Loading...
HomeMy WebLinkAbout2010-05-25; City Council; 20244; APPROVE CARLSBAD TRANSNET LOCAL STREET IMPROVEMENT PROGRAM OF PROJECTS FOR FISCAL YEAR 2010-2011 THROUGH 2014-2015CITY OF CARLSBAD - AGENDA BILL 20,244AB# MTG. 5/25/10 DEPT. ENG APPROVE THE CARLSBAD TRANSNET LOCAL STREET IMPROVEMENT PROGRAM OF PROJECTS FOR FISCAL YEARS 2010/11 THROUGH 2014/15 DEPT. HEAD CITY ATTY. CITY MGR. UA-- RECOMMENDED ACTION: Adopt Resolution No. 2010-125 approving the Carlsbad TransNet Local Street Improvement Program of Projects for Fiscal Years 2010/11 through 2014/15. ITEM EXPLANATION: The 2010 Regional Transportation Improvement Program (RTIP) is a program of proposed highway, arterial, transit, and bikeway projects for Fiscal Years 2010/11 through 2014/15. The San Diego Association of Governments (SANDAG) is required by State and Federal laws to develop and adopt the RTIP every two years. Each member agency of SANDAG that desires to expend TransNet and/or certain Federal and State funds must approve a Program of Projects once every two years. In addition to projects with these funding sources, the Program of Projects also includes regionally significant capacity increasing projects regardless of the funding source. The Federal Metropolitan Planning and Air Quality Conformity Regulations also require inclusion of all regionally significant capacity increasing road projects for air quality emissions analysis. The approval process includes a public hearing which allows citizens an opportunity to comment on the City's Program of Projects. The adopted Resolution approving the Carlsbad Program of Projects is due to SANDAG by June 30th. The Program of Projects is then incorporated into the 2010 RTIP as assembled and submitted to the State by SANDAG by August 1, 2010. The proposed Carlsbad Program of Projects for Fiscal Years 2010/11 through 2014/15, which is attached as Exhibit A to the Resolution, includes projects with the following fund types: Federal - SAFETEA-LU (High Priority Project, HPP) Federal - Highway Bridge Program (HBP) State - Transportation Development Act (TDA) SANDAG - TransNet Local Local - City funds Local - Private funds The Federal funding included in the Carlsbad Program of Projects consists of $1,436,000 in Federal SAFETEA-LU, High Priority Project funds for Poinsettia Lane Reach E. The City is also programmed to receive Federal Highway Bridge Program funding which is included by SANDAG and Caltrans as a lump sum allocation and therefore is not listed as a funding line item on the City of Carlsbad Program of Projects. DEPARTMENT CONTACT: Marshall Plantz, (760) 602-2766, mplan@ci.carlsbad.ca.us FOR CITY CLERKS USE ONL Y COUNCIL ACTION:APPROVED DENIED CONTINUED D WITHDRAWN D AMENDED D CONTINUED TO DATE SPECIFIC D CONTINUED TO DATE UNKNOWN D RETURNED TO STAFF D OTHER - SEE MINUTES D Page 2 The State IDA funds are programmed for the installation of audible and count down pedestrian signal equipment. The TransNet funds are programmed for a variety of projects including bridge improvement, roadway improvement and roadway maintenance projects. The Transnet funding will provide the local matching funds for two bridge railing projects along Carlsbad Boulevard. The bridges are located across the warm water outfall channel from the Encina power station and over the railroad just south of State Street. The TransNet funds are also programmed for roadway widening projects which are in progress as well as the ongoing Pavement Management Program. The Program of Projects also includes various capacity increasing roadway projects located along regionally significant arterials, regardless of the funding source. The projects in this category include various roadway segments and intersection improvements. The majority of these projects are funded by local City funds such as Traffic Impact Fees and/or local Private funds. The Program of Projects can be revised as needed on a quarterly basis during the two year period between the adoption of the 2010 RTIP and the subsequent 2012 RTIP. ENVIRONMENTAL IMPACT: This activity is statutorily exempt from CEQA pursuant to State CEQA Guidelines, Section 15276, which states that CEQA does not apply to the adoption of regional transportation improvement programs. FISCAL IMPACT: Approving the RTIP is a requirement under State law for receiving TransNet, State and Federal funds. Approval of the RTIP ensures eligibility for funding and programs the funding for future obligation. Inclusion in the RTIP, however, is not a guarantee that projects will receive the stated funding. The amounts shown are the best available estimates of anticipated funding. In the event that funding falls short or is not available, the City Council is not obligated to proceed with a project just because it is included in the RTIP. EXHIBITS: 1. Resolution No. 2010-125 approving the Carlsbad TransNet Local Street Improvement Program of Projects for Fiscal Years 2010/11 through 2014/15. RESOLUTION NO. 2010-125 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD, CALIFORNIA, ADOPTING THE CARLSBAD TRANSNET LOCAL STREET IMPROVEMENT PROGRAM OF PROJECTS FOR FISCAL YEARS 2010111 THROUGH 2014115. WHEREAS, on November 4, 2004, the voters of San Diego County approved the San Diego Transportation Improvement Program Ordinance and Expenditure Plan (TransNet Extension Ordinance); and WHEREAS, the TransNet Extension Ordinance provides that SANDAG, acting as the Regional Transportation Commission, shall approve a multi-year program of projects submitted by local jurisdictions identifying those transportation projects eligible to use transportation sales tax (TransNet) funds; and WHEREAS, the City of Carlsbad was provided with an estimate of annual TransNet local street and road revenues for Fiscal Years 201 1 through 2015; and WHEREAS, the City of Carlsbad has held a clearly noticed public hearing with an agenda item that clearly identified the proposed list of projects prior to approval of the projects by its authorized legislative body in accordance with Section 5(A) of the TransNet Ordinance and Rule 7 of the SANDAG Board Policy 31. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carlsbad, California, as follows: 1. That the above recitations are true and correct. 2. That pursuant to Section 2(C)(1) of the TransNet Extension Ordinance, the City of Carlsbad certifies that no more than 30 percent of its annual revenues from the TransNet funds shall be spent on maintenance related projects. 3. That pursuant to Section 4(E)(3) of the TransNet Extension Ordinance, the City of Carlsbad certifies that all new projects, or major reconstruction projects, funded by TransNet revenues shall accommodate travel by pedestrians and bicyclists, and that any exception to this requirement permitted under the Ordinance and proposed shall be clearly noticed as part of the City of Carlsbad's public hearing process. 4. That pursuant to Section 8 of the TransNet Extension Ordinance, the City of Carlsbad certifies that the required minimum annual level of local discretionary funds to be expended for street and road purposes will be met through the 5-year period consistent with the most recent Maintenance of Effort Requirements adopted by SANDAG. 5. That pursuant to Section 9A of the TransNet Extension Ordinance, the City of Carlsbad certifies that it will extract $2,000 from the private sector for each newly constructed residential housing unit in the City of Carlsbad to comply with the provisions of the Regional Transportation Congestion lmprovement Program (RTCIP). 6. That pursuant to Section 13 of the Transnet Extension Ordinance, the City of Carlsbad certifies that is has established a separate Transportation lmprovement Account for TransNet Revenue with interest earned expended only for those purposes for which the funds were allocated. 7. That pursuant to Section 18 of the TransNet Extension Ordinance, the City of Carlsbad certifies that each project of $250,000 or more will be clearly designated during construction with TransNet project funding identification signs. 8. That the City of Carlsbad does hereby certify that all other applicable provisions of the TransNet Extension Ordinance and the SANDAG Board Policy 31 have been met. 9. That the City of Carlsbad agrees to indemnify, hold harmless and defend SANDAG, the San Diego County Regional Transportation Commission, and all officers and employees thereof against all causes of action or claims related to local TransNet funded projects. 10. That the Carlsbad TransNet Local Street Improvement Program of Projects for Fiscal Years 201 1 through 2015 attached to this Resolution as Exhibit A is hereby approved. 111 Ill /I/ 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 PASSED, APPROVED AND ADOPTED at a Regular Meeting of the City Council of the City of Carlsbad on the 25th day of May, 2010, by the following vote to wit: AYES: Council Members Lewis, Kulchin, Hall, Packard and Blackburn. NOES: None. ABSENT: None. ATTEST: .LJL. L/ORRAlKlfe M. WO^D/City Clerk ''/r * V"/llli«»4% /"< i ^ i T TO K (•';•.••£.£•<•.•/"• A' Table 1 2010 Regional Transportation Improvement Program San Diego Region (in $OOOs) Carlsbad. City of MPO ID: CB04A Capacity Status: ci TITLE: EI Camino Real Widening - Tamarack RTIP#: 10-00 (CR) Avenue to Chestnut Avenue DESCRIPTION: El Camino Real from Tamarack Ave.to Chestnut Ave. - in Carlsbad, widen El Camino Real to prime arterial standards with three travel lanes, bike lanes and sidewalks in each direction including intersection improvements at Tamarack Avenue and Chestnut Avenue EST TOTAL COST: $12,349 RTP PG NO: A-6 RAS (TA 7-43) Local Funds Local RTCIP TransNet - LSI Carry Over TOTAL TOTAL $8,001 $422 $3,926 $12,349 PRIOR $8,001 $422 $8,423 10/11 11/12 12/13 13/14 14/15 $3,926 $3,926 PE RW CON $1,225 $60 $6,716 $422 $3,926 $1,225 $60 $11,064 MPO ID: CB04B Capacity Status: ci TITLE: El Camino Real and Cannon Road RTIP#: 10-00 DESCRIPTION: El Camino Real from El Camino Real to Cannon Road - in Carlsbad, along the eastside of El Camino Real just south of Cannon Road widen to prime arterial standards with three through lanes, a right turn lane and a sidewalk approaching the intersection. EST TOTAL COST: $589 RTP PG NO: A-6 RAS (TA 7-43) TOTAL Local Funds $589 TOTAL $589 PRIOR 10/11 11/12 12/13 13/14 14/15 $589 $589 PE RW CON $85 $504 $85 $504 MPO ID: CB04C Capacity Status: CI TITLE: El Camino Real - Lisa Street to Crestview Drive RTIP#: 10-00 (CR) DESCRIPTION: El Camino Real from Lisa Street to Crestview Drive - in Carlsbad, along the west side of El Camino Real, roadway widening to provide three southbound through lanes, curb, gutter and sidewalk per Prime Arterial standards. EST TOTAL COST: $2,125 RTP PG NO: A-6 RAS (TA 7-43) TransNet - LSI TransNet - LSI Carry Over TOTAL TOTAL PF $1,955 $170 $2,125 MOR 10/11 11/12 12/13 13/14 14/15 $1,955 $170 $170 $1,955 PE RW CON $1,955 $170 $170 $1,955 ' Pending final SANDAG approval Page 1 Tuesday, April 27, 2010 2010 Regional Transportation Improvement Program San Diego Region (in $OOOs) Carlsbad. City of MPO ID: CB12 Capacity Status: Cl DELAYED TITLE: College Boulevard Reach A RTIP#: 10-00 DESCRIPTION: College Boulevard from Badger Lane to Cannon Road - in Carlsbad, from Badger Lane to Cannon Road, construct a new segment of College Blvd. to provide 4-lane roadway with raised median, bike lanes and sidewalks/trails in accordance with Major Arterial standards. EST TOTAL COST: $1 1 ,952 RTP PG NO: A-6 RAS (TA 7-43) Local Funds TOTAL TOTAL $11,952 $11,952 PRIOR $11,952 $11,952 10/11 11/12 12/13 13/14 14/15 PE RW CON $2,774 $9,178 $2,774 $9,178 MPOID:CB13 Capacity Status: Cl TITLE: Poinsettia Lane Reach E RTIP#: 10-00 DESCRIPTION: Poinsettia Lane from Cassia Drive to Skimmer Court - in Carlsbad, from Cassia Drive to Skimmer Court, construct a new 4-lane roadway with median, bike lanes, and sidewalks/trails to major arterial standards. EST TOTAL COST: $1 3,450 RTP PG NO: A-6 EAR MARK NO: CA366/517 RAS (TA 7-43) TOTAL HPP $1,436 Local Funds $12,014 TOTAL $13,450 PRIOR 10/11 11/12 12/13 13/14 14/15 $1,436 $1,260 $10,754 $1,260 $12,190 PE RW CON $1,436 $1,260 $1,900 $8,854 $1,260 $1,900 $10,290 MPO ID: CB17 Capacity Status: NCI TITLE: Carlsbad Blvd. Bridge over Encina Exempt Category: Safety - Power Station RTIP #: Guardrails, median barriers, crash cushions 10-00 DESCRIPTION: Carlsbad Blvd. from Encina Power Plant to Warm water outfall channel - in Carlsbad, on the Carlsbad Blvd bridge over the Encina Power Plant warm water discharge, match to HBP, part of CAL44). RTP PG NO: A-6 RAS (TA 7-43) TransNet - L (Cash) TOTAL TOTAL PRIOR $158 $8 $158 $8 10/11 11/12 upgrade bridge railings on the bridge, (local EST TOTAL COST: 12/13 13/14 14/15 $150 $150 PE RW $57 $57 $158 CON $101 $101 ' Pending final SANDAG approval Page 2 Tuesday, April 27, 2010 1 2010 Regional Transportation Improvement Program San Diego Region (in $OOOs) Carlsbad. City of MPOID: CB18 Capacity Status: NCI TITLE: Carlsbad Blvd. Bridge over SDNR Railroad RTIP#: 10-00 Exempt Category: Safety - Guardrails, median barriers, crash cushions DESCRIPTION: Carlsbad Blvd. from Mountain View to State - in Carlsbad 0.6 miles NW of Carlsbad V lage Drive, upgrade the bridge railings on the Carlsbad Blvd. Bridge over the San Diego Northern Railway (SDNR) railroad (local match to HBP, part of CAL44) EST TOTAL COST: $44 RTP PG NO: A-6 RAS (TA 7-43) TransNet - L (Cash) TOTAL TOTAL $44 $44 PRIOR $12 $12 10/11 11/12 12/13 13/14 14/15 $32 $32 PE RW CON $44 $44 MPOID: CB20 TITLE: Pavement Management DESCRIPTION: Capacity Status: NCI RTIP #: - Overlay Exempt Category: Safety - Pavement resurfacing and/or rehabilitation Street locations by year as 10-00(CR) follows: FY10/11 roadways - Palomar Airport Road, College Blvd., Cannon Blvd., Faraday Ave., Paseo del Norte Barcelona, El Camino Real, Levante Carlsbad Blvd., Basswood Ave , Carslbad Blvd., FY 1 1/12 roadways - La Costa Ave., Calle Street, Rancho Santa Fe, Los Coches and FY 12/13 roadways - Carlsbad V llage Drive, Grand Avenue, Jefferson Street, State Street, Chestnut Avenue, , Las Flores, and Kelly Dr., FY 13/14 roadways - Avenida Encinas, Paseo Del Norte, Poinsettia, El Camino Rea , Alicante,and El Fuerte, FY 14/15 roadways - El Camino Real, Faraday Avenue, El Fuerte, Palmer Wary, Melrose Drive, Palomar Airport Road, Cannon Road and College Blvd. - in Carlsbad, pavement overlay and roadway repairs; to be implemented in a series of zones throughout the RTP PGNO: City. A-6 Local Funds TransNet TransNet TransNet - L (Cash) -LSI - LSI Carry Over TOTAL TOTAL $11,400 $946 $5,895 $2,269 $20,510 PRIOR $3,715 $946 $329 $4,990 EST TOTAL COST: 10/11 11/12 12/13 13/14 14/15 $2,120 $1,260 $1,310 $1,370 $1,625 $1,990 $2,030 $1,875 $1,940 $2,120 $3,200 $3,300 $3,400 $3,500 PE RW $22,620 CON $11,400 $946 $5,895 $2,269 $20,510 MPO ID: CB21 Capacity Status: NCI RTIP #: TITLE: Pavement Management -Seal Exempt Category: Safety - Pavement resurfacing and/or rehabilitation DESCRIPTION: 10-00 Various minor/local roadways within each zone as noted on the project diagram - In Carlsbad, street sealing and roadway repairs RTP PGNO:A-6 Local Funds TOTAL TOTAL $3,300 $3,300 PRIOR $800 $800 EST TOTAL COST: 10/11 11/12 12/13 13/14 14/15 $500 $500 $500 $500 $500 $500 $500 $500 $500 $500 PE RW $3,300 CON $3,300 $3,300 " Pending final SANDAG approval Page 3 Tuesday, April 27, 2010 2010 Regional Transportation Improvement Program San Diego Region (in $OOOs) Carlsbad, City of MPO ID: CB22 Capacity Status: Cl TITLE: Avenida Encinas - Widen from PAR to EWPCF RTIP #:10-00 DESCRIPTION: Avenida Encinas from Palomar Airport Rd. to EWPCF - in Carlsbad, Avenida Encinas from Palomar Airport Road southerly to existing improvements adjacent to the widening to Secondary Arterial standards. Encina Water Pollution Control Facility; roadway EST TOTAL COST: RTP PG NO: A-6 Local Funds TOTAL TOTAL PRIOR $3,041 $2,605 $3,041 $2,605 10/11 11/12 12/13 13/14 14/15 $436 $436 PE RW $400 $30 $400 $30 $3,041 CON $2,611 $2,611 MPO ID: CB24 Capacity Status: Cl RTIP#: 10-00 TITLE: College Boulevard and Palomar Airport Road - Intersection Improvements DESCRIPTION: College Boulevard from College Blvd to Palomar Airport Road - in Carlsbad, at the intersection of College Blvd. and Palomar Airport Raod, roadway widening along southbound College Blvd. to provide dual left turns, one thru lane, one shared thru/right turn lane and one right turn lane and to lengthen right turn lanes on the other approaches to the intersection. EST TOTAL COST: $838 RTP PG NO: A-6 RAS (TA 7-43) Local Funds TOTAL TOTAL $838 $838 PRIOR 10/11 11/12 12/13 13/14 14/15 $838 $838 PE RW CON $193 $645 $193 $645 MPO ID: CB26 Capacity Status: Cl TITLE: Melrose and Palomar Airport Road RTIP#: 10-00 DESCRIPTION: Melrose Drive from Melrose Drive to Palomar Airport Road - in Carlsbad, at the intersection fo Palomar Airport Road and Melrose Drive, roadway widening along southbound Melrose to provide an additional right turn lane to westbound Palomar Airport Road EST TOTAL COST: $4 1 0 RTP PG NO: A-6 RAS (TA 7-43) Local Funds TOTAL TOTAL $410 $410 PRIOR 10/11 11/12 12/13 13/14 14/15 $410 $410 PE RW CON $50 $360 $50 $360 MPO ID: CB29 Capacity Status: NCI TITLE: Pedestrian Signals - Carlsbad Exempt Category DESCRIPTION: Air Quality 21 Intersections in Carlsbad - installation of audible pedestrain TDA - Bicycles TOTAL TOTAL $151 $151 PRIOR $151 $151 10/11 11/12 - Bicycle and pedestrian facilities RTIP #: signals and count-down pedestrian signals EST TOTAL COST: 12/13 13/14 14/15 PE RW 10-00 $151 CON $151 $151 ' Pending final SANDAG approval Page 4 Tuesday, April 27, 2010 2010 Regional Transportation Improvement Program San Diego Region (in $OOOs) Carlsbad. City of MPO ID: CB30 Capacity Status: Cl TITLE: EI Camino Real Left Turn Lane to westbound Tamarack Ave. RTIP#: 10-00 DESCRIPTION: El Camino Real from El Camino Real to Tamarack - in Carlsbad at the intersection of El Camino Real and Tamarack Avenue construct a second left turn lane from El Camino Real to westbound Tamarack. EST TOTAL COST: $286 RTF PG NO: A-6 RAS (TA 7-43) TOTAL Local Funds $286 TOTAL $286 PRIOR 10/11 11/12 12/13 13/14 14/15 $286 $286 PE RW CON $70 $216 $70 $216 MPO ID: CB31 Capacity Status: ci RTIP #:10-00 TITLE: El Camino Real Widening - La Costa Avenue to Arenal Road DESCRIPTION: El Camino Real from La Costa Ave, to Arenal Rd. - in Carlsbad, along El Camino Real from 700 feet north of La Costa Avenue to Arenal Road, widening along the southbound side of the roadway to provide three travel lanes and a bike lane in accordance with Prime Arterial Standards. EST TOTAL COST: RTP PG NO: A-6 RAS (TA 7-43) Local Funds Local RTCIP TOTAL TOTAL PF $625 $1,775 $2,400 ilOR 10/11 11/12 12/13 13/14 14/15 $625 $1,775 $2,400 PE RW $625 $625 $2,400 CON $1,775 $1,775 MPO ID: CB32 Capacity Status: ci RTIP #: TITLE: El Camino Real Widening - Cassia to Camino Vida Roble DESCRIPTION: El Camino Real from Cassia Road to Camino Vida Roble - feet north of Cassia Road to Camino Vida Roble, along the travel lanes and a bike lane in accordance with 10-00 in Carlsbad, widen El Camino Real from 900 northbound side of the roadway to provide three Prime Arterial standards. EST TOTAL COST: RTP PG NO: A-6 RAS (TA 7-43) TransNet - LSI Carry Over TOTAL TOTAL $2,650 $2,650 PRIOR 10/11 11/12 $215 $215 12/13 13/14 14/15 $2,435 $2,435 PE RW $315 $1,350 $315 $1,350 $2,650 CON $985 $985 ' Pending final SANDAG approval Page 5 Tuesday, April 27, 2010 2010 Regional Transportation Improvement Program San Diego Region (in $OOOs) Carlsbad, City of MPO ID: CB33 Capacity Status: ci RTIP#:10-00 TITLE: Ralomar Airport Road and El Camino Real Right Turn Lane DESCRIPTION: Palomar Airport Road from Palomar Airport Road to El Camino Real - Palomar Airport Road and El Camino Real, widening along eastbound in Carlsbad, at the intersection of Palomar Airport Road to provide a dedicated right turn lane to southbound El Camino Real. EST TOTAL COST: RTP PG NO: A-6 RAS (TA 7-43) Local Funds TOTAL TOTAL PRIOR $590 $590 10/11 11/12 12/13 13/14 14/15 $590 $590 PE RW $90 $90 $590 CON $500 $500 MPO ID: CB34 Capacity Status: CI RTIP#: 10-00 TITLE: Palomar Airport Road and Paseo Del Norte Right Turn Lane DESCRIPTION: Palomar Airport Road from Palomar Airport Road to Paseo Del Norte - in Carlsbad, at the intersection of Palomar Airport Road and Paseo Del dedicated right turn lane to Norte, widening along eastbound Palomar Airport Road to provide a southbound Paseo Del Norte EST TOTAL COST: $563 RTP PG NO: A-6 RAS (TA 7-43) Local Funds TOTAL TOTAL $563 $563 PRIOR 10/11 11/12 12/13 13/14 14/15 $563 $563 PE RW CON $63 $500 $63 $500 MPO ID: CB35 Capacity Status: ci TITLE: Palomar Airport Road and Paseo Del Norte Left Turn Lane RTIP#: 10-00 DESCRIPTION: Palomar Airport Road from Palomar Airport Road to Paseo Del Norte - in Carlsbad, lengthen the left turn pocket along eastbound Palomar Airport Road to northbound Paseo Del Norte EST TOTAL COST: $232 RTP PG NO: A-6 RAS (TA 7-43) TOTAL Local Funds $232 TOTAL $232 PRIOR 10/11 11/12 12/13 13/14 14/15 $232 $232 PE RW CON $30 $202 $30 $202 * Pending final SANDAG approval Page 6 Tuesday, April 27, 2010 2010 Regional Transportation Improvement Program San Diego Region (in $OOOs) Carlsbad. City of MPO ID: CB36 Capacity Status: NCI RTIP#: TITLE: Carlsbad Boulevard Realignment Exempt Category: Other - Engineering studies DESCRIPTION: Carlsbad Boulevard from Palomar Airport Road to Avenida Encinas - in Carlsbad, from Palomar Airport Road to south of Avenida Encinas, realign the southbound lanes of Carlsbad Blvd and future construction completion of roadway to major arterial standards with enhanced parkways EST TOTAL COST: RTP PG NO: A-6 RAS (TA 7-43) Local Funds TransNet - L Carry Over TransNet - LSI TransNet - LSI Carry Over TOTAL TOTAL $250 $346 $1,967 $687 $3,250 PRIOR $250 $250 10/11 11/12 12/13 13/14 14/15 $346 $1 ,967 $687 $3,000 PE RW $250 $346 $1,967 $687 10-00(CR) $3,250 CON $3,250 1 Pending final SANDAG approval Page 7 Tuesday, April 27, 2010 12 PROOF OF PUBLICATION (2010 & 2011 C.C.P.) This spi fnr the County Clerk's Filing Stamp MAY 2 0 2010 CITY OF CARLSBAD CITY CLERK'S OFFICE STATE OF CALIFORNIA County of San Diego I am a citizen of the United States and a resident of the County aforesaid: I am over the age of years and not a party to or interested in tl entitled matter. I am the principal clerk of t of ProjectNorth County Tir Formerly known as the Blade-Citizen and Tt Advocate and which newspapers ha\ adjudicated newspapers of general circulatic Superior Court of the County of San Diego, California, for the City of Oceanside and th Escondido, Court Decree number 171349, County of San Diego, that the notice of v annexed is a printed copy (set in type not sm nonpariel), has been published in each regular anu entire issue of said newspaper and not in any supplement thereof on the following dates, to-wit: Proof of Publication of NOTICE OF PUBLIC HEARING NOTICE IS HEREBY GIVEN THAT THE City Council of the City of Carlsbad will hold a public hearing at City Council Chambers, 1200 Carlsbad Village Drive, Carlsbad, California, at 6:00 p.m. on Tuesday, May 25, .2010, to consider approving the Carlsbad Transnet Local Street Improvement Program of Project for fiscal years 2010/11 through 2014/15 for inclusion in the Regional Transportation Improvement Program. The Carlsbad Program of Projects consists of the following: Amount Project " Amount El Camino Real Widening -Tamarack Avenue to Chestnut Avenue $12,349,000 College Boulevard and Palomar Airport Road -Intersection Improvements $838,000 El Camino Real and Cannon Road $589,000 Melrose and Palomar Airport Road $410,000 El Camino Real-Lisa Street to Crestview Drive $2,125,000 Pedestrian Signals $151,000 College Boulevard Reach A .; $11,952,000 El Camino Real Left Turn Lane to westbound Tamarack.. $286,000 Poinsettia Lane Reach E : $13,450,000 El Camino Real Widening La Costa Avenue to Arena! Road $2,400,000 Carlsbad Boulevard Bridge over Encina Power Station : $158,000 El Camino Real Widening Cassia to Camino Vida Ruble .-. $2,650,000 Carlsbad Boulevard Bridge over San Diego Northern Railway Railroad $44,000 Palomar Airport Road Right Turn Lane to southbound El Camino Real $590,000 Pavement Management - Overlay $20,515,000 Palomar Airport Road Right Turn Lane to southbound Paseo Del Norte $563,000 Pavement Management - Seal $3,300,000 Palomar Airpoct Road Left Turn Lane to northbound Paseo Del Norte $232,000 AvenibaEncinas-WidenfromPARtoEWPCF $3,041,000 Carlsbad Blvd. Realignment $3,250,000 Copies of the Program of Project List are on file in the Office of the City Clerk and are open to public inspection. Those persons wishing to speak on this item are cordially invited to attend the public hearing. Copies of the agenda bill will beavailable after Friday, May 21, 2010. If you have any questions, please contact Marshall Plant, Senior Civil Engineer in the PublicWorks Department at 760-602-2766. If you challenge the selected projects in court, you may be limited to raising only those issuesraised by you or someone else at the Public Hearing deMritad in ttiis notice, or in written correspondence delivered to the City ofCarlsbad, Attn: Office of the City Clerk, 1200 Carlsbad Village Wve, Carlsbad, 92008, at or prior to the Public Hearing. CITY OF CAflLSBAD, CITY COUNCIL . PUBLISH: MAY 15,2010 May 15th, 2010 I certify (or declare) under penalty of perjury that the foregoing is true and correct. Dated at Escondido, California On this 17th, day of May.^010, Jane Allshouse NORTH COUNTY TIMES Legal Advertising NOTICE OF PUBLIC HEARING NOTICE IS HEREBY GIVEN THAT THE City Council of the City of Carlsbad will hold a public hearing at City Council Chambers, 1200 Carlsbad Village Drive, Carlsbad, California, at 6:00 p.m. on Tuesday, May 25, 2010, to consider approving the Carlsbad Transnet Local Street Improvement Program of Project for fiscal years 2010/11 through 2014/15 for inclusion in the Regional Transportation Improvement Program. The Carlsbad Program of Projects consists of the following: Project El Camino Real Widening - Tamarack Avenue to Chestnut Avenue El Camino Real and Cannon Road El Camino Real - Lisa Street to Crestview Drive College Boulevard Reach A Poinsettia Lane Reach E Carlsbad Boulevard Bridge over Encina Power Station Carlsbad Boulevard Bridge over San Diego Northern Railway Railroad Pavement Management - Overlay Pavement Management - Seal Avenida Encinas - Widen from PAR to EWPCF College Boulevard and Palomar Airport Road - Intersection Improvements Melrose and Palomar Airport Road Pedestrian Signals El Camino Real Left Turn Lane to westbound Tamarack El Camino Real Widening La Costa Avenue to Arenal Road El Camino Real Widening Cassia to Camino Vida Roble Palomar Airport Road Right Turn Lane to southbound El Camino Real Palomar Airport Road Right Turn Lane to southbound Paseo Del Norte Palomar Airport Road Left Turn Lane to northbound Paseo Del Norte Carlsbad Blvd. Realignment Amount $12,349,000 $589,000 $2,125,000 $11,952,000 $13,450,000 $158,000 $44,000 $20,510,000 $3,300,000 $3,041,000 $838,000 $410,000 $151,000 $286,000 $2,400,000 $2,650,000 $590,000 $563,000 $232,000 $3,250,000 Copies of the Program of Project List are on file in the Office of the City Clerk and are open to public inspection. Those persons wishing to speak on this item are cordially invited to attend the public hearing. Copies of the agenda bill will be available after Friday, May 21, 2010. If you have any questions, please contact Marshall Plantz, Senior Civil Engineer in the Public Works Department at 760-602-2766. If you challenge the selected projects in court, you may be limited to raising only those issues raised by you or someone else at the Public Hearing described in this notice, or in written correspondence delivered to the City of Carlsbad, Attn: Office of the City Clerk, 1200 Carlsbad Village Drive, Carlsbad, 92008, at or prior to the Public Hearing. CITY OF CARLSBAD CITY COUNCIL PUBLISH: MAY 15, 2010 Carlsbad Program of Projects Fiscal Years 2010/11 to 2014/15 Marshall Plantz 5/25/10 The Carlsbad Program of Projects •A forecast of transportation projects over the next five years. •Inclusion in the Regional Transportation Improvement Program (RTIP). The RTIP •Multi-year planning and funding document. •Highway, arterial, transit and bikeway projects. •Support the Regional Transportation Plan. •Air quality analysis. •Ability to receive funding from Federal, State and TransNet sources. Types of Projects •Federal or State funds •TransNet funds •Regionally significant •Capacity increasing Federal & State Funded Projects •Federal –Poinsettia Lane Reach E –Carlsbad Blvd. Bridge at Encina Power Plant –Carlsbad Blvd. Bridge over SDNR •State –Pedestrian Signal Improvements –(TDA) TransNet Funded Projects •TransNet –Pavement Management –Carlsbad Blvd. Bridge at Encina Power Plant –Carlsbad Blvd. Bridge over SDNR –Carlsbad Blvd. Realignment –El Camino Real (ECR) –Tamarack to Chestnut –ECR –Lisa Street to Crestview –ECR-Cassia Road to Camino Vida Roble Capacity Increasing Projects without Federal, State or TransNet Funding –Palomar Airport Road (PAR) and College Blvd. –PAR right turn to south bound El Camino Real –PAR right turn to south bound Paseo Del Norte –PAR left turn to north bound Paseo Del Norte Capacity Increasing Projects without Federal, State or TransNet Funding –Melrose Drive right turn to west bound PAR –ECR left turn lane to west bound Tamarack –ECR and Cannon Road –ECR –La Costa Ave. to Arenal Road –College Blvd. Reach A –Avenida Encinas –Palomar Airport Road to EWPCF Next Steps •Conduct a public hearing. •Adopt a Resolution approving the Program of Projects. •Submit the Resolution to SANDAG by June 30th. •SANDAG assembles and adopts the RTIP for the region. Board action on September 24th. •SANDAG submits the RTIP to the State by October 1st.