Loading...
HomeMy WebLinkAbout2008-10-07; City Council; 19599; Final Accounting of Local Declaration of Emergency and Notice of Completion for Repair of Sinkhole Storm Drain and Potable Water Pipelines from 2277 and 2283 Cameo Road to El Camino Real Project Nos 6607 and 5011CITY OF CARLSBAD CITY COUNCIL AND 1 0 CARLSBAD MUNICIPAL WATER DISTRICT - AGENDA BILL 19.599 MTG. 10/07/08 DEPT.ENG FINAL ACCOUNTING OF LOCAL DECLARATION OF EMERGENCY AND NOTICE OF COMPLETION FOR REPAIR OF THE SINKHOLE, STORM DRAIN, AND POTABLE WATER PIPELINES FROM 2277 AND 2283 CAMEO ROAD TO EL CAMINO REAL, PROJECT NOS. 6607 AND 501 1 DEPT. CITY ATTY. CITY MGR. \jj RECOMMENDED ACTION: Adopt Resolution No. 2008-284 accepting the final accounting and the contract for the Local Emergency repair of the sinkhole and storm drain pipeline from 2283 Cameo Road to El Camino Real as complete and directing the City Clerk to record a Notice of Completion and release bonds in accordance with State Law and City Ordinances. Adopt Resolution No. 1339 accepting the final accounting and contract for the Local Emergency repair of the sinkhole and potable water pipeline from 2277 Cameo Road to El Camino Real as complete and directing the Secretary to record a Notice of Completion and release bonds in accordance with State Law and City Ordinances. ITEM EXPLANATION: On March 7, 2008, the City Manager declared a state of local emergency to repair the sinkhole and storm drain at 2277 and 2283 Cameo Road in Carlsbad. On March 18, 2008, the City Council ratified the declaration of local emergency pursuant to California Public Contract Code Section 22050. Due to the nature of the construction efforts associated with the repairs for the sinkhole and storm drain from 2283 Cameo Road to El Camino Real, City and Carlsbad Municipal Water District (CMWD) staff evaluated the adjacent 6-inch asbestos cement potable water pipeline. City and CMWD staff observed the brittle pipe material had been placed in loosely compacted fill and the pipeline was damaged. The water pipeline is a part of the CMWD water system and is required to maintain water service to properties in the area and fire hydrants. Staff analyzed the impacts to the overall water system and determined the water pipeline is required. CMWD operates under the City of Carlsbad Purchasing rules pursuant to the Operation Agreement between CMWD and the City dated June 25, 1991. Replacement of the water pipeline required a Declaration of Local Emergency by CMWD. On April 22, 2008, CMWD declared a local emergency for the repair of the water pipeline. Staff returned to Council on substantial completion of the repairs to the sinkhole, storm drain, and potable water pipeline from 2277 and 2283 Cameo Road to El Camino Real that has abated the health and safety issues related to Local Emergency. Staff is returning a final time to report a final accounting of the projects. DEPARTMENT CONTACT: Sherri Howard 760-602-2756 showa@ci.carlsbad.ca. us FOR CITY CLERKS USE ONLY. COUNCIL/BOARD APPROVED H" ACTION: DENIED D CONTINUED D WITHDRAWN D AMENDED D CONTINUED TO DATE SPECIFIC D CONTINUED TO DATE UNKNOWN D RETURNED TO STAFF D OTHER-SEE MINUTES D Page 2 On May 8, 2008, the City of Carlsbad and Don Hubbard Contracting Company entered into a contract in the amount of $176,495 for the storm drain and sinkhole repair between Cameo Road and El Camino Real, Project No. 6607. On June 10, 2008, the Carlsbad Municipal Water District and Don Hubbard Contracting Company entered into a contract in the amount of $90,500 for the potable water pipeline repair between Cameo Road and El Camino Real, Project No. 5011. Don Hubbard Contracting Company has completed the contract work. Staff has inspected the work and found it to be satisfactory. Staff recommend formal acceptance of the improvements by the City of Carlsbad City Council and the Carlsbad Municipal Water District Board. ENVIRONMENTAL IMPACT: The approval of the final accounting and Notice of Completions are a ministerial process and are exempt from the requirements of CEQA pursuant to Section 15268 of the State CEQA Guidelines. FISCAL IMPACT: The following represents the final accounting of the repair and replacements of the sinkhole, storm drain and water pipelines from Cameo Road to El Camino Real. 6607 STORM DRAIN PIPELINE Design Construction Inspection Right-of-Way Acquisition TOTAL $11,231 $124,335 $9,779 $19,300 $164,646 5011 POTABLE WATER PIPELINE Design Construction Inspection TOTAL $4,218 $81,988 $6,532 $92,738 EXHIBITS: 1. Resolution No. 2008-284 accepting the final accounting and the contract for the Local Emergency Repair of the sinkhole and storm drain pipeline from 2283 Cameo Road to El Camino Real as complete and directing the City Clerk to Record a Notice of Completion and release bonds in accordance with State Law and City Ordinances. 2. Resolution No. 1339 accepting the final accounting and contract for the Local Emergency repair of the sinkhole and potable water pipeline from 2277 Cameo Road to El Camino Real as complete and directing the Secretary to record a Notice of Completion and release bonds in accordance with State Law and City Ordinances. 3. Notice of Completion for Storm Drain Pipeline and Sinkhole Repair between Cameo Road and El Camino Real, Project No 6607 4. Notice of Completion for Potable Water Pipeline Repair between Cameo Road and El Camino Real, Contract No. 5011. 1 RESOLUTION NO. 2008-284 2 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF 3 CARLSBAD, CALIFORNIA, ACCEPTING THE FINAL ACCOUNTING AND THE CONTRACT FOR THE LOCAL 4 EMERGENCY REPAIR OF THE SINKHOLE AND STORM DRAIN PIPELINE FROM 2283 CAMEO ROAD TO EL CAMINO REAL AS 5 COMPLETE AND DIRECTING THE CITY CLERK TO RECORD A NOTICE OF COMPLETION AND RELEASE BONDS IN 6 ACCORDANCE WITH STATE LAW AND CITY ORDINANCES. 7 WHEREAS, on March 1, 2008, a sinkhole and separated storm drain pipeline were 8 discovered in a drainage easement located at 2283 Cameo Road; and 9 WHEREAS, the sinkhole created a nuisance in the rear yard at 2277 and 2283 Cameo10 Road;and 11 WHEREAS, the sinkhole and missing storm drain segment had the potential to undermine an existing 6-inch potable water pipeline and cause erosion and damage of real 13 property at 2277 and 2283 Cameo Road and the downstream properties located at 3813 and 14 3817 El Camino Real; and WHEREAS, emergency repairs were needed to mitigate potential damage to the existing potable water system and further damage to real property; and 17 WHEREAS, Public Contract Code Section 1102 defines an emergency as "a sudden, 18 unexpected occurrence that poses a clear and imminent danger, requiring immediate action to 19 prevent or mitigate the loss or impairment of life, health, property, or essential public services"; and 20 WHEREAS, staff determined that the potential damage to water lines, as well as the 2-, threat to real property met the criteria for an emergency as defined in Public Contract Code Section 1102; and22 WHEREAS, in the event of an emergency, Section 3.28.130 of the Carlsbad Municipal 23 Code gives the City Manager authority to declare a public emergency subject to confirmation by 24 the City Council, by four-fifths vote at its next regularly scheduled meeting following the declaration 25 of the emergency; and 26 /// 27 28 1 WHEREAS, said Local Emergency continues until the sinkhole and all associated 2 components and conditions have been restored and declared abated by order of the City Manager o and City Council; and WHEREAS, on March 7, 2008, the City Manager declared a state of Local Emergency; ando . WHEREAS, on March 18, 2008, City Council confirmed a continuing state ofb 7 Local Emergency; and o WHEREAS, on April 1, 2008, City Council declared a continuing state of g Local Emergency; and 10 WHEREAS, on April 15, 2008, City Council declared a continuing state of 11 Local Emergency; and 12 WHEREAS, on April 22, 2008, City Council declared a continuing state of 13 Local Emergency; and 14 WHEREAS, on May 6, 2008, City Council declared the Local Emergency had been 15 abated and no need for the state of Local Emergency to continue for repairs of sinkhole and storm 16 drain pipeline from 2283 Cameo Road to El Camino Real; and 17 WHEREAS, a final accounting of the project indicate $164,646 was required to mitigate 18 the sinkhole and storm drain pipeline repair; and 19 WHEREAS, the construction of the Storm Drain and Sinkhole Repair between 20 Cameo Road and El Camino Real has been completed to the City's satisfaction by Don Hubbard 21 Construction Company; and 22 WHEREAS, the formal project Notice of Completion has been prepared. 23 NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carlsbad, 24 California, as follows: 25 1. That the above recitations are true and correct. 26 2. That the City Council accepts the final accounting for the repairs of sinkhole and 27 storm drain pipeline from 2283 Cameo Road to El Camino Real. 28 3. That the Storm Drain and Sinkhole Repair between Cameo Road and El Camino Real, is deemed complete and is hereby accepted by the City Council of the City of Carlsbad, Project 6607. 4. The City Clerk of the City of Carlsbad is hereby authorized and directed to execute and record the Notice of Completion for the Storm Drain and Sinkhole Repair between Cameo Road and El Camino Real, Project No. 6607. 7 /// 8 /// /// 11 /// 12 /// 13 /// 14 /// 15 /// 16 /// 17 /// 18 /// 19 /// 20 /// 21 /// 22 /// 23 /// 24 25 26 27 28 5 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 PASSED, APPROVED AND ADOPTED at a Joint Special Meeting of the Carlsbad City Council and Carlsbad Municipal Water District of on the 7th day of October, 2008, by the following vote to wit: AYES: Council Members Lewis, Kulchin, Hall, Packard and Nygaard. NOES: None. ABSENT: None. ATTEST: UTORRAlNEIM. WOOD, City Clerk (SEAL) 1 RESOLUTION NO. 1339 2 A RESOLUTION OF THE BOARD OF DIRECTORS OF CARLSBAD 3 MUNICIPAL WATER DISTRICT (CMWD) ACCEPTING THE FINAL ACCOUNTING AND THE CONTRACT FOR THE LOCAL 4 EMERGENCY REPAIR OF THE SINKHOLE AND POTABLE WATER PIPELINE FROM 2277 CAMEO ROAD TO EL CAMINO REAL AND 5 DIRECTING THE SECRETARY TO RECORD A NOTICE OF COMPLETION AND RELEASE BONDS IN ACCORDANCE WITH 6 STATE LAW AND CITY ORDINANCES. 7 WHEREAS, on March 1, 2008, a sinkhole and separated storm drain pipeline were discovered in a drainage easement located at 2283 Cameo Road; and8 WHEREAS, the sinkhole created a nuisance in the rear yard at 2277 and 2283 Cameo 9 Road; and 10 WHEREAS, the sinkhole and missing storm drain segment had the potential to 11 undermine an existing 6-inch potable water pipeline and cause erosion and damage of real 12 property at 2277 and 2283 Cameo Road and the downstream properties located at 3813 and 13 3817 El Camino Real; and 14 WHEREAS, CMWD has determined the potable water pipeline requires replacement; 15 and 16 WHEREAS, Public Contract Code Section 1102 defines an emergency as "a sudden, 17 unexpected occurrence that poses a clear and imminent danger, requiring immediate action to ._ prevent or mitigate the loss or impairment of life, health, property, or essential public services"; and WHEREAS, staff determined that the potential damage to water lines, as well as the19 threat to real property meets the criteria for an emergency as defined in Public Contract Code 20 Section 1102; and 21 WHEREAS, the Carlsbad Municipal Water District operates under the City of Carlsbad 22 purchasing rules pursuant to the Operation Agreement between Carlsbad Municipal Water District 23 and the City of Carlsbad dated June 25, 1991; and 24 WHEREAS, in the event of an emergency, Section 3.28.130 of the Carlsbad Municipal 25 Code gives the City Manager authority to declare a public emergency subject to confirmation by 26 the City Council, by four-fifths vote at its next regularly scheduled meeting following the declaration 27 of the emergency; and 28 1 WHEREAS, the City Manager declared a Local Emergency on March 7, 2008; and 2 WHEREAS, said Local Emergency continues until the sinkhole and all associated 3 components and conditions have been restored and declared abated by order of the City Manager and City Council; and WHEREAS, on April 22, 2008, the Carlsbad Municipal Water District declared a Local 5 Emergency; and 6 WHEREAS, on May 6, 2008 Carlsbad Municipal Water District declared that said Local Emergency had been abated and no need for the state of Local Emergency to continue for repairs Q of sinkhole and potable water pipeline from 2277 Cameo Road to El Camino Real; and * WHEREAS, a final accounting of the project indicate $92,738 was required to mitigate to 10 sinkhole and potable water pipeline repair; and 11 WHEREAS, the Potable Water Pipeline Repair between 2277 Cameo Road and 12 El Camino Real, Project No. 5011, is complete; and -13 WHEREAS, all work has been completed to the Carlsbad Municipal Water District's satisfaction by Don Hubbard Constriction Company; and WHEREAS, the formal project Notice of Completion has been prepared. i O NOW, THEREFORE, BE IT RESOLVED by the Board of Directors of Carlsbad Municipal 16 Water District (CMWD) of the City of Carlsbad, California, as follows: 17 1. That the above recitations are true and correct. 1 fi 2. That the Board of Directors of Carlsbad Municipal Water District accepts the final 19 accounting for the repairs of sinkhole and potable water pipeline from 2277 Cameo Road to 20 El Camino Real. 21 3. That the contract for the Potable Water Pipeline Repair between 2277 Cameo 22 Road and El Camino Real, Project No. 5011, is deemed complete and is hereby accepted by the 23 Board of Directors of Carlsbad Municipal Water District. 24 4. The Secretary of the Board is hereby authorized and directed to execute and 25 record the Notice of Completion for the Potable Water Pipeline Repair between Cameo Road and 26 El Camino Real, Project No. 5011. 27 /// 28 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 PASSED, APPROVED AND ADOPTED at a Joint Special Meeting of the Carlsbad Municipal Water District Board of Directors and the Carlsbad City Council on the 7th day of October, 2008, by the following vote to wit: AYES: Board Members Lewis, Kulchin, Hall, Packard and Nygaard. NOES: None. ABSENT: None. UA LEWIS, President ATTEST: LORRAINEM. WOOD, Secretary (SEAL) Recording requested by: CITY OF CARLSBAD When recorded mail to: City Clerk City of Carlsbad 1200 Carlsbad Village Dr. Carlsbad, CA 92008 I Space above this line for Recorder's Use NOTICE OF COMPLETION Notice is hereby given that: 1. The undersigned is owner of the interest or estate stated below in the property hereinafter described. 2. The full name of the undersigned is City of Carlsbad, a municipal corporation. 3. The full address of the undersigned is 1200 Carlsbad Village Drive, Carlsbad, California 92008. 4. The nature of the title of the undersigned is: In fee. 5. A work of improvement on the property hereinafter described was completed on Mav 29. 2008. 6. The name of the contractor for such work of improvement is Don Hubbard Contracting Company. 7. The property on which the work of improvement was completed is in the City of Carlsbad, County of San Diego, State of California; and is described as the construction of repair of sinkhole and stormdrain pipeline between Cameo Road and El Camino Real. Project No. 6607. GLENN PRUIM Public Works Director VERIFICATION OF CITY CLERK I, the undersigned, say: I am the City Clerk of the City of Carlsbad, 1200 Carlsbad Village Drive, Carlsbad, California, 92008. The City Council of said City on &JbcA>aX~ "l^ . 2008, accepted the above described work as completed and ordered that a Notice of Completion be filed. I declare under penalty of perjury that the foregoing is true and correct. Executed on fOMtobfoO ^"1 2008, at Carlsbad, California. CITY OF CARLSBAD = LORRAINE M. WOOD 'c City Clerk Recording requested by: ) CITY OF CARLSBAD ) ) When recorded mail to: ) ) City Clerk ) City of Carlsbad ) 1200 Carlsbad Village Dr. ) Carlsbad, CA 92008 ) Space above this line for Recorder's Use NOTICE OF COMPLETION Notice is hereby given that: 1. The undersigned is owner of the interest or estate stated below in the property hereinafter described. 2. The full name of the undersigned is Carlsbad Municipal Water District (CMWD), a municipal corporation. 3. The full address of the undersigned is 1200 Carlsbad Village Drive, Carlsbad, California 92008. 4. The nature of the title of the undersigned is: In fee. 5. A work of improvement on the property hereinafter described was completed on May 29. 2008. 6. The name of the contractor for such work of improvement is Don Hubbard Contracting Company. 7. The property on which the work of improvement was completed is in the City of Carlsbad, County of San Diego, State of California, and is described as the construction of repair of a sinkhole and potable water pipeline between Cameo Road and El Camino Real. Project No. 5011. ATER DISTRICT 'GLENN PRUIM Public Works Director VERIFICATION OF CITY CLERK I, the undersigned, say: I am the Secretary of the Carlsbad Municipal Water District, 1200 Carlsbad Village Drive, Carlsbad, California, 92008. The Executive Board of said District on October ^ 2008, accepted the above described work as completed and ordered that a Notice of Completion be filed. I declare under penalty of perjury that the foregoing is true and correct. Executed on (Ofrfa^jt:.^ 1 2008, at Carlsbad, California. CARLSBAD MUNICIPAL WATER DISTRICT VVoc LORRAINE M. WOOD21": Secretary