HomeMy WebLinkAbout2009-03-10; City Council; 19740; Poinsettia Park parking lot projectCITY OF CARLSBAD - AGENDA BILL 10
AB# 19,740
MTG. 3/10/09
DEPT. ENG
AUTHORIZATION TO ADVERTISE FOR BIDS FOR THE
POINSETTIA COMMUNITY PARK PHASE IIB PARKING LOTS,
PROJECT NO. 4504
DEPT. HEAD/Z/^/tT
CITYATTY. V(@,
CITY MGR. U>-^
RECOMMENDED ACTION:
Adopt Resolution No. 2009-046 approving plans and specifications, and authorizing the City Clerk
to advertise for bids for the construction of the Poinsettia Community Park Phase IIB Parking Lots, Project
No. 4504.
ITEM EXPLANATION:
The proposed Poinsettia Community Park Phase IIB Parking Lots project is located in Poinsettia
Community Park, which is accessed from Hidden Valley Road, refer to Exhibit 1. The construction of the
parking lots is part of the overall master plan for Poinsettia Community Park approved by Council in 1992.
Future phases of the master plan call for a community center, completion of the tennis complex
(clubhouse, center court, and practice backstop), additional tot lot, and various other amenities.
Plans and specifications have been completed and are on file in the Engineering Department for the
construction of the two (2) additional parking lots at the entrance to Poinsettia Community Park. A total of
97 parking spaces in both lots will be constructed. The project includes paving and striping for the parking
lots, lighting, and installation of adjacent landscaping. The project also includes low impact development
elements such as zero curb and vegetated swales.
ENVIRONMENTAL IMPACT:
This project is consistent with CUP 92-05/HDP 92-09 approved by the Planning Commission in October
1992 as well as the Mitigated Negative Declaration issued by the Planning Director on July 30,1992.
FISCAL IMPACT:
Table 1 shows the current status of the Poinsettia Community Park Phase IIB Parking Lot project:
TABLE 1 - POINSETTIA COMMUNITY PARK PHASE IIB PARKING LOTS
PROJECT NO. 4504
TASK DESCRIPTION
Design
Construction, Inspection, Materials
Testing
Environmental Mitigation & Monitoring
Right-of-Way Acquisition
Studies and Reports
TOTAL
APPROPRIATED
TO DATE
$85,215
878,185
0
0
0
$963,400
EXPENDITURES/
ENCUMBRANCES
TO DATE
$65,911
10,000
0
0
0
$75,911
REMAINING
BALANCES
$19,304
868,185
0
0
0
$887,489
DEPARTMENT CONTACTS: Eva Plajzer, 760-602-2787, eplai@ci.carlsbad.ca.us
FOR CITY CLERKS USE ONLY
COUNCIL ACTION: APPROVED
DENIED
CONTINUED
WITHDRAWN
AMENDED
X
D
D
D
D
CONTINUED TO DATE SPECIFIC
CONTINUED TO DATE UNKNOWN
RETURNED TO STAFF
OTHER -SEE MINUTES
D
n
D
n
Page 2
An Engineer's Estimate of the construction cost for the project was prepared by RBF Consulting in January
2009 and totals $500,000. The total estimated construction cost is shown in Table 2.
TABLE 2 - PROJECT CONSTRUCTION COST ESTIMATE
Pdirii^ttia Gipthrrturiity Park ProMt No, 4504
Construction Contract (Engineer's Estimate)
Construction Contingency (15%)
Construction Management and Inspection (10%)
Testing (5%)
TOTAL ESTIMATED CONSTRUCTION COSTS
PROJECT AVAILABLE BALANCE
ADDITIONAL APPROPRIATION ANTICIPATED FOR CONSTRUCTION
Estimated
Ctjsts
$500,000
$75,000
$50,000
$25,000
$650,000
$887,489
-0-
Sufficient funds have been appropriated from the Public Facilities Fund to construct the project. Staff
recommends approving the plans and specifications and authorizing the City Clerk to advertise for bids for
the construction of Poinsettia Community Park Phase IIB Parking Lots, Project No. 4504. Staff
recommends that payment of prevailing wages not be required on this project and that the construction
contract should reflect this recommendation.
EXHIBITS:
1. Location map.
2.Resolution No. 2009-046 _ approving plans and specifications, and authorizing the City Clerk
to advertise for bids for the construction of the Poinsettia Community Park Phase IIB Parking Lots,
Project No. 4504.
LOCATION MAP
RD.
NOT TO SCALE
SITE
VICINITY
MAP
NOT TO
SCALE
PROJECT NAME
POINSETTIA COMMUNITY PARK PHASE JIB
PARKING LOTS
PROJECT
NUMBER
4504
EXHIBIT
1
DRAW BY: SCOTT EVANS, CARLSBAD ENGINEERING DEPT. 2/18/09 C: \CAPITAL\PLAJZER\POINSETJIA PARK PARKING LOTS\4504.DWG
1
RESOLUTION NO. 2009-046
2
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
3 CARLSBAD, CALIFORNIA, AUTHORIZING THE CITY CLERK TO
ADVERTISE FOR BIDS FOR THE CONSTRUCTION OF THE
4 POINSETTIA COMMUNITY PARK PHASE IIB PARKING LOTS,
PROJECT NO. 4504.
5
WHEREAS, the City Council of the City of Carlsbad, California, has determined it
6
necessary, desirable, and in the public interest to construct two additional parking lots at the
7
Poinsettia Community Park; and
8
WHEREAS, the plans and specifications for furnishing of all labor, materials, tools,
9
equipment, transportation, and other expenses necessary or incidental to the Poinsettia10
Community Park Phase IIB Parking Lots, Project No. 4504, have been prepared and are on file in11
the Public Works-Engineering Department of the City of Carlsbad and are incorporated herein by
reference; and13
WHEREAS, funding for said project has been appropriated from Public Facilities Fund in
the 2008/2009 Capital Improvement Program in the amount of $963,400 to cover all project costs15
and is sufficient; and16
WHEREAS, payment of prevailing wages will not be required as part of the construction
contract;lo
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carlsbad,i y
P0 California, as follows:
21 1. That the above recitations are true and correct.
22 2. That the plans, specifications, and contract documents for the Poinsettia
23 Community Park Phase IIB Parking Lots, Project No. 4504 are on file in the Public Works-
24 Engineering Department of the City of Carlsbad and are hereby approved.
25 3. The City Clerk of the City of Carlsbad is hereby authorized and directed to
26 publish, in accordance with State law, a Notice to Contractors Inviting Bids for the construction of
27 Poinsettia Community Park Phase IIB Parking Lots, Project No. 4504, in accordance with the
28 plans, specifications, and contract documents referred to herein.
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
PASSED, APPROVED AND ADOPTED at a Regular Meeting of the City Council
of the City of Carlsbad on the 10th day of March, 2009, by the following vote to wit:
AYES: Council Members Lewis, Kulchin, Hall, Packard and Blackburn.
NOES: None.
ABSENT: None.
ATTEST:
.tO.*r—r ^ v ^>< . *_^J?/U>uC-
LffRRAJflE M. W<&)D/City Cle'rk <