5
25
50
30.25
180
80.5
90
50
25
100
40
75
105
25
155
210
75
76
26.5
25
80
250
25
90
95
25
5 x 20
13 x 15
10 x 31
4 x 38
100
195
310
152
crushed
@ storm drain/rebar
neded
big palm tree growing over
sidewalk
@ bus stop
@ trash can
@ dead end
@ storm drain/rebar
needed
gAuserapps'contract administralion\STS 08-02, Summer 2008 Concrete Repairs. Al -1 Scope ol Work xis Page 8 of 10
LOCATION
STS 08-02
Summer 2008 Concrete Repairs "AL-1"
CONCRETE REPAIRS
GUTTER
TYPE AMOUNT
SIDEWALK
WIDTH LENGTH TOTAL
APPROACH
WIDTH LENGTH TOTAL
COMMENTS
Sevilla @ 4861
Spanish @ 3435
Spanish @ 3460
Spyglass @ 1854
State @ 2333
State @ 2501
Sunnyhill @ 4285
Sunnyhill @ 4285
Sunnyhill @ 4285
Tamarack @ 1529
Tamarack @ 1559
Tamarack @ 1 559
Tamarack E/o 1649
Tamarack W/o Adams
Tamarack W/o East Pointe 300'
Tamarack W/o East Pointe 300'
Tamarack @ East Pointe NE
Tamarack E/o Hibiscus E/B
Tamarack @ I -5 bridge
Tamarack @ I-5 NB Off
Tamarack @ I-5 NB Off
Tamarack @ I-5 NB Off
Tamarack W/o Skyline 100'
Telescope @ 4628
Telescope @ 4670
Tyler a/f 3235
Tyler a/f 3327
Valencia @ 1870
Valley @ 3228
Valley a/f 3431 & 3435
Valley @ Bonita
Valley @ Oak SE
C&G
C&G
C&G
G
C&G
G
C&G
C&G
C&G
17
13
66
18
7
18
28
98
48
5 x 23
5 x 37
5 x 13
4 x 7
5 x 11
3 x 5
1 x 5
4 x 11
4 x 32
4 x 31
5 x 56
1 x 5
2 x 3
5 x 6
5 x 10
6 x 5
5 x 11
5 x 10
5 x 5
5 x 5
5 x 5
5 x 10
5 x 37
6 x 12
115
185
65
28
55
15
5
44
128
124
280
5
6
30
50
30
55
50
25
25
25
50
185
72
5 x 11
5 x 6
6 x 6
8 x 10
55
30
36
80
1/2 approach raised
in approach
fire hydrant & 2 pillars in
way
@ storm drain / rebar
needed / drain pipe under
sidewalk
heaving - very bad
@ storm drain
rebar needed
@ beginning of bridge
cold mix
cold mix w/water box
gAiisi?rapps\contract adininistration\STS 08-02. Summer 2008 Concrete Repairs, AL-1 Scope of Wotk xls Page S of 10
LOCATION
STS 08-02
Summer 2008 Concrete Repairs "AL-1"
CONCRETE REPAIRS
GUTTER SIDEWALK
TYPE AMOUNT WIDTH LENGTH TOTAL
APPROACH
WIDTH LENGTH TOTAL
COMMENTS
Via Hinton @ Via Marta
Via Marta @ 4994
Washington @ Chestnut NW
Westhaven @ 3700
Westwood @ 3285
Wickham @ Monroe
Wintergreen a/f 2940
Yvette @ 3720
Yvette @ 3730
C&G
C&G
C&G
Total
11
10
34
1,656.20
5 x 5
6 x 11
5 x 5
3 x 6
4 x 16
5 x 10
5 x 6
5 x 40
Total
25
66
25
18
64
50
30
200
18,830.87
8 x 16
Total
128
2,842.80
meter box/cold mix
sunk @ storm drain
heaving @ storm drain
g \usf>rapps\r;ontrar,t ariministralion'STS 08-0?, Summer 2008 Concrete Repairs. Al -1 Scope of Work xls>Page 10 of 10
LOCATION
STS 08-02
Summer 2008 Concrete Repairs "AL-1"
PEDESTRIAN RAMP REPAIRS
PEDESTRIAN RAMP
WIDTH LENGTH TOTAL SQ FT
COMMENTS
Chestnut @ Woodland
Monroe @ Carlsbad Village Dr
Monroe a/f Hosp
Pio Pico @ 2880
Valley @ Oak SE
Via Marta @ 4994
Wickham @ Monroe
5 x 12
7 x 11
8 x 8
8x 8
7 x 17
8x 12
7 x 11
Total
60
77
64
64
119
96
77
557
water box & utility pole in ramp
f:\hheis\cnt\concrete repairs\STS 08-0? Summer 2008 Concrete Repairs. AL-1 Scope ofWork.xls Pago 1 of 1
.OCATION
STS 08-02
Summer 2008 Concrete Repairs "AL-1"
CROSS GUTTER REPAIRS
CROSS GUTTER
WIDTH LENGTH TOTAL SQ FT
COMMENTS
donroe
)ak
'aim
Carlsbad Bl
.oma Wy
rfonroe
'aim
Jidgecrest
'alley
Vickham
a/f Hosp
@ Harding
@ Madison
@ Beech NW
@ 4928
a/f Hosp
@ Madison
@ Camden
@ Oak SE
@ Monroe
10 x
6 x
6 x
1 x
20 x
1 x
1 x
1 x
1 x
1 x
10
14
7
84
30
75
105
295
500
91
Total
100
84
42
84
600
75
105
295
500
91
1,976
rebar needed
ORIGINAL
f:\hheiconcrete repairs\STS 08-02, Summer 2008 Concrete Repairs, AL-1 Scope of Work.xls Page 1 of 1
STS 08-02
Summer 2008 Concrete Repairs "AL-1"
UNDER SIDEWALK DRAIN (D-27) REPAIRS
LOCATION D-27 COMMENTS
WIDTH LENGTH TOTAL SQ FT
Acacia @ 295
Aura Cir @ 2024
5 x 5
5 x 5
Total
25
25
50
D-25
D-25
f:\hheis\cnt\concrete repairs\STS 08-02, Summer 2008 Concrete Repairs, AL-1 Scope ofWork.xls Page 1 of 1