HomeMy WebLinkAbout2009-04-14; City Council; 19769; North Batiquitors interceptor sewer projectCITY OF CARLSBAD - AGENDA BILL
AB# 19i769
MTG. 4/14/09
DEPT. ENG
APPROVAL OF PLANS AND SPECIFICATIONS AND
AUTHORIZATION TO ADVERTISE TO RECEIVE BIDS FOR
NORTH BATIQUITOS INTERCEPTOR SEWER MANHOLE
REHABILITATION, PROJECT NO. 3538
DEPT. HEAD ]^TJ
CITYATTY. . (gz>~
CITY MGR. JQ^
RECOMMENDED ACTION:
Adopt Resolution No.2009-069 approving plans and specifications and authorizing the
City Clerk to advertise to receive bids for the North Batiquitos Interceptor Sewer, Manhole
Rehabilitation, Project No. 3538.
ITEM EXPLANATION:
The North Batiquitos Interceptor Sewer (NBIS) is divided into reaches NB1 through NB9 and begins
near the north shore of the Batiquitos Lagoon at Columbine Dr, just west of El Camino Real. From that
beginning point the NBIS pipeline alignment continues westerly along the north shore of the lagoon to
the North Batiquitos Lift Station, located near Gabiano Lane. From the lift station the alignment goes
northwesterly under Interstate 5 and continues north to the Encina Water Pollution Control Facility.
The NBIS was constructed in the early and mid 1970s, with the final upper reaches being completed
in 1976.
This manhole rehabilitation project includes reaches NB1 through NB4 of the NBIS, a 1.9 mile long
section of the sewer that follows the north shoreline of the lagoon between El Camino Real and
Gabiano Lane. Much of the alignment is in or near a public trail with the remaining portions of the
alignment traversing the Four Seasons Resort golf course, agricultural property and property owned
by the Batiquitos Lagoon Foundation. During its most recent cleaning and inspection, the pipeline in
reaches NB1 through NB4 was found to be in good condition. However, 41 manholes in this alignment
were found to be severely corroded with considerable ground water infiltration present and in need of
replacement or rehabilitation. In consideration of the sewer's sensitive location, specific methods of
trenchless rehabilitation have been selected. Manholes will be rehabilitated without excavation, using
low impact work methods designed to eliminate direct impacts to the surrounding habitat.
In order to anticipate and minimize any impacts the project could have on the properties, City staff
corresponded with the Aviara Masters Association, Four Seasons Resort, State of California, and
Batiquitos Lagoon Foundation during the design phase of the project. Since much of the alignment is
on or near the public trail and the resort golf course, a continued effort will be made to coordinate
construction activities in an effort to minimize any inconveniences to the users of the properties during
the construction phase.
City staff has prepared plans and specifications for the rehabilitation of 41 existing manholes on the
North Batiquitos Interceptor Sewer and the project drawings and contract documents are on file in the
Public Works-Engineering Department. The manhole improvements are consistent with
recommendation in the City's 2003 Sewer Master Plan. Staff recommends approving the plans and
specifications and authorizing the City Clerk to advertise for bids for the North Batiquitos Interceptor
Sewer Manhole Rehabilitation, Project No. 3538.
DEPARTMENT CONTACT: Mark Biskup, (760) 602-2763. mark.biskup@carlsbadca.aov
FOR C/7T CLERKS USE ONL Y. ;
COUNCIL ACTION: APPROVED X CONTINUED TO DATE SPECIFIC D
DENIED D CONTINUED TO DATE UNKNOWN D
CONTINUED D RETURNED TO STAFF D
WITHDRAWN D OTHER-SEE MINUTES D
AMENDED D
Page 2
ENVIRONMENTAL IMPACT:
A Coastal Development Permit (CDP 07-13), Mitigated Negative Declaration (MND) and Mitigation
Monitoring and Reporting Program (MMRP) were prepared for the Batiquitos Interceptor Sewer
Rehabilitation Project in compliance with the California Environmental Quality Act. Planning
Commission Resolutions 6463 and 6464 approving the CDP, MND and MMRP were approved by the
Planning Commission on September 17, 2008. No further environmental review is required.
FISCAL IMPACT:
PROJECT COST SUMMARY FOR THE DESIGN, ENVIRONMENTAL AND
CONSTRUCTION PHASES OF THE NORTH BATIQUITOS ^EWER MANHOLE
REHABILITATION (PROJECT NO. 3538) ,-
Environmental
Engineering Design
Manhole/Pipeline Cleaning and Assessment
DESIGN & ENVIRONMENTAL SUBTOTAL
CONSTRUCTION PHASE
Engineer's Construction Cost Estimate with Contingency
Construction Management and Inspection (Estimated)
Environmental Monitoring
CONSTRUCTION SUBTOTAL
TOTAL PROJECT COST (Manhole Rehabilitation) ;
CURRENT APPROPRIATION
$47,012
$49,767
$67,596
$164,375
$566,000
$45,000
$7,000
$618,000
$782,375
$1,199,000
Staff recommends that payment of prevailing wages not be required on this project and that the
construction contract should reflect this recommendation. Sufficient funds are available for the
completion of the manhole rehabilitation construction. The project is funded from the
Sewer Replacement Fund.
EXHIBITS:
1. Location Map.
2. Resolution No.2009-069 approving plans and specifications and authorizing the
City Clerk to advertise bids for the North Batiquitos Interceptor Sewer Manhole Rehabilitation,
Project No. 3538.
LOCATION MAP
ENCINA WASTEWATER
OLLUTION CONTROL
AGILITY
CITY OF CARLSBAD
NOT A PART
NBIS UPPER REACHES
NB5 THROUGH NB9
ORTH BATIQUITOS
IFT STATION
ROJECT ALIGNMENT
BIS REACHES NB1 THROUGH NB4
North Batiquitos Interceptor Sewer
(NBIS)
NBIS Reaches 1-4
NBIS Upper Reaches (not a part of project)
Interstate Freeway
Street
City Boundary
PROJECT NAME: NORTH BATIQUITOS
INTERCEPTOR SEWER MANHOLE REHABILITATION,
PROJECT #
3538
EXHIBIT
1
?
1
RESOLUTION NO. 2009-069
2
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
3
4 n
SEWER MANHOLE REHABILITATION. PROJECT NO. 3538.
5 "
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
^rf 2-
CARLSBAD, CALIFORNIA, APPROVING PLANS AND
SPECIFICATIONS AND AUTHORIZATION TO ADVERTISE TO
RECEIVE BIDS FOR NORTH BATIQUITOS INTERCEPTOR
WHEREAS, the City Council of the City of Carlsbad, California, desires to rehabilitate
41 existing manholes in reaches NB1 through NB4 in the North Batiquitos Interceptor Sewer in
conformance with the Sewer Master Plan; and
WHEREAS, the plans and specifications for furnishing of all labor, materials, tools,
equipment, transportation, and other expenses necessary or incidental to the North Batiquitos
Interceptor Sewer Manhole Rehabilitation, Project No. 3538, have been prepared and are on file in
the Public Works-Engineering Department of the City of Carlsbad and are incorporated herein by
reference; and
WHEREAS, a Coastal Development Permit (CDP 07-13), Mitigated Negative Declaration
(MND) and Mitigation Monitoring and Reporting Program (MMRP) were prepared for the Batiquitos
Interceptor Sewer Rehabilitation Project in compliance with the California Environmental Quality
Act. Planning Commission Resolutions 6463 and 6464 approving the CDP, MND and MMRP
were approved by the Planning Commission on September 17, 2008 and no further environmental
review is required; and
WHEREAS, the City Council has determined that the payment of prevailing wages is not in
the City's best interest for the project and that this determination shall be included in the notice of
inviting bids; and
WHEREAS, funds in the Sewer Replacement Fund are sufficient for the project.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carlsbad,
California, as follows:
2Q 1. That the above recitations are true and correct.
27
28
1 2. That the plans, specifications, and contract documents for the North Batiquitos
2 Interceptor Sewer Manhole Rehabilitation, Project No. 3538, are on file in the Public Works-
3 Engineering Department of the City of Carlsbad and are hereby approved.
4 3. The notice inviting bids shall include the determination that the contract will not
5 require the payment of prevailing wages.
4. The City Clerk of the City of Carlsbad is hereby authorized and directed to publish,
7 in accordance with state law, a Notice to Contractors Inviting Bids for the construction of the North
8 Batiquitos Interceptor Sewer Manhole Rehabilitation, Project No. 3538, in accordance with the
plans, specifications, and contract documents referred to herein.
10 "'
11 '"
12
13 '"
14
15 ///
16
17
18
19
20
21
22
23
24
25
26
27
28
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
PASSED, APPROVED AND ADOPTED at a Regular Meeting of the City Council
of the City of Carlsbad on the 14th day of, 2009, by the following vote to wit:
AYES: Council Members Lewis, Kulchin, Hall, Packard and Blackburn.
NOES: None.
ABSENT: None.
MS, Mayor
ATTEST:
M. Web'D, City'Clerk 6