HomeMy WebLinkAbout2009-12-01; City Council; 20045; Pipe Replacement Alder Av and Marron RdCITY OF CARLSBAD - AGENDA BILL AB#20.045 MTG. 12/01/09 DEPT.ENG APPROVAL OF PLANS AND SPECIFICATIONS AND AUTHORIZATION TO ADVERTISE FOR BIDS FOR THE CORRUGATED METAL PIPE REPLACEMENT PROGRAM -ALDER AVENUE AND MARRON ROAD, PROJECT NO. 6607 DEPT. HEAD CITY ATTY. CITY MGR. (jj RECOMMENDED ACTION: Adopt Resolution No. 2009-292 approving plans and specifications and authorizing the City Clerk to advertise for bids for the Corrugated Metal Pipe Replacement Program - Alder Avenue and Marron Road, Project No. 6607. ITEM EXPLANATION: The Corrugated Metal Pipe (CMP) Replacement Program was established as a five-year program to replace, repair or remediate deteriorated CMP storm drain systems throughout the City. The pipelines included in the program were identified after City staff inspected the interior of the storm drain pipe and assessed the condition of CMP pipelines. The program includes the replacement or remediation of 25 storm drain pipelines. The Alder Avenue project will construct new storm drain and curb inlets to alleviate an existing drainage issue and install a cured-in-place liner into an existing pipeline that conveys run off from Alder Avenue down to El Camino Real a distance of 252 feet. The Marron Road project will install a cured-in-place liner into a storm drain pipeline in the Westfield Shopping Center parking lot near the North County Transit District Transit Center. ENVIRONMENTAL IMPACT: The project is exempt from the California Environmental Quality Act (CEQA) per State CEQA Guidelines Section 15301(b) - minor alteration of existing facilities of public utility services involving negligible or no expansion. A portion of the project is located in the coastal zone. However, repair and maintenance activities not described in Carlsbad Municipal Code Section 21.201.070 do not require a Coastal Development Permit. DEPARTMENT CONTACT: Sherri Howard 760-602-2756 Sherri. Howard@carlsbadca.gov FOR CITY CLERKS USE ONLY COUNCIL ACTION: APPROVED DENIED CONTINUED WITHDRAWN AMENDED t^ D D D D CONTINUED TO DATE SPECIFIC CONTINUED TO DATE UNKNOWN RETURNED TO STAFF OTHER - SEE MINUTES D D D D Page 2 FISCAL IMPACT: Table 1 shows the current status of the CMP Replacement Program: TABLE 1 - CMP REPLACEMENT PROGRAM - PROJECT NO. 6607 TASK DESCRIPTION Design Construction, Inspection, Materials Testing Environmental Mitigation & Monitoring Real Property Acquisition TOTAL APPROPRIATED TO DATE $501,000 $1,247,700 $31,000 $29,300 $1,809,000 EXPENDITURES/ ENCUMBRANCES/ OBLIGATIONS TO DATE $309,778 $141,767 $50 $24,300 $475,895 REMAINING BALANCES $191,222 $1,105,933 $30,950 $5,000 $1,333,105 An Engineer's Estimate of the construction cost for the Alder Avenue and Marron Road pipeline rehabilitation was prepared by Harris and Associates on September 25, 2009, and totals $146,000. The total estimated construction cost is shown in Table 2. TABLE 2 - PROJECT CONSTRUCTION COST ESTIMATE CMP REPLACEMENT PROGRAM ALDER AVENUE AND MARRON ROAD PROJECT NO. 6607 Construction Contract (Engineer's Estimate) Construction Contingency (10%) Construction Management and Inspection (10%) Testing (5%) TOTAL ESTIMATED CONSTRUCTION COSTS (ALDER AVENUE AND MARRON ROAD) PROJECT AVAILABLE BALANCE ADDITIONAL APPROPRIATION ANTICIPATED FOR CONSTRUCTION ESTIMATED COSTS $146,000 $14,600 $14,600 $7,300 $182,500 $1,333,105 -0- Sufficient funds have been appropriated from the Infrastructure Replacement Fund (IRF) to fund this project. Annually, funds are added to the project through the Capital Improvement Program. This funding source is not subject to State or Federal restrictions regarding prevailing wage. Therefore, pursuant to Carlsbad Municipal Code Section 3.28.130, prevailing wages are not required for the construction of CMP Replacement Program, Project No. 6607. Staff recommends approving the plans and specifications and authorizing the City Clerk to advertise for bids for the construction of CMP Replacement Program -Alder Avenue and Marron Road, Project No. 6607. EXHIBITS: 1. Location map. 2. CMP Replacement Program Project List. 3. Resolution No. 2009-292 approving plans and specifications, and authorizing the City Clerk to advertise for bids for the Corrugated Metal Pipe Replacement Program - Alder Avenue and Marron Road, Project No. 6607. LOCATION MAP SITE 'SITE CITY OF OCEANSIDE HIGHWAY SITE VICINITY MAP NOT TO SCALE NOT TO SCALE SITE PROJECT NAME CORRUGATED METAL PIPE REPLACEMENT PROGRAM ALDER AVENUE & MARRON ROAD PROJECT NUMBER 6607-3 EXHIBIT 1 DRAWN BY: SCOTT EVANS, CARLSBAD ENGINEERING DEPT. 9/29/09 C:\CAPITAL\HOWARD\6607 CUP PROGRAU_AU>ER-UARRON.DWG Exhibit 2 CMP Replacement Program Project List Fiscal Year 2008/2009 2009/2010 2010/2011 2011/2012 2012/2013 Site No.Site Status Environmetally Sensitive Site 3 10 15 19 and 20 21 23 25 31 Westfield Shopping Center north end of Monroe Street State Street from Laguna Drive to Beech Avenue In driveway off Park Drive just south of May Court Easement off Via Libertad On Oak Avenue from Lincoln Street to Washington Street Entrance to Flower Fields Apartments off Avenida de Anita Highland Drive to James Drive between Tamarack Avenue and Chinquapin Avenue On Carlsbad Village Drive between Victoria Avenue & Chatham Road Requesting Authorization to Bid Out to Bid Private ** Out to Bid Out to Bid Private ** Design Complete No No No Yes No No No Yes 13 and 77 14j 68 and 69 70 and 71 Easement on the west side of ECR to Cameo Road From Holly Brae Lane in an easement to ECR Easement between Alder Avenue and ECR Easement between Alder Avenue and ECR Complete Design Requesting Authorization to Bid Requesting Authorization to Bid No Yes Yes Yes 6 29 86 and 87 Crossing Jefferson Street between I-5 and Marron Road Easement east of the corner of Oak Avenue & Washington Street crossing RR In an Easement southwest of Hoover Street to the Agua Hedionda Lagoon Pre-Design Pre-Design Pre-Design Yes No Yes 43 47 and 48 60 Easement off Van Allen Way On Costa Del Mar to an easement - entrance to La Costa Resort At the end of cul-de-sac on Badajoz Place to an easement Pre-Design Pre-Design Pre-Design No Yes No 34 42 35 38 39 and 40 57 and 66 63 Crossing Highland Drive at Adams Street Crossing Adams Street just down from Highland Drive Crossing Bruce Road at 1729 to 1751 Bruce Road Easement off Cannon Road on Strawberry Fields From Garfield Street between Date Avenue and Olive Avenue in an easement to Agua Hedionda Lagoon Easement off La Costa Avenue at #2433 La Costa Avenue Easement at Romeria Street and Gibraltar Street Pre-Design Pre-Design Pre-Design Pre-Design Design * Pre-Design Pre-Design Yes Yes No No Yes No No : - Moved forward at request of Operations and Maintenance due to condition * - Removed from program Updated November 2009 1 RESOLUTION NO. 2009-292 2 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD, CALIFORNIA, AUTHORIZING TO ADVERTISE 3 FOR BIDS FOR THE CORRUGATED METAL PIPE REPLACEMENT PROGRAM - ALDER AVENUE AND MARRON 4 ROAD. PROJECT NO. 6607. _ 5 WHEREAS, the City Council of the City of Carlsbad, California, has determined it 6 necessary, desirable, and in the public interest to construct the Corrugated Metal Pipe (CMP) 7 Replacement Program -Alder Avenue and Marron Road; and 8 WHEREAS, the plans and specifications for furnishing of all labor, materials, tools, 9 equipment, transportation, and other expenses necessary or incidental to the CMP Replacement 10 Program -Alder Avenue and Marron Road, Project No. 6607, have been prepared and are on file in the Public Works-Engineering Department of the City of Carlsbad and are incorporated herein by reference; and13 ' WHEREAS, funding for said project has been appropriated from the Infrastructure14 Replacement Fund (IRF) to cover all project costs and is sufficient. I O NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carlsbad,16 California, as follows: 1 . That the above recitations are true and correct.1o 2. That the plans, specifications, and contract documents for the CMP Replacementi y __ Program - Alder Avenue and Marron Road, Project No. 6607 are on file in the Public Works- 21 Engineering Department of the City of Carlsbad and are hereby approved. 22 4. The City Clerk of the City of Carlsbad is hereby authorized and directed to 23 publish, in accordance with State law, a Notice to Contractors Inviting Bids for the CMP 24 Replacement Program - Alder Avenue and Marron Road, Project No. 6607, in accordance with 25 the plans, specifications, and contract documents referred to herein. 26 27 28 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 PASSED, APPROVED AND ADOPTED at a Regular Meeting of the City Council of the City of Carlsbad on the 1st day of December, 2009, by the following vote to wit: AYES: Council Members Lewis, Kulchin, Hall, Packard and Blackburn. NOES: None. ABSENT: None. IEWIS, Mayor ATTEST: I/ORRAINE MfWObD, City'Clerk/) (SEAL)U ^ w Lisa Hildabrand All Receive-Agenda Item # ^ For the Information of the: From: Sent: To: Subject: Glenn Pruim Tuesday, December 01, 2009 1:54 PM Lisa Hildabrand RE: question from briefing Asst. •*- . City Manager Lisa, There are a couple of answers to your question. From a storm water quality perspective, we have a good proactive program. We inspect all of the drainage inlets and clean all of those rated poor and the ones that have been designated high priority. In addition to removing debris we perform a condition assessment of the physical structure. Your question, however, probably pertains to the condition of our Corrugated Metal Pipes (CMP). We do not have a clearly defined program for this. In 2003, we video-inspected all of our existing CMP and assigned ratings based on the results of the inspection. Those pipes that received poor ratings are in the CIP for replacement. These are the projects that you've been seeing recently, including the one on tonight's agenda. Our plan is to perform recurring inspections (at a frequency to be determined) of all remaining CMPs and update the prioritization. We will be preparing a program and including this effort in the upcoming storm drain maintenance budget. My estimate is that we should do this every 3-5 years and the work could be done by contract or by utilizing the existing video van (that we use for sewer inspection) and overtime staff hours. This would be one of those managed service delivery questions. The likely result of this program is that we'll see in increase in the number of repair/replacement projects in the CIP. in most (if not all) cases, we'll be replacing CMP with either Reinforced Concrete Pipe (RCP) or plastic pipe. These pipes last longer and will reduce the inventory of CMP that will need periodic video inspection. At this time we don't have any proactive program for monitoring the condition of RCP or plastic drainage pipe. I hope this answers your question. Tx.... Glenn From: Lisa Hildabrand Sent: Tuesday, December 01, 2009 10:34 AM To: Glenn Pruim Subject: question from briefing Importance: High DEC - 1 2009 Glenn- A question came up in the briefings yesterday on what programs we have in place to check the state of our storm drains. Can you give me a brief synopsis? Thanks. Lisa Hildabrand City Manager CAR I