Loading...
HomeMy WebLinkAbout2011-06-21; City Council; 20586; APPROVAL PLANS 2011 PAVEMENT OVERLAY PROJECTCITY OF CARLSBAD - AGENDA BILL AB# 20,586 MTG. 6/21/11 DEPT. TRANS APPROVAL OF PLANS AND SPECIFICATIONS AND AUTHORIZATION TO ADVERTISE FOR BIDS FOR CONSTRUCTION OF THE 201 1 PAVEMENT OVERLAY PROJECT NO. 6001-1 1-OL DEPT. DIRECTOR /?//•'' ^^iim CITY ATTORNEY ^\_ CITY MANAGER /<>— — RECOMMENDED ACTION: Adopt Resolution No. 2011-129 approving plans and specifications and authorizing the City Clerk to advertise for bids for the construction of the 2011 Pavement Overlay Project No. 6001-11-OL. ITEM EXPLANATION: The 2011 Pavement Overlay Project is part of the City's ongoing Pavement Management Program. This project will resurface Levante Street, Camino De Los Coches, Calle Timiteo, Normandy Lane, and a portion of El Camino Real by applying a rubberized asphalt concrete layer over the existing roadway. Staff recommends approving the project and authorizing the City Clerk to advertise for bids for the construction of the 2011 Pavement Overlay Project No. 6001-11-OL. ENVIRONMENTAL IMPACT: The project is exempt from the California Environmental Quality Act (CEQA) per State CEQA Guidelines Section 15301(c) - minor alteration of existing facilities including streets, sidewalks, gutters, and similar facilities involving negligible or no expansion. FISCAL IMPACT: The estimated construction cost for the 2011 Pavement Overlay Project is shown in the table below. 2011 PAVEMENT OVERLAY PROJECT - ENGINEER'S ESTIMATE: PROJECT ITEM Construction Contract Construction Contingency Administration, Testing, and Inspection TOTAL ESTIMATED PROJECT COST ESTIMATED COST $1,774,000 $100,000 $120,000 $1,994,000 DEPARTMENT CONTACT: Jon Schauble, (760) 602-2762, jon.schauble@carlsbadca.gov FOR CITY CLERKS USE ONLY COUNCIL ACTION: APPROVED DENIED CONTINUED WITHDRAWN AMENDED * D D D CONTINUED TO DATE SPECIFIC CONTINUED TO DATE UNKNOWN RETURNED TO STAFF OTHER -SEE MINUTES D D D D Page 2 The current status of the Pavement Management Program is shown in the table below. PAVEMENT MANAGEMENT PROGRAM - CIP NO. 6001 TASK DESCRIPTION Design Construction, Inspection, Materials Testing TOTAL CURRENT APPROPRIATION $120,043 7,227,567 $7,347,610 CURRENT YEAR EXPENDITURES/ ENCUMBRANCES $108,527 2,143,294 $2,251,821 REMAINING -BAlMNCES $11,516 $5,084,273 $5,095,789 The remaining Pavement Management Program balance of $5,095,789 includes $1,975,000 that was previously allocated for the 2011 Slurry Seal Project by City Council on April 26, 2011. There are sufficient funds available to complete the 2011 Pavement Overlay Project. Staff has applied for and received a rubberized asphalt concrete grant in the amount of $130,720 from California Department of Resources Recycling and Recovery (CalRecycle). The Pavement Management Program funds consist of Cal Recycle grant money, non-jurisdictional fees (generated from trash haulers), TransNet-Local funds available for drawdown from SANDAG, and remaining Proposition 1B funds (provided by the state). The project will be advertised with prevailing wage requirements as it is partially funded with restricted funds (Proposition 1B). Remaining Pavement Management Program funds will be used on future pavement rehabilitation projects. EXHIBITS: 1. Location Map. 2. Resolution No. 2011-129 approving plans and specifications and authorizing the City Clerk to advertise for bids for the 2011 Pavement Overlay Project No. 6001-11-OL. LOCATION MAP STREETS TO BE OVERLAYED NOT TO SCALE PROJECT NAME PAVEMENT MANAGEMENT PROGRAM 2011 OVERLAY PROJECT NUMBER 6001-11OL EXHIBIT 1 DRAWN BY: SCOTT EVANS. CARLSBAD UTILITIES DEPT. 5/11/11 C:\TRANSPORTATION DEPARTUENT\DESIGN DIVIStON\UAASHOFF\2011 OVERLAY LOC UAP.DVG 1 RESOLUTION NO. 2011-129 2 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF 3 CARLSBAD, CALIFORNIA, APPROVING PLANS AND SPECIFICATIONS, AND AUTHORIZING THE CITY CLERK TO 4 ADVERTISE FOR BIDS FOR THE CONSTRUCTION OF THE 2011 PAVEMENT OVERLAY PROJECT NO. 6001-11-PL. 5 WHEREAS, the City Council of the City of Carlsbad, California, has determined it 6 necessary, desirable, and in the public interest to rehabilitate various roadways as part of the 7 City's ongoing Pavement Management Program; and 8 WHEREAS, the plans and specifications for furnishing of all labor, materials, tools,9 equipment, transportation, and other expenses necessary or incidental to the 2011 Pavement 10 Overlay Project No. 6001-11-OL, have been prepared and are on file in the Transportation11 Department of the City of Carlsbad and are incorporated herein by reference; and WHEREAS, the project is exempt from the California Environmental Quality Act (CEQA) I O per State CEQA Guidelines Section 15301(c); and14 WHEREAS, sufficient funds are available in the Pavement Management Program15 account number 6001 in order to complete this project; and16 WHEREAS, prevailing wages will be paid for this project as it is being funded with restricted funds.18 NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carlsbad,19 _ California, as follows: _. 1. That the above recitations are true and correct. 22 2. That the plans, specifications, and contract documents for the 2011 Pavement 23 Overlay Project No. 6001-11-OL, on file in the Transportation Department of the City of Carlsbad 24 are hereby approved. 25 3. The City Clerk of the City of Carlsbad is hereby authorized and directed to 2Q publish, in accordance with State law, a Notice to Contractors Inviting Bids for the construction of 27 the 2011 Pavement Overlay Project No. 6001-11-OL, in accordance with the plans, specifications, 28 and contract documents referred to herein. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 PASSED, APPROVED AND ADOPTED at a Regular Meeting of the City Council of the City of Carlsbad on the 21st day of June 2011, by the following vote to wit: AYES: Council Members Hall, Kulchin, Blackburn, Douglas, Packard. NOES: None. ABSENT: None. MATT HALL, Mayor ATTEST: LORRAINE M. WOOD, City Clerk (SEAL)