Loading...
HomeMy WebLinkAbout2010-01-26; City Council; 20105; La Golondrina and El Fuerte St Sewer ExtensionsCITY OF CARLSBAD - AGENDA BILL AB# 20,105 MTG- 1/26/10 DEPT. UTIL ACCEPTING BIDS AND AWARD OF CONTRACT TO HPS MECHANICAL, INC., FOR LA GOLONDRINA AND EL FUERTE STREET SEWER EXTENSIONS, PROJECT NOS. 3951 AND 5500 DEPT. DIRECTOR ,£7 /? CITY ATTORNEY X^' CITY MANAGER \jj^ RECOMMENDED ACTION: Adopt Resolution No. 2010-016 accepting bids and award of contract to HPS Mechanical, Inc., for the La Golondrina and El Fuerte Street Sewer Extensions, Project Nos. 3951 and 5500. ITEM EXPLANATION: The La Golondrina and El Fuerte Street Sewer Extensions are gravity flow sewer pipelines which will, after their construction, allow for the elimination of two wastewater lift stations. Recent development on adjacent downstream properties provides the opportunity to connect the two local sewer collection areas in the City's southwest quadrant into downstream pipeline gravity conveyance systems. The La Golondrina sewer pipeline extension includes the construction of approximately 1,000 lineal feet of 8-inch diameter gravity flow pipeline to connect to the existing sewer pipeline at Vermarine Court. Approximately 600 lineal feet of the pipeline extension will be constructed using fusible polyvinyl chloride (FPVC) pipeline under the open space parcel by means of Horizontal Directional Drilling (HDD) to avoid impacts to the environmentally sensitive habitat. The construction of the gravity flow pipeline allows for the removal of the La Golondrina Lift Station (LGLS) which was constructed in 1984 to temporarily serve the 111 dwelling units of Carlsbad Tract 73-29 until a gravity flow pipeline system could be constructed. The demolition and removal of the LGLS will follow the construction of the gravity flow sewer pipeline and is included with this contract. The El Fuerte Street Sewer Extension includes the construction of approximately 1,300 lineal feet of 8-inch diameter sewer pipeline in El Fuerte Street by way of open trench construction and 540 lineal feet of 8-inch diameter FPVC pipeline, under environmentally sensitive habitat, by way of HDD. The construction of the gravity flow pipeline allows for the removal of the La Costa Meadows Unit 3 Lift Station (LCM 3) which was constructed in 1976 and serves 95 dwelling units from Meadows 3 Service Area and Village Q4 of Carlsbad Tract 93-04. Demolition and removal of LCM 3 will follow the construction of the gravity flow sewer pipeline and is included with this contract. On October 20, 2009, through the adoption of Resolution No. 2009-067, the Carlsbad City Council approved plans and specifications and authorized the City Clerk to advertise to receive bids for the La Golondrina and El Fuerte Street Sewer Extensions, Project Nos. 3951 and 5500. DEPARTMENT CONTACT: Mark Biskup, (760) 602-2763, mark.biskup@carlsbadca.gov FOR CITY CLERKS USE ONLY. COUNCIL ACTION: APPROVED DENIED CONTINUED WITHDRAWN AMENDED ^D D D CONTINUED TO DATE SPECIFIC CONTINUED TO DATE UNKNOWN RETURNED TO STAFF OTHER -SEE MINUTES D D D D Page 2 On December 9, 2009, eight (8) sealed bids were received for the construction of this project, which are summarized in the table below: CONTRACTOR 1. HPS Mechanical, Inc. 2. Don Hubbard Contracting Co. 3. Palm Engineering Construction Co, Inc. 4. Burtech Pipeline, Inc. 5. NEWest Construction Co. 6. Zondiros Corp. 7. Balboa Construction 8. Scheidel Contracting and Engineering Inc. CITY/STATE Bakersfield, CA San Marcos, CA San Diego, CA Encinitas, CA San Diego, CA San Marcos, CA Vista, CA La Mesa, CA TOTAL $637,164 $735,510 $769,670 $785,000 $824,259 $940,900 $947,385 $991,440 The Engineer's Estimate for this project is $1,259,825. Staff has completed its review of all documents and finds that they are in order. Therefore, staff recommends that HPS Mechanical, Inc. be awarded the contract. ENVIRONMENTAL IMPACT: A Mitigated Negative Declaration (MND) and Mitigation Monitoring and Reporting Program (MMRP) were prepared for the La Golondrina and El Fuerte Street Sewer Extension Project (EIA 08-01). The Notice of Intent (NOI) to adopt a MND was published in the newspaper February 26, 2009, and sent to the State Clearinghouse for a 30-day public review (February 26, 2009 - March 26 2009). No further environmental review is required. No city permits are required for this project; therefore, the MND was approved administratively by the Planning Director on April 13, 2009 in compliance with the California Environmental Quality Act (CEQA) Guidelines Section 15074. FISCAL IMPACT: PROJECT COST SUMMARY FOR THE DESIGN, ENVIRONMENTAL AND CONSTRUCTION PHASES OF THE LA GOLONDRINA AND EL FUERTE STREET SEWER EXTENSIONS (PROJECT NOS. 3951 & 5500) DESIGN & ENVIRONMENTAL PHASE Engineering Design & Environmental Easement Acquisitions DESIGN & ENVIRONMENTAL SUBTOTAL CONSTRUCTION PHASE Construction Contract (HPS, INC.) Contingency for Construction Construction Management and Inspection (Estimated 8%) Biological Monitoring CONSTRUCTION SUBTOTAL TOTAL PROJECT COST CURRENT APPROPRIATION $231,626 $13,850 $245,476 $637,164 $100,000 $51,000 $8,000 $796,164 $1,041,640 $ 2,255,420 Sufficient funds are available for the completion of the pipeline construction. The project is funded from the Sewer Replacement Fund. A portion of this project benefits Leucadia Wastewater District (LWD). An agreement between the City and LWD requires LWD to reimburse the City for cost of that work. The reimbursement, based on the HPS Mechanical, Inc. bid schedule, is $21,964. Page3 EXHIBITS: 1. Location Map. 2. Resolution No. 2010-016 accepting bids and award of contract to HPS Mechanical, Inc., for the La Golondrina and El Fuerte Street Sewer Extensions, Project Nos. 3951 and 5500. LOCATION MAP La Costa Meadows Lift Station, LCM3/ RANCHO CARLSBAD VILLAGE Q-4 ^Iy2 VICINITY MAP v NTS -c? 800 JFeet LEGEND PIPELINE EXTENSIONS PROJECT NAME: LA GOLONDRINAAND EL FUERTE STREET SEWER EXTENSIONS PROJECT NOS. CP 3951 & 5500 EXHIBIT 1 7 1 RESOLUTION NO. 2010-016 2 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD, CALIFORNIA, ACCEPTING BIDS AND AWARD OF 3 CONTRACT TO HPS MECHANICAL, INC., FOR LA GOLONDRINA AND EL FUERTE STREET SEWER EXTENSIONS, PROJECT 4 NOS. 3951 AND 5500. 5 WHEREAS, the City Council of the City of Carlsbad, California, desires to construct a 6 gravity flow wastewater pipeline, the El Fuerte Sewer Extension, and remove the La Costa 7 Meadows Unit 3 Lift Station; and 8 WHEREAS, the City Council of the City of Carlsbad, California, desires to construct a 9 gravity flow wastewater pipeline, the La Golondrina Sewer Extension, and remove the La 10 Golondrina Lift Station; and 11 WHEREAS, the plans and specifications for furnishing of all labor, materials, tools, 12 equipment, transportation, and other expenses necessary or incidental to the La Golondrina and El 13 Fuerte Street Sewer Extensions, Project Nos. 3951 and 5500, have been prepared and are on file 14 in the Public Works-Engineering Department of the City of Carlsbad and are incorporated herein 15 by reference; and 1R WHEREAS, easements for the construction and operation of the El Fuerte Sewer and La 17 Golondrina Sewer Extensions have been acquired; and 18 WHEREAS, A Mitigated Negative Declaration (MND) and Mitigation Monitoring and 19 Reporting Program (MMRP) were prepared for the La Golondrina and El Fuerte Street Sewer 20 Extension Project (EIA 08-01), the Notice of Intent (NOI) to adopt an MND was published in the 21 newspaper (February 26, 2009-March 26, 2009), and no further environmental review is required, 22 and no city permits were required for this project, therefore the MND was approved 23 administratively by the Planning Director on April 13, 2009 in compliance with the California 24 Environmental Quality Act (CEQA) Guidelines Section 15074; and 25 WHEREAS, on October, 2009, through the adoption of Resolution No. 2009-067, the 26 Carlsbad City Council approved plans and specifications and authorized the City Clerk to advertise 27 28 6 7 8 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 to receive bids for the La Golondrina and El Fuerte Street Sewer Extensions, Project Nos. 3951 and 5500; and WHEREAS, eight (8) sealed bids were received on December 9, 2009, by the City of Carlsbad for the construction of said project; and WHEREAS, the lowest responsive and responsible bid to construct said project was submitted by HPS Mechanical, Inc. in the amount of $637,164; and WHEREAS, a portion of this work benefits Leucadia Wastewater District (LWD); and WHEREAS, through an agreement between the City and LWD, LWD will reimburse the City for the cost of work in this project that benefits LWD upon its completion; and WHEREAS the reimbursement to the City from LWD for said work based on the HPS Mechanical, Inc. bid schedule, is $21,964; and WHEREAS, funds in the Sewer Replacement Fund are sufficient to complete said project. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carlsbad, California, as follows: 1. That the above recitations are true and correct. 2. That the bid in the amount of $637,164 submitted by HPS Mechanical, Inc., for the construction of the La Golondrina and El Fuerte Street Sewer Extensions, Project Nos. 3951 and 5500, is accepted and the Mayor is hereby authorized to execute a contract with HPS Mechanical, Inc. 3. The City Manager is hereby authorized to approve construction change orders up to $100,000. 4. That the award of this contract is contingent upon the bidder submitting the lowest responsible bid executing the required contract and submitting the required bonds and insurance policies, as described in the contract, within twenty (20) days of adoption of this resolution. The City Manager may grant reasonable extensions of time. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 PASSED, APPROVED AND ADOPTED at a Regular Meeting of the City Council of the City of Carlsbad on the 26th day of January, 2010, by the following vote to wit: AYES: Council Members Lewis, Kulchin, Hall, Packard and Blackburn. NOES: None. ABSENT: None. UJDE K. LEWIS, Mayor ATTEST: LORRAI ASEAL) 7