APPROVAL OF PLANS AND SPECIFICATIONS AND
AUTHORIZATION TO ADVERTISE BIDS FOR
CONSTRUCTION OF THE 2009 PAVEMENT OVERLAY
PROJECT NO. 6001-09OL
9
^i s-,
DEPT. HEAD /</ Q'
CITY ATTY. ^
CITY MGR. \JJ^—
RECOMMENDED ACTION:
Adopt Resolution No. 2009-088 approving plans and specifications and authorizing the
City Clerk to advertise for bids for the 2009 Pavement Overlay, Project No. 6001-09OL.
ITEM EXPLANATION:
The 2009 Pavement Overlay Project is part of the City's ongoing Pavement Management Program.
This rehabilitation project will extend the life of various roadways in the northeast quadrant of the City
by applying a rubberized asphalt concrete layer over the existing pavement. Roadways for this project
were selected based on the age and existing condition of the pavement.
ENVIRONMENTAL IMPACT:
This project is categorically exempt from the environmental review process under CEQA Guidelines
Section 15301 Class 1(c) Existing Facilities, of the Public Resources Code (California Environmental
Quality Act).
FISCAL IMPACT:
The current status of the Pavement Management Program is shown in the table below.
PAVEMENT MANAGEMENT PROGRAM - CIP NO. 6001
TASK DESCRIPTION
Design
Construction, Inspection,
Materials Testing
TOTAL
CURRENT YEAR
APPROPRIATION
$71,838
$7,678,185
$7,750,023
CURRENT YEAR
EXPENDITURES/
ENCUMBRANCES
$41,094
$3,361,735
$3,402,829
REMAINING
BALANCES*
$30,744
$4,316,450
$4,347,194
*The Remaining Balance will be used to pay for both the 2009 Calendar Year Slurry Seal and 2009 Calendar Year
Pavement Overlay.
The estimated construction cost for the 2009 Pavement Overlay Project is shown in the table below.
2009 PAVEMENT OVERLAY PROJECT - ENGINEER'S ESTIMATE:
Construction Contract
Construction Contingency (7%)
Administration, Testing, and Inspection (5%)
TOTAL ESTIMATED PROJECT COST
$2,000,000
$140,000
$100,000
$2,240,000
DEPARTMENT CONTACT: Jon Schauble, (760) 602-2762, jon.schauble@carlsbadca.gov
FOR CITY CLERKS USE ONLY
COUNCIL ACTION:APPROVED
DENIED
CONTINUED D
WITHDRAWN D
AMENDED D
CONTINUED TO DATE SPECIFIC D
CONTINUED TO DATE UNKNOWN D
RETURNED TO STAFF D
OTHER - SEE MINUTES D
Page 2
Sufficient funds are available to complete this project, as shown above. Remaining Pavement
Management Program funds will be used on future pavement rehabilitation projects.
This project will be advertised with prevailing wage requirements as it is paid with restricted funds
(TransNet-Local).
EXHIBITS:
1. Street List.
2. Resolution No. 2009-088 approving plans and specifications, and authorizing
the City Clerk to advertise for bids for the 2009 Pavement Overlay, Project No. 6001-09OL.
2009 PAVEMENT OVERLAY STREET LIST EXHIBIT 1
Street
Appian Rd.
Avenida De Anita
Avenida De Anita
Avenida De Anita
Avenida De Anita
Avenida De Anita
Avenida De Anita
Avenida De Anita
Avenida De Anita
Avenida De Anita
Avenida De Anita
Avenida De Anita
Buena Vista Circle
Carlsbad Village Dr.
Carlsbad Village Dr.
El Camino Real
El Camino Real
Garibaldi PI.
Garibaldi PI.
Lafayette Ct.
Longview Dr.
Marron Rd.
Oxford St.
Pontiac Dr.
Pontiac Dr.
Pontiac Dr.
Tamarack Ave.
Tamarack Ave.
Tamarack Ave.
Tamarack Ave.
Tamarack Ave.
York Rd.
York Rd.
York Rd.
From
Trieste Dr.
Via Vera
Via Sorbete
Via Judy
Via Esparta
Via De Paz
Via Bocas
Via Astuto
Flower Fields Wy.
Calle Susana
Avenida De Louisa
Via Astuto
Laguna Dr
El Camino Real
Appian Rd.
Marron Rd.
Hosp Wy.
Lafayette Ct.
End
End
Chestnut Ave.
El Camino Real
Chestnut Ave.
Spokane Wy.
Olympia Dr.
Brighton Dr.
Wilshire Ave.
Simsbury Ct.
Cheshire Ave.
Chatham Rd.
Milford
Oxford St.
Lyons Ct.
Athens Ave.
To
Outlook Ct
Via Sorbete
Carlsbad Village Dr.
Via Naranja
Via Vera
Via Judy
Via Esparta
Avenida De Louisa
Marron Rd.
Via Bocas
Via De Paz
Flower Fields Wy.
End
Appian Rd.
Appian Rd.
Hosp Wy.
Carlsbad Village Dr.
Appian Rd.
Lafayette Ct.
Garibaldi PI.
End
End
York Rd.
Chestnut Ave.
Spokane Wy.
Mayfair Ct.
Cheshire Ave.
Milford PI.
Simsbury Ct.
Wilshire Ave.
Harwich
Athens Ave.
Pontiac Dr.
Lyons Ct.
,—, • > \ j, ^1 ys i I"*•— > ' ex
1
RESOLUTION NO. 2009-088
2
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
3 CARLSBAD, CALIFORNIA, APPROVING PLANS AND
SPECIFICATIONS, AND AUTHORIZING THE CITY CLERK TO
4 ADVERTISE FOR BIDS FOR THE CONSTRUCTION OF THE
2009 PAVEMENT OVERLAY. PROJECT NO. 6001-09OL.
5
WHEREAS, the City Council of the City of Carlsbad, California, has determined it
6
necessary, desirable, and in the public interest to rehabilitate various roadways as part of the
7
City's ongoing Pavement Management Program; and
8
WHEREAS, the plans and specifications for furnishing of all labor, materials, tools,
9
equipment, transportation, and other expenses necessary or incidental to the 2009 Pavement
10
Overlay, Project No. 6001-09OL, have been prepared and are on file in the Public Works-
Engineering Department of the City of Carlsbad and are incorporated herein by reference; and
WHEREAS, sufficient funds are available in the Pavement Management Program
I o
account number 6001 in order to complete this project; and14
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carlsbad,
I O
California, as follows:16
1. That the above recitations are true and correct.17
2. That the plans, specifications, and contract documents for the 2009 Pavement18
„-. Overlay, Project No. 6001-09OL, on file in the Public Works-Engineering Department of the City ofi y
2n Carlsbad are hereby approved.
21 3. The City Clerk of the City of Carlsbad is hereby authorized and directed to
22 publish, in accordance with State law, a Notice to Contractors Inviting Bids for the construction of
23 the 2009 Pavement Overlay, Project No. 6001-09OL, in accordance with the plans, specifications,
24 and contract documents referred to herein.
25 '"
26 '"
27 IH
28 in
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
PASSED, APPROVED AND ADOPTED at a Regular Meeting of the City Council
of the City of Carlsbad on the 5th day of May, 2009, by the following vote to wit:
AYES: Council Members Lewis, Kulchin, Hall, Packard and Blackburn.
NOES: None.
ABSENT: None.
LEWIS, Mayo1
ATTEST: