Loading...
HomeMy WebLinkAbout2008-05-20; City Council; 19458; Preliminary 2008-2009 CIP programCITY OF CARLSBAD - AGENDA BILL AB# 19,458 MTG. 05/20/08 DEPT. FIN PRELIMINARY 2008-2009 TO BUILDOUT CAPITAL IMPROVEMENT PROGRAM DEPT. HEAD CITY ATTY. CITY MGR. RECOMMENDED ACTION: Accept report. Set public hearing for June 24, 2008. Adopt Resolution No. 2008-152 approving the Proposition 1B spending plan as outlined in the proposed Capital Improvement Program Budget and directing staff to proceed with the submittal for allocation of funds. ITEM EXPLANATION: The Preliminary Capital Improvement Program (CIP) is a planning document as well as a budget document. It incorporates the current status of all of the City's capital funds with the capital construction budgets and development projections for the upcoming years, and then projects future revenues and expenditures for all known projects until the buildout of the City. The CIP is a financial planning document, not a commitment for spending. All construction costs are estimates and are reviewed and further refined each year. The information shown in subsequent years is to provide the most comprehensive snapshot of all the known future facilities the City of Carlsbad plans to construct. Overview - Fiscal Year 2008-09 Staff began the CIP process by evaluating the existing construction schedules for City facilities in conjunction with the workload of the staff needed to complete the projects. In addition, staff considered the availability of funding as well as the priority of the project based on the project ranking criteria shown in the table. In addition to evaluating the availability of capital construction funds, operating fund impacts were also considered. In the FY 2008-09 CIP, there are approximately 204 existing and new projects scheduled between now and buildout. Project Ranking Criteria • Health and Safety • Legal Mandates • Operating Cost Impacts • Growth Management Standards • Council Priorities • Other Standards • Completion of Basic Infrastructure Linkage • Public Opinion/Surveys • Funding & Timing Opportunity DEPARTMENT CONTACT: Lisa Irvine 760-602-2430 lirvin@ci.carlsbad.ca.us FOR CITY CLERKS USE ONLY. COUNCIL ACTION: APPROVED DENIED CONTINUED WITHDRAWN AMENDED a D D D D CONTINUED TO DATE SPECIFIC CONTINUED TO DATE UNKNOWN RETURNED TO STAFF OTHER -SFFMINMTFS Council, received tV>e report. D Dnn (See Minute?for detail?; Page 2 The cost of construction materials reached historicalBuilding Cost Index Percent Increase Calendar Year 10.00% 8.00% 6.00% 4.00% 2.00% 0.00% \ •"*>*/:". : --V 2001 2002 2003 2004 2005 2006 2007 2008 high levels over the past three years. Due to the economic slowdown, the increase in building costs has slowed dramatically in Calendar Year 2008. The cumulative cost increases for building materials resulted in cost increases for most projects. This cost escalation, as well as change in scope or new projects, has contributed to the projected shortfall at buildout in the Planned Local Drainage Area Fund of $7.5 million, in the Public Facilities Fees (PFF) Fund of $1.5 million, and in the Traffic Impact Fee Fund of $27.7 million. City staff is currently preparing updates to the Planned Local Drainage Area and Traffic Impact Fee programs in order to cover those deficits. It is also important to note that as the City approaches buildout, there are fewer remaining development projects to pay those fees. While this is not an immediate problem, it is an indication that the City may not have the money to build all of the projects listed under those programs. The City may need to pursue other funding options, and/or make adjustments to the timing and scope of the affected projects. The General Capital Construction Fund (GCC) was also projected to have a deficit of approximately $5 million at buildout, and staff is recommending transferring planned projects to another funding source in order to help remedy this deficit. The proposed CIP shows a recommendation to transfer $4.5 million in street and traffic signal projects from the GCC Fund to the Gas Tax Fund, where sufficient balances are available. Additional options are available to further balance the PFF, however given that the PFF is not anticipated to be in deficit until Fiscal Year 2019, staff will continue to monitor the projected deficit in PFF and bring forward additional solutions at the appropriate time. Major Projects for Fiscal Year 2008-09 Some of the major projects scheduled to receive new or additional funding in the FY 2008-09 CIP are summarized below. More information on all the projects can be found in the accompanying CIP report. • Poinsettia Community Park - Parking - The original Poinsettia Community Park Master Plan included additional parking. This component of the project has been moved forward due to recent concerns about adequate parking. The total cost is approximately $903,000. • Leo Carrillo Event Area Expansion - The popularity of Carrillo Ranch for parties and weddings has continued to increase every year, and a new patio will be constructed in FY 2008-09. The flagstone patio, seat wall, lighting, landscape and additional service access will provide more level floor space for events, and potentially increase additional future rental revenue. The cost estimate for this project is $267,000. • Water and Wastewater Infrastructure - Appropriations of $26.2 million are included in the FY 2008-09 CIP for several large water and wastewater construction/replacement projects including the Vista/Carlsbad Interceptor projects, Home Plant Lift Station replacement, and College Boulevard and Maerkle transmission mains. Page 3 • El Camino Real Widening - Tamarack to Chestnut - An outside lane will be added to widen the street to full prime arterial road standards. The project will include curb, gutter, sidewalk, pavement and streetlights. The total estimated cost of the project is $8.1 million. • Pavement Management - A street can last a lifetime if it is properly maintained. Part of that maintenance program is the sealing and overlay of the existing street surface. Carlsbad's local streets are maintained on a regular cycle to ensure a good riding surface, and to extend the life of the street. In addition, any problem areas are addressed as they are identified. The FY 2008-09 CIP has $3.4 million budgeted for this program. • Concrete Repair - This is a companion program to the pavement management program. It will insure that curbs, gutters and sidewalks are also properly maintained. By allocating the funding, both pavement and concrete replacements can be accomplished at the same time. This will help maximize efficiencies and reduce inconvenience to the citizens. The FY 2008-09 CIP has $350,000 budgeted for this program. Future Facilities The CIP for FY 2008-09 to Buildout outlines approximately 143 future projects at a cost of approximately $450.8 million as shown below (the aforementioned 204 projects included 61 continuing projects and 143 future projects). CIP Projects - All Future Projects Project Type Streets/Circulation Civic Projects Wastewater Parks Water Drainage Other (loans) Total Future Percent 31% 18% 17% 15% 11% 5% 3% 100% Total Cost 144,464,629 79,080,521 75,101,675 67,730,835 49,910,636 21,492,394 13,063,365 450,844,055 Specific timing and cost estimates for all planned capital projects are identified in the accompanying report and schedules. There are 11 projects in the CIP for which there is currently no identifiable funding source. The City will investigate obtaining possible outside funding such as federal and state grants, loans, or other financing sources. These unfunded projects are: • Business Park Recreational Facility (partial) • Cannon Lake Park (6.7 Acres) • Cannon Road - REACH 4B - College/Cannon to City Limits (partial)* • Carlsbad Boulevard Mountain View to Northerly City Limits (partial)* • Carlsbad Boulevard/Palomar Airport Road Improvements (partial)* • Hosp Grove/Buena Vista Lagoon Improvements • Palomar Airport Road Widening and Bridge Reconstruction • Pine Avenue Park - Madison Property • Pine Avenue Park - Restrooms/Storage • Robertson Ranch (NE Quadrant) Park Development (partial) Page 4 (*) These projects are in the revised TIF fee program which is planned to generate enough revenue to pay for 20% of the total cost. The remaining 80% is unfunded. A portion of Poinsettia Lane - Reach E was included on the unfunded list for FY 2007-08. Since that time, revenues in the Bridge and Thoroughfare District #2 Fund were higher than anticipated, so the project is now expected to be fully funded. The proposed Capital Improvement Program for FY 2008-09 is an exhibit to this report. Staff is requesting that Council set the public hearing for the adoption of the CIP, as well as for the City's Operating Budget, for the meeting of June 24, 2008. During this public hearing, comments from interested citizens and others are welcomed. There will also be a public meeting on June 12, 2008, where staff will present to the citizens of Carlsbad, the FY 2008- 09 CIP and Operating Budgets, answer any questions, and gather comments from citizens to provide feedback to Carlsbad's City Council. This meeting will be held at 6:00 P.M. at the Faraday Building in Room 173B. Proposition 1B (Transportation Bond) Funding Carlsbad will be receiving approximately $3.1 million in State Bond funds from the Local Street and Roads Account in the next two years. These funds must be expended by June 30, 2011, and must be spent on "projects that will assist in reducing local traffic congestions and further deterioration, improving traffic flows, or increasing traffic safety that may include, but not be limited to, street and highway pavement maintenance, rehabilitation, installation, construction and reconstruction of necessary associated facilities such as drainage and traffic control devices, or maintenance, rehabilitation, installation, construction and reconstruction of facilities that expand ridership on transit systems, safety projects to reduce fatalities, or as a local match to obtain state or federal transportation funds for similar purposes." In order to receive the funds, each city and county must submit to the Department of Finance, a list of projects which must be included in a city or county budget that has been adopted by the jurisdiction's board at a regular public meeting. Carlsbad's CIP includes a pavement management spending plan which averages approximately $3.6 million per year; therefore, the recommendation is to use the State Transportation Bond Funds to supplement the TransNet-Local funds currently programmed for the pavement management program, thereby allowing City Council greater flexibility in using the available TransNet-Local funds in future years. A resolution approving the Proposition 1B spending plan as outlined in the proposed Capital Improvement Program budget is attached hereto (Exhibit 2), so that Staff can apply for these funds as soon as possible, thereby decreasing the likelihood that disbursement of these State funds is postponed or eliminated. FISCAL IMPACT: This is the Preliminary Capital Improvement Program and any changes made by staff or Council will be reflected in the Final Capital Improvement Program documents at the Operating Budget and Capital Improvement Program Adoption on June 24, 2008. The total new appropriations on July 1, 2008 are currently estimated to be $58,839,891 from the CIP funds shown on the attached schedules. Existing expenditures and appropriations shown in Page 5 the attached schedules are through April 25, 2008. In addition, revenue projections are provided to show the cash flows and balances for each of the funds. Staff will continue to review the capital requirements for the City, and may return with additional changes prior to the adoption of the CIP on June 24, 2008. EXHIBITS: 1. 2008-2009 Preliminary Capital Improvement Program. 2. Adopt Resolution No. 2008-152 approving the Proposition 1B spending plan as outlined in the proposed Capital Improvement Program Budget and directing staff to proceed with the submittal for allocation of funds. Exhibit 1 2008-2009 PRELIMINARY CAPITAL IMPROVEMENT PROGRAM OVERVIEW The City of Carlsbad Preliminary Capital Improvement Program (CIP) is a planning document that outlines the expenditure plan for future capital projects and the corresponding revenues to pay for those expenditures. The CIP is a financial planning document, not a commitment for spending. All construction costs are estimates and are reviewed and further refined each year. Spending authorization is given only at the time the City Council formally adopts the proposed budget, and, at that time, funds are only appropriated for the following fiscal year. Information is shown in subsequent years to provide the most comprehensive snapshot of all the known future facilities the City of Carlsbad plans to construct. The Fiscal Year 2008-09 Preliminary Capital Improvement Program outlines approximately $58.8 million in new appropriations to provide additional funding for the continuation of existing projects as well as funding for new projects. Projected revenues during the same fiscal year are estimated at $40.3 million. Revenues are collected as building permits are issued; as the need for facilities arises, the money is used to fund the new facilities. As the City continues to grow and develop, there is a corresponding increase in the demand for development-related services and new facilities. To ensure that the necessary infrastructure and facilities are built on a schedule that meets or exceeds this demand, the citizens of Carlsbad adopted a Growth Management Plan in 1986. The Growth Management Plan states that unless a standard level of facilities is available to meet new demands resulting from the City's growth, development cannot proceed. This Plan is the foundation for making decisions about the timing and prioritization of the capital projects under consideration. A discussion of the City's Growth Management Plan is located at the end of this report. The remainder of the report explains the process and the results of the City's plans for its capital facilities. A large increase in the cost of construction materials has occurred over the past three years, pushing up the cost of projects. This cost escalation has contributed to the projected shortfall at buildout in the Planned Local Drainage Area Funds of $7.5 million, in the Public Facilities Fees (PFF) Fund of $1.5 million, and in the Traffic Impact Fee Fund of $27.7 million. City staff is currently preparing updates to the Planned Local Drainage Area and Traffic Impact Fee programs in order to cover those deficits. It is also important to note that as the City approaches buildout, there are fewer available development projects to pay those fees. While this is not an immediate problem, it is an indication that the City may not have the money to build all of the projects listed under those programs. The City may need to pursue other funding options, or make adjustments to the timing and/or scope of the affected projects. The General Capital Construction Fund (GCC) was also projected to have a deficit of approximately $5 million at buildout. The proposed CIP shows a recommendation to transfer the funding source for $4.5 million of street and traffic signal projects from the GCC Fund to the Gas Tax Fund where sufficient balances are available. If these recommendations are not approved, then the GCC deficit would continue at the $5 million level. Additional options are available to further balance the PFF Fund, however given that the PFF Fund is not anticipated to be in deficit until FY 2019, City staff will continue to monitor the projected deficit in PFF and bring forward options or solutions at the appropriate time. Proposition C was approved by the voters of Carlsbad in November 2002. It allowed the City to expend over $1 million (per project) of general funds to help finance the following projects: • City/Safety Training Center • A portion of Cannon Road - East of College (Reach 4) • Trails and Open Space • A Swimming Pool Complex 1-1 2008-2009 PRELIMINARY CAPITAL IMPROVEMENT PROGRAM As a result of the ballot initiative the City set aside $35 million for Proposition C projects. Currently, $16.2 million has been appropriated for Alga Norte Park, $13.7 million has been appropriated for the Joint First Responders Training Facility, and $100,000 is allocated for design of a City Administrative Training Facility. A remaining balance of $5.0 million is available to help fund Proposition C projects. It is still anticipated that the City will meet all of its growth management standards. This reflects the Council's continued commitment to construct the facilities as needed to serve the current and anticipated development occurring throughout the City. PROJECT EVALUATION What is the definition of a CIP project? Projects that are shown in the CIP are generally defined as any construction (or reconstruction/replacement) of major infrastructure such as streets, libraries, parks, fire stations and administrative facilities, water, sewer and drainage facilities, and other facilities that are located on or in the ground. In most cases, the total construction cost of each of these assets is recorded and tracked as part of the City's inventory of capital infrastructure assets and other City-owned property. The CIP and the Operating Budget are integral parts of the total City financing plan. Staff began the process by evaluating the construction schedules for City facilities in conjunction with the workload of the staff needed to complete the projects. In the FY 2008-09 CIP, there are approximately 204 continuing and new projects planned through buildout. All projects were analyzed using the criteria shown in the table. Project timing was reviewed, and an evaluation of the availability of capital construction funds, as well as operating funds, was then factored into the evaluation process. Project Ranking Criteria 1. Is the project required to ensure the health and safety of the citizens, as the result of a legal mandate, or to maintain compliance with the City's Growth Management Plan? Are operating funds available to operate the facility? 2. Is the project needed soon for growth management compliance? 3. Is the project needed now for other City standards (example: ball field standards)? 4. Does the project complete or provide part of the basic infrastructure (example: a linking road segment)? 5. Are there other reasons to construct the project (example: Council priority, timing or funding opportunity, public demand)? 10.00% 8.00% 6.00% 4.00% 2.00% 0.00% Building Cost Index Percent Increase Calendar Year /"""-.a..... ft / V/ \ *\^X*-<-^ % 2001 2002 2003 2004 2005 2006 2007 2008 significantly, with only a 0.44% increase CAPITAL PROJECTS Due to the volatility in construction costs, all capital project costs were updated to reflect the latest increases in materials costs. This was done through either a detailed review of the cost components, or, in cases where the project was only in its conceptual stage, by increasing the total cost by the Engineering News Record (ENR) index. As seen in the chart, the past several years have seen large building cost increases; between 6% and 8% per year between 2005 and 2007. In 2008, corresponding to the economic downturn, the increase in building costs slowed down in the first four months of the calendar year. The following two sections provide information about the major capital projects. The first section focuses on projects planned in the next five years, and the second section contains an overview I-2 2008-2009 PRELIMINARY CAPITAL IMPROVEMENT PROGRAM of the entire expenditure plan through the buildout of the City. All construction costs are estimates and only projects scheduled for FY 2008-09 are appropriated. The information shown in the future years reflect the most comprehensive snapshot of the known future facilities and their associated cost at this point in time. THE NEXT FIVE YEARS... PARK PROJECTS The City Council conducted a workshop and re-prioritized several projects, including Park projects. These projects were scheduled in accordance with the priority list where possible, as long as funding and other resources were available. Where funding was not available, the projects were moved out. Three park projects were affected by this prioritization: Pine Avenue Park Phase II was moved to buildout, Robertson Ranch (NE Quadrant) Park Development was moved up to FY2013-18, and Leo Carrillo Park Phase III was moved up from buildout to FY2010- 11. The City has planned a number of park projects over the next five years which will enhance the recreational opportunities for Carlsbad's residents, and allow the City to meet the standards for park acreage as set forth in the growth management plan. Some of the more significant projects are listed below. • Alga Norte Park and Aquatic Center - This park site consists of 30 acres in the Southeast Quadrant with planned amenities that include ball fields, soccer fields, picnic areas, tot lots, a skate park, a dog park, restrooms, parking facilities, and an aquatic center. The aquatic center will include a 50-meter competition pool, a 12-lane instructional pool, a therapy pool as well as a water play area. A swimming pool complex was one of the projects approved by the voters through Proposition C in 2002. The total cost of the park is estimated to be $22.1 million. The total cost of the aquatic center is estimated to be $28.3 million. At this time, construction of the park components is expected to begin in 2008-09. • Leo Carrillo Park - Phase III - The third phase of this historic park facility includes renovation of additional buildings, construction of additional restrooms, an arboretum area, and construction of a barn into a community theater. The total cost is approximately $2.9 million and design is expected to begin in FY 2009-10. In addition, in 2008-09 the City plans to expand the event area and construct a new patio area of approximately 2,500 square feet to provide a more attractive venue for events. CIVIC FACILITIES Civic facilities include a variety of facilities from which the City can offer its services to the public. Many of these are still in the preliminary design stage, and will be further defined over the next several years. • Civic Center - The Civic Center will consolidate City administrative operations and facilities into a more centralized location. It also may include a variety of other services and recreational opportunities for citizens and visitors. Council, citizens and members of the business community have been participating in a visioning process to determine the anticipated needs for the citizens and for the City. Once the process is complete, a site will be chosen and design and construction can begin. • Public Works Center - The construction of the Public Works Center and associated improvements include offices, shops, a yard, warehouse and parking to accommodate the Public Works Department. The cost has been escalated to reflect inflation and the revised I-3 2008-2009 PRELIMINARY CAPITAL IMPROVEMENT PROGRAM cost is now approximately $28.1 million. • Fire Station No. 3 Relocation - Fire Station No. 3 is currently located at the corner of Chestnut and Catalina. As the City grows eastward, relocation of this station is needed to help ensure the five-minute response time. The new station is budgeted as a 6,200 square foot facility, and the current proposed site is next to Calavera Community Park. The suitability of this location is currently under review. Total cost is projected at $7.5 million. STREET PROJECTS Traffic congestion continues to be one of the top concerns among citizens. To help improve the flow of traffic throughout Carlsbad and to keep the City's streets in top condition, there are a number of street projects expected to be completed in the next five years. Some of the larger street projects include: • Carlsbad Boulevard Encinas Creek Bridge Replacement - Complete replacement of the existing bridge, originally constructed in 1913, is planned in the next five years at a total cost of $4.4 million. • Poinsettia Lane Reach E - This project includes completion of the final link along Poinsettia Lane between Cassia Road east to Skimmer Court. The total cost is approximately $13.1 million, and the City expects to begin the design in FY 2011-12. • Pavement Management - A street can last a lifetime if it is properly maintained. Applying seals and overlays when roadways are beginning to show signs of distress can minimize the more expensive repair/reactive maintenance activities. Carlsbad's proactive maintenance approach consists of the scheduled application of a seal or overlay once every seven years to efficiently maintain over 344 miles of public roadways, at an annual cost of approximately $3.6 million. • Sidewalk Construction/Concrete Repair - In addition to the pavement management program, the City plans to fund $3.2 million for construction of sidewalks and repair of aging concrete infrastructure. There are several new road projects which were added as part of the revised Traffic Impact Fee program. The fee is currently still under review, and it is not certain when and how many of these projects will be constructed as currently planned. The new TIF projects scheduled in the next five years are as follows: - Avenida Encinas Widening - South of Palomar Airport Road - El Camino Real/Cannon Road Interchange Improvements - El Camino Real Widening - Tamarack to Chestnut - Melrose Drive Dual Turn Lane to West of Palomar Airport Road - Palomar Airport Road and College Boulevard Improvements - Palomar Airport Road Widening at Paseo del Norte WATER/WASTEWATER PROJECTS The City's water and wastewater projects are a vital component to the continued health and welfare of its citizens. Most new lines are built and paid for by developers. As the City ages, it will becomes necessary to repair and replace the lines that already exist, and an increase in these projects is anticipated in future years. I-4 rl 2008-2009 PRELIMINARY CAPITAL IMPROVEMENT PROGRAM • Vista/Carlsbad Interceptor - Reaches 1 to 5 and 11 to 15, and the Agua Hedionda lift station are scheduled in the next five years. These projects are required to handle buildout flows and replace deteriorated pipelines. The total cost for all the projects is approximately $45.4 million. The City of Vista's share of this cost is $30.1 million, leaving Carlsbad responsible for funding the remaining $15.3 million. • Wastewater Lines - Other major wastewater lines scheduled for construction or replacement within the next five years include: - Beach Street Sewer Replacement - Buena Interceptor Sewer Improvements - Home Plant Lift Station Replacement - North Agua Hedionda Sewer Replacement • Water Lines - Major water lines scheduled for construction or replacement within the next five years include: - Carlsbad Boulevard - South of Avenida Encinas - College Boulevard - Cannon Road to Badger Lane - Maerkle Transmission Main - Melrose Drive from Palomar Airport Road to Faraday • Maerkle Reservoir Storage - Construction of a buried 16 million gallon water storage reservoir next to the existing reservoir is planned in order to provide additional emergency storage and meet the 10-day storage criteria based on ultimate demands. The total cost is $14.2 million. CAPITAL PROJECTS THROUGH BUILDOUT The CIP for FY 2008-09 to Buildout outlines approximately 143 future projects at a cost of approximately $450.8 million as shown below. CIP Projects - All Future Projects Project Type Streets/Circulation Civic Projects Wastewater Parks Water Drainage Other (loans) Total Future Percent 31% 18% 17% 15% 11% 5% 3% 100% Total Cost 144,464,629 79,080,521 75,101,675 67,730,835 49,910,636 21,492,394 13,063,365 450,844,055 Park and recreational facility construction and acquisition projects total approximately $67.7 million. Park projects planned within all quadrants of the City are listed below in addition to when the design and/or construction is expected to begin. More detail follows on specific projects not discussed earlier in this report. I-5 ID 2008-2009 PRELIMINARY CAPITAL IMPROVEMENT PROGRAM PARK PROJECTS BY QUADRANT Northeast Quadrant Park Site Development: 2013-18 Southeast Quadrant Alga Norte Park: 2008-09 Alga Norte Aquatic Center: TBD Leo Carrillo Park Phase III: 2010-11 Northwest Quadrant Pine Avenue Park Community Building: 2018-23 Southwest Quadrant Poinsettia Park Community Building: 2012-13 Aviara Community Building: 2018-23 Citywide Park and Recreational Projects Veteran's Memorial Park: 2018-23 Business Park Recreational Facility: 2018-23 • Aviara Community Facility - Located in the southwest quadrant of the city, this project includes the construction of an 18,000 square foot community facility that would include meeting and activity rooms, as well as park offices. • Poinsettia Park Community Center - Phase II of this 42-acre park includes amenities such as a community facility, gymnasium, enclosed soccer field, tot lot, picnic areas, tennis complex, clubhouse, stadium court and additional parking. The cost is expected to be approximately $14.7 million. The timing of the design is scheduled to begin in FY 2012-13 with construction in the following year. • Veterans Memorial Park - This project is located south and east of Agua Hedionda Lagoon adjacent to the City Golf Course, The Crossings at Carlsbad. The Master Plan includes the following improvements: community leisure needs, open space interpretive area, parking and maintenance facility. Other suggested uses for this park include an amphitheater complex, sports complex, conference center and numerous other active/passive recreation amenities. Approximately 31% of future expenditures are planned for street and traffic signal construction projects. Included in this category is construction of major roadways that will add east to west and north to south connections, as well as provide additional routes to the neighboring cities of Oceanside, Vista, and San Marcos. Sections of these roads are already under construction by developers. Additional roadway projects include replacement of the Carlsbad Boulevard Encinas Creek Bridge, several road-widening projects, and funding for sidewalk construction, concrete repair work and pavement overlay. Currently there are 21 traffic signals identified and recommended for construction in future years. Sewer and drainage projects are expected to cost over $96.5 million, which includes over $35 million in sewer replacement projects. Funding is also provided for the repayment of bonds for the expansion of the Encina Wastewater Facility, and the Encina Water Pollution Control Facility projects. Future water projects include construction of new waterlines, both potable and recycled, concurrent with new development. Some of the major areas in which these installations or upgrades are planned include segments of College Boulevard and El Fuerte, and along El Camino Real. Replacement of existing potable and recycled waterlines is also included in this category, and additional reservoirs are planned to increase storage for ultimate demands. In addition, $27.6 million is planned for known replacement projects. Construction of Civic facilities such as libraries, administrative facilities, police and fire facilities are currently estimated at $79 million of the total planned capital expenditures to buildout. I-6 2008-2009 PRELIMINARY CAPITAL IMPROVEMENT PROGRAM Specific timing and cost estimates for all capital projects are identified in the Detail Schedule of Capital Projects (FY 2008-09 to Buildout) following this narrative. UNFUNDED PROJECTS There are several projects identified in the CIP for which there is no identifiable funding source, and in some cases, where only partial funding has been identified. The City will investigate obtaining possible outside funding such as Federal and State grants, loans, or other financing sources. Once funding is identified for these projects, the project costs will have to be reviewed and updated to reflect actual cost estimates. The unfunded projects do not receive annual inflationary increases. These projects are: • Business Park Recreational Facility (partial) • Cannon Lake Park (6.7 Acres) • *Cannon Road - REACH 4B - College/Cannon to City Limits (80%) • *Carlsbad Boulevard Mountain View to Northerly City Limits (80%) • *Carlsbad Boulevard/Palomar Airport Road Improvements (80%) • Hosp Grove/Buena Vista Lagoon Improvements • Palomar Airport Road Widening and Bridge Reconstruction • Pine Ave. Park - Madison Property • Pine Ave. Park - Restrooms/Storage • Robertson Ranch (NE Quadrant) Park Development (partial) (*) These projects are in the revised TIF fee program which is planned to generate enough revenue to pay for 20% of the total cost. The remaining 80% is unfunded. FUTURE GROWTH AND DEVELOPMENT There are a variety of revenues that are used to fund the capital projects. In order to estimate future revenues from development, several assumptions about the rate and type of future development need to be made. These assumptions can change from year-to- year and correlate with the economic climate. Every year, City staff evaluates all existing and future private development projects, and compares this information to the buildout capacity of the City using adopted general plans. Information about existing development activity combined with estimates of how remaining net developable land might develop, are then summarized to prepare future projections about when and where residential and non-residential development will occur. Finance Department staff prepares cash flow schedules using current fund balances combined with future estimated fees paid by those developments, and then compares the available funds to the expenditure plan, to ensure that funding will be sufficient for construction of the capital projects as planned in the CIP. In addition to evaluating whether or not capital funds are sufficient, significant operating cost impacts and availability of staff resources are also used to evaluate the timing of projects. Where funding discrepancies occur, alternative financing methods and project timing are again evaluated, and recommendations are made to resolve the discrepancies. Residential development is expected to taper off in the future. The number of annual building permits issued is projected to decline compared to the previous five-year period. The development schedules of the remaining vacant parcels is driving the timing of the future units, rather than economic or market conditions. There are approximately 4,570 units remaining before the City is predominantly built out. Residential development for FY 2007-08 is projected at 255 units, with an average about 280 units 1-7 2008-2009 PRELIMINARY CAPITAL IMPROVEMENT PROGRAM per year over the next five years. This is compared to an average of over 860 units per year for the previous five-year period. The decline, particularly in the next five years, is due to the current economic downturn and the dwindling supply of developable land. The amount of non-residential development is projected to also decline slightly over the next five years. The average annual square feet of non-residential development for the past five years was about 1033,000. For FY 2007-08, the estimate is for 1,300,000 square feet, and the average annual development for the next five-year period is approximately 509,000 square feet per year. Projects include several neighborhood commercial/retail developments located in or near the areas where most of the residential development has occurred, or where new development is planned over the next several years. In the southeast quadrant, commercial projects include retail and restaurants, a theater, and a daycare and church. Sunny Creek Plaza is a planned commercial development located east of El Camino Real at College Boulevard next to the Sunny Creek residential neighborhood, and the Bressi Ranch area will also have a commercial development. Other commercial developments are planned at Calavera Hills and at Poinsettia Shores. Industrial development consists of various new office and industrial projects, as well as expansion of existing projects at Kelly Corporate Center, Gemological Institute of America and Legoland. Development estimates provide the data and basis for estimating future fee revenues, which are calculated by multiplying each applicable development fee by the estimated number of dwelling units and/or square feet of construction expected during each year. The following table shows the number of residential units and non-residential square feet of development used in calculating estimated revenues for FY 2008-09 and subsequent years to buildout. Projected Development Residential and Non-Residential Construction Year 2007-08 current 2008-2009 2009-2010 2010-2011 2011-2012 2012-2013 Years 6-10 Years 11 -buildout Total Future Residential Units 255 193 368 264 286 296 1,970 1,191 4,568 Non-Residential Square Feet 1,291,597 424,174 499,851 541,203 533,248 544,692 4,639,302 2,617,746 9,800,216 REVENUES Revenues for Capital Projects from now until buildout are estimated to be approximately $615.9 million and are segregated into five major categories: (1) fees generated by development in Carlsbad, (2) special district fees and taxes (Community Facilities Districts and Bridge and Thoroughfare Benefit Districts), (3) Water and Wastewater Replacement reserves, (4) Infrastructure Replacement reserves (other than wastewater and water), and (5) Other sources including grants, bond issues, and contributions from other agencies. I-8 13 2008-2009 PRELIMINARY CAPITAL IMPROVEMENT PROGRAM Revenue Estimates FY2008-09 to Buildout Total Revenue = $615.9 Million Other Agencies 19% Developer Fees 22% Infrastructure Replacement Transfers 26% Financing Districts 9% Water/Wastewater Replacement Transfers 24% Approximately 22% of all capital revenue is received as a result of development, and is dependent upon assumptions made about the City's annual growth in dwelling units and commercial/ industrial square feet. Development revenues include Public Facilities Fees (PFF), Traffic Impact Fees (TIF), Park-ln-Lieu Fees (PIL), Planned Local Drainage (PLD) Fees, Water Connection Fees (MFF), and Sewer Connection charges. Revenue from special districts, such as Community Facilities Districts (CFD) and Bridge and Thoroughfare Benefit Districts (BTD) comprise 9% of the total. Water and Wastewater replacement revenues generated by user fees equal approximately 24% of total revenues, and are used to pay for replacement of existing water and sewer facilities. Infrastructure replacement revenues, equal to 26%, are transfers from the City's General Fund, which are being set aside to pay for replacement of major capital facilities other than wastewater and water facilities. The remaining 9% consists of revenues from other agencies and include federal and state grants, the county sales tax program (TransNet), redevelopment agency revenue, golf course funding, and contributions from cities and other agencies. CALCULATION OF FUTURE FEES The revenue projections of the Capital Improvement Program reflect the growth assumptions identified in the previous section. The following information delineates how those assumptions were applied to estimate future development revenues. The mix of multi-family and single-family residential units is assumed to be 35% and 65% respectively, and reflects the anticipated mix of residential development for each Local Facilities Management Zone. The building permit valuation used for computing Public Facilities Fees is $178,633 per multi-family dwelling unit, and $315,200 per single-family dwelling unit. A building permit valuation of $42 per square foot of construction is used to calculate non-residential Public Facilities Fees. In order to calculate estimated revenues for Traffic Impact Fees (TIF), the number of average daily trips was computed for each type of development use. A multi-family residential dwelling unit is assigned eight trips per day and a single-family unit is assigned ten trips per day. The trips-per- day value for commercial and industrial buildings are 40 and 8 trips per 1,000 square feet of development, respectively, although the actual volume of trips generated by commercial/industrial building can vary widely depending on the ultimate land use. CFD #1 is a citywide district established to finance various civic facilities required under the City's I-9 2008-2009 PRELIMINARY CAPITAL IMPROVEMENT PROGRAM Growth Management Plan. CFD #3 was established for the Faraday Avenue and Melrose Drive Extensions east of El Camino Real. This project encompasses the extension of Melrose Drive from Palomar Airport Road to the Carlsbad/Vista city limits and the extension of Faraday Avenue from Orion Way to Melrose Drive in Vista. Park-in-Lieu Fees are collected for the purchase and development of parkland within each quadrant of the City, and the fees are based on the acquisition cost of parkland. Projects in the CIP funded with Park- in-Lieu Fees include future park site acquisition, development and restoration. There are two existing Bridge and Thoroughfare Fee Districts (BTD), which were formed by property owners to finance specific road construction projects located within each of the district boundaries. Poinsettia Lane - Aviara Parkway (BTD No. 2) was formed to finance the construction of Poinsettia Lane between Aviara Parkway and El Camino Real and Aviara Parkway between Palomar Airport Road and Poinsettia Lane. BTD No. 3 (Cannon Road West) was formed to fund portions of Cannon Road from Interstate 5 to El Camino Real. Although construction of this project is complete, revenues collected from future development within the district will be used to repay an advance that provided interim funding to complete the project. SUMMARY The proposed FY 2008-09 to Buildout CIP is being driven by the City's commitment to ensure that facilities are available to service the developing areas as well as the current residents. Carlsbad's philosophy has been to build quality capital facilities, which meet, and at times exceed, Growth Management standards. Phasing projects over a period of years to match funding availability for construction and operations is often used to meet the needs of growth management. The FY 2008-09 to Buildout Capital Improvement Program reflects the commitment of Carlsbad's Council and staff to continue providing its residents with a better quality of life. GROWTH MANAGEMENT PLAN The Growth Management Plan was developed and voted into law by the citizens of Carlsbad in 1986. The plan was established to manage development within the City by linking residential, commercial, and industrial development directly to standards for availability of public services and facilities. The Growth Management Plan has established precise standards for eleven public facilities. Standards must be met at all times as growth occurs. Facilities for which standards have been established are as follows: - City Administrative - Library - Wastewater Treatment - Parks - Circulation - Drainage - Fire - Open Space - Schools - Sewer Collection - Water Distribution The plan requires that appropriate public facilities be available, in conformance with the adopted performance standards, as development occurs. Unless all of the eleven public facility standards have been met, no new development can occur. The Growth Management Plan impacts both the Operating Budget and the Capital Improvement Program. The detailed level of planning required by Growth Management has allowed Carlsbad's 1-10 2008-2009 PRELIMINARY CAPITAL IMPROVEMENT PROGRAM Capital Improvement Program to anticipate the funding needed for capital improvements through buildout of the City. The timing of construction of facilities is governed by the rate of development and the eleven performance standards. New public facilities often require additional staffing and other resources, which affects the Operating Budget. Facilities such as community centers, parks, and fire stations have been constructed and opened to the public under this program. The Capital Improvement Program has been designed to specifically address areas where new or expanded facilities will be needed to maintain compliance with the adopted performance standards. With the adoption of the FY 2008-09 CIP, compliance with the Growth Management Plan is continued. 1-11 PRELIMINARY CAPITAL IMPROVEMENT PROGRAM FISCAL YEAR 2008-09 TO BUILDOUT PROJECT TITLE CIVIC PROJECTS ADMINISTRATIVE FACILITIES CIVIC CENTER CITY ADMIN TRAINING FACILITY (PRE-DESIGN) - PROP C PUBLIC WORKS CENTER *- PUBLIC WORKS CENTER ~ PUBLIC WORKS CENTER X POLICE & FIRE FACILITIES ^ FIRE STATION #3 RELOCATION FIRE STATION 03 RELOCATION (GENERAL FUND) FIRE STATION #5 STORAGE BUILDING«ESTROOMS FIRE STATION #6 (PERMANENT) JOINT FIRST RESPONDERS TRAINING FACILITY JOINT FIRST RESPONDERS TRAINING FACILITY - PROP C POLICE CAD IMPLEMENTATION LIBRARY FACILITIES LIBRARY EXPANSION (COLE) LIBRARY EXPANSION (COLE) LIBRARY EXPANSION (LEARNING CENTER) LIBRARY EXPANSION (LEARNING CENTER) LIBRARY EXPANSION (LEARNING CENTER) MISCELLANEOUS CITYWIOE PROJECTS PROPOSITION C PROJECTS BICYCLE MASTER PLAN CFDIM ADMINISTRATION COASTAL RAIL TRAIL COASTAL RAIL TRAIL COASTAL RAIL TRAIL (CMAQ) PEDESTRIAN MASTER PLAN PEDESTRIAN MASTER PLAN PUBLIC WORKS INVENTORY AND FAC MAINT PROGRAM STREETSCAPE IMPROVEMENTS VILLAGE PUBLIC PARKING ENHANCEMENT PROGRAM SUBTOTAL CIVIC PROJECTS FACILITIES MAINTENANCE BEACH ACCESS STAIRS REPLACEMENT REPAIR RECOATING GUARDRAIL PAR BRIDGE AT CARLSBAD BLVD STAGECOACH PARK PICNIC SHELTER SUBTOTAL FACILITIES MAINTENANCE PARK PROJECTS CITYWIDE PARKS BUSINESS PARK RECREATIONAL FACILITY (PARTIAL FUNDING) CARLSBAD MUNICIPAL GOLF COURSE CARLSBAD MUNICIPAL GOLF COURSE LAKE CALAVERA TRAILS MASTER PLAN/CONSTRUCTION SENIOR CTR EXPANSION - 1ST FLOOR SENIOR CTR EXPANSION - 2ND FLOOR VETERAN'S MEMORIAL PARK NORTHWEST QUADRANT PARKS PINE AVENUE PARK - PINE COMMUNITY BUILDING - PHASE II PINE AVENUE PARK - PINE COMMUNITY BUILDING - PHASE II NORTHEAST QUADRANT PARKS ROBERTSON RANCH ACQUISITION ROBERTSON RANCH PARK DEVELOPMENT (PARTIAL FUNDING) FUND CFDIM GCC CFDIM WATER REPL SEWER REPL PFF GCC GCC PFF GCC GCC GCC CFDIM PFF GCC CFDIM OTHER GCC TRANSNETSIKE CFDJM TRANSNET/BIKE OTHER FED GRNT TDA GCC GCC REDVL VILLAGE REDVL VILLAGE IRF GCC GCC ZONES GOLF COURSE GOLF COURSE GCC REDVL VILLAGE GCC CFDIM PIL-NW PFF PIL-NE PIL-NE TOTAL BUDGET 26.100,000 100,000 17.080,366 7,169,600 3.861,200 7,001.000 540,000 316,600 5,830.000 10,850,000 13,650,000 2.312.228 4,580,016 9,832.400 388,660 4,491,837 1,259,503 .5,034,205 150.000 1,084,387 221,800 184,176 4.413,784 100,000 150,000 404.992 400,000 850,000 128,356,754 517.500 130.000 100,000 747.500 3,400,000 55,266,655 750,000 598,750 1,082,044 529,162 23,239,800 1,784,400 7.892,000 4,550,000 4,000,000 PRIOR EXP/ENC . 1,217,262 . - 314.241 5,505.367 1,748,653 1.890.290 . 175,356 4,418,756 1,257,224 68.960 122500 215,664 184,176 3.892,493 100,000 26,210 402.737 . - 21.539,889 131,212 75,831 86,387 293,430 55,171,872 584,772 51,019 857.532 456.686 - 340,482 BALANCE YEAR1 YEAR 2 YEAR 3 YEAR 4 YEARS YEAR 6-10 BUILDOUT FORWARD 2008-2009 2009-2010 2010-2011 2011-2012 2012-2013 2013-2018 2018-2023 1,491,004 1,000.000 540,000 2,359 324,633 9,101,347 13,650,000 421,938 213.304 73,081 2,279 81,040 81,887 8,136 - 521,291 123,790 2,255 100.000 27.736,344 386,288 54,169 13,613 454,070 94,783 165.228 547.731 224.512 72.476 - 4,209.518 SOUTHWEST QUADRANT PARKS 26,100.000 100,000 14,372,100 7,169,600 3.861,200 493.200 5,404,200 103,600 4:580,016 9,832,400 5,034,205 110,000 110,000 110,000 110,000 110.000 330.000 300,000 850.000 5.144.205 903,200 31.017.100 213,600 26,210,000 1,180,000 14,412,416 - 3,400,000 23,239,800 1.784,400 7,892,000 4,000,000 PRELIMINARY CAPITAL IMPROVEMENT PROGRAM FISCAL YEAR 2008-09 TO BUILDOUT PROJECT TITLE AVIARA COMMUNITY PARK COMMUNITY BUILDING AVIARA COMMUNITY PARK COMMUNITY BUILDING AVIARA REIMBURSEMENT AGREEMENT POINSETTIA COMMUNITY PARK - TENNIS COURTS * COMMUNITY CENTER POINSETTIA COMMUNITY PARK - TENNIS COURTS & COMMUNITY CENTER POINSETTIA COMMUNITY PARK - PARKING SOUTHEAST QUADRANT PARKS ALGA NORTE PARK • PHASE 1 (30 ACRES) ALGA NORTE PARK - PHASE II (POOL) ALGA NORTE PARK - PHASE II (POOL) ALGA NORTE PARK - PHASE II (POOL) PROP C FUNDS LEO CARRILLO PARK - PHASE III LEO CARRILLO PARK - PHASE III LEO CARRILLO BARN LEO CARRILLO PARK - EROSION CONTROL LEO CARRILLO BARN RESTORATION/STABILIZATION LEO CARRILLO BARN STABILIZATION ($197K = GRANT) LEO CARRILLO EVENT AREA EXPANSION SUBTOTAL PARK PROJECTS DRAINAGE PROJECTS AGUA HEDIONDA CHANNEL (PLDA '8") CALLE GAVANZO DRAINAGE CALLE GAVANZO DRAINAGE CARLSBAD BLVD STORM DRAIN REPLACEMENT CMP REPLACEMENT PROGRAM COLLEGE BLVD. BRIDGE FACILITY BL (REIMB./PLDA "B") COLLEGE BLVD/CANNON RD (BASIN BJB - REIMS JPLDA "B") (FEMA + PLD) COLLEGE BLVD/CANNON RD (BJ AND CALAVERA CR. CHANNEL) CYNTHIA LANE STORM DRAIN FARADAY/MELROSE DRAINAGE FACILITIES (PLDA "8') HOSP GROVE PARK DRAINAGE IMPROVEMENTS KELLY DRIVE CHANNEL REPAIR LA COSTA AVE STORM DRAIN REPLACEMENT MASTER PLAN UPDATE MISCELLANEOUS MASTER DRAINAGE FACILITIES MISCELLANEOUS ROAD SUBDRAINS NW QUADRANT STORM DRAIN IMPROVEMENT PROGRAM NW QUADRANT STORM DRAIN IMPROVEMENT PROGRAM PARK DRIVE AND TAMARACK AVENUE STORM DRAIN (PLDA "B') RIDGECREST DRAINAGE IMPROVEMENTS ROMERIA DRAINAGE IMPROVEMENTS ROMERIA DRAINAGE IMPROVEMENTS TAMARACK AND ECR STORM DRAIN AND SILT. BASIN (REIMBJPLDA "B") SUBTOTAL DRAINAGE PROJECTS SEWER PROJECTS 6NCINA WATER POLLUTION CONTROL FACILITY BUILDING IMPROVEMENTS CAPITAL ACO/REPUREHAB AND STAFFING PHASE IV EXPANSION - DEBT SERVICE PHASE V EXPANSION SEWER COLLECTION SYSTEM AVENIDA ENCINAS GRAVITY SEWER BEECH STREET SEWER REPLACEMENT BUENA INTERCEPTOR SEWER IMPROVEMENTS CALAVERA HILLS TREATMENT PLANT - DEMOLITION CARLSBAD TRUNK SEWER REACHES VCT1A, VCT1B, VCT1C (SBA "A") CARLSBAD TRUNK SEWER REACHES VCT1 A, VCT1B, VCT1C (SBA "A") CONDITION ASSESSMENT OF SEWER MAINS FARADAY AVENUE • ORION TO MELROSE SEWER HOME PLANT - PIPELINE REPLACEMENT HOME PLANT LIFT STATION REPLACEMENT FUND PFF PIL-SW PIL-SW PIL-SW PFF PFF PFF PFF GCC GCC PFF PIL-SE PFF GCC PFF GCC PIL-SE PLD GCC GAS TAX IRF IRF PLD PLD PLD IRF PLD IRF IRF IRF PLD PLD GAS TAX GCC GAS TAX PLD GCC GCC GAS TAX PLD SEWER REPL SEWER REPL SEWER CONN SEWER CONN SEWER REPL SEWER REPL SEWER REPL SEWER REPL SEW BENEF SEWER REPL SEWER REPL SEWER REPL SEWER REPL SEWER REPL TOTAL BUDGET 7,632.200 2,698,700 238,000 558,811 14,160,415 903,185 22,107,510 6,099,695 6,000.000 16.215,795 1,057.000 866,100 1,000.000 267.000 33.000 500,000 267,000 183,697.222 1,896,522 62,500 12,531 218,000 2,583,000 1,911,800 1,073.294 2,536/449 253,750 300,000 150.000 1,158500 492.150 494,933 11,318,800 560,000 460,250 2,862,094 631,400 117,500 274,000 338,000 1,323,800 31,029,273 4,552,878 17,425,028 7,457,651 10,603,878 276,300 1,947.000 2,840.000 689.000 120.600 427.635 626,000 110.200 534,000 1.812,000 PRIOR EXP/ENC . . 18,900 558,811 1,124,733 - 1,777,168 500.000 - 389,265 . 254,383 32,977 58,697 62,177,297 1,838,213 57,749 12,290 33,135 45,331 . 934,108 309,856 107,324 14,651 158,643 7.280 494.856 10,948 186,390 . . 20,380 94,715 - . 4,323,669 4,394,855 1.227,008 935,507 6.784,201 . - 128,443 . 50,425 71,466 - BALANCE YEAR1 YEAR 2 YEARS YEAR 4 YEAR 5 YEAR 6-10 BUILDOUT FORWARD 2008-2009 2009-2010 2010-2011 2011-2012 2012-2013 2013-2018 2018-2023 219,100 24,682 - 20,330,342 5,599,695 6,000,000 15,826,530 . 12,617 23 441,303 20,550 53.789,090 60,309 4.751 241 184,865 529,669 . 139,186 2,226.593 146,426 285,349 - 281,357 484,870 77 - 474,052 118,860 - 97,120 179,285 - 5,213,010 158,023 551,489 . 3,819,677 - . 831,557 23,500 59,775 368,534 - 7,632,200 2,698.700 1,035,000 11,976.000 903,185 310,500 746,500 866,100 1,000,000 246,450 1,149,635 310.500 2.612,600 - 1,035,000 15,976,000 46,647,100 802,000 427,000 502,000 277,000 1,911,800 i I 150,000 36,000 682,500 11.318,800 75,000 155,000 406,055 397,573 415,898 694.228 048,340 631,400 338,000 1.323.800 1,962,055 1.507,073 917,898 971,228 948,340 2,543,200 12.642.600 744,152 967.252 1.441,019 1.578,061 1.205,020 6.690.054 3.020.973 937,170 933,007 931,419 932,469 931,469 1,856,610 276,300 1,947.000 500,000 1,380,000 142,000 523,500 103,600 17,000 427,635 313,000 313,000 94,000 1,812,000 PRELIMINARY CAPITAL IMPROVEMENT PROGRAM FISCAL YEAR 2008-09 TO BUILDOUT PROJECT TITLE LA COSTA MEADOWS SEWER EXTENSION LA GOLONDRIA SEWER EXTENSION NORTH AGUA HEOIONDA INTERCEPTOR - WEST SEGMENT NORTH AGUA HEDIONDA TRUNK SEWER REACH NAHT1 A (SBA "B") NORTH BATIQUITOS INTERCEPTOR REHABILITATION POINSETTIA SEWAGE LIFT STATION ODOR/NOISE ABATEMENT SEWER LIFT STATION REMOVALS - VARIOUS SEWER LIFT STATION REPAIRS AND UPGRADES SEWER LINE REFURBISHMENTS/REPLACEMENT AND MANHOLES SEWER MASTER PLAN/CONNECTION FEE UPDATE SEWER MONITORING PROGRAM TERRAMAR LIFT STATION REPLACEMENT VISTA/CARLSBAD INTERCEPTOR BUENA VISTA LIFT STATION FORCE MAIN (VC-4) VISTA/CARLSBAD INTERCEPTOR AGUA HEDIONDA LIFT STATION (VC12) VISTA/CARLSBAD INTERCEPTOR REACH VC11B VISTA/CARLSBAD INTERCEPTOR REACH VC13 TO VC15 VISTACARLSBAD INTERCEPTOR REHAB REACHES 1 AND 2 VISTA/CARLSBAD INTERCEPTOR REPLACEMENT REACH 3 SUBTOTAL SEWER PROJECTS WATER DISTRIBUTION SYSTEM AVIARA PARKWAY AT PLUM TREE BUENA VISTA PUMP STATION IMPROVEMENTS (STUDY) CALAVERA HILLS WATER BOOSTER STATION STANDBY GENERATOR CANNON ROAD EAST OF EL CAMINO REAL - Relmb CARLSBAD BOULEVARD • SOUTH OF AVENIDA ENCINAS CATHODIC PROTECTION PROGRAM COLLEGE BOULEVARD - CANNON TO BADGER LANE COLLEGE BOULEVARD (ECR TO CANNON ROAD) - Relmb CRESTVIEW DRIVE TRANSMISSION MAIN D RESERVOIR DRAINAGE IMPROVEMENTS (STUDY) D RESERVOIR - PHASE I D RESERVOIR - PHASE II DEMOLITION OF WATER FACILITIES AT PAJAMA DRIVE DESALINATION GROUNDWATER/SEAWATER STUDY EL CAMINO REAL - PALOMAR AIRPORT ROAD SOUTH EL CAMINO REAL BETWEEN COLLEGE AND JACKSPAR EL CAMINO REAL CROSSING AT KELLY DRIVE EL CAMINO REAL TRANSMISSION MAIN FROM FARADAY TO COUGAR DRIVE EL CAMINO REAL/CARLSBAD VILL DR PIPELINE REPL. EL FUERTE - NORTH OF LOKER - (Relmb) EL FUERTE AND CORINTIA STREET ELLERY WATER PUMP PROJECT FARADAY AVENUE - ORION TO MELROSE WATERLINE - (Relmb) FARADAY AVENUE EXTENSION - Relmb GROUNDWATER DEVELOPMENT - SAN LUIS REY RIVER (STUDY) LAKE CALAVERA RESERVOIR IMPROVEMENTS MAERKLE DAM FLOATING COVER DRAINPIPE REPLACE. MAERKLE FACILITY IMPROVEMENTS MAERKLE PUMP STATION IMPROVEMENTS MAERKLE PUMP STATION IMPROVEMENTS MAERKLE RESERVOIR BRIDGE REPLACEMENT MAERKLE RESERVOIR STORAGE (TAP #2) MAERKLE TRANSMISSION MAIN MARRON ROAD • PRESSURE REGULATING STATION TO OCEANSIDE MASTER PLAN UPDATE MELROSE DRIVE - PALOMAR AIRPORT ROAD TO FARADAY - (Relmb) MISCELLANEOUS PIPELINE REPLACEMENT PROJECTS MISCELLANEOUS WATER RESERVOIR FENCING MISCELLANEOUS WATER VALVE REPAIRS/REPLACEMENTS OCEANSIOE INTERTIE UPGRADE PAR/ECR PUMP STATION PAR/ECR PUMP STATION POINSETTIA LANE - EL CAMINO REAL TO SKIMMER CT (Relmb) FUND SEWER REPL SEWER REPL SEWER REPL SEWER REPL SEWER REPL SEWER REPL SEWER REPL SEWER REPL SEWER REPL SEWER REPL SEWER CONN SEWER REPL SEWER CONN SEWER CONN SEWER CONN SEWER CONN SEWER REPL SEWER CONN WATER REPL WATER REPL WATER CONN WATER CONN WATER REPL WATER REPL WATER CONN WATER CONN WATER REPL WATER REPL WATER CONN WATER REPL WATER REPL WATER REPL WATER REPL WATER CONN WATER CONN WATER REPL WATER REPL WATER CONN WATER REPL WATER REPL WATER CONN WATER CONN WATER REPL WATER REPL WATER REPL WATER REPL WATER CONN WATER REPL WATER REPL WATER CONN WATER R6PL WATER CONN WATER CONN WATER CONN WATER REPL WATER REPL WATER REPL WATER REPL WATER CONN WATER REPL WATER CONN TOTAL BUDGET 1.146,877 1,108,543 4,177.751 1,737,000 1,199.000 669,500 689,000 1,360,380 5,974,600 500,000 352,000 517,000 3.350,000 17,400.000 6,430,000 14,700,000 830.975 2.688,220 114,253,016 475,700 100,000 485,200 760,800 917,200 1.246,700 1,086,000 530,000 155,800 135,000 6,410,100 2,136,600 95,500 744,400 3,225.000 971,275 725.000 774,100 269.975 250,000 181,700 205.900 887,210 776,000 55,000 6.646.908 200.000 1,870,200 771,325 771,325 328,750 14,244,500 4,875.000 767,200 500.000 1,475,000 1,876.700 197,399 250,000 114,600 997,350 990.350 125.700 PRIOR EXP/ENC 78,700 120.110 1,080.171 . 154,140 669.337 83 449,414 211,718 - . - 446,668 91,027 5,649 596,791 262,279 - 17,757,992 . - - - - . . . . . 57,498 - 2,340.294 970,678 725,000 180,602 267,112 44.819 11.739 5.962,344 196,156 135,923 44.322 24,833 3,698 - 256,409 37,177 - - 881,247 955,867 - BALANCE YEAR1 YEAR 2 YEARS YEAR 4 FORWARD 2008-2009 2009-2010 2010-2011 2011-2012 960.820 881.285 3,097.580 - 1,044.860 163 88,917 130,966 2,188,282 - 66,000 25,000 53,332 1,728.333 3.543,351 1,203,209 568,696 . 21,393,349 . 760,800 - 624.000 . - - . . . 38,002 . 884,706 597 - 593,498 2,883 148,750 . 161,081 85.471 - 684,564 3,844 1,734,277 54,425 10.103 3,917 - 491,302 - - 743,591 160,222 118,103 34,483 YEARS YEAR 6-10 2012-2013 2013-2018 BUILDOUT 2018-2023 107,357 107,148 767,000 970.000 600,000 80,000 100.000 100,000 100,000 330,000 330,000 330,000 330,000 100,000 300.000 330,000 1,650,000 274.600 500,000 22,000 22,000 22.000 22,000 22,000 110.000 66,000 492,000 2.850,000 1,400,000 14,180,640 616,000 2,265,000 800.000 12,100,000 596,220 2.092,000 13,926,827 33,788,199 4,914,158 5,054.530 3,005.089 11,051,299 3.361,573 475.700 100,000 54,100 431,100 917,200 475,800 146,900 1,066,000 530.000 32.500 123,300 135,000 6.410,100 2,136,600 744,400 101.250 161.700 790.000 776.000 55.000 716.900 716.900 300,000 14,244,500 4,380,000 767,200 500,000 1.475,000 433,000 443,700 125,000 125,000 114,600 125.700 PRELIMINARY CAPITAL IMPROVEMENT PROGRAM FISCAL YEAR 2008-09 TO BUILDOUT PROJECT TITLE POINSETTIA LANE - SKIMMER CT TO CASSIA POINSETTIA LANE - SKIMMER CT TO CASSIA POINSETTIA LANE EAST OF BLACK RAIL ROAD 12" POINSETTIA LANE EAST OF BLACK RAIL ROAD 12" PRESSURE REDUCING STATION REPLACEMENT RANCHO CARRILLO OVERSIZING/EXTENSION SAN MARCOS BOULEVARD WEST OF SDCWA TANGLEWOOD PRESSURE REDUCING STATION REPLACEMENT TRI-AGENCIES WATER TRANSMISSION PIPELINE REPLACEMENT WATER PIPELINE REPLACEMENT - CAMEO ROAD TO ECR WATER SYSTEM INTERTIE CONNECTION SUBTOTAL WATER DISTRIBUTION SYSTEM FUND WATER REPL WATER CONN WATER CONN WATER REPL WATER REPL WATER CONN WATER REPL WATER REPL WATER REPL WATER REPL WATER REPL TOTAL BUDGET 488.100 383,600 230,500 230,400 1,102,000 192,700 3,091,241 364,750 5,605,000 120,000 439,000 72,760,758 PRIOR EXP/ENC . - - - 1,999 3,052,765 350,851 114.527 . 34,774 16,650,634 BALANCE YEAR1 YEAR2 YEARS YEAR4 YEARS YEAR6-10 FORWARD 2008-2009 2009-2010 2010-2011 2011-2012 2012-2013 2013-2018 - . - 150,701 38,476 3,899 160.473 120.000 404,226 8.214,374 RECYCLED WATER PROJECTS CARLSBAD WATER RECYCLING FACILITY SCADA MODIFICATIONS CHESTNUT AVENUE RECYCLED WATER LINE ECRfTAMARACK PUMP STATION REMOVAL I-5 RECYCLED WATER TRANSMISSION LINE PUMP STATION REMOVAL RECYCLED WATER LINE - BUSINESS PARK AND SEA CLIFF HOA RECYCLED WATER LINE - INNOVATION WAYAND GATEWAY RECYCLED WATER PH II - MAHR RESERVOIR IMPROV. RECYCLED WATER PH II • PUMP STATIONS RECYCLED WATER MASTER PLAN UPDATE SUBTOTAL RECYCLED WATER PROJECTS WATER REPL WATER REPL WATER REPL WATER REPL WATER REPL RECL WATER RECL WATER RECL WATER RECL WATER WATER REPL 210.000 436,100 80,019 266,610 442,700 230,000 675,000 2.957,000 4.918.574 250,000 10.466,003 . . 911 - . 2,919,101 4.663,297 7.583,309 133,305 441.789 . 37,899 255,277 . 868,270 CIRCULATION SYSTEM TRAFFIC SIGNAL PROJECTS CLARY BATTERY BACKUP SYSTEMS TRAF SIG - ALGA ROAD AND CAZADERO TRAF SIG - ARMADA DRIVE AND GRAND PACIFIC RESORTS TRAF SIG - AVIARA PARKWAY-POINSETTIA LANE TO EL CAMINO REAL TRAF SIG - AVIARA PARKWAY-POINSETTIA LANE TO EL CAMINO REAL TRAF SIG - AVIARA PARKWAY-POINSETTIA LANE TO EL CAMINO REAL TRAF SIG - AVIARA PKWY AND CAMINO DE LAS ON DAS- REIMS TRAF SIG - CALLE BARCELONA AND PASEO AVELLANO TRAF SIG - CAMINO DE LOS COCHES AND LA COSTA AVENUE TRAF SIG - CAMINO VIDA ROBLE AND YARROW DRIVE TRAF SIG - CANNON ROAD AND AVENIDA ENCINAS-relm TRAF SIG - CANNON ROAD AND COLLEGE BOULEVARD TRAF SIG - CARLSBAD BLVD & TAMARACK SIGNAL REPAIRS TRAF SIG - CARLSBAD BOULEVARD AND CHERRY AVENUE TRAF SIG - EL CAMINO REAL AND CHESTNUT SIGNAL REPAIRS TRAF SIG - EL CAMINO REAL AND TAMARACK SIGNAL REPAIRS TRAF SIG - EL FUERTE ST AND RANCHO PANCHO TRAF SIG - FARADAY AVE. AND CAMINO HILLS DRIVE TRAF SIG - FARADAY AVENUE AND PALMER WAY TRAF SIG - FARADAY AVENUE AND RUTHERFORD ROAD TRAF SIG - LA COSTA AVENUE AND CALLE MADERO TRAF SIG - LA COSTA AVENUE AND ESFERA STREET TRAF SIG - LA COSTA AVENUE AND GIBRALTAR TRAF SIG - LA COSTA AVENUE AND LEVANTE TRAF SIG - LA COSTA AVENUE/NUEVA CASTILLA WAY TRAF SIG - MELROSE DRIVE AND LA COSTA AVENUE TRAF SIG - MONROE STREET AND HOSP WAY TRAF SIG - PASEO DEL NORTE /HARBOR POINT ROAD TRAF SIG - POINSETTIA LANE AND BLACKRAIL ROAD TRAF SIG - POINSETTIA LANE AND BRIGANTINE ROAD TRAF SIG - RANCHO SANTA FE ROAD AND AVENIDA LA CIMA TRAF SIG - RANCHO SANTA FE ROAD AND CALLE JUNIPERO TRAF SIG - RANCHO SANTA FE ROAD AND QUESTHAVEN ROAD TRAF SIG - TAMARACK AVE. AND PONTIAC DRIVE TRAF SIG - TAMARACK AVE. AND VALLEY STREET VIDEO DETECTION CONVERSION GAS TAX GAS TAX GAS TAX TIF OTHER GAS TAX GAS TAX GCC GAS TAX GAS TAX PFF GAS TAX IRF GAS TAX IRF IRF GAS TAX GAS TAX GAS TAX GAS TAX GAS TAX GAS TAX GAS TAX GAS TAX GAS TAX GAS TAX GAS TAX GAS TAX GCC GAS TAX GCC GAS TAX GAS TAX GAS TAX GAS TAX GAS TAX 120.000 210.000 190.000 29.969 645.447 160,000 105,000 210,000 190.000 190,000 150,000 210,000 230,000 190,000 206,000 141,000 190,000 190,000 190,000 210,000 190,000 190,000 190.000 210.000 190,000 190.000 210,000 210.000 236.991 190,000 190,000 210.000 124,767 210,000 190,000 1,850,000 120,000 . 10,474 335,447 . 4,389 - 185 - . . - . - - . - 222,745 - 4,280 - 3.954 259.500 . 19,495 287,202 160,000 105,000 205.611 - 149,815 . 230,000 206,000 141,000 1 210,000 - - 14.246 - 185,720 124.787 - - 324,500 BUILDOUT 2018-2023 489.100 383,600 230,500 230,400 1,102,000 330.000 5,000,000 10,989.250 6,809,800 759,300 16,262,700 123,300 12.184.200 767,200 210,000 436.100 80.019 133,305 230,000 675,000 250,000 1,385,000 438,100 80,019 133.305 210,000 190,000 42,798 : 190,000 190,000 210,000 190.000 190,000 190,000 190,000 190,000 190,000 190,000 210.000 190,000 190.000 210.000 210.000 190,000 210,000 206,046 190.000 277.000 247.000 307,000 300,000 135,000 PRELIMINARY CAPITAL IMPROVEMENT PROGRAM FISCAL YEAR 2008-09 TO BUILDOUT PROJECT TITLE SUBTOTAL TRAFFIC SIGNAL PROJECTS STREET PROJECTS, AVENIDA ENCINAS WIDENING - SOUTH OF PALOMAR AIRPORT ROAD BRIDGE PREVENTITIVE MAINTENANCE PLAN BRIDGE PREVENTITIVE MAINTENANCE PLAN CANNON ROAD REACH 4 (20% FUNDING) CANNON ROAD REACH 4B CARLSBAD BLVD BRIDGE CONCRETE BARRIER POWER PLANT CARLSBAD BLVD BRIDGE CONCRETE BARRIER POWER PLANT CARLSBAD BLVD BRIDGE CONCRETE BARRIER RAILROAD CARLSBAD BLVD. AT BREAKWATER ROAD - LEFT TURN LANE CARLSBAD BLVD. AT STATE ST - INTERSECTION ENHANCEMENT DESIGN CARLSBAD BOULEVARD ENCINAS CREEK BRIDGE REPLACEMENT CARLSBAD BOULEVARD ENCINAS CREEK BRIDGE REPLACEMENT CARLSBAD BOULEVARD ENCINAS CREEK BRIDGE REPLACEMENT CARLSBAD BOULEVARD ENCINAS CREEK BRIDGE REPLACEMENT (PLDA C) CARLSBAD BOULEVARD MEDIAN-TAMARACK AVENUE TO PINE AVENUE CARLSBAD BOULEVARD MOUNTAIN VIEW TO NORTHERLY CITY LIMITS (20% FUNDINC CARLSBAD BOULEVARD / PALOMAR AIRPORT ROAD (20% FUNDING) CARLSBAD BOULEVARD / PALOMAR AIRPORT ROAD (RTCIP 1 20% FUNDING) CARLSBAD BOULEVARD RETROFIT OVER SDNR CARLSBAD BOULEVARD WIDENING - CANNON TO MANZANO CARLSBAD VILLAGE DRIVE AND AVENIDA DE ANITA CARLSBAD VILLAGE DRIVE - PONTIAC TO VICTORIA COLLEGE BLVD REACH A AND CANNON REACH 4A COLLEGE/CANNON ASSESSMENT DISTRICT CONCRETE REPAIR PROGRAM CONCRETE REPAIR PROGRAM CONCRETE REPAIR WORK CONCRETE REPLACEMENT EL CAMINO REAL AND CARLSBAD VILLAGE DRIVE DUAL LEFT TURNS EL CAMINO REAL LEFT TURN LANE TO WEST TAMARACK EL CAMINO REAL RIGHT TURN LANE TO NORTH ALGA ROAD EL CAMINO REAL /CANNON ROAD INTERCHANGE IMPROVEMENTS EL CAMINO REAL / CANNON ROAD INTERCHANGE IMPROVEMENTS (RTCIP) EL CAMINO REAL MEDIANS EL CAMINO REAL MEDIANS EL CAMINO REAL MEDIANS - LA COSTA EL CAMINO REAL WIDENING - ARENAL ROAD TO LA COSTA AVENEUE (RTCIP) EL CAMINO REAL WIDENING • ARENAL ROAD TO LA COSTA AVENEUE EL CAMINO REAL WIDENING - CASSIA RD TO CAMINO VIDA ROBLE EL CAMINO REAL WIDENING - LISA STREET TO CRESTVIEW DR EL CAMINO REAL WIDENING - NORTH OF COUGAR DRIVE EL CAMINO REAL WIDENING • TAMARACK TO CHESTNUT EL CAMINO REAL WIDENING • TAMARACK TO CHESTNUT (RTCIP) EL FUERTE EXTENSION FARADAY AVENUE EXTENSION 1-5 AND LA COSTA AVENUE AUXILLARY LANES LA COSTA AVE SLOPE REPAIR WEST OF ROMERIA MARBELLA WALL BEAUTIFICATION MELROSE DRIVE • SOUTH OF PALOMAR AIRPORT ROAD MELROSE DRIVE AND ALGA ROAD DUAL LEFT TURN LANES (RTCIP) MELROSE DRIVE EXTENSION MELROSE DRIVE EXTENSION MELROSE DRIVE TURN LANE TO WEST PALOMAR AIRPORT ROAD PALOMAR AIRPORT ROAD AND COLLEGE BOULEVARD PALOMAR AIRPORT ROAD AND MELROSE DRIVE RIGHT TURN PALOMAR AIRPORT ROAD AND MELROSE DRIVE RIGHT TURN PALOMAR AIRPORT ROAD TURN LANE TO SOUTH EL CAMINO REAL PALOMAR AIRPORT ROAD TURN LANE TO NORTH EL FUERTE STREET PALOMAR AIRPORT ROAD TURN LANE TO SOUTH MELROSE DRIVE PALOMAR AIRPORT ROAD WIDENING AT MELROSE DRIVE PALOMAR AIRPORT ROAD WIDENING AT PASEO DEL NORTE FUND TIF FED GRNT GAS TAX TIF TRANSNET-HWY GCC GAS TAX GCC REOVL SCCRDA REDVL VILLAGE REDVL SCCRDA FED GRNT TRANSNET-LOC PLD GAS TAX TIF TIF TIF TRANSNET-LOC TIF GCC TIF OTHER OTHER GCC GAS TAX GAS TAX IRF TIF TIF TIF TIF TIF PFF GAS TAX PFF TIF TIF GAS TAX TRANSNET-LOC TRANSNET-LOC TIF TIF OTHER OTHER CFD»1 GAS TAX GCC OTHER TIF OTHER OTHER TIF TIF OTHER GAS TAX TIF TIF TIF OTHER TIF TOTAL BUDGET 8,739,174 5,045.000 88,530 21.470 5,400,000 1,761,000 420,000 880,000 277,000 243,150 100,000 339,135 1.964,702 254.548 1,891,582 2,112,500 2.541.200 712,400 2,815.000 1.734,000 5,360,000 105,000 4,841.000 1,713.002 10,314,481 250,000 3.500,000 750,000 1,243,350 865,000 253,000 335,000 1,231,000 974,000 909,500 1,502,900 90,500 601,000 1.704,000 4,026,000 959,000 493,000 7,656,000 422,000 4,095,146 16.248.065 2.000.000 183,500 160,000 228,938 946,000 1,525.584 3.477,792 410,000 587,000 165.980 88,500 588.000 918,000 88.500 2,826,268 1,244,000 PRIOR EXP/ENC 960,974 205.743 88,530 9,453 797,834 12,000 . 12,000 243,000 94,181 297,682 38,568 297,682 . 1,476,949 . 2,940 407,149 9.957,983 131,197 - - 1,108,475 144,030 - 251,742 893,296 39,723 13,549,975 . 37.691 2,221 1,024,473 3,426,384 - 980 9,500 2,622,919 67,600 BALANCE YEAR1 YEAR 2 YEARS YEAR 4 YEARS YEAR 6-10 BUILDOUT •FORWARD 2008-2009 2009-2010 2010-2011 2011-2012 2012-2013 2013-2018 2018-2023 2,343.356 | 252,798 467,000 1,387,000 497,000 700.000 1,751.046 380.000 19.257 - 12.017 963.166 408,000 - 265,000 150 100,000 244,954 42,051 102,060 - 1,305,853 356,498 118,803 250.000 450,000 134,875 - - 765,470 - 90,500 - - 241,258 ' ••• 1,0f1.504 *' ' : 4,055,423 2,698.090 - 42,309 226,717 - 501,111 51,408 - 165,000 55,500 203,349 457,400 2,380,000 2.440,000 5.400,000 880,000 1,667,020 215,980 1,593,900 2.112,500 2,541.200 712,400 2,815,000 215,000 5,360,000 4,841,000 250,000 250,000 250,000 250,000 250,000 1,250,000 750,000 100.000 100,000 100,000 ; 885.000 253.000 335.000 300,000 931,000 974,000 1,502,900 601,000 1.704,000 4,026,000 959,000 5,751,200 422,000 2,000,000 183,500 80,000 946,000 410,000 587.000 23,500 568,000 916,000 68,500 719,000 PRELIMINARY CAPITAL IMPROVEMENT PROGRAM FISCAL YEAR 2008-09 TO BUILDOUT PROJECT TITLE PARK DRIVE, MARINA TO COVE PAVEMENT MANAGEMENT PROGRAM PAVEMENT MANAGEMENT PROGRAM (PROP 1B Funds) PAVEMENT MANAGEMENT PROGRAM PAVEMENT MANAGEMENT PROGRAM (NON-JURIS FEES) POINSETTPA LANE - REACH E POINSETTIA LANE - REACHES A,B,C,F,G & AVIARA PKWY REIMS POINSETTIA LANE EAST OF EL CAMINO REAL FINANCING PROGRAM POINSETTIA LANE WIDENING - PASEO DEL NORTE TO BATIQUITOS (RTCIP) RANCHO SANTA FE ROAD AND OLIVENHAIN IMPROVEMENTS RANCHO SANTA FE ROAD NORTH - PHASE I RANCHO SANTA FE ROAD NORTH - PHASE II (BRIDGE) SAN MARCOS ROAD PROJECT SIDEWALK/STREET CONSTRUCTION - VARIOUS LOCATIONS SIDEWALK/STREET CONSTRUCTION • VALLEY AND MAGNOLIA SIDEWALKS TAMARACK AND ADAMS TRAFFIC MONITORING PROGRAM UNDERGROUND DIST. 17 - HARDING, ROOSEVELT VILLAGE STREETSCAPE IMPROVEMENTS SUBTOTAL STREETS PROJECTS FUND GAS TAX TRANSNET-LOC OTHER GAS TAX TRANSNET-LOC BTD#2 • BTD#2 OTHER TIF RSF ROAD RSF ROAD RSF ROAD GCC TIF TIF GAS TAX TIF GCC REDVL VILLAGE TOTAL BUDGET 416,300 63,743,156 3,167,193 7,994,088 12,837,802 13,090,000 1,320,729 28,932.793 2,287,000 5,985.905 26.406.243 18,641.000 2,984,147 3,295.672 630.000 48.500 1.718.900 509.800 275,000 308,743,451 PRIOR EXP/ENC . 21,033,239 - 7,993,938 1,928,802 698 . 24,216,684 4,799.003 26,307,828 18,202,471 2,929,760 . 29,945 . 142,358 96.122 272,979 145,205,727 BALANCE YEAR1 YEAR 2 YEAR 3 YEAR 4 YEARS YEAR 6-10 BUILOOUT FORWARD 2008-2009 2009-2010 2010-2011 2011-2012 2012-2013 2013-2018 2018-2023 . .•. 288,110 - 150 - 349,302 - 4,716.109 - 1,186,902 98,415 438,529 54,387 1.395.672 60.055 48.500 120,386 413,678 2,021 24,507,939 LOANS TO OTHER FUNDS GAS TAX LOAN BTD#2 GAS TAX LOAN TO BTD*3 CANNON ROAD WEST , GCC LOAN TO PIL-NW FOR MADISON ST PROPERTY PURCHASES GCC LOAN TO PIL-NW FOR PINE SCHOOL ACQUISITION PFF LOAN TO PIL-NE FOR PARK SITE ACQUISITION GCC LOAN TO PLDA - HEDIONDA AND CALAVERA CREEK SEWER REPL TO SEW BENEF A FOR CARLSBAD TRUNK SEWER SUBTOTAL FUTURE LOANS TO OTHER FUNDS GAS TAX GAS TAX GCC GCC PFF GCC SEWER REPL 2,643,344 1,000,000 320.000 860.000 4,550,000 420.021 3,270,000 13,063.365 2,643,344 1,000,000 320,000 860,000 4,550,000 420,021 3,270,000 13.083,365 - LOAN REPAYMENTS BTD#2 REPAYMENT TO GAS TAX FUND BTD#3 CANNON ROAD WEST TO GAS TAX FUND GCC LOAN TO PLDA - HEDIONDA AND CALAVERA CREEK PIL-NW TO GCC FOR MADISON ST PROPERTY PURCHASES PIL-NW TO GCC FOR PINE SCHOOL ACQUISITION PIL-NE TO PFF FOR PARK ACQUISITION SBA C,D,E,F TO SEW REPL FOR S AGUA HEDIONDA INTERCEPTOR SUBTOTAL LOAN REPAYMENTS GRAND TOTAL ALL FUNDED PROJECTS UNFUNDED PROJECTS* BUSINESS PARK RECREATIONAL FACILITY (PARTIAL FUNDING) CANNON LAKE PARK (6.7 ACRES) CANNON ROAD REACH 4 (20% FUNDED) CARLSBAD BOULEVARD MOUNTAIN VIEW TO NORTHERLY CITY LIMITS (20% FUNDED) CARLSBAD BOULEVARD / PALOMAR AIRPORT ROAD (20% FUNDED) HOSP GROVBBUENA VISTA LAGOON REC1 IMPROVEMENTS PALOMAR AIRPORT ROAD WIDENING AND BRIDGE RECONSTRUCTION PINE AVENUE PARK - MADISION PROPERTY PINE AVENUE PARK- RESTROOM/STORAGE BLDG. ROBERTSON RANCH PARK DEVELOPMENT (PARTIAL FUNDING) TOTAL UNFUNDED PROJECTS BTD#2 BTD*3 PLD PIL-NW PIL-NW PIL-NE SEW BENEF 2.643,344 1.000,000 420,021 320,000 860,000 4,550.000 3,270.000 13.063.365 884,919,881 7,100,000 2,243.000 21,600.000 10,184,800 14,109,600 1,280,000 10,500,000 1,900,000 372,900 6,500,000 75,770.300 289,558,486 - 144,519,802 416,300 2,650.000 1,118,083 1,300,744 2.925,000 3,000.000 15.065,000 16.365,000 1,629.937 1,537,256 750,000 752,000 762.000 775.000 800.000 3,935.000 3.135,000 1.600,000 11,140.000 1.320,729 2,287,000 100,000 300,000 300,000 300,000 180,000 720,000 540.000 112,156 96,000 96,000 98,000 96,000 480,000 480,000 15,536,756 13,556,000 7,077,300 5,946,000 15,466,000 28.879.000 52.568.729 - I 2.643,344 1,000,000 420,021 320,000 860,000 4.550,000 3,270,000 8,513,365 - ' - - . . 4,550,000 58,839,891 57,777,872 48,765,375 29,078,363 47,487.729 73,564,745 135.329,618 CITY OF CARLSBAD CAPITAL FUNDS PROJECTED FUND BALANCES FOR FY 2007-2008 FUND BTD#2 - POINSETTIA LANE/AVIARA PKWY BTD#3 - CANNON ROAD WEST CFD#1 -CITYWIDE GAS TAX GENERAL CAPITAL CONST. GOLF COURSE GRANTS - FEDERAL GRANTS - STATE INFRASTRUCTURE REPLACEMENT OTHER PARK FEE ZONES 5,13,16 PARK-IN-LIEU NE PARK-IN-LIEU NW PARK-IN-LIEU SE PARK-IN-LIEU SW PLANNED LOCAL DRAIN'G PUBLIC FACILITIES FEE RANCHO SANTA FE ROAD PROJECT REDEVELOPMENT VILLAGE REDEVELOPMENT SCCRDA SEWER BENEFIT AREAS SEWER CONNECTION SEWER REPLACEMENT TDA TRAFFIC IMPACT FEE TRANSNET/BIKE TRANSNET/HIGHWAY TRANSNET/LOCAL TRANSPORTATION FUNDING WATER - MAJOR FACILITY WATER - RECYCLED WATER WATER - REPLACEMENT TOTAL JULY 1,2007 UNRESERVED BALANCE 9,762,023 996,313 54,030,463 5,711,378 46,089,916 5,106,076 (6,973) 0 28,755,856 18,149,949 1,673,548 4,505,469 870,225 982,208 1,036,181 10,357,833 46,757,835 13,112,003 989,184 324,496 5,025,229 26,921,846 22,984,519 95,710 11,555,584 63,218 1,233,441 6,364,996 318,840 18,400,924 1,290,091 34,802,449 378,260,830 ESTIMATED REVENUES 551,910 210,928 5,338,551 1,826,050 10,665,557 3,229,295 555,358 0 9,626,913 16,446,107 329,896 497,654 257,954 105,317 78,673 341,663 7,001,400 7,793,976 715,000 250,000 671,398 1,895,213 6,485,131 3,255 1,284,449 82,903 57,519 3,677,000 14,633 2,127,879 0 19,484,723 101,606,306 ESTIMATED EXPENDITURES 0 0 3,443,912 1,988,885 4,547,016 7,909,257 333,816 0 334,010 16,053,583 0 282 0 0 558,811 452,198 6,815,176 5,325,970 841,341 73,082 15,035 3,340,815 1,657,133 95,248 797,951 37,509 854 2,900,277 0 638,027 86,461 6,581,512 64,828,161 ESTIMATED DEBT SERVICE LOANS & OTHER 0 37,808 284,942 277,698 0 166,103 0 0 0 464,488 0 0 0 0 0 988,805 7,100,000 7,317 0 0 2,000,000 1,675,240 350,600 0 0 0 2,301 35,843 223,464 0 0 0 13,614,609 JUNE 30, 2008 PROJECTED BALANCE 10,313,933 1,169,433 55,640,160 5,270,845 52,208,457 260,011 214,569 0 38,048,759 18,077,985 2,003,444 5,002,841 1,128,179 1,087,525 556,043 9,258,493 39,844,059 15,572,692 862,843 501,414 3,681,592 23,801,004 27,461,917 3,717 12,042,082 108,612 1,287,805 7,105,876 110,009 19,890,776 1,203,630 47,705,660 401,424,366 I-26 CITY OF CARLSBAD CAPITAL FUNDS PROJECTED FUND BALANCES FOR FY 2008-2009 FUND BTDS2 - POINSETTIA LANE/AVIARA PKV\A BTD#3 - CANNON ROAD WEST CFD#1 -CITYWIDE GAS TAX GENERAL CAPITAL CONST. GOLF COURSE GRANTS - FEDERAL GRANTS - STATE INFRASTRUCTURE REPLACEMENT OTHER PARK FEE ZONES 5,13,16 PARK-IN-LIEU NE PARK-IN-LIEU NW PARK-IN-LIEU SE PARK-IN-LIEU SW PLANNED LOCAL DRAIN'G PUBLIC FACILITIES FEE RANCHO SANTA FE ROAD PROJECT REDEVELOPMENT VILLAGE REDEVELOPMENT SCCRDA SEWER BENEFIT AREAS SEWER CONNECTION SEWER REPLACEMENT TDA TRAFFIC IMPACT FEE TRANSNET/BIKE TRANSNET/HIGHWAY TRANSNET/LOCAL TRANSPORTATION FUNDING WATER - MAJOR FACILITY WATER - RECYCLED WATER WATER - REPLACEMENT TOTAL JULY 1,2008 PROJECTED BALANCE 10,313,933 1,169,433 55,640,160 5,270,845 52,208,457 260,011 214,569 0 38,048,759 18,077,985 2,003,444 5,002,841 1,128,179 1,087,525 556,043 9,258,493 39,844,059 15,572,692 862,843 501,414 3,681,592 23,801,004 27,461,917 3,717 12,042,082 108,612 1,287,805 7,105,876 110,009 19,890,776 1,203,630 47,705,660 401,424,366 ESTIMATED REVENUES 167,310 67,500 1,653,013 5,264,027 1,797,021 0 1,973,742 0 8,220,000 0 41,612 384,898 149,905 37,421 122,953 245,166 1,263,513 0 100,000 0 289,167 327,295 6,910,289 0 531,007 0 0 4,110,529 975,000 992,284 0 4,705,445 40,329,097 06/30/2008 CONTINUING APPROPR. 349,302 0 1,645,972 2,214,727 49,233,262 260,011 521,291 0 2,725,350 14,549,039 0 4,209,518 0 20,550 219,100 2,711,514 28,285,160 1,723,846 426,533 245,104 0 10,413,902 10,979,447 0 3,083,769 87,176 963,166 569,419 0 1,316,847 293,176 7,472,621 144,519,802 07/01/2008 NEW APPROPR. 2,643,344 1,000,000 110,000 1,586,055 5,269,205 0 0 0 988,000 42,798 0 0 1,180,000 246,450 0 2,013,921 903,185 0 0 0 3,270,000 6,625,170 7,301,657 0 9,690,856 0 0 3,615,000 0 4,462,250 905,000 6,987,000 58,839,891 2008-2009 TOTAL CIP APPROPR. 2,992,646 1,000,000 1,755,972 3,800,782 54,502,467 260,011 521,291 0 3,713,350 14,591,837 0 4,209,518 1,180,000 267,000 219,100 4,725,435 29,188,345 1.723,846 426,533 245,104 3,270,000 17,039,072 18,281,104 0 12,774,625 87,176 963,166 4,184,419 0 5,779,097 1,198,176 14,459,621 203,359,693 JUNE 30, 2009 PROJECTED BALANCE 7,488,597 236,933 55,537,201 6,734,090 (496,989) 0 1,667,020 0 42,555,409 3,486,148 2,045,056 1,178,221 98,085 857,945 459,896 4,778,223 11,919,227 13,848,846 536,310 256,310 700,759 7,089,228 16,091,102 3,717 (201,536) 21,436 324,639 7,031,986 1,085,009 15,103,963 5,454 37,951,484 238,393,770 I-26 CITY OF CARLSBAD CAPITAL FUNDS REVENUES ACTUAL AND ESTIMATED FUND BTD#2 - POINSETTIA LANE/AVIARA PKWY BTD#3 - CANNON ROAD WEST CFD#1 -CITYWIDE GAS TAX GENERAL CAPITAL CONST. GOLF COURSE GRANTS - FEDERAL GRANTS - STATE INFRASTRUCTURE REPLACEMENT OTHER PARK FEE ZONES 5,13,16 PARK-IN-LIEU NE PARK-IN-LIEU NW PARK-IN-LIEU SE PARK-IN-LIEU SW PLANNED LOCAL DRAIN'G PUBLIC FACILITIES FEE RANCHO SANTA FE ROAD PROJECT REDEVELOPMENT VILLAGE REDEVELOPMENT SCCRDA SEWER BENEFIT AREAS SEWER CONNECTION SEWER REPLACEMENT TDA TRAFFIC IMPACT FEE TRANSNET/BIKE TRANSNET/HIGHWAY TRANSNET/LOCAL TRANSPORTATION FUNDING WATER - MAJOR FACILITY WATER - RECYCLED WATER WATER - REPLACEMENT TOTAL CAPITAL FUNDS 2004-2005 ACTUAL REVENUE 1,998,341 44,911 7,100,722 1,955,691 2,459,316 354,593 667,538 1,852 4,405,430 29,398,816 99,420 48,251 50,048 1,186,959 462,471 1,711,440 10,023,947 5,191,343 1,445,277 584,004 801,202 2,416,264 1,641,162 5,325 2,014,264 2,797 47,046 2,873,656 8,576 5,164,198 4,678,829 1,393,946 90,237,635 2005-2006 ACTUAL REVENUE 1.376,967 94,297 4,595,150 1,974,975 2,699,589 33,308,251 1,127,704 429,683 4,787,770 14,888,674 303,004 216,055 577,594 342,046 180,662 974,397 7,177,940 5,393,508 1,058,550 74,118 362,151 1,672,308 5,271,251 136,933 1,407,742 65,859 28,618 2,320,925 6,935 3,386,838 10,878,643 5,495,772 112,614,909 2006-2007 ACTUAL REVENUE 1,464,639 294,705 5,211,545 2,081,059 4,267,485 10,081,550 174,071 713,518 8,638,352 1,312,538 475,682 (156,828) 168,477 185,155 213,446 1,191,821 7,127,851 4,927,526 1,102,804 402,109 844,640 2,647,425 4,747,787 100,462 1,902,317 17,175 64,774 5,249,511 16,615 2,717,428 6,310,853 3,937,486 78,433,978 2007-2008 ESTIMATED REVENUE 551,910 210,928 5,338,551 1,826,050 10,665,557 3,229,295 555,358 0 9,626,913 16,446,107 329,896 497,654 257,954 105,317 78,673 341,663 7,001,400 7,793,976 715,000 250,000 671,398 1,895,213 6,485,131 3,255 1,284,449 82,903 57,519 3,677,000 14,633 2,127,879 0 19,484,723 101.606,306 2008-2009 ESTIMATED REVENUE 167,310 67,500 1,653,013 5,264,027 1,797,021 0 1,973,742 0 8,220.000 0 41,612 384,898 149,905 37,421 122,953 245,166 1,263,513 0 100,000 0 289,167 327,295 6,910,289 0 531,007 0 0 4,110,529 975,000 992,284 0 4,705,445 40,329,097 Note: Revenues include interfund loans and transfers in. I-26 CAPITAL FUNDS BUDGET EXPENDITURE SCHEDULE FUND BTD#2 - POINSETTIA LANBAVIARA PKWA BTD#3 - CANNON ROAD WEST CFD#1 -CITYWIDE GAS TAX GENERAL CAPITAL CONST. GOLF COURSE GRANTS - FEDERAL GRANTS - STATE INFRASTRUCTURE REPLACEMENT OTHER PARK FEE ZONES 5,13,16 PARK-IN-LIEU NE PARK-IN-LIEU NW PARK-IN-LIEU SE PARK-IN-LIEU SW PLANNED LOCAL DRAIN'G PUBLIC FACILITIES FEE RANCHO SANTA FE ROAD PROJECT REDEVELOPMENT VILLAGE REDEVELOPMENT SCCRDA SEWER BENEFIT AREAS SEWER CONNECTION SEWER REPLACEMENT TDA TRAFFIC IMPACT FEE TRANSNET/BIKE TRANSNET/HIGHWAY TRANSNET/LOCAL TRANSPORTATION FUNDING WATER - MAJOR FACILITY WATER - RECYCLED WATER WATER - REPLACEMENT TOTAL CAPITAL FUNDS 2005-2006 ACTUAL 116 20,312 188,281 2,735,687 2,650,728 26,426,592 1,475,430 445,294 1,459,679 19,972,734 0 216,470 0 0 0 1,230,192 7,653,585 7,944,216 24,576 225,217 629,637 1,244,997 3,927,937 136,933 509,411 32,720 76,019 4,668,118 4,905 501,035 10,004,001 3,347,918 97,752,740 2006-2007 ACTUAL 0 441,205 1,061,255 3,069,941 2,709,462 24,610,889 (166,682) 728,123 1,786,327 10,185,739 0 689,594 462,876 0 0 467,751 1,422,530 2,735,145 264,594 17,631 5,831 4,739,333 3,836,803 4,751 1,463,883 181,337 16,035 3,830,558 - 2,243,730 2,857,408 2,810,850 72,476,899 2007-2008 ESTIMATED 0 37,808 3,728,854 2,266,583 4,547,016 8,075,360 333,816 0 334,010 16,518,071 0 282 0 0 558,811 1,441,003 13,915,176 5,333,287 841,341 73,082 2,015,035 5,016,055 2,007,733 95,248 797,951 37,509 3,155 2,936,120 223,464 638,027 86,461 6,581,512 78,442,770 2007-2008 CONTINUING APPROPR. 349,302 0 1,645,972 2,214,727 49,233,262 260,011 521,291 0 2,725,350 14,549,039 0 4,209,518 0 20,550 219,100 2,711,514 28,285,160 1,723,846 426,533 245,104 0 10,413,902 10,979,447 0 3,083,769 87,176 963,166 569,419 0 1,316,847 293,176 7,472,621 144,519,802 2008-2009 NEW APPROPR. 2,643,344 1,000,000 110,000 1,586,055 5,269,205 0 0 0 988,000 42,798 0 0 1,180,000 246,450 0 2,013,921 903,185 0 0 0 3,270,000 6,625,170 7,301,657 0 9,690,856 0 0 3,615,000 0 4,462,250 905,000 6,987,000 58,839,891 2008-2009 TOTAL CIP APPROPR. 2,992,646 1,000,000 1,755,972 3,800,782 54,502,467 260,011 521,291 0 3,713,350 14,591,837 0 4,209,518 1,180,000 267,000 219,100 4,725,435 29,188,345 1,723,846 426,533 245,104 3,270,000 17,039,072 18,281,104 0 12,774,625 87,176 963,166 4,184,419 0 5,779,097 1,198,176 14,459,621 203,359,693 I-26 CAPITAL IMPROVEMENT PROGRAM FUND SUMMARY BTD NO. 2 AVIARA PARKWAY - POINSETT1A LANE BEGINNING FUND BALANCE (1) REVENUES DEVELOPER FEES/FEDERAL GRANT TOTAL REVENUES CAPITAL PROJECTS POINSETTIA LANE - REACH E POINSETTIA LANE - REACHES A,B,C,F,G & AVIARA PKWY REIMB BTD#2 REPAYMENT TO GAS TAX FUND TOTAL PROJECT EXPENDITURES ENDING FUND BALANCE PRIOR YEARS N/A N/A 350,000 350,000 N/A YEAR1 2008-2009 9,964,631 167,310 167,310 2,643,314 2,643,344 7,488,597 YEAR 2 2009-2010 7,488,597 167,310 167,310 7,655,907 YEAR 3 2010-2011 7,655,907 2,162,770 2,162,770 9,818,677 YEAR 4 2011-2012 9,818,677 152,100 152,100 1,600,000 1,600,000 8,370,777 YEARS 2012-2013 8,370,777 882,180 882,180 11,140,000 11,140,000 (1,887,043) BUILDOUT 2013++ (1,887,043) 9,434,582 9/434,582 1,320,729 1,320,729 6,226,810 BTD NO. 3 CANNON ROAD WEST PRIOR YEARS BEGINNING FUND BALANCE (1) N/A REVENUES DEVELOPER FEES TOTAL REVENUES N/A CAPITAL PROJECTS BTD#3 CANNON ROAD WEST TO GAS TAX FUND TOTAL PROJECT EXPENDITURES ENDING FUND BALANCE N/A YEAR1 2008-2009 1,169,433 67,500 67,500 1,000,000 1,000,000 236,933 YEAR 2 2009-2010 236,933 73,445 73,445 310,378 YEAR 3 2010-2011 310,378 73,445 73,445 383,823 YEAR 4 2011-2012 383,823 107,662 107,662 491,485 YEARS 2012-2013 491,485 96,017 96,017 587,502 BUILDOUT 2013++ 587,502 3,238,944 3,238,944 3,826,446 COMMUNITY FACILITIES DISTRICT NO. 1 (CFD 1) BEGINNING FUND BALANCE (1) REVENUES DEVELOPER SPECIAL TAXES TOTAL REVENUES CAPITAL PROJECTS CFO#1 ADMINISTRATION CMC CENTER I-5 AND LA COSTA AVENUE AUXILLARY LANES LIBRARY EXPANSION (COLE) LIBRARY EXPANSION (LEARNING CENTER) PUBLIC WORKS CENTER VETERAN'S MEMORIAL PARK TOTAL PROJECT EXPENDITURES ENDING FUND BALANCE PRIOR YEARS N/A N/A 204387 4,491,837 2,708,266 7,404,490 N/A YEAR1 2008-2009 53,994,188 1,653,013 1,653,013 110,000 110,000 55,537,201 YEAR2 2009-2010 55,537,201 2,166,018 2,166,018 110,000 110,000 57,593,219 YEAR 3 2010-2011 57,593,219 2,688,518 2,688,518 110,000 14,372,100 14,482,100 45,799,637 YEAR 4 2011-2012 45,799,637 2,563,238 2,563,238 110,000 110,000 48,252,875 YEARS 2012-2013 48,252^75 2,396,616 2,396,616 110,000 26,100,000 26,210,000 24,439,491 BUILDOUT 2013++ 24,439,491 18,866,461 18,866,461 330,000 2,000,000 4,580,016 23,239,800 30,149,816 13,156,137 (1) Equal to projected fund balance less any continuing appropriations. CAPITAL IMPROVEMENT PROGRAM FUND SUMMARY GAS TAX FUND BEGINNING FUND BALANCE (1) REVENUES GAS TAXES LOAN REPAYMENTS TOTAL REVENUES CAPITAL PROJECTS BRIDGE PREVENTITIVE MAINTENANCE PLAN CALLE GAVANZO DRAINAGE CARLSBAD BLVD BRIDGE CONCRETE BARRIER POWER PLANT CARLSBAD BOULEVARD MEDIAN-TAMARACK TO PINE AVENUE CLARY BATTERY BACKUP SYSTEMS CONCRETE REPAIR PROGRAM CONCRETE REPAIR WORK EL CAMINO REAL MEDIANS EL CAMINO REAL WIDENING - CASSIA TO CAMINO VIDA ROBLE GAS TAX LOAN BTD« GAS TAX LOAN TO BTD#3 CANNON ROAD WEST LA COSTA AVE SLOPE REPAIR WEST OF ROMERIA MISCELLANEOUS ROAD SUBDRAINS NW QUADRANT STORM DRAIN IMPROVEMENT PROGRAM PALOMAR AIRPORT ROAD AND MELROSE DRIVE RIGHT TURN PARK DRIVE. MARINA TO COVE PAVEMENT MANAGEMENT PROGRAM ROMERIA DRAINAGE IMPROVEMENTS TAMARACK AND ADAMS TRAP SIG - ALGA ROAD AND CA2ADERO TRAP SIG - ARMADA DRIVE AND GRAND PACIFIC RESORTS TRAF SIG - AVIARA PKWY-POINSETTIA LANE TO EL CAMINO REAL TRAP SIG - AVIARA PKWY AND CAMINO DE LAS ONDAS- REIMS TRAF SIG - CAMINO DE LOS COCHES AND LA COSTA AVENUE TRAF SIG - CAMINO VIDA ROBLE AND YARROW DRIVE TRAF SIG - CANNON ROAD AND COLLEGE BOULEVARD TRAF SIG - CARLSBAD BOULEVARD AND CHERRY AVENUE TRAF SIG - EL FUERTE ST AND RANCHO PANCHO TRAF SIG - FARADAY AVE. AND CAMINO HILLS DRIVE TRAF SIG - FARADAY AVENUE AND PALMER WAY TRAF SIG - LA COSTA AVENUE AND CALLE MADERO TRAF SIG - LA COSTA AVENUE AND ESFERA STREET TRAF SIG - LA COSTA AVENUE AND GIBRALTAR TRAF SIG - LA COSTA AVENUE AND LEVANTE TRAF SIG - LA COSTA AVENUE/NUEVA CASTILLA WAY TRAF SIG - MELROSE DRIVE AND LA COSTA AVENUE TRAF SIG - MONROE STREET AND HOSP WAY TRAF SIG - PASEO DEL NORTE /HARBOR POINT ROAD TRAF SIG - POINSETTIA LANE AND BRIGANTINE ROAD TRAF SIG - RANCHO SANTA FE ROAD AND CALLE JUNIPERO TRAF SIG - RANCHO SANTA FE ROAD AND QUESTHAVEN ROAD TRAF SIG - TAMARACK AVE. AND PONTIAC DRIVE TRAF SIG - TAMARACK AVE. AND VALLEY STREET VIDEO DETECTION CONVERSION TOTAL PROJECT EXPENDITURES ENDING FUND BALANCE PRIOR YEARS N/A N/A 21,470 12,531 - - 120,000 250,000 450,000 - - 2,643,344 1,000,000 - 485,000 - 65,000 - 7,994,088 - 48,500 - - 160,000 105,000 - - - - - - - - - - - - - - . 124,767 3,954 - 584,000 14,277,654 N/A YEAR1 2008-2009 3,056,118 1,620,683 3,643,344 5,264,027 - - - - - 250,000 100,000 - - - - 183,500 75,000 406,055 23,500 - - 338,000 - - - - - - - - - - - - - - - - - - - 210,000 - - - - • - 1,586,055 6,734,090 YEAR 2 2009-2010 6,734,090 1,669,304 - 1,669,304 - - 880,000 - - 250,000 100,000 - 4,026,000 - - - - 397,573 - - - - - - - - - • - - - - 190,000 - - - - - - - - - - - 277,000 6,120,573 2,282,821 YEAR 3 YEAR 4 2010-2011 2011-2012 2,282,821 1,433,006 1,719,383 1,770,964 - 1,719,383 1,770,964 - - - - - 250,000 250,000 100,000 - - - - - - 415,898 694,228 - 416,300 - - - - - - - ., - - 190,000 190,000 190,000 - 190,000 190,000 190,000 - 190,000 - - - - - - - - 247,000 307,000 2,569,198 1,441,228 1,433,006 1,762,743 YEARS 2012-2013 1,762,743 1,824,093 - 1,824,093 - - - - - 250,000 - - - - - - - 948,340 - - - - - - - - 190,000 - - - - - - - - 210,000 - - - - - - - - 300,000 1,898,340 1,688,496 BUILDOUT 2013++ 1,688,496 21,538,522 . 21,538,522 - - - 2,112,500 - 2,000,000 - 1,502,900 - - - - - - - - - - - 210,000 190,000 - - 190,000 210,000 - - - - - - - - 190,000 210,000 - 190,000 210,000 - 206,046 190,000 135,000 7,746,446 15,480,572 (1) Equal to projected fund balance less any continuing appropriations. CAPITAL IMPROVEMENT PROGRAM FUND SUMMARY GENERAL CAPITAL CONSTRUCTION (GCC) BEGINNING FUND BALANCE (1) REVENUES LOAN REPAYMENTS & OTHER TOTAL REVENUES CAPITAL PROJECTS ALGA NORTE PARK - PHASE II (POOL) ALGA NORTE PARK - PHASE II (POOL) PROP C FUNDS CALLE GAVANZO DRAINAGE CARLSBAD BLVD BRIDGE CONCRETE BARRIER POWER PLANT CARLSBAD BLVD BRIDGE CONCRETE BARRIER RAILROAD CARLSBAD VILLAGE DRIVE AND AVENIDA DE ANITA CITY ADMIN TRAINING FACILITY (PRE-DESIGN) - PROP C CONCRETE REPAIR PROGRAM FIRE STATION #3 RELOCATION (GENERAL FUND) FIRE STATION #5 STORAGE BUILDING/RESTROOMS GCC LOAN TO PIL-NW FOR MADISON ST PROPERTY PURCHASES GCC LOAN TO PIL-NW FOR PINE SCHOOL ACQUISITION GCC LOAN TO PLDA - HEDIONDA AND CALAVERA CREEK JOINT FIRST RESPONDERS TRAINING FACILITY JOINT FIRST RESPONDERS TRAINING FACILITY - PROP C LAKE CALAVERA TRAILS MASTER PLAN/CONSTRUCTION LEO CARRILLO BARN STABILIZATION (S197K = GRANT) LEO CARRILLO PARK - EROSION CONTROL LIBRARY EXPANSION (LEARNING CENTER) MARBELLA WALL BEAUTIFICATION NW QUADRANT STORM DRAIN IMPROVEMENT PROGRAM PEDESTRIAN MASTER PLAN POLICE CAD IMPLEMENTATION PROPOSITION C PROJECTS PUBLIC WORKS INVENTORY AND FAC MAINT PROGRAM REPAIR RECOATING GUARDRAIL PAR BRIDGE AT CARLSBAD BLVD RIDGECREST DRAINAGE IMPROVEMENTS ROMERIA DRAINAGE IMPROVEMENTS SAN MARCOS ROAD PROJECT SENIOR CTR EXPANSION - 2ND FLOOR STAGECOACH PARK PICNIC SHELTER TRAF SIG - CALLE BARCELONA AND PASEO AVELLANO TRAP SIG - POINSETTIA LANE AND BLACKRAIL ROAD TRAF SIG - RANCHO SANTA FE ROAD AND AVENIDA LA CIMA UNDERGROUND DIST. 17 - HARDING, ROOSEVELT TOTAL PROJECT EXPENDITURES PRIOR YEARS N/A N/A 6,000,000 16,215,795 62,500 420,000 277,000 105,000 250,000 540,000 316,600 320,000 860,000 420,021 10,850,000 13,650,000 598,750 500,000 267,000 388,660 80,000 305,250 150,000 2,312,228 404,992 130,000 117,500 274,000 2,984,147 529,162 100,000 210,000 236,991 190,000 509,800 60,575,396 N/A YEAR1 YEAR 2 YEAR 3 YEAR 4 YEARS BUILDOUT 2008-2009 2009-2010 2010-2011 2011-2012 2012-2013 2013++ 2,975,195 (496,989) (496,989) (596,989) (596,990) (596,990) 1,797,021 ..... 1,797,021 ..... . . - - . . 100,000- - - - - - - - - . -- 80,000 ..... 155,000 ..... . . 5,034,205 ..... . . . . - . - . . - - 5,269,205 - 100,000 (496,989) (496,989) (596,989) (596,990) (596,990) (596,990) GOLF COURSE FUND BEGINNING FUND BALANCE (1) REVENUES BOND PROCEEDS ADVANCES TOTAL REVENUES CAPITAL PROJECTS CARLSBAD MUNICIPAL GOLF COURSE TOTAL PROJECT EXPENDITURES ENDING FUND BALANCE PRIOR YEAR1 YEAR 2 YEAR 3 YEAR 4 YEARS BUILDOUT YEARS 2008-2009 2009-2010 2010-2011 2011-2012 2012-2013 2013++ N/A ...... - - N/A .... 56,016,655 56,016,655 .... N/A - - (1) Equal to projected fund balance less any continuing appropriations. CAPITAL IMPROVEMENT PROGRAM FUND SUMMARY GRANTS - FEDERAL BEGINNING FUND BALANCE (1) REVENUES GRANT REVENUE TOTAL REVENUES CAPITAL PROJECTS BRIDGE PREVENTITIVE MAINTENANCE PLAN CARLSBAD BOULEVARD ENCINAS CREEK BRIDGE REPLACEMENT COASTAL RAIL TRAIL (CMAQ) TOTAL PROJECT EXPENDITURES ENDING FUND BALANCE PRIOR YEARS N/A N/A 88,530 297,682 4,413,784 4,799,996 N/A YEAR1 YEAR 2 YEAR 3 YEAR 4 YEARS 2008-2009 2009-2010 2010-2011 2011-2012 2012-2013 BUILDOUT 2013++ (306,722) 1,667,020 .... 1,973,742 ..... 1,973,742 ..... 1,667,020 .... 1,667,020 .... 1,667,020 - INFRASTRUCTURE MAINTENANCE & REPLACEMENT (IM&R) PRIOR YEARS BEGINNING FUND BALANCE (1) REVENUES GENERAL FUND TRANSFER TOTAL REVENUES CAPITAL PROJECTS BEACH ACCESS STAIRS REPLACEMENT CARLSBAD BLVD STORM DRAIN REPLACEMENT CMP REPLACEMENT PROGRAM CONCRETE REPLACEMENT CYNTHIA LANE STORM DRAIN HOSP GROVE PARK DRAINAGE IMPROVEMENTS KELLY DRIVE CHANNEL REPAIR LA COSTA AVE STORM DRAIN REPLACEMENT TRAP SIG • CARLSBAD BLVD & TAMARACK SIGNAL REPAIRS TRAP SIG - EL CAMINO REAL AND CHESTNUT SIGNAL REPAIRS TRAP SIG - EL CAMINO REAL AND TAMARACK SIGNAL REPAIRS TOTAL PROJECT EXPENDITURES ENDING FUND BALANCE N/A N/A 517,500 218,000 575,000 1,243,350 253,750 440,000 492,150 230,000 206,000 141,000 4,316,750 N/A YEAR1 2008-2009 35,323,409 8,220,000 8,220,000 802,000 150,000 36,000 988,000 42,555,409 YEAR 2 YEAR 3 YEAR 4 2009-2010 2010-2011 2011-2012 42,555,409 50,047,909 58,634,909 8,602,000 9,089,000 9,500,000 8,602,000 9,089,000 9,500,000 427,000 502,000 277,000 682,500 1,109,500 502,000 277,000 50,047,909 58,634,909 67,857,909 YEAR 5 BUILDOUT 2012-2013 2013++ 67,857,909 77,727,909 9,870,000 114360,000 9,870,000 114,360,000 77,727,909 192,087,909 OTHER BEGINNING FUND BALANCE (1) REVENUES OTHER FINANCING SOURCES TOTAL REVENUES CAPITAL PROJECTS COASTAL RAIL TRAIL COLLEGE BLVD REACH A AND CANNON REACH 4A COLLEGE/CANNON ASSESSMENT DISTRICT EL FUERTE EXTENSION FARADAY AVENUE EXTENSION LIBRARY EXPANSION (LEARNING CENTER) MELROSE DRIVE - SOUTH OF PALOMAR AIRPORT ROAD MELROSE DRIVE EXTENSION MELROSE DRIVE EXTENSION PALOMAR AIRPORT ROAD AND MELROSE DRIVE RIGHT TURN PALOMAR AIRPORT ROAD WIDENING AT MELROSE DRIVE PAVEMENT MANAGEMENT PROGRAM (PROP 1B Funds) POINSETTIA LANE EAST OF EL CAMINO REAL FINANCING PROGRAM TRAP SIG - AVIARA PARKWAY-POINSETTIA LANE TO EL CAMINO REAL TOTAL PROJECT EXPENDITURES ENDING FUND BALANCE PRIOR YEARS N/A N/A 184,176 1,713,002 10,314,481 4,095,146 16,248,065 1,259,503 228,938 1,525,584 3,477,792 165,980 2,826,268 - 28,932,793 602,649 71,574,377 N/A YEAR 1 YEAR 2 2008-2009 2009-2010 3,528,946 3/186,148 1,629,937 1,629,937 - - - - - - - - - - - 1,629,937 - 42,798 42,798 1,629,937 3,486,148 3/186,148 YEAR 3 YEAR 4 2010-2011 2011-2012 3,486,148 3/186,148 1,537,256 1,537,256 - - - - - - - - - - - 1,537,256 - - 1,537,256 3,486,148 3,486,148 YEAR 5 BUILDOUT 2012-2013 2013-H- 3,486,148 3,486,148 - - - - - - - - - - - - - - - - 3,486,148 3,486,148 (1) Equal to projected fund balance less any continuing appropriations. CAPITAL IMPROVEMENT PROGRAM FUND SUMMARY PARK-IN-LIEU NE BEGINNING FUND BALANCE (1) REVENUES DEVELOPER FEES TOTAL REVENUES CAPITAL PROJECTS PIL-NE TO PFF FOR PARK ACQUISITION ROBERTSON RANCH ACQUISITION ROBERTSON RANCH PARK DEVELOPMENT TOTAL PROJECT EXPENDITURES ENDING FUND BALANCE PRIOR YEARS N/A N/A 4,550,000 4,550,000 N/A YEAR1 2008-2009 793,323 384,898 384,898 1,178,221 YEAR 2 2009-2010 1,178,221 1,101,235 1,101,235 2,279,456 YEAR3 2010-2011 2,279,456 555,963 555,963 2,835,419 YEAR 4 2011-2012 2,835,419 620,113 620,113 3,455,532 YEARS 2012-2013 3,455,532 497,159 497,159 3,952,691 BUILDOUT 2013++ 3,952,691 6,821,241 6,821,241 4,550,000 4,000,000 8,550,000 2,223,932 PARK-IN-LIEU NW BEGINNING FUND BALANCE (1) REVENUES DEVELOPER FEES TOTAL REVENUES CAPITAL PROJECTS PINE AVENUE PARK - PINE COMMUNITY BUILDING - PHASE II PIL-NW TO GCC FOR MADISON ST PROPERTY PURCHASES PIL-NW TO GCC FOR PINE SCHOOL ACQUISITION TOTAL PROJECT EXPENDITURES ENDING FUND BALANCE PRIOR YEARS N/A N/A N/A YEAR1 2008-2009 1,128,179 149,905 149,905 320,000 860,000 1,180,000 98,085 YEAR 2 2009-2010 98,085 142,767 142,767 240,852 YEAR 3 2010-2011 240,852 142,767 142,767 383,619 YEAR 4 2011-2012 383,619 149,905 149,905 533,524 YEARS 2012-2013 533,524 371,194 371,194 904,718 BUILDOUT 2013++ 904,718 2,234,304 2,234,304 1,784,400 1,784,400 1,354,622 PARK-IN-LIEU SE BEGINNING FUND BALANCE (1) REVENUES DEVELOPER FEES TOTAL REVENUES CAPITAL PROJECTS LEO CARRILLO EVENT AREA EXPANSION LEO CARRILLO PARK - PHASE III TOTAL PROJECT EXPENDITURES ENDING FUND BALANCE PRIOR YEARS N/A N/A 20,550 20,550 N/A YEAR1 2008-2009 1,066,975 37,421 37,421 246,450 246,450 857,945 YEAR.2 2009-2010 857,945 53,458 53/158 911/103 YEAR 3 2010-2011 911/103 53,458 53,458 866,100 866,100 98,761 YEAR4 2011-2012 98,761 53,458 53/458 152,219 YEARS 2012-2013 152,219 53,458 53,458 205,677 BUILDOUT 2013++ 205,677 53,458 53,458 259,135 PARK-IN-LIEU SW BEGINNING FUND BALANCE (1) REVENUES DEVELOPER FEES TOTAL REVENUES CAPITAL PROJECTS AVIARA COMMUNITY PARK COMMUNITY BUILDING AVIARA REIMBURSEMENT AGREEMENT POINSETTIA COMMUNITY PARK - TENNIS COURTS & COMMUNITY CENTE! TOTAL PROJECT EXPENDITURES PRIOR YEARS N/A N/A 238,000 558,811 796,811 N/A YEAR1 2008-2009 336,943 122,953 122,953 459,896 YEAR 2 2009-2010 459,896 58,804 58,804 518,700 YEARS 2010-2011 518,700 58,804 58,804 577,504 YEAR 4 2011-2012 577,504 53,458 53,458 630,962 YEARS 2012-2013 630,962 58,804 58,804 689,766 BUILDOUT 2013++ 689,766 4,100,229 4,100,229 2,698,700 2,698,700 2,091,294 (1) Equal to projected fund balance less any continuing appropriations.31 CAPITAL IMPROVEMENT PROGRAM FUND SUMMARY PARK FEE ZONES 5,13,16 BEGINNING FUND BALANCE (1) REVENUES DEVELOPER FEES TOTAL REVENUES CAPITAL PROJECTS BUSINESS PARK RECREATIONAL FACILITY (PARTIAL FUNDING) TOTAL PROJECT EXPENDITURES ENDING FUND BALANCE PRIOR YEARS N/A N/A N/A YEAR1 2008-2009 2,003,444 41,612 41,612 2,045,056 YEAR 2 2009-2010 2,045,056 64,074 64,074 2,109,130 YEAR 3 2010-2011 2,109,130 70,810 70,810 2,179,940 YEAR 4 2011-2012 2,179,940 77,710 77,710 2,257,651 YEARS 2012-2013 2,257,651 70,810 70,810 2,328,461 BUILDOUT 2013++ 2,328,461 1,116,215 1,116,215 3,400,000 3,400,000 44,676 PLANNED LOCAL DRAINAGE AREA FEES (PLDA) BEGINNING FUND BALANCE (1)_ REVENUES DEVELOPER FEES TOTAL REVENUES CAPITAL PROJECTS AGUA HEDIONDA CHANNEL (PLDA "B") CARLSBAD BOULEVARD ENCINAS CREEK BRIDGE REPLACEMENT (PLDA COLLEGE BLVD. BRIDGE FACILITY BL (REIMB./PLDA "B") COLLEGE BLVD/CANNON RD (BASIN BJB - REIMB./PLDA "B") (FEMA + PLC COLLEGE BLVD/CANNON RD (BJ AND CALAVERA CR. CHANNEL) FARADAY/MELROSE DRAINAGE FACILITIES (PLDA "B") GCC LOAN TO PLDA - HEDIONDA AND CALAVERA CREEK MASTER PLAN UPDATE MISCELLANEOUS MASTER DRAINAGE FACILITIES PARK DRIVE AND TAMARACK AVENUE STORM DRAIN (PLDA "B") TAMARACK AND ECR STORM DRAIN AND SILT. BASIN (REIMB./PLDA "B") TOTAL PROJECT EXPENDITURES ENDING FUND BALANCE PRIOR YEARS N/A N/A 1,896,522 297,682 - 1,073,294 2,536,449 300,000 - 494,933 - - 6,598,880 N/A YEAR1 2008-2009 6,546,979 245,166 245,166 - 1,593,900 - - - - 420,021 - - - - 2,013,921 4,778,223 YEAR2 2009-2010 4,778,223 245,166 245,166 - - - - - - - - - - - - 5,023,389 YEAR 3 YEAR 4 YEAR 5 2010-2011 2011-2012 2012-2013 5,023,389 5,173,798 5,341,598 150,408 167,800 186334 150,408 167,800 186,334 . - - . - - - - - - . - 5,173,798 5,341,598 5,527,932 BUILDOUT 2013++ 5,527,932 2,126,618 2,126,618 - - 1,911,800 - - - - - 11,318,800 631,400 1323,800 15,185,800 (7,531,250) PUBLIC FACILITY FEE FUND (PFF) BEGINNING FUND BALANCE (1) REVENUES DEVELOPER FEES LOAN REPAYMENTS TOTAL REVENUES CAPITAL PROJECTS ALGA NORTE PARK - PHASE 1 (30 ACRES) ALGA NORTE PARK - PHASE II (POOL) AVIARA COMMUNITY PARK COMMUNITY BUILDING EL CAMINO REAL MEDIANS EL CAMINO REAL MEDIANS - LA COSTA FIRE STATION *3 RELOCATION FIRE STATION #6 (PERMANENT) LEO CARRILLO BARN LEOCARRILLO BARN RESTORATION/STABILIZATION LEO CARRILLO PARK - PHASE III LIBRARY EXPANSION (COLE) PFF LOAN TO PIL-NE FOR PARK SITE ACQUISITION PINE AVENUE PARK - PINE COMMUNITY BUILDING - PHASE II POINSETTIA COMMUNITY PARK - PARKING POINSETTIA COMMUNITY PARK - TENNIS COURTS & COMMUNITY CENTEf TRAF SIG - CANNON ROAD AND AVENIDA ENCINAS-reim. TOTAL PROJECT EXPENDITURES ENDING FUND BALANCE PRIOR YEARS N/A N/A 22,107,510 6,099,695 - 909,500 90,500 1,000,000 5,830,000 - 33,000 - - 4,550,000 - - 1,149,415 150,000 41,919,620 N/A YEAR1 2008-2009 11,558,899 1,263,513 1,263,513 - - - - - - - - - - '- - - 903,185 - - 903,185 11,919,227 YEAR2 2009-2010 11,919,227 2,173,035 - 2,173,035 - - - 493,200 - - 310,500 - - - - - - 803,700 13,288,562 YEAR 3 YEAR 4 YEAR 5 2010-2011 2011-2012 2012-2013 13,288,562 7,836,369 9,532,263 1,698,507 1,799,493 1,856,908 . 1,698,507 1,799/193 1,856,908 . - - . - 5,404,200 103,600 - 1,000,000. 746,500 - - - - 1,035,000 . 7,150,700 103,600 1,035,000 7,836,369 9,532,263 10,354,171 BUILDOUT 2013++ 10,354,171 20,930,952 4,550,000 25/480,952 - - . 7,632,200 - - - - - - - 9,832,400 - 7,892,000 - 11,976,000 - 37,332,600 (1,497,478) (1) Equal to projected fund balance less any continuing appropriations. CAPITAL IMPROVEMENT PROGRAM FUND SUMMARY RANCHO SANTA FE ROAD PROJECT BEGINNING FUND BALANCE (1) REVENUES DEVELOPER SPECIAL TAXES/OTHER AGENCIES TOTAL REVENUES CAPITAL PROJECTS RANCHO SANTA FE ROAD AND OLIVENHAIN IMPROVEMENTS RANCHO SANTA FE ROAD NORTH - PHASE 1 RANCHO SANTA FE ROAD NORTH - PHASE II (BRIDGE) TOTAL PROJECT EXPENDITURES ENDING FUND BALANCE PRIOR YEARS N/A N/A 3,985,905 26,406,243 18,641,000 51,033,148 N/A YEAR1 YEAR 2 YEAR 3 YEAR 4 2008-2009 2009-2010 2010-2011 2011-2012 13,848,846 13,848,846 14,297,856 14,297,856 449,010 449,010 13,848,846 14,297,856 14,297,856 14,297,856 YEARS 2012-2013 14,297,856 5,510,600 5,510,600 19,808,456 BUILDOUT 2013++ 19,808,456 754,911 754,911 20,563,367 REDEVELOPMENT - VILLAGE BEGINNING FUND BALANCE (1) REVENUES TAX INCREMENT AND GENERAL FUND ADVANCE TOTAL REVENUES CAPITAL PROJECTS CARLSBAD BLVD. AT STATE ST - INTERSECTION ENHANCEMENT DESIGN SENIOR CTR EXPANSION - 1ST FLOOR STREETSCAPE IMPROVEMENTS VILLAGE PUBLIC PARKING ENHANCEMENT PROGRAM VILLAGE STREETSCAPE IMPROVEMENTS TOTAL PROJECT EXPENDITURES ENDING FUND BALANCE PRIOR YEARS N/A N/A 100,000 1,082,044 100,000 275,000 1,557,044 N/A YEAR1 YEAR2 YEAR3 YEAR4 2008-2009 2009-2010 2010-2011 2011-2012 436,310 536,310 536,310 536,310 100,000 300,000 100,000 300,000 300,000 300,000 536,310 536,310 536,310 536,310 YEARS 2012-2013 536,310 - 536,310 BUILDOUT 2013++ 536,310 850,000 850,000 850,000 850,000 536,310 REDEVELOPMENT - SCCRDA BEGINNING FUND BALANCE (1) REVENUES TAX INCREMENT AND GENERAL FUND ADVANCE TOTAL REVENUES CAPITAL PROJECTS CARLSBAD BLVD. AT BREAKWATER ROAD - LEFT TURN LANE CARLSBAD BLVD. ENCINAS CREEK BRIDGE REPLACEMENT TOTAL PROJECT EXPENDITURES ENDING FUND BALANCE PRIOR YEARS N/A N/A 243,150 339,135 582,285 N/A YEAR1 YEAR 2 YEAR 3 YEAR 4 2008-2009 2009-2010 2010-2011 2011-2012 256,310 256,310 256,310 256,310 YEARS 2012-2013 256,310 BUILDOUT 2013++ 256,310 - 256,310 256,310 256,310 256,310 256,310 256,310 (1) Equal to projected fund balance less any continuing appropriations. CAPITAL IMPROVEMENT PROGRAM FUND SUMMARY SEWER BENEFIT AREA FEES (SBA) BEGINNING FUND BALANCE (1) REVENUES DEVELOPER FEES TOTAL REVENUES CAPITAL PROJECTS CARLSBAD TRUNK SEWER REACHES VCT1A. VCT1B, VCT1C (SBA "A") SBA C,D,E,F TO SEW REPL FOR S AGUA HEDIONDA INTERCEPTOR TOTAL PROJECT EXPENDITURES ENDING FUND BALANCE PRIOR YEARS N/A N/A N/A YEAR1 2008-2009 3,681,592 289,167 289,167 3,270,000 3,270,000 700,759 YEAR 2 2009-2010 700,759 689,467 689,467 1,390,226 YEAR 3 2010-2011 1,390,226 358,916 358,916 1,749,142 YEAR 4 2011-2012 1,749,142 386,732 386,732 2,135,874 YEARS 2012-2013 2,135,874 445318 445,818 103,600 103,600 2/478,092 BUILDOUT 2013++ 2,478,092 4,680,967 4,680,967 17,000 17,000 7,142,059 SEWER CONNECTION FEE FUND BEGINNING FUND BALANCE (1) REVENUES DEVELOPER FEES OTHER AGENCY CONTRIBUTIONS (CITY OF VISTA) TOTAL REVENUES CAPITAL, PROJECTS PHASE IV EXPANSION - DEBT SERVICE PHASE V EXPANSION SEWER MONITORING PROGRAM VISTA/CARLSBAD INTERCEPTOR AGUA HEDIONDA LIFT STATION (VC12) VISTA/CARLSBAD INTERCEPTOR BUENA VISTA LIFT STATION FORCE MAI VISTA/CARLSBAD INTERCEPTOR REACH VC11B VISTA/CARLSBAD INTERCEPTOR REACH VC13 TO VC15 VISTA/CARLSBAD INTERCEPTOR REPLACEMENT REACH 3 TOTAL PROJECT EXPENDITURES ENDING FUND BALANCE PRIOR YEARS N/A N/A 935,507 10,603,878 66,000 1,819360 500,000 3,549,000 1,800,000 19,273,745 N/A YEAR1 2008-2009 13,387,102 327,295 327,295 937,170 22,000 1,400,000 2,850,000 616,000 800,000 6,625,170 7,089,228 YEAR 2 2009-2010 7,089,228 499,792 27,714,830 28,214,622 933,007 22,000 14,180,640 2,265,000 12,100,000 29,500,647 5,803,202 YEAR 3 2010-2011 5,803,202 391,500 391,500 931,419 22,000 596,220 1,549,639 4,645,064 YEAR 4 2011-2012 4,645,064 403,718 2,408,645 2,812,363 932,469 22,000 2,092,000 3,046,469 4,410,957 YEARS 2012-2013 4,410,957 425,627 425,627 931,469 22,000 953/469 3,883,115 BUILDOUT 2013++ 3,883,115 5,849,725 5,849,725 1,856,610 176,000 2,032,610 7,700,230 (1) Equal to projected fund balance less any continuing appropriations. CAPITAL IMPROVEMENT PROGRAM FUND SUMMARY SEWER REPLACEMENT FUND BEGINNING FUND BALANCE (1) REVENUES TRANSFER FROM OPERATING FUND LOAN REPAYMENTS TOTAL REVENUES CAPITAL PROJECTS AVENIDA ENCINAS GRAVITY SEWER BEECH STREET SEWER REPLACEMENT BUENA INTERCEPTOR SEWER IMPROVEMENTS BUILDING IMPROVEMENTS CALAVERA HILLS TREATMENT PLANT - DEMOLITION CAPITAL ACQ/REPL/REHAB AND STAFFING CARLSBAD TRUNK SEWER REACHES VCT1 A, VCT1B, VCT1C (SBA "A") CONDITION ASSESSMENT OF SEWER MAINS FARADAY AVENUE - ORION TO MELROSE SEWER HOME PLANT - PIPELINE REPLACEMENT HOME PLANT LIFT STATION REPLACEMENT LA COSTA MEADOWS SEWER EXTENSION LA GOLONDRIA SEWER EXTENSION NORTH AGUA HEDIONDA INTERCEPTOR - WEST SEGMENT NORTH AGUA HEDIONDA TRUNK SEWER REACH NAHT1A (SBA "B") NORTH BATIQUITOS INTERCEPTOR REHABILITATION POINSETTtA SEWAGE LIFT STATION ODOR/NOISE ABATEMENT PUBLIC WORKS CENTER SEWER LIFT STATION REMOVALS - VARIOUS SEWER LIFT STATION REPAIRS AND UPGRADES SEWER LINE REFURBISHMENTS/REPLACEMENT AND MANHOLES SEWER MASTER PLAN/CONNECTION FEE UPDATE SEWER REPL TO SEW BENEF A FOR CARLSBAD TRUNK SEWER TERRAMAR LIFT STATION REPLACEMENT VISTA/CARLSBAD INTERCEPTOR REHAB REACHES 1 AND 2 TOTAL PROJECT EXPENDITURES ENDING FUND BALANCE PRIOR YEARS N/A N/A - - 960,000 4,552,878 23,500 1,778,497 - - 110,200 440,000 - 1,039,520 1,001,395 4,177,751 - 1,199,000 669,500 - 89,000 580^80 2,400,000 - 3,270,000 25,000 830,975 23,147,596 N/A YEAR1 2008-2009 16,482,470 3,640,289 3,270,000 6,910,289 - 1,947,000 500,000 - - 744,152 - 313,000 - 94,000 1,812,000 107,357 107,148 - 767,000 - - - - 80,000 330,000 500,000 - - - 7,301,657 16,091,102 YEAR 2 2009-2010 16,091,102 3,712,7% - 3,712,796 276,300 - 1,380,000 - 142,000 967,252 - - - - . - - - - - - - - 600,000 100,000 330,000 - 492,000 - 4,287,552 15,516,346 YEAR 3 2010-2011 15,516,346 3,787,116 - 3,787,116 - - - - 523,500 1,441,019 - - - - - - - - 970,000 - - 3,861,200 - 100,000 330,000 - - - - 7,225,719 12,077,743 YEAR 4 2011-2012 12,077,743 3,863,294 - 3,863,294 . - - - - 1,578,061 - - - - - - - - - - - - - 100,000 330,000 - - - - 2,008,061 13,932,976 YEARS 2012-2013 13,932,976 3,941^76 - 3,941,376 - - - 1,205,020 - 313,000 - - - - - - - - - - - 100,000 330,000 - - - - 1,948,020 15,926,333 BUILDOUT 2013++ 15,926,333 45,081,970 - 45,081,970 . - - - - 9,711,027 427,635 - - - - - - - - - - - 300,000 1,924,600 - - - • 12,363,262 48,645,041 TDA BEGINNING FUND BALANCE (1) REVENUES GRANTS TOTAL REVENUES CAPITAL PROJECTS PEDESTRIAN MASTER PLAN TOTAL PROJECT EXPENDITURES ENDING FUND BALANCE PRIOR YEARS N/A N/A 100,000 100,000 N/A YEAR1 2008-2009 3,717 - YEAR 2 2009-2010 3,717 - YEAR 3 2010-2011 3,717 - YEAR 4 2011-2012 3,717 - YEARS 2012-2013 3,717 - BUILDOUT 2013++ 3,717 - - 3,717 - 3,717 - ^,717 - 3,717 - 3,717 - 3,717 (1) Equal to projected fund balance less any continuing appropriations. CAPITAL IMPROVEMENT PROGRAM FUND SUMMARY TRAFFIC IMPACT FEES (TIF) BEGINNING RIND BALANCE (1) REVENUES DEVELOPER FEES TOTAL REVENUES CAPITAL PROJECTS AVENIDA ENCINAS WIDENING - SOUTH OF PALOMAR AIRPORT RD. CANNON ROAD REACH 4 (20% FUNDING) CARLSBAD BLVD. / PALOMAR AIRPORT ROAD (20% FUNDING) CARLSBAD BLVD. / PALOMAR AIRPORT RD (RTCIP/20% FUNDING) CARLSBAD BLVD. MOUNTAIN VIEW TO N. CITY LIMITS (20% FUNDING) CARLSBAD BLVD. WIDENING - CANNON TO MANZANO CARLSBAD VILLAGE DRIVE - PONTIAC TO VICTORIA EL CAMINO REAL / CANNON RD. INTERCHANGE EL CAMINO REAL / CANNON RD. INTERCHANGE (RTCIP) EL CAMINO REAL AND CARLSBAD VILLAGE DRIVE DUAL LEFT TURNS EL CAMINO REAL LEFT TURN LANE TO WEST TAMARACK EL CAMINO REAL RIGHT TURN LANE TO NORTH ALGA ROAD EL CAMINO REAL WIDENING - ARENAL RD. TO LA COSTA AVE. EL CAMINO REAL WIDENING - ARENAL RD. TO LA COSTA AVE. (RTCIP) EL CAMINO REAL WIDENING - TAMARACK TO CHESTNUT EL CAMINO REAL WIDENING - TAMARACK TO CHESTNUT (RTCIP) MELROSE DRIVE AND ALGA ROAD DUAL LEFT TURN LANES (RTCIP) MELROSE DRIVE TURN LANE TO WEST PALOMAR AIRPORT ROAD PALOMAR AIRPORT ROAD AND COLLEGE BOULEVARD PALOMAR AIRPORT ROAD TURN LANE TO N EL FUERTE STREET PALOMAR AIRPORT ROAD TURN LANE TO S EL CAMINO REAL PALOMAR AIRPORT ROAD TURN LANE TO SOUTH MELROSE DRIVE PALOMAR AIRPORT ROAD WIDENING AT PASEO DEL NORTE POINSETTIA LN WIDENING - PASEO DEL NORTE/BATIQUITOS (RTCIP) SIDEWALK/STREET CONSTRUCTION - VALLEY AND MAGNOLIA SIDEWALK/STREET CONSTRUCTION - VARIOUS LOCATIONS TRAP SIG - AVIARA PKWY-POINSETTIA LANE TO EL CAMINO REAL TRAFFIC MONITORING PROGRAM TOTAL PROJECT EXPENDITURES ENDING FUND BALANCE PRIOR YEARS N/A N/A 225,000 - - - - - - - - - - - - - 1,904,800 - - - - - - - 525,000 - 90,000 1,395,672 29,969 262,744 4,433,185 N/A YEAR1 2008-2009 8,958,313 531,007 531,007 2,380,000 - - - - - - - - - - - - 5,751,200 - - - - - - 88,500 719,000 - 540,000 100,000 - 112,156 9,690,856 (201,536) YEAR 2 2009-2010 (201,536) 727,568 727,568 - - - - - - - 300,000 - - 253,000 - - - - 422,000 - - 587,000 - - - - - 300,000 - 96,000 1,958,000 (1,431,968) YEARS 2010-2011 (1,431,968) 690,314 690,314 - - - - - - - 931,000 974,000 - - - - - - - - 410,000 - - - - - - 300,000 - 96,000 2,711,000 (3,452,654) YEAR* 2011-2012 (3,452,654) 698,993 698,993 - - - - - - - - - - - - - - - - - - - - - - - - 300,000 . . 96,000 396,000 (3,149,661) YEARS 2012-2013 (3,149,661) 716,344 716,344 - - - - - - - - - - - - - - - - - - - - - - - - - 180,000 - 96,000 276,000 (2,709,317) BUILDOUT 2013++ (2,709,317) 8,982,544 8,982,544 2,440,000 5,400,000 712,400 2,815,000 2,541,200 5,360,000 4,841,000 - - 865,000 - 335,000 1,704,000 601,000 - - 946,000 - - 916,000 568,000 - - 2,287,000 - 720,000 - 960,000 34,011,600 (27,738,374) (1) Equal to projected fund balance less any continuing appropriations. CAPITAL IMPROVEMENT PROGRAM FUND SUMMARY TRANSNET/BICYCLE BEGINNING FUND BALANCE (1) REVENUES TRANSNET REVENUE TOTAL REVENUES CAPITAL PROJECTS BICYCLE MASTER PLAN COASTAL RAIL TRAIL TOTAL PROJECT EXPENDITURES ENDING FUND BALANCE PRIOR YEARS N/A N/A 150,000 221,800 371,800 N/A YEAR1 2008-2009 21/436 YEAR2 2009-2010 21,436 YEARS 2010-2011 21,436 YEAR 4 2011-2012 21/436 YEARS 2012-2013 21,436 BUILDOUT 2013-n- 21,436 - 21,436 21,436 21,436 21/436 21,436 21/436 TRANSNET/HIGHWAY BEGINNING FUND BALANCE (1) REVENUES TRANSNET REVENUE TOTAL REVENUES CAPITAL PROJECTS CANNON ROAD REACH 4B TOTAL PROJECT EXPENDITURES ENDING FUND BALANCE PRIOR YEARS N/A N/A 1,761,000 1,761,000 N/A YEAR1 2008-2009 324,639 YEAR2 2009-2010 324,639 YEAR3 2010-2011 324,639 YEAR 4 2011-2012 324,639 YEARS 2012-2013 324,639 BUILDOUT 2013++ 324,639 324,639 324,639 324,639 324,639 324,639 324,639 TRANSNET-LOCAL BEGINNING FUND BALANCE (1) REVENUES TRANSPORTATION TAXES NON JURISDICTIONAL FEES TOTAL REVENUES CAPITAL PROJECTS CARLSBAD BOULEVARD ENCINAS CREEK BRIDGE REPLACEMENT CARLSBAD BOULEVARD RETROFIT OVER SDNR EL CAMINO REAL WIDENING - LISA STREET TO CRESTVIEW OR EL CAMINO REAL WIDENING - NORTH OF COUGAR DRIVE PAVEMENT MANAGEMENT PROGRAM PAVEMENT MANAGEMENT PROGRAM (NON-JURIS FEES) TOTAL PROJECT EXPENDITURES ENDING FUND BALANCE TRANSPORTATION FUNDING BEGINNING FUND BALANCE (1) REVENUES PROPOSITION 42 FUNDS TOTAL REVENUES CAPITAL PROJECTS TOTAL PROJECT EXPENDITURES ENDING FUND BALANCE PRIOR YEARS N/A N/A 38,568 1,519,000 493,000 21,319,349 1,928,802 25,298,719 N/A YEAR1 2008-2009 6,536,457 3,360,529 750,000 4,110,529 215,000 2,650,000 750,000 3,615,000 7,031,986 PRIOR YEARS N/A N/A N/A YEAR1 2008-2009 110,009 975,000 975,000 1,085,009 YEAR2 2009-2010 7,031,986 3,510,890 752,000 4,262,890 215,980 959,000 1,118,063 752,000 3,045,043 8,249,833 YEAR2 2009-2010 1,085,009 1,004,250 1,004,250 2,089,259 YEAR 3 • 2010-2011 8,249,833 .- , 3,701,203 762,000 4/463,203 1,300,744 762,000 2,062,744 10,650,292 YEAR3 2010-2011 2,089,259 1,034,378 1,034,378 3,123,637 YEAR 4 2011-2012 10,650,292 2,753,000 775,000 3,528,000 2,925,000 775,000 3,700,000 10/478,292 YEAR 4 2011-2012 3,123,637 1,065,409 1,065/409 4,189,045 YEARS 2012-2013 10,478,292 2,882,000 800,000 3,682,000 3,000,000 800,000 3,800,000 10,360,292 YEARS 2012-2013 4,189,045 1,097371 1,097,371 5,286/416 BUILDOUT 2013++ 10,360,292 28,820,000 7,070,000 35,890,000 31,430,000 7,070,000 38,500,000 7,750,292 BUILDOUT 2013++ 5,286,416 13,267,962 13,267,962 18,554,379 (1) Equal to projected fund balance fess any continuing appropriations. CAPITAL IMPROVEMENT PROGRAM FUND SUMMARY WATER - MAJOR FACILITY FEE FUND BEGINNING FUND BALANCE (1) REVENUES DEVELOPER FEES TOTAL REVENUES CAPITAL PROJECTS CALAVERA HILLS WATER BOOSTER STATION GENERATOR CANNON ROAD EAST OF EL CAMINO REAL - Reimb COLLEGE BOULEVARD - CANNON TO BADGER LANE COLLEGE BOULEVARD (ECR TO CANNON ROAD) - Reimb D RESERVOIR - PHASE 1 EL CAMINO REAL BETWEEN COLLEGE AND JACKSPAR EL CAMINO REAL CROSSING AT KELLY DRIVE EL FUERTE - NORTH OF LOKER - (Reimb) FARADAY AVENUE - ORION TO MELROSE WATERLINE - (Reimb) FARADAY AVENUE EXTENSION- Reimb MAERKLE PUMP STATION IMPROVEMENTS MAERKLE RESERVOIR STORAGE (TAP #2) MARRON RD. - PRESSURE REGULATING STATION TO OCEANSIDE MASTER PLAN UPDATE MELROSE DRIVE - PALOMAR AIRPORT RD. TO FARADAY - (Reimb) PAR/ECR PUMP STATION POINSETTIA LANE - EL CAMINO REAL TO SKIMMER CT (Reimb) POINSETTIA LANE - SKIMMER CT TO CASSIA POINSETTIA LANE EAST OF BLACK RAIL ROAD 12" RANCHO CARRILLO OVERSIZING/EXTENSION TOTAL PROJECT EXPENDITURES ENDING FUND BALANCE PRIOR YEARS N/A N/A - 760,800 - - 971,275 725,000 148,750 97,210 - 54,425 - - - - 997,350 - - - 152,700 3,907,510 N/A YEAR1 YEAR 2 YEARS YEAR 4 2008-2009 2009-2010 2010-2011 2011-2012 18,573,929 15,103,963 15,830,460 17,005/489 992,284 1,502,497 1,229,129 1,259,543 992,284 1,502,497 1,229,129 1,259,543 54,100 431,100 - 1,066,000 530,000 - - - - 101,250 790,000 776,000 - 14,244,500 - 500,000 1,475,000 - - - - - 4,462,250 776,000 54,100 14,675,600 15,103,963 15,830,460 17,005/189 3,589,432 YEAR 5 BUILDOUT 2012-2013 2013++ 3,589,432 4,785,575 1,196,143 16,562,899 1,196,143 16,562^99 . - - - 6,410,100 - - . - - 716,900 - 767,200 - - - 125,700 383,600 230,500 - 8,634,000 4,785,575 12,714,474 WATER - RECYCLED WATER FUND BEGINNING FUND BALANCE (1) REVENUES CONNECTION FEES TOTAL REVENUES CAPITAL PROJECTS RECYCLED WATER LINE - BUSINESS PARK AND SEA CLIFF HOA RECYCLED WATER LINE - INNOVATION WAYAND GATEWAY RECYCLED WATER PH II - MAHR RESERVOIR IMPROV. RECYCLED WATER PH II - PUMP STATIONS TOTAL PROJECT EXPENDITURES ENDING FUND BALANCE PRIOR YEARS N/A N/A - - 2,957,000 4,918,574 7,875,574 N/A YEAR1 YEAR2 YEAR3 YEAR4 2008-2009 2009-2010 2010-2011 2011-2012 910,454 5,454 5,454 5,454 . - 230,000 675,000 . . 905,000 5/454 5,454 5,454 5/454 YEAR 5 BUILDOUT 2012-2013 2013++ 5,454 5/454 - - - - - - - 5/454 5/454 (1) Equal to projected fund balance less any continuing appropriations. CAPITAL IMPROVEMENT PROGRAM FUND SUMMARY WATER REPLACEMENT FUND BEGINNING FUND BALANCE (1) REVENUES TRANSFER FROM OPERATING FUND TOTAL REVENUES CAPITAL PROJECTS AVIARA PARKWAY AT PLUM TREE BUENA VISTA PUMP STATION IMPROVEMENTS (STUDY) CARLSBAD BOULEVARD - SOUTH OF AVENIDA ENCINAS CARLSBAD WATER RECYCLING FACILITY SCADA MODIFICATIONS CATHODIC PROTECTION PROGRAM CHESTNUT AVENUE RECYCLED WATER LINE CRESTVIEW DRIVE TRANSMISSION MAIN D RESERVOIR - PHASE 11 D RESERVOIR DRAINAGE IMPROVEMENTS (STUDY) DEMOLITION OF WATER FACILITIES AT PAJAMA DRIVE DESALINATION GROUNDWATER/SEAWATER STUDY ECR/TAMARACK PUMP STATION REMOVAL EL CAMINO REAL - PALOMAR AIRPORT ROAD SOUTH EL CAMINO REAL FROM FARADAY TO COUGAR DRIVE EL CAMINO REAL/CARLSBAD VILL DR PIPELINE REPL EL FUERTE AND CORINTIA STREET ELLERY WATER PUMP PROJECT GROUNDWATER DEVELOPMENT - SAN LUIS REY RIVER (STUDY) 1-5 RECYCLED WATER TRANSMISSION LINE LAKE CALAVERA RESERVOIR IMPROVEMENTS MAERKLE DAM FLOATING COVER DRAINPIPE REPLACE. MAERKLE FACILITY IMPROVEMENTS MAERKLE PUMP STATION IMPROVEMENTS MAERKLE RESERVOIR BRIDGE REPLACEMENT MAERKLE TRANSMISSION MAIN MISCELLANEOUS PIPELINE REPLACEMENT PROJECTS MISCELLANEOUS WATER RESERVOIR FENCING MISCELLANEOUS WATER VALVE REPAIRS/REPLACEMENTS OCEANSIDE INTERTIE UPGRADE PAR/ECR PUMP STATION POINSETTIA LANE - SKIMMER CT TO CASSIA POINSETTIA LANE EAST OF BLACK RAIL ROAD 12" PRESSURE REDUCING STATION REPLACEMENT PUBLIC WORKS CENTER PUMP STATION REMOVAL RECYCLED WATER MASTER PLAN UPDATE SAN MARCOS BOULEVARD WEST OF SDCWA TANGLEWOOD PRESSURE REDUCING STATION REPLACEMENT TRI-AGENCIES WATER TRANSMISSION PIPELINE REPLACEMENT WATER PIPELINE REPLACEMENT - CAMEO ROAD TO ECR WATER SYSTEM INTERTIE CONNECTION TOTAL PROJECT EXPENDITURES ENDING FUND BALANCE PRIOR YEARS N/A N/A - - - - 624,000 - - - 95,500 - - 3,225,000 774,100 269,975 - 205,900 - 133,305 6,646,908 200,000 1,870,200 54,425 28,750 495,000 1,000,000 197,399 - - 990350 - - - - 442,700 - 3,091,241 354,750 275,000 120,000 439,000 21,533,503 N/A YEAR1 2008-2009 40,233,039 4,705,445 4,705,445 - 100,000 - 210,000 - - - - 135,000 - - - - - - - - 55,000 - - - - -.. 300,000 4,380,000 - - 125,000 - - - - 1,102,000 - - 250,000 - - 330,000 - - 6,987,000 37,951/484 YEAR 2 2009-2010 37,951,484 4,780,470 4,780,470 - - - - 475,800 436,100 - - - - - - - - - - - - - - - - 433,000 - 125,000 - - - - - - - - - - 5,000,000 - - 6,469,900 36,262,054 YEAR 3 YEAR 4 YEAR 5 2010-2011 2011-2012 2012-2013 36,262,054 33,164,402 36,379,572 4,857,167 4,935,575 5,015,738 4,857,167 4,935,575 5,015,738 475,700 . 917,200 - 146,900 - 32,500 123,300 - - . . - 80,019 - - - 161,700 . .- 133,305 . - - - . - 443,700 - - 114,600 - - - - 7,169,600 . - . - . . - 7,954,819 1,720,405 123,300 33,164,402 36,379,572 41,272,010 BUILDOUT 2013++ 41,272,010 57,940,975 57,940,975 _ - - - - - 2,136,600 - - 744,400 . - - - - - - - - - - 716,900 - - - - - - - 489,100 230,400 - - - - - - - - - 4,317,400 94,895,586 (1) Equal to projected fund balance less any continuing appropriations. Exhibit 2 1 RESOLUTION NO. 2008-152 2 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF 3 CARLSBAD, CALIFORNIA, APPROVING THE PROPOSITION 1B 4 SPENDING PLAN. 5 6 7 WHEREAS, the Budget Bill (SB78) included a $600 million appropriation for 8 cities and counties from the Local Street and Roads Account contained in Proposition 9 1B, the Transportation Bond, and SB88, the trailer bill, provided for the implementation 10 of Proposition 1B and included an additional appropriation of $350 million for a total of 1J $950 million available for cities and counties for eligible street and road projects; and 12 WHEREAS, the City of Carlsbad will receive an allocation of approximately $3.1 13 million for eligible street and road projects, including pavement management projects; 14 and 15 WHEREAS, the City of Carlsbad plans to use the $3.1 million bond fund 16 allocation for pavement management expenses incurred prior to the spending deadline j8 of June 30, 2011 and shown in the attached exhibit (Exhibit 1); and 19 WHEREAS, the City of Carlsbad must submit to the Department of Finance a list 20 of projects expected to be funded with these bond funds before an allocation is made. 21 // 22 // 23 „ 24 // 25 26 27 28 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 Exhibit 2 NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carlsbad, California, as follows: 1 .That the above recitations are true and correct. 2. That the City Council of the City of Carlsbad approves the spending plan, as shown in Exhibit 1, for the Proposition 1B allocation, and directs staff to proceed with the application of these funds. PASSED, APPROVED AND ADOPTED at a Regular Meeting of the City Council of the City of Carlsbad on the 20tb day of May , 2008, by the following vote: AYES: Council Members Lewis, Kulcbin, Hall, Packard and Nygaard. NOES: None. ABSENT: None. ATTEST: LORRAINE M. WOOD, City Clerk <SEAL) May 20, 20081City of CarlsbadCity of CarlsbadProposedProposed20082008--2009 to Buildout2009 to BuildoutCapital Improvement ProgramCapital Improvement ProgramCarlsbad May 20, 2008220082008--2009 2009 Proposed Capital Improvement ProgramProposed Capital Improvement ProgramTonight's AgendaTonight's AgendaƒƒCIP ProcessCIP ProcessƒƒBuilding CostsBuilding CostsƒƒRevenue & Expenditures to BuildoutRevenue & Expenditures to BuildoutƒƒProp. 1B FundingProp. 1B FundingƒƒNew ProjectsNew ProjectsƒƒProjects Projects --Next 3 YearsNext 3 Years99Set Public HearingSet Public Hearing99Adopt Resolution for Prop. 1B Funding PlanAdopt Resolution for Prop. 1B Funding Plan May 20, 20083Budget CalendarBudget CalendarCOUNCIL MEETINGSCOUNCIL MEETINGSTodayToday––CIP WorkshopCIP WorkshopSet Public Hearing for June 24Set Public Hearing for June 24ththJune 10thJune 10th––Operating Budget WorkshopOperating Budget WorkshopJune 24thJune 24th––Public Hearing and Adoption ofPublic Hearing and Adoption ofFiscal Year 2008Fiscal Year 2008--09 Operating and09 Operating andCapital BudgetsCapital BudgetsOTHER PUBLIC MEETINGSOTHER PUBLIC MEETINGSJune 12th June 12th --CitizenCitizen’’s Budget Workshops Budget Workshop May 20, 20084CitizenCitizen’’s Budget Workshops Budget Workshop„„WhenWhen::Thursday,Thursday,June 12June 12thth„„WhereWhere::Faraday CenterFaraday Center1635 Faraday Avenue, 1635 Faraday Avenue, Room 173BRoom 173B„„TimeTime::6:00pm6:00pmCall the Finance Department at(760) 602-2430 for additional information. May 20, 20085CIP Process CIP Process ––Planning DocumentPlanning Document„„CIP Review CommitteeCIP Review CommitteeEvaluates Projects based on:Evaluates Projects based on:„„Priority Ranking CriteriaPriority Ranking Criteria„„Availability of ResourcesAvailability of Resources„„Construction schedulesConstruction schedules May 20, 20086Project Priority Ranking CriteriaProject Priority Ranking Criteria„„Health and SafetyHealth and Safety„„Compliance with Legal MandatesCompliance with Legal Mandates„„Council Top PrioritiesCouncil Top Priorities„„Operating Cost ImpactsOperating Cost Impacts„„Compliance with Growth Management Compliance with Growth Management „„Compliance with Other StandardsCompliance with Other Standards„„Completion of Basic InfrastructureCompletion of Basic Infrastructure„„Public Opinion/SurveysPublic Opinion/Surveys„„Funding or Timing OpportunityFunding or Timing Opportunity May 20, 20087Construction Cost AnalysisConstruction Cost Analysis„„Building cost increases = project cost increasesBuilding cost increases = project cost increases„„Decrease in 2008Decrease in 2008Building Cost Index - Percent Increase0.00%2.00%4.00%6.00%8.00%10.00%2001 2002 2003 2004 2005 2006 2007 2008 May 20, 20088Economic UncertaintyEconomic Uncertainty„„Carlsbad continues to fund infrastructure Carlsbad continues to fund infrastructure „„Civic projects Civic projects ––potentially could be deferredpotentially could be deferred May 20, 20089Development ProjectionsDevelopment ProjectionsƒƒWhen will development occur?When will development occur?ƒƒWhat facilities will be needed?What facilities will be needed?ƒƒWill sufficient resources be Will sufficient resources be available?available? May 20, 200810Residential ConstructionResidential Construction(Units)(Units)••All Future Years = 4,568All Future Years = 4,568••Next 5 Years = 1,400Next 5 Years = 1,400••Total = 48,108Total = 48,108Non-Residential Construction(Square Feet)••All Future Years = $ 9.8 million All Future Years = $ 9.8 million ••Next 5 Years = $ 2.54 millionNext 5 Years = $ 2.54 million••Total = $ 26+++ millionTotal = $ 26+++ million May 20, 200811La Costa La Costa GreensGreensRobertson Robertson RanchRanchCantariniCantariniHolly SpringsHolly SpringsThompson Thompson TabataTabataPoinsettia Poinsettia PlacePlace54321521432,065 Units - Next 5 YearsResidential May 20, 200812Funding SourcesFunding SourcesTotal Revenue = $616 MillionTotal Revenue = $616 Million(Through Buildout)(Through Buildout)$0$20$40$60$80$100$120$140$160DevelopmentFeesSpecialDistrictsWater/SewerReplacementInfrastructureReplacementOther SourcesIn MillionsIn Millions May 20, 200813Development RevenuesDevelopment Revenues$137 Million$137 Million„„Water and Sewer Connection FeesWater and Sewer Connection Fees„„Public Facilities Fees Public Facilities Fees „„Park In Lieu FeesPark In Lieu Fees„„Traffic Impact FeesTraffic Impact Fees„„Planned Local Drainage Area FeesPlanned Local Drainage Area Fees$0$20$40$60$80$100$120$140$160DevelopmentFeesSpecialDistrictsWater/SewerReplacementInfrastructureReplacementOther SourcesIn MillionsIn Millions May 20, 200814Special DistrictsSpecial Districts$54 Million$54 MillionƒƒCFD#1 CFD#1 --Citywide Community Facilities DistrictCitywide Community Facilities DistrictƒƒBTD#2 BTD#2 --Aviara ParkwayAviara Parkway--Poinsettia LanePoinsettia LaneƒƒBTD#3 BTD#3 --Cannon Road WestCannon Road WestƒƒRancho Santa Fe Road Fee DistrictRancho Santa Fe Road Fee District$0$20$40$60$80$100$120$140$160DevelopmentFeesSpecialDistrictsWater/SewerReplacementInfrastructureReplacementOther SourcesIn MillionsIn Millions May 20, 200815Replacement FundsReplacement Funds$309 Million$309 Million„„Annual transfers from operating funds Annual transfers from operating funds „„Used for replacement of existing infrastructureUsed for replacement of existing infrastructure$0$20$40$60$80$100$120$140$160DevelopmentFeesSpecialDistrictsWater/SewerReplacementInfrastructureReplacementOther SourcesIn MillionsIn MillionsReplacement Revenues = 50% May 20, 200816Other RevenuesOther Revenues$116 Million$116 Million„„TransNet allocationTransNet allocation„„Gas TaxGas Tax„„RedevelopmentRedevelopment$0$20$40$60$80$100$120$140$160DevelopmentFeesSpecialDistrictsWater/SewerReplacementInfrastructureReplacementOther SourcesIn MillionsIn Millions„„Federal and State grantsFederal and State grants„„Other agencies Other agencies May 20, 200817Proposition 1B Transportation FundsProposition 1B Transportation Funds„„Funding from StateFunding from State„„Allocation = $3.1 millionAllocation = $3.1 million„„Roadway maintenance Roadway maintenance „„Must be spent by 2011Must be spent by 2011„„Application must include approved spending Application must include approved spending planplan„„Action this evening:Action this evening:Approve spending planApprove spending plan May 20, 200818Project ExpendituresProject Expenditures20082008--09 to Buildout09 to Buildout$451 Million$451 MillionParks15%Sewer/Drainage22%Civic17%Loans3%Water11%Streets32% May 20, 20081920082008--09 Revenues09 Revenues$40.3 Million$40.3 MillionDevelopment11%Other Agencies35%Infrastructure Replacement49%Special Districts5% May 20, 20082020082008--09 New Appropriations09 New Appropriations$59 Million$59 MillionParks2%Civic/Misc.9%Water21%Streets27%Sewer/Drainage27%Loans14% May 20, 200821Continuing ProjectsContinuing Projects$145 Million$145 Million„„Alga Norte Park and Aquatic ComplexAlga Norte Park and Aquatic Complex„„Joint First Responders Training FacilityJoint First Responders Training Facility„„Fire Station No. 6 Fire Station No. 6 „„VistaVista--Carlsbad InterceptorCarlsbad Interceptor„„Parkland Acquisition Parkland Acquisition ––NE QuadrantNE Quadrant„„Pavement ManagementPavement Management May 20, 200822Unfunded Projects Unfunded Projects --$76 million$76 million•BUSINESS PARK RECREATIONAL FACILITY (PARTIAL FUNDING)•CANNON LAKE PARK (6.7 ACRES)•CANNON ROAD REACH 4 (20% FUNDED)•CARLSBAD BOULEVARD MOUNTAIN VIEW TO NORTHERLY CITY LIMITS (20% FUNDED)•CARLSBAD BOULEVARD / PALOMAR AIRPORT ROAD (20% FUNDED)•HOSP GROVE/BUENA VISTA LAGOON RECREATIONAL IMPROVEMENTS•PALOMAR AIRPORT ROAD WIDENING AND BRIDGE RECONSTRUCTION•PINE AVENUE PARK - MADISION PROPERTY•PINE AVENUE PARK - RESTROOM/STORAGE BLDG.•ROBERTSON RANCH PARK DEVELOPMENT (PARTIAL FUNDING) May 20, 200823NEW CIP PROJECTS NEW CIP PROJECTS May 20, 200824HOSP GROVE PARKHOSP GROVE PARKDRAINAGE IMPROVEMENTSDRAINAGE IMPROVEMENTS„„Replace existing asphalt Replace existing asphalt drainage way and drainage way and maintenance access maintenance access roadway with concreteroadway with concrete„„$150,000$150,000 May 20, 200825BEACH STREET SEWER REPLACEMENTBEACH STREET SEWER REPLACEMENT„„Replace 30 year old Replace 30 year old sewer pipesewer pipe„„Existing pipe has Existing pipe has significant deterioration significant deterioration and requires frequent and requires frequent maintenancemaintenance„„$1,947,000$1,947,000 May 20, 200826SEWER PROJECTSSEWER PROJECTS„„Siphon/Force Main Sewer Siphon/Force Main Sewer AssessmentsAssessments„„TerramarTerramarLift Station ReplacementLift Station Replacement$626,000$626,000$517,000$517,000 May 20, 200827RECYCLED WATER PROJECTSRECYCLED WATER PROJECTS„„Recycled Water Master PlanRecycled Water Master Plan„„Business Park and Sea Cliff Development Business Park and Sea Cliff Development Service LinesService Lines„„Innovation Way/Gateway Road Recycled Innovation Way/Gateway Road Recycled Water LineWater Line„„Carlsbad Water Recycling Facility Carlsbad Water Recycling Facility UpgradesUpgrades$250,000$250,000$230,000$230,000$675,000$675,000$210,000$210,000 May 20, 200828WATER DISTRIBUTION SYSTEMWATER DISTRIBUTION SYSTEM„„Buena Vista Pump Station ImprovementsBuena Vista Pump Station Improvements„„D Reservoir Drainage ImprovementsD Reservoir Drainage Improvements„„Pressure Reducing Stations Pressure Reducing Stations Rehabilitation/ReplacementRehabilitation/Replacement„„Miscellaneous Water Valve Miscellaneous Water Valve Repair/Replacement ProgramRepair/Replacement Program„„Groundwater Development in the San Luis Groundwater Development in the San Luis Rey River BasinRey River Basin$$100,000100,000$135,000$135,000$1,102,000$1,102,000$250,000$250,000$55,000$55,000 May 20, 200829ROADWAY PROJECTSROADWAY PROJECTS„„La Costa Ave Slope RepairLa Costa Ave Slope Repair„„West of West of RomeriaRomeriaStreetStreet„„El Camino Real WideningEl Camino Real Widening„„Cassia Road to Camino Vida Cassia Road to Camino Vida RobleRoble$183,500$183,500$4,026,000$4,026,000 May 20, 200830TRAFFIC IMPACT FEE PROJECTSTRAFFIC IMPACT FEE PROJECTS„„Avenida Encinas Widening Avenida Encinas Widening ––South of Palomar South of Palomar Airport RoadAirport Road„„El Camino Real/Cannon Road IntersectionEl Camino Real/Cannon Road Intersection„„El Camino Real Widening El Camino Real Widening ––Tamarack to ChestnutTamarack to Chestnut„„Melrose Drive to Palomar Airport Road Turn LaneMelrose Drive to Palomar Airport Road Turn Lane„„Palomar Airport Road/College Blvd Intersection Palomar Airport Road/College Blvd Intersection ImprovementsImprovements„„Palomar Airport Road Widening at Palomar Airport Road Widening at PaseoPaseodel Nortedel Norte May 20, 200831Projects….next 3 years….. May 20, 200832Projects – NEXT 3 YEARSFirst Responders Training FacilityFire Station 3 Relocation May 20, 200833Projects – NEXT 3 YEARSParks•Carrillo Ranch Phase III•Alga Norte Park May 20, 200834Projects – NEXT 3 YEARSTraffic Signals12 Locations May 20, 200835Projects – NEXT 3 YEARSRoadway ImprovementsIntersection Improvements May 20, 200836Projects – NEXT 3 YEARSWastewaterDrainageWater May 20, 200837ONON--GOING PROJECTSGOING PROJECTS„„NW Quadrant Storm Drain RepairsNW Quadrant Storm Drain Repairs„„NW Quadrant Sewer RepairsNW Quadrant Sewer Repairs„„CMP Replacement ProgramCMP Replacement Program„„Pavement Management ProgramPavement Management Program„„Sewer Line Rehab/Replacement ProgramSewer Line Rehab/Replacement Program„„CathodicCathodicProtection ProgramProtection Program„„Water Line and Valve Replacement ProgramWater Line and Valve Replacement Program„„Sidewalk Repair ProgramSidewalk Repair Program„„Miscellaneous Road SubMiscellaneous Road Sub--drain Repair Programdrain Repair Program May 20, 200838CitizenCitizen’’s Budget Workshops Budget Workshop„„WhenWhen::Thursday,Thursday,June 12June 12thth„„WhereWhere::Faraday CenterFaraday Center1635 Faraday Avenue, 1635 Faraday Avenue, Room 173BRoom 173B„„TimeTime::6:00pm6:00pmCall the Finance Department at(760) 602-2430 for additional information. May 20, 200839Council ActionCouncil Action1.1.Set Public Hearing for June 24Set Public Hearing for June 24thth, 2008, 20082.2.Adopt Resolution 2008Adopt Resolution 2008--152 approved 152 approved Proposition 1B Spending Plan Proposition 1B Spending Plan May 20, 200840BlankBlankQuestions ~ CommentsQuestions ~ CommentsTamarack State Beach ~ 2008 May 20, 200841““PROP CPROP C””ProjectsProjectsProjectsProjectsAllocationAllocationOriginal Set AsideOriginal Set Aside$35,000,000$35,000,000Aquatic ComplexAquatic Complex$16,215,795$16,215,795City / Safety Training FacilityCity / Safety Training Facility$ 13,750,000$ 13,750,000Cannon Road Cannon Road ––Reach 4Reach 4Trails/Open SpaceTrails/Open SpaceRemaining AllocationRemaining Allocation$5,034,205$5,034,205 May 20, 200842Public Facilities Fee FundPublic Facilities Fee FundChange from Prior YearChange from Prior YearProjected deficit in 2020Projected deficit in 2020($12.7 million)($12.7 million)Adjustments to projection:Adjustments to projection:Interest earned 2007Interest earned 2007--0808+ $ 2.3 million+ $ 2.3 millionIncrease in revenue estimateIncrease in revenue estimate+ $ 2.0 million+ $ 2.0 million(increased assessed valuation)(increased assessed valuation)Loan repayments in wrong fundLoan repayments in wrong fund+ $ 7.1 million+ $ 7.1 millionNet other adjustmentsNet other adjustments($ 0.2 million)($ 0.2 million)----------------------------------------------= Current projected deficit= Current projected deficit20202020($ 1.5 million)($ 1.5 million)====================