HomeMy WebLinkAbout2008-08-05; City Council; 19534; Awarding Contract to Socal Pacific Construction Corporation for Vista/Carlsbad Interceptor Sewer Reaches VC13-VC15 Manhole Rehabilitation Projent No 3949CITY OF CARLSBAD - AGENDA BILL
AB# 19,534
MTG. 8/05/08
DEPT. ENG
ACCEPTING BIDS AND AWARDING THE CONTRACT TO
SOCAL PACIFIC CONSTRUCTION CORPORATION FOR
VISTA/CARLSBAD INTERCEPTOR SEWER, REACHES VC13-VC15,
MANHOLE REHABILITATION, PROJECT NO. 3949
DEPT. HEAD f^T^T
CITY ATTY. @&
CITY MGR. U/"^
RECOMMENDED ACTION:
Adopt Resolution No. 2008-225 accepting bids and awarding the contract to SOCAL Pacific
Construction Corporation for the Vista/Carlsbad Interceptor Sewer, Reaches VC13-VC15 Manhole
Rehabilitation, Project No. 3949.
ITEM EXPLANATION:
The Vista/Carlsbad (VIC) Interceptor Sewer was constructed in 1965 and is jointly-owned by the
City of Vista and the City of Carlsbad. The alignment, approximately eight miles in length within the
City of Carlsbad, extends from just west of the intersection of College Boulevard and Highway 78 to
the Encina Water Pollution Control Facility (Encina).
The V/C Interceptor Sewer is divided into reaches numbered VC1 through VC16. Reaches VC1
through VC11A have been replaced or rehabilitated in recent years, with the exception of the
Buena Vista Force Main (Reach VC4), which is currently in design for replacement. The City has
recently completed a study to investigate alternatives and develop a design concept to replace
Reaches VC11B through VC15. The preferred design concept includes replacement of the trestle
bridge across Agua Hedionda Lagoon with a new concrete bridge (VC11B), and construction of a new
lift station approximately 50-feet east of the current facility with a new force main (VC12). The pipeline
in Reaches VC13 through VC15 is in good condition but undersized for future flows. The preferred
design for these lower reaches includes constructing a parallel gravity pipeline and continuing to utilize
the existing Reaches VC13 through VC15. Together the parallel pipelines will provide capacity for the
ultimate future flows. The existing gravity interceptor sewer will also maintain existing sewer
connections.
While the PVC lined pipeline was found to be in good condition, a total of 27 manholes in Reaches
VC13 through VC15 are severely corroded and require immediate attention. In consideration of the
significant environmental permitting and coordination issues for the bridge, lift station and new
pipeline, construction of the new improvements is expected to occur no earlier than January 2010.
The manhole rehabilitation portion of the project has, therefore, been separated into its own
construction contract in an effort to expedite the improvements and eliminate the risk of a manhole
failure.
On May 6, 2008, through the adoption of Resolution No. 2008-130, the Carlsbad City Council
approved plans and specifications and authorized the City Clerk to advertise to receive bids for the
Vista/Carlsbad Interceptor Sewer, Reaches VC13-VC15 Manhole Rehabilitation, Project No. 3949.
DEPARTMENT CONTACT: Mark Biskup, (760) 602-2763, mbisc@ci.carlsbad.ca.us
FOR CITY CLERKS USE ONL Y. w
COUNCIL ACTION: APPROVED M
DENIED T]
CONTINUED D
WITHDRAWN D
AMENDED D
CONTINUED TO DATE SPECIFIC
CONTINUED TO DATE UNKNOWN
RETURNED TO STAFF
OTHER - SEE MINUTES
D
D
D
D
Page 2
On July 8, 2008, two (2) sealed bids were received for the construction of this project, which are
summarized in the table below:
CONTRACTOR
1 . SOCAL Pacific Construction Corporation
2. Weir Construction
CITY/STATE
Lake Elsinore, CA
Escondido, CA
/'".•TOTAt-y--1
$279,682
$375,493
The Engineer's Estimate for this project is $361,900. Staff has completed its review of all documents
and finds that they are in order. Therefore, staff recommends that SOCAL Pacific Construction
Corporation be awarded the contract.
ENVIRONMENTAL IMPACT:
A Notice of Exemption was filed on June 1, 2007 for EA 07-01-Vista-Carlsbad Interceptor Sewer
Reaches 11B-15 Access Hole Replacement, in compliance with Section 21152b of the Public
Resources Code (California Environmental Quality Act) by the City of Carlsbad's Assistant Planning
Director.
FISCAL IMPACT:
PROJECT COST SUMMARY.FOR THE DESIGN, ENVIRONMENTAL AND^^:'^'
CONSTRUCTION PHASE Of^f HE MC SEWER MANHOLE ^ MEHABI1pt^^N^I%)£
' •••..':•-.... ; ' .' " ' •'• ".-?!• {PROJECT NO. 3949)": r ••' '-: " r "^^W^W'.^**'
DESIGN PHASE
Environmental for Manholes (Planning Systems)
Engineering Staff (Project Design and Management)
Manhole/Pipeline Assessment Report (Affordable Pipeline)
Miscellaneous
DESIGN SUBTOTAL
CONSTRUCTION PHASE
Construction (SOCAL Pacific Construction Corporation)
Construction Contingency
Construction Management and Inspection (10%)
CONSTRUCTION SUBTOTAL
TOTAL PROJECT COST (Manhole Rehabilitation}*
Planning & Design Costs to Date (Lift Station, Pipeline and Bridge)
Total Estimated Cost Through Current Phase
CURRENT APPROPRIATION
$11,790
$10,000
$16,290
$1,214
$39,294
$279,682
$30,000
$28,000
$337,682
$3m07C
$561,816
$938,792
$2,600,000
"Vista's share of Total Project Cost is $221,221 and Carlsbad's share is $155,755.
Sufficient funds are available for the completion of the manhole rehabilitation construction.
The remaining funds will be applied to the new interceptor sewer improvements. The total amount
budgeted in the Capital Improvement Program for all project costs for Reaches VC11B-VC15 and the
lift station replacement is approximately $38.5 million. All project-related costs will be shared between
the City of Carlsbad and the City of Vista as described in an existing agreement for ownership,
operation, and maintenance between the two cities. Carlsbad's cost share of the project is funded
from the Sewer Connection Fee Fund.
EXHIBITS:
1.
2.
Location Map.
Resolution No. 2008-225 accepting bids and awarding the contract to SOCAL Pacific
Construction Corporation for the Vista/Carlsbad Interceptor Sewer, Reaches VC13-VC15
Manhole Rehabilitation, Project No. 3949.
4- I
LOCATION MAP
vista Meter Station
Begin V/C Interceptor
Reach VC11B
Lagoon Crossing
Existing Agua Hedionda
Lift Station
VC13THROUGHVC15
PROJECT LOCATION
VC11BthruVC15
VC1 thruVCHA
Not a Part of Projecl
Water Body
RAK>MAR AIRPORT RD
VC16& Encina Water Pollution
Control Facility
Parcel Boundary
PROJECT NAME: VISTA/CARLSBAD INTERCEPTOR
SEWER MANHOLE REHABILITATION
REACHES VC13 THROUGH VC15
PROJECT #
CP 3949
EXHIBIT
A
1
RESOLUTION NO. 2008-225
2
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
3 CARLSBAD, CALIFORNIA, ACCEPTING BIDS AND AWARDING
THE CONTRACT TO SOCAL PACIFIC CONSTRUCTION
4 CORPORATION FOR VISTA/CARLSBAD INTERCEPTOR SEWER
REACHES VC13 THROUGH VC15 MANHOLE REHABILITATION,
5 PROJECT NO. 3949.
6 WHEREAS, the City Council of the City of Carlsbad, California, desires to rehabilitate
7 27 existing manholes in Reaches VC13 through VC15 in the Vista/Carlsbad Interceptor Sewer in
8 conformance with the Sewer Master Plan; and
9 WHEREAS, a Notice of Exemption was filed on June 1, 2007 in compliance with Section
10 21152b of the Public Resources Code (California Environmental Quality Act) by the City of
11 Carlsbad's Assistant Planning Director; and
12 WHEREAS, on May 6, 2008, through the adoption of Resolution No. 2008-130, the
13 Carlsbad City Council approved of plans and specifications and authorized the City Clerk to
14 advertise to receive bids the Vista/Carlsbad Interceptor Sewer, Reaches VC13-VC15 Manhole
15 Rehabilitation, Project No. 3949; and
16 WHEREAS, two (2) sealed bids were received on July 8, 2008 by the City of Carlsbad for
17 the construction of said project; and
18 WHEREAS, the lowest responsive and responsible bid to construct said project was
19 submitted by SOCAL Pacific Construction Corporation, in the amount of $279,682; and
20 WHEREAS, funds in the Sewer Connection Fee Fund are sufficient to complete said
21 project.
22 NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carlsbad,
23 California, as follows:
24 1. That the above recitations are true and correct.
25 2. That the bid in the amount of $279,682 submitted by SOCAL Pacific Construction
26 Corporation, for the construction of the Vista/Carlsbad Interceptor Sewer Reaches VC13-VC15
27 Manhole Rehabilitation, Project No. 3949, is accepted and the Mayor is hereby authorized to
28 execute a contract with SOCAL Pacific Construction Corporation.
1 3. The City Manager is hereby authorized to approve construction change orders up to
2 $30,000.
3 4. That the award of this contract is contingent upon the bidder submitting the lowest
4 responsible bid executing the required contract and submitting the required bonds and insurance
5 policies, as described in the contract, within twenty (20) days of adoption of this resolution.
Q The City Manager may grant reasonable extensions of time.
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
PASSED, APPROVED AND ADOPTED at a Regular Meeting of the City Council
of the City of Carlsbad on the 5th day of August. 2008, by the following vote to
wit:
AYES: Council Members Lewis, Kulchin, Hall, Packard, Nygaard
NOES: None
ABSENT: None
ATTEST:
LORR/CfNEltfr:ity Clerk