HomeMy WebLinkAbout2010-02-16; City Council; 20115; Award Contract for Corrugated Metal Pipe Replacement Program State Street and Oak Avenue Project No 6607CITY OF CARLSBAD - AGENDA BILL
AB# 20,115
MTG. 02/16/10
DEPT. UTIL
AWARD OF CONTRACT FOR THE CORRUGATED
METAL PIPE REPLACEMENT PROGRAM - STATE
STREET AND OAK AVENUE, PROJECT NO. 6607
DEPT. DIRECTOR /%jf
CITY ATTORNEY (jf2^
CITY MANAGER / ,^
RECOMMENDED ACTION:
Adopt Resolution No. 2010-021 _ accepting bids and awarding the contract to Empire Pipeline
for the Corrugated Metal Pipe Replacement Program - State Street and Oak Avenue, Project No.
6607.
ITEM EXPLANATION:
The Corrugated Metal Pipe (CMP) Replacement Program was established as a five-year program to
replace, repair or remediate deteriorated CMP storm drain systems throughout the City. The pipelines
included in the program were identified after City staff inspected the interior of the storm drain pipe
and assessed the condition of CMP pipelines. The program includes the eventual replacement or
remediation of 25 storm drain pipelines. The locations of the pipelines and status are included in
Exhibit 2.
The State Street storm drain pipeline project will construct a new larger pipeline in State Street
between Beech Avenue and the unnamed street that provides an auxiliary access to the Carlsbad
Village Coaster Station parking lot. The pipeline will connect to an existing storm drain in the North
County Transit District right-of-way. The new reinforced concrete storm drain pipeline will replace an
existing corroded 24-inch corrugated metal pipe storm drain with pipe varying in size from 18 inches
to 36 inches. New curb inlets and manholes will be constructed. The existing storm drain pipeline,
which is located under the sidewalk, will be filled with concrete slurry and abandoned in place. All
work associated with the State Street storm drain project will be completed as night work to minimize
disruptions to local businesses.
The Oak Avenue storm drain replaces an existing corroded 12-inch corrugated metal pipe with an 18-
inch reinforced concrete storm drain pipe between Lincoln Street and Washington Street. Three new
manholes will be constructed with this pipeline.
The plans and specifications were completed and on November 10, 2009, through Resolution Number
2009-284, Council authorized to advertize for bids to for the Corrugated Metal Pipe Replacement
Project - State Street and Oak Avenue.
On January 7, 2010, eighteen (18) sealed bids were received, opened, witnessed for the construction
of this project as shown in the following Table 1.
DEPARTMENT CONTACT: Sherri Howard 760-602-2756 Sherri.Howard@carlsbadca.gov
FOR CITY CLERKS USE ONLY
COUNCIL ACTION: APPROVED
DENIED
CONTINUED
WITHDRAWN
AMENDED
If
D
D
D
CONTINUED TO DATE SPECIFIC
CONTINUED TO DATE UNKNOWN
RETURNED TO STAFF
OTHER - SEE MINUTES
D
D
D
D
Page 2
TABLE 1 - CORRUGATED METAL PIPE REPLACEMENT PROGRAM -
STATE STREET AND OAK AVENUE - PROJECT NO 6607
CONTRACTOR
1. Empire Pipeline
2. KTA Construction
3. Tri-Group Construction
4. T.C. Construction Company, Inc.
5. Burtech Pipeline, Inc.
6. Basile Construction Inc.
7. Balboa Construction, Inc.
8. Palm Engineering Construction Company, Inc.
9. Nikola Corporation
10. Southland Paving, Inc.
11. L.B. Civil Construction
12. GCI Construction, Inc.
13. Scheidel Contracting and Engineering
14. Tiago Inc.
15. Kip Inc.
16. Don Hubbard Contracting Co.
17. Zondiros Corporation
18. Savala Construction Company Inc.
BID LUMP SUM
$345,690.00
$357,680.00
$360,655.00
$379,802.30
$385,000.00
$385,278.84
$423,710.00
$424,420.00
$430,349.00
$468,352.00
$476,490.00
$491,560.00
$495,950.00
$496,513.75
$518,660.00
$584,370.00
$603,100.00
$624,870.70
The Engineer's Estimate for construction costs, prepared by Harris and Associates, was $530,000.
Bid documents submitted by the lowest bidder, Empire Pipeline, were determined to be responsive
after staff completed a review of the contract documents and determined that they were in order.
Based on a review of the bids submitted, staff recommends awarding the construction contract to
Empire Pipeline, in the amount of $345,690.
ENVIRONMENTAL IMPACT:
The project is exempt from the California Environmental Quality Act (CEQA) per State CEQA
Guidelines Section 15301(b) - minor alteration of existing facilities of public utility services involving
negligible or no expansion and 15304(f) - minor trenching or backfilling.
FISCAL IMPACT:
Table 2 shows the current status of the Corrugate Metal Pipe Replacement Program:
TABLE 2 - CORRUGATED METAL PIPE REPLACEMENT PROGRAM - PROJECT NO. 6607
TASK DESCRIPTION
Design
Construction, Inspection, Materials Testing
Environmental Mitigation & Monitoring
Real Property Acquisition
TOTAL
APPROPRIATED
TO DATE
$501,000
$1,247,700
$31,000
$29,300
$1,809,000
EXPENDITURES/
ENCUMBRANCES
TO DATE
$313,431
$146,759
$90
$24,300
$484,540
REMAINING
BALANCES
$187,569
$1,100,941
$30,910
$5,000
$1,324,420
Page 3
With the lowest bidder included, the total estimated construction cost for replacement of the pipelines
is shown in Table 3.
TABLE 3 - PROJECT CONSTRUCTION COST ESTIMATE
CMP REPLACEMENT PROGRAM - STATE STREET AND OAK AVENUE
PROJECT NO. 6607
Construction Contract
Construction Contingency (15%)
Construction Management and Inspection (10%)
Testing (5%)
TOTAL ESTIMATED CONSTRUCTION COSTS (STATE STREET AND OAK
AVENUE)
PROJECT AVAILABLE BALANCE
ADDITIONAL APPROPRIATION ANTICIPATED FOR CONSTRUCTION
ESTIMATED
COSTS
$345,690
$52,000
$35,000
$17,000
$449,690
$1,324,420
-0-
Sufficient funds have been appropriated from the Infrastructure Replacement Fund (IRF) to fund this
project. Annually, funds are added to the project through the Capital Improvement Program. This
funding source is not subject to State or Federal restrictions regarding prevailing wage. Therefore,
pursuant to Carlsbad Municipal Code Section 3.28.130, prevailing wages are not required for the
construction of CMP Replacement Program, Project No. 6607. Staff recommends awarding the
contract for the construction of CMP Replacement Program - State Street and Oak Avenue, Project
No. 6607 to Empire Pipeline.
EXHIBITS:
1. Location map.
2. Resolution No. 2010-021 accepting bids and awarding the contract to Empire Pipeline
for the for the Corrugated Metal Pipe Replacement Program - State Street and Oak Avenue,
Project No. 6607.
LOCATION MAP
SITE
SITE
NOT TO SCALE
SITE
VICINITY
MAP
NOT TO
SCALE
PROJECT NAME
CORRUGATED METAL PIPE REPLACEMENT PROGRAM
STATE STREET & OAK AVENUE
PROJECT
NUMBER
6607
EXHIBIT
1
DRAWN BY: SCOTT EVANS, CARLSBAD ENGINEERING DEPT. 9/22/09 C: \CAP1TAL\HOWARD\6607 CUP PROGRAU_STATE-OAK.DWG
1
2
3
4
24
25
26
27
28
RESOLUTION NO. 2010-021
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
CARLSBAD, CALIFORNIA, ACCEPTING BIDS AND AWARDING
THE CONTRACT TO EEMPIRE PIPELINE FOR THE FOR THE
CORRUGATED METAL PIPE REPLACEMENT PROGRAM -
STATE STREET AND OAK AVENUE. PROJECT NO. 6607.
WHEREAS, on November 10, 2009, the City Council of the City of Carlsbad, through
6
Resolution No. 2009-284, has previously authorized to advertize for bids to construct the
Corrugate Metal Pipe Replacement Program - State Street and Oak Avenue; and
8
WHEREAS, eighteen (18) sealed bids were received on January 7, 2010, by the City for
9
the construction of said project; and
10
WHEREAS, the lowest responsive and responsible bid to construct said project was
submitted by Empire Pipeline in the amount of $345,690; and
WHEREAS, the City Council of the City of Carlsbad, California, has determined it
1 O
necessary, desirable, and in the public interest to accept bids and award a contract to construct14
the Corrugated Metal Pipe Replacement Program - State Street and Oak Avenue; and
I O
WHEREAS, funding for said project has been appropriated from the Infrastructure16
Replacement Fund (IRF) to cover all project costs and is sufficient; and
WHEREAS, the City Manager is hereby authorized to approve change orders in the18
cumulative amount equal to the contingency hereby set at fifteen percent (15%) of the contract
20
21 NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carlsbad,
22 California, as follows:
23 1. That the above recitations are true and correct.
2. That the bid amount of $345,690 submitted by Empire Pipeline is hereby
accepted and the Mayor is hereby authorized to execute a contract with Empire Pipeline for the
construction of the Corrugated Metal Pipe Replacement Program - State Street and Oak Avenue,
5
1 Project No. 6607, in accordance with plans, specifications, and contract documents referred to
2 herein.
3 3. That the award of contract is contingent upon the bidder submitting the lowest
4 responsive bid executing the required contract and submitting the required bonds and insurance
5 policies, as described in the contract, within twenty (20) days of adoption of this resolution. The
6 City Manager may grant reasonable extensions of time.
7 ///
8 ///
9 ///
10 ///
11 ///
12 ///
13 ///
14 ///
15 ///
16 ///
17 ///
18 ///
19 ///
20 ///
21 ///
22 ///
23 ///
24 ///
25 ///
26 ///
27 ///
28
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
PASSED, APPROVED AND ADOPTED at a Regular Meeting of the City Council
of the City of Carlsbad on the 16th day of February, 2010, by the following vote to wit:
AYES: Council Members Lewis, Kulchin, Hall, Packard, Blackburn
NOES: None
ABSENT: None
JDE A LEWISrMayor
ATTEST:
LO
Karen R.
(SEAL)
ity Clerk
ant City Clerk