HomeMy WebLinkAbout2009-06-16; City Council; 19854; 2009 Slurry seal project awardCITY OF CARLSBAD - AGENDA BILL 19,854AB# MTG. 6/16/09 DEPT. ENG AWARD OF CONTRACT FOR CONSTRUCTION OF THE 2009 SLURRY SEAL PROJECT PROJECT NO. 6001-09SS DEPT. HEAD CITY ATTY. CITY MGR. [jj, RECOMMENDED ACTION: Adopt Resolution No. 2009-138 accepting bids and awarding the contract to All American Asphalt for construction of the 2009 Slurry Seal Project No. 6001-09SS. ITEM EXPLANATION: The 2009 Slurry Seal Project No. 6001-09SS, which is part of the City's ongoing Pavement Management Program, will provide a new, flexible wearing surface to the existing pavement and extend the useful life of the roadways identified for this year's program (refer to Exhibit 1 for list of streets). The application of asphaltic emulsion-aggregate slurry seal rejuvenates and protects the roadway surface from the harmful effects of sunlight and it protects the underlying base material from the damaging effects of water penetration. On May 27, 2009, five (5) sealed bids were received for the construction of this project as shown on the following table. CONTRACTOR 1. 2. 3. 4. 5. All American Asphalt Pavement Coatings Company American Asphalt South Inc. Roy Allan Inc. Valley Slurry Seal Company TOTAL AMOUNT OF BID $406,159 $436,419 $441,216 $490,063 $578,361 All bid documents submitted by All American Asphalt have been reviewed by staff and were found to be in order. Staff recommends awarding the construction contract to All American Asphalt in the amount of $406,159. ENVIRONMENTAL IMPACT: This project is categorically exempt from the environmental review process under CEQA Guidelines Section 15301 Class 1(c) Existing Facilities, of the Public Resources Code (California Environmental Quality Act). DEPARTMENT CONTACT: Jon Schauble, (760) 602-2762, ischa@ci.carlsbad.ca.us FOR CITY CLERKS USE ONLY. COUNCIL ACTION: APPROVED DENIED CONTINUED WITHDRAWN AMENDED £nnnn CONTINUED TO DATE SPECIFIC CONTINUED TO DATE UNKNOWN RETURNED TO STAFF OTHER - SEE MINUTES nnnn Page 2 FISCAL IMPACT: The current status of the Pavement Management Program is shown in the table below. PAVEMENT MANAGEMENT PROGRAM - CIP NO. 6001 TASK DESCRIPTION Design Construction, Inspection, Materials Testing TOTAL CURRENT APPROPRIATION $71,838 $7,678,185 $7,750,023 CURRENT YEAR EXPENDITURES/ ENCUMBRANCES $46,633 $3,363,434 $3,410,067 REMAINING BALANCES* $25,205 $4,314,751 $4,339,956 The remaining balance will be used to pay for both the 2009 Calendar Year Slurry Seal and 2009 Calendar Year Pavement Overlay Projects. The estimated construction costs associated with this project are summarized in the following table. Construction Contract Construction Contingency (7%) Project Administration, Testing & Inspection (7%) TOTAL ESTIMATE PROJECT COST $406,159 $28,431 $28,431 $463,021 Sufficient funds are available to complete this project, as shown above. Remaining Pavement Management Program funds will be used on future pavement rehabilitation and resurfacing projects. This project did not require payment of prevailing wages for construction as it is paid with non- restricted funds (Non-Jurisdictional Fees). The significant decrease in the bid amount as compared to engineer's estimate of $925,000 can be attributed to the current economic conditions and lack of prevailing wage requirements. EXHIBITS: 1. 2009 Slurry Seal Street List. 2.Resolution No.2009-138 accepting bids and awarding the contract to All American Asphalt for construction of the 2009 Slurry Seal Project No. 6001-09SS. 2. 2009 SLURRY SEAL STREET LIST EXHIBIT 1 Street Aberdeen Ct. Ames Place Ashby Ct. Athens Ave. Auburn Ave. Banff Ct. Brookwood Ct. Calmeria PI Camino Arena Catalina Dr Catalina Dr Chestnut Ave. Chestnut Ave. Chestnut Ave. Corte Penca Corvallis St. Dundee Ct. Edinburgh Dr. Gary Cir. Gateshead Rd. Glasgow Dr. Glasgow Dr. Glasgow Dr. Granada Wy. Greenock Ct. Harwich Dr. Haverhill St. Haymar Dr. Inverness Ct. Inverness Dr. Kingston St. Kirkwall Ave. La Portalada Lakewood St. Laredo St. Lawrence St. Lyons Ct. Mariposa Rd Mark Cr Medford Ct. Middleton Dr. Milano Dr. Naples Ct. Olympia Dr. Olympia Dr. Porta Place Sierra Morena Ave. Sierra Morena Ave. Sierra Morena Ave. Sitio Solana From Edinburgh Dr. Chestnut Ave. Harwich Dr. York Rd. Laredo St. End Edinburgh Dr. Mariposa Rd Paseo Esmerado Trieste Dr. Chestnut Ave. El Camino Real Sierra Morena Ave. Oxford End Olympia Dr. End Tamarack Ave. Trieste Dr. Glassgow Dr. Woodstock St. Edinburgh Dr. End Trieste Dr. Inverness Dr. Tamarack Ave. Auburn Ave. El Camino Real Edinburgh Dr. Gateshead Rd. Auburn Ave. Tamarack Ave. Tamarack Ave. Olympia Dr. Auburn Ave. Olympia Dr. York Rd. Calmeria PI Trieste Dr. End Salem PI. Trieste Dr. Ames PI. Pontiac Dr. Pontiac Dr. Trieste Dr. Trieste Dr. Chestnut Ave. Chestnut Ave. Camino Arena To End End End Pontiac Dr. Kingston St. Glassgow Dr. End End Corte Penca Chestnut Ave. end Catalina Oxford St. Pontiac Dr. End Spokane Wy. Glassgow Dr. End End End Carlsbad Village Dr. Woodstock St. Edinburgh Dr. Santa Clara Wy. End Carlsbad Village Dr. Victoria Ave. End End Edinburgh Dr. Victoria Ave. Glassgow Dr. end Spokane Wy. Victoria Ave. Spokane Wy. End Aviara Pkwy End Lawrence St. Woodstock St. Sierra Morena End Spokane west end La Portalada Chestnut Ave. Chestnut Ave. Milano Dr. End Page 1 of 2 2009 SLURRY SEAL STREET LIST EXHIBIT 1 Street Southampton Rd. Southampton Rd. Southampton Rd. Spokane Wy. Spokane Wy. Steven Cr Stirling Ave. Stirling Ct. Stockton PI. Stromberg Cr. Topeka St. Trieste Dr. Trieste Dr. Trieste Dr. Victoria Ave. Waterbury Wy. Woodstock St. From Pontiac Dr. Chancery Ct. Chelsea Ct. Pontiac Dr. Lawrence St. Trieste Dr. Glassgow Dr. Inverness Dr. Seabury PI. Trieste Dr. Olympia Dr. Porta PI. Chestnut Ave. Chestnut Ave. Pontiac Dr. Concord St Glassgow Dr. To Chancery Ct. Chelsea Ct. Pontiac Dr. Olympia Dr. Pontiac Dr. End Stirling Ct. End End End Spokane Wy. Milano Dr. Porta PI. Appian Carlsbad Village Dr. west end Lancaster Page 2 of 2 17 18 19 20 21 22 23 24 25 26 27 28 1 RESOLUTION NO. 2009-138 2 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD, CALIFORNIA, ACCEPTING BIDS AND AWARDING A CONTRACT FOR CONSTRUCTION OF THE 2009 SLURRY SEAL PROJECT NO. 6001-09SS.4 WHEREAS, on April 7, 2009, the City Council of the City of Carlsbad approved plans for 5 construction of the 2009 Slurry Seal Project No. 6001-09SS; and 6 WHEREAS, the City Council has previously determined that payment of prevailing wages will not be required as part of the construction contract per City of Carlsbad Municipal Code8 Section 3.28.1309 WHEREAS, five (5) sealed bids were received on May 27, 2009 by the City of Carlsbad for the construction of said project; and WHEREAS, the lowest responsive and responsible bid to construct said project was submitted by All American Asphalt, in the amount of $406,159; and1 o WHEREAS, there are sufficient funds available to complete the project; and , WHEREAS, subsection 3.28.040(C)(6) of the Carlsbad Municipal Code authorizes the 10 1fi City Manager to approve change orders in the amount equal to the contingency set at the time of project award. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carlsbad, California, as follows: 1. That the above recitations are true and correct. 2. That payment of prevailing wages will not be required as part of the construction contract per City of Carlsbad Municipal Code Section 3.28.130. 3. That the low bid of $406,159 submitted by All American Asphalt, for the construction of the 2009 Slurry Seal Project No. 6001-09SS, is accepted and the Mayor is hereby authorized to execute a contract with All American Asphalt for Project No. 6001-09SS. 4. That the City Manager is hereby authorized to approve construction change orders up to $28,431. 1 5. That the award of this contract is contingent upon the bidder submitting the 2 lowest responsible bid executing the required contract and submitting the required bonds and 3 insurance policies, as described in the contract, within twenty (20) days of adoption of this 4 resolution. The City Manager may grant reasonable extensions of time. 5 /// 6 /// 7 /// 8 /// 9 /// 10 /// 11 /// 12 /// 13 /// 14 /// 15 /// 16 /// 17 /// 18 /// 19 /// 20 /// 21 /// 22 /// 23 /// 24 /// 25 /// 26 /// 27 /// 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 PASSED, APPROVED AND ADOPTED at a Regular Meeting of the City Council of the City of Carlsbad on the 16th day of June, 2009, by the following vote to wit: AYES: Council Members Lewis, Kulchin, Hall, Packard and Blackburn. NOES: None. ABSENT: None. LORRAIN (SEAL) Comparison of Slurry Bids for 2008 and 2009 Item Slurry Aggregate Wages Area (SF) Price/SF Slurry Bid Item Total Bid 2008 Emulsion-Aggregate Slurry Type 2 Prevailing 652,160 $0.21 $136,954 $569,403 2009 Emulsion-Aggregate Slurry Type 1 Non-Prevailing 2,037,159 $0.10 $193,530 $406,159 All Receive-Agenda Item #. For the Information of Ihe: CITY COUNCIL Asst. CM CA *^CC (^ Notes: Typically, Type 2 aggregate is slightly more expensive than Type 1. Typically, smaller project area (SF) leads to higher price per square foot. Total bid includes other items in the projects that are not comparable.