HomeMy WebLinkAbout2011-06-21; City Council; 20600 Attachments; FY 11-12 OPERATION CAPITAL IMPROVEMENT BUDGETEXHIBIT 8 1 RESOLUTION NO. 2011-146 2 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF 3 CARLSBAD, CALIFORNIA, DETERMINING THAT THE FY 2011- 2012 CAPITAL IMPROVEMENT PROGRAM BUDGET IS 4 CONSISTENT WITH THE GENERAL PLAN ON PROPERTY GENERALLY LOCATED CITYWIDE. 5 " 6 WHEREAS, the City Council of the City of Carlsbad, California has reviewed the 7 Capital Improvement Program for FY 2011-12 and has held such public hearings as are 8 necessary prior to adoption of the Capital Improvement Program Budget; and 9 WHEREAS, on June 21, 2011 the City Council made a finding of General Plan 10 Consistency for all projects receiving an allocation of funds for FY 2011-12 pursuant to Carlsbad 11 Municipal Code Section 2.24.065 (b); and 12 WHEREAS, at said hearing, upon hearing and considering all testimony and arguments, if any, of all persons desiring to be heard, said Council considered all factors relating to the City Council Determination; and 15 NOW, THEREFORE, BE IT HEREBY RESOLVED by the City Council as follows: A) That the foregoing recitations are true and correct. B) That based on the evidence presented at the hearing, the City Council determines that the Capital Improvement Program for FY 2011-12 is consistent with the General Plan based on the following findings: 19 Findings: 20 1. The projects are consistent with the goals, objectives, and policies of the city's General Plan in that the projects are required to ensure the provision of adequate public facilities and services concurrent with or prior to need. 22 2. The projects are consistent with applicable goals, objectives, and policies of the Land Use, 23 Circulation, and Open Space and Conservation Elements of the General Plan, as described in Exhibit "A." 24 3. As required by the General Plan, the proposed improvements are consistent with the city's 25 Growth Management Plan in that the projects ensure that the necessary improvements are provided for drainage, sewer, water distribution, traffic signals, and street projects in accordance 26 with the performance standards contained in the city's Growth Management regulations. 27 28 1 PASSED, APPROVED AND ADOPTED at a Joint Special Meeting of the 2 Carlsbad City Council, Carlsbad Municipal Water District Board of Directors, Carlsbad Housing and Redevelopment Commission held on the 21st day of June 2011, by the 4 following vote to wit: 5 " 6.. AYES: Council Members Hall, Kulchin, Blackburn, Douglas, Packard. 7 NOES: None.8 9 ABSENT: None. 10 11 MATT HALL, Mayor 12 ATTEST:13 14 17 18 19 20 21 22 23 24 25 26 27 28 -lORRANNE M. WOOD, City Clerk 16 (SEAL) Exhibit "A" FY 2011-2012 CAPITAL IMPROVEMENT PROGRAM PROJECT DESCRIPTIONS, GENERAL PLAN CONSISTENCY, AND ANTICIPATED ENVIRONMENTAL REVIEW CAPITAL PROJEECT DESCRIPTION CARLSBAD VILLAGE DRIVE GUARD RAIL REPLACEMENT PROJECT NAME PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Carlsbad Village Drive between Pontiac Drive and Victoria Avenue. PROJECT DESCRIPTION: Replace 1,225 feet of guard rail, posts, blocks and hardware along west bound Carlsbad Village Drive. PROJECT NEED: Replace 1,225 feet of guard rail, posts, blocks and hardware along west bound Carlsbad Village Drive. FINANCING: Purpose Design Construction Total Cost = Estimated Cost $ 5,000 $ 75,000 $ 80,000 Funding Source Gas Tax Gas Tax GENERAL PLAN CONSISTENCY: To design streets for the safe and efficient movement of people, goods and services within and through the City in the most environmentally sound and aesthetically pleasing manner possible. Circulation Element, Streets & Traffic Control, Objective B.2. ANTICIPATED ENVIRONMENTAL REVIEW: The project is exempt from environmental review per CEQA Guidelines Section 15301(b) - Repair and maintenance of existing facilities. Carlsbad Village Drive guard rail replacement.docx CAPITAL PROJEECT DESCRIPTION REPLACE PUMPS AT BATIQUITOS LIFT STATION PROJECT NAME PROJECT NO. PROJECT LOCATION MAP: REPLACE PUMPS AT BATIQUITOS LIFT STATION PROJECT LOCATION: Batiquitos Sewer Lift Station at 7382 Gabbiano Lane. PROJECT DESCRIPTION: Replace the three pumps with new, more efficient pumps. PROJECT NEED: Useful life has been met on all three pumps. Replace pumps using a new pumping strategy to reduce overall station maintenance costs and increase reliability. FINANCING: Purpose Construction Total Cost = Estimated Cost $ 250,000 $ 250,000 Funding Source Sewer Replacement GENERAL PLAN CONSISTENCY: A City which maintains a system of public facilities adequate for the projected population. Land Use Element, Growth Management and Public Facilities, Goal,A.2. ANTICIPATED ENVIRONMENTAL REVIEW: The project is exempt from environmental review per CEQA Guidelines Section 15301(b) - Repair and maintenance of existing facilities. REPLACE PUMPS AT BATIQUITOS LIFT STATION.docx CAPITAL PROJECT DESCRIPTION SEWER RELOCATION AT SUMMERWIND PLACE PROJECT NAME PROJECT NO. PROJECT LOCATION MAP: SEWER RELOCATION AT SUMMERWIND PLACE PROJECT LOCATION: From the end of Summerwind Place to the North Agua Hedionda Interceptor Sewer (NAHI) which runs along the north side of Agua Hedionda Creek. PROJECT DESCRIPTION: Construct approximately 1,150 feet of new 8-inch diameter sewer main. The alignment is across property owned by individual property owners and the subdivision HOA. PROJECT NEED: The existing 8-inch sewer in Summerwind Place collects residential sewage from approximately 35 single-family homes and connects to the NAHI sewer. The connection point is at a manhole surrounded by wetland habitat and is not easily accessible for maintenance. Solids tend to settle out in the upper reach of the NAHI because of minimal sewage flow which can lead to an eventual stoppage and spill if not frequently cleaned. FINANCING: Purpose Environmental Property Design Construction Total Cost = Estimated Cost $ 15,000 $ 8,000 $ 47,000 $510,000 $ 580,000 Funding Source Sewer Replacement Sewer Replacement Sewer Replacement Sewer Replacement GENERAL PLAN CONSISTENCY: A City which maintains a system of public facilities adequate for the projected population. Land Use Element, Growth Management and Public Facilities, Goal, A.2. ANTICIPATED ENVIRONMENTAL REVIEW: Potential Mitigated Negative Declaration. Sewer Relocation at Summerwind Place.docx CAPITAL PROJECT DESCRIPTION TRAFFIC SIGNAL PROGRAM PROJECT NAME PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Throughout the city. PROJECT DESCRIPTION: Upgrade traffic signal equipment and create a traffic signal communications network to manage the traffic signals. PROJECT NEED: Improve traffic flow in the city. FINANCING: Estimated CostPurpose Equipment Construction Total Cost = $4,100,000 $1,510,000 $5,610,000 Funding Source GCC/IRF GCC/IRF GENERAL PLAN CONSISTENCY: A City with properly maintained, smooth functioning and safe traffic control systems. Circulation Element, Streets & Traffic Control, Goal A.4. ANTICIPATED ENVIRONMENTAL REVIEW: The project is exempt per CEQA Guidelines Section15301 - Repair and Maintenance of existing facilities. Traffic Signal Program.docx CAPITAL PROJECT DESCRIPTION SIMSBURY SEWER EXTENSION PROJECT NAME PROJECT NO. PROJECT LOCATION MAP: SIMSBURY SEWER EXTENSION Simsbury Sewer Extension.docx PROJECT LOCATION: From the Simsbury Lift Station along Simsbury Court to the future Quarry Creek Development and the Vista/Carlsbad sewer pipeline which runs along the SR-78 alignment. PROJECT DESCRIPTION: Construct a gravity flow sewer pipeline and remove the Simsbury Lift Station PROJECT NEED: The Simsbury Sewer extension project (Reach VCT-1C) allows for the removal of Simsbury Lift Station with the construction of a gravity pipeline connection to the future Quarry Creek Development. FINANCING: Purpose Environmental Design Construction Total Cost = Estimated Cost $ 20,000 $ 78,000 $ 630,000 $ 728,000 Funding Source Sewer Benefit "A" Sewer Benefit "A" Sewer Benefit "A" GENERAL PLAN CONSISTENCY: A City which maintains a system of public facilities adequate for the projected population. Land Use Element, Growth Management and Public Facilities, Goal, A.2. ANTICIPATED ENVIRONMENTAL REVIEW: Potential Mitigated Negative Declaration. CAPITAL PROJECT DESCRIPTION SEWER COLLECTION SYSTEM - TAMARACK @ RR R-O-W SEWER RELOCATION PROJECT NAME PROJECT NO. PROJECT LOCATION MAP: TAMARACK @ RR R-O-W fiR SEWER RELOCATION PROJECT LOCATION: Tamarack Avenue on the east side of the railroad tracks. PROJECT DESCRIPTION: Replace approximately 200 lineal feet of the gravity sewer pipeline which crosses under the railroad tracks at Tamarack Avenue. The project includes the abandonment of that deteriorated portion and the construction of a replacement pipeline alignment. The alignment of the PVC 10-inch diameter pipeline will be modified and will no longer cross under the railroad tracks, but instead will connect directly to the Vista/Carlsbad Interceptor Sewer on the east side of the railroad tracks. PROJECT NEED: City staff discovered the deteriorated 10-inch diameter section of vitrified clay and iron pipeline during routine CCTV inspection. The cast iron pipeline portion is corroded and there are offsets in the joints of the VCP portion. FINANCING: Purpose Design Construction Total Cost = Estimated Cost $ 16,000 $ 236,000 $252,000 Funding Source Sewer Replacement Sewer Replacement GENERAL PLAN CONSISTENCY: A City which maintains a system of public facilities adequate for the projected population. Land Use Element, Growth Management and Public Facilities, Goal, A.2. ANTICIPATED ENVIRONMENTAL REVIEW: The project is exempt from environmental review per CEQA Guidelines Section 15301(b) - repair and maintenance of existing facilities involving negligible or no expansion and 15304(f) - minor trenching and backfilling. SEWER - TAMARACK @ RR R-O-W SEWER RELOCATION o CAPITAL PROJECT DESCRIPTION GATESHEAD SEWER LIFT STATION REMOVAL PROJECT NAME PROJECT NO. PROJECT LOCATION MAP: GATESHEAD SEWER LIFT STATION REMOVAL PROJECT LOCATION: 4779 Gateshead Road. PROJECT DESCRIPTION: Remove the existing Gateshead sewer lift station and extend sewer pipeline to connect to a gravity sewer line. PROJECT NEED: Construction of the final phase of the Robertson Ranch Development will provide an adjacent gravity flow sewer system that the Gateshead sewer lift station collection basin can connect to. The lift station will no longer be necessary to provide sewer service to that collection area. FINANCING: Purpose Design Construction Total Cost = Estimated Cost $ 3,240 $ 69,984 $ 73,224 Funding Source Sewer Replacement Sewer Replacement GENERAL PLAN CONSISTENCY: Manage the disposal or recycling of solid waste and sewage within the City. Land Use, Growth Management and Public Facilities, Implementing Policies and Action Programs C.10. ANTICIPATED ENVIRONMENTAL REVIEW: The project is exempt from environmental review per CEQA Guidelines Section 15301(l)(4)- Demolition and removal of small accessory structures. Gateshead Sewer Lift Station Removal.docx CAPITAL PROJECT DESCRIPTION VANCOUVER SEWER EXTENSION PROJECT NAME PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: From the Vancouver Sewer Lift Station along Vancouver Street southwesterly to an existing sewer line in Via Topacio. PROJECT DESCRIPTION: Construct a gravity flow sewer pipeline and remove Vancouver Sewer Lift Station. PROJECT NEED: Existing downstream sewer infrastructure provides the opportunity to abandon the Vancouver Sewer Lift Station with the construction of a gravity flow pipeline. FINANCING: Purpose Environmental Design Property Acq. Construction Total Cost = Estimated Cost $ 39,902 $ 63,844 $ 5,000 $ 861,892 $ 970,638 Funding Source Sewer Replacement Sewer Replacement Sewer Replacement Sewer Replacement GENERAL PLAN CONSISTENCY: A City which maintains a system of public facilities adequate for the projected population. Land Use Element, Growth Management and Public Facilities, Goal,A.2. ANTICIPATED ENVIRONMENTAL REVIEW: Potential Mitigated Negative Declaration. Vancouver Sewer Extension.docx CAPITAL PROJECT DESCRIPTION BUENA INTERCEPTOR REHABILITATION AT ENCINA PROJECT NAME PROJECT NO. PROJECT LOCATION MAP: BUENA INTERCEPTOR REHABILITATION ENCINA PROJECT LOCATION: Approximately 300 feet of 30-inch diameter RCP sewer located at the Encina Water Pollution Control Facility between 1-5 and the Encina Influent Structure. PROJECT DESCRIPTION: Rehabilitate approximately 300 feet of the 30-inch diameter Buena Interceptor Sewer that is located on the Encina Water Pollution Control Facility site. The existing lining material on the pipe interior has failed and needs to be replaced to protect the pipe from further corrosion. PROJECT NEED: The existing lining on the pipe interior has failed and is in need of rehabilitation. The City of Vista is the majority owner of this pipe and will be the lead agency for the repair. Carlsbad's share is approximately 35% of the total project cost. FINANCING: Purpose Construction Total Cost = "Carlsbad share. Estimated Cost $100,000 $100,000* Funding Source Sewer Replacement GENERAL PLAN CONSISTENCY: A City which maintains a system of public facilities adequate for the projected population. Land Use Element, Growth Management & Public Facilities, Goal A.2. ANTICIPATED ENVIRONMENTAL REVIEW: The project is exempt from environmental review per CEQA Guidelines Section 15301(b) - Repair and maintenance of existing facilities involving negligible or no expansion. BUENA INTERCEPTOR REHABILITATION AT ENCINA.dOCX CAPITAL PROJECT DESCRIPTION ECR & COLLEGE BOULEVARD INTERSECTION IMPROVEMENT PROJECT NAME PROJECT NO. PROJECT LOCATION MAP: ECR & COLLEGE BOULEVARD INTERSECTION IMPROVEMENT PROJECT LOCATION: ECR & College Boulevard Intersection PROJECT DESCRIPTION: Improve the intersection by widening south bound El Camino Real to provide three through lanes and a dedicated right turn lane to west bound College Boulevard. PROJECT NEED: To improve the capacity of the intersection and to update the roadways to conform to the roadway classification as described in the circulation element. FINANCING: Purpose Environmental Design Property Acq. Construction Total Cost = Estimated Cost $ 16,000 $ 55,000 $ 34,000 $410,000 $515,000 Funding Source Developer/CUSD Developer/CUSD Developer/CUSD Dev/CUSD/Unfunded GENERAL PLAN CONSISTENCY: A City with an adequate circulation infrastructure to serve the project population. Circulation Element, Streets & Traffic Control, Goal A.2. ANTICIPATED ENVIRONMENTAL REVIEW: The project is exempt from environmental review per CEQA Guidelines Section 15301(c) - Minor alteration of existing facilities, including streets, involving negligible or no expansion. ECR and College Blvd Inersection Imp.docx CAPITAL PROJEECT DESCRIPTION TRAFFIC SIGNAL - EL FUERTE ST. AND LOKER AVE. PROJECT NAME PROJECT NO. PROJECT LOCATION MAP: L FUERTE STAND LOKER AVE PROJECT LOCATION: Intersection of El Fuerte St. and Loker Ave. PROJECT DESCRIPTION: Installation of a four-leg fully-actuated traffic signal including a type 170-ATC Coldfire controller, video detection, battery back-up system, traffic signal interconnected system and appurtenant singing and striping. PROJECT NEED: Due to a number of collisions that have occurred at the intersection staff recommends proceeding with the installation of a traffic signal. The proposed traffic signal will assign the right-of-way for both motorists and pedestrians entering and crossing at this intersection. FINANCING: Purpose Estimated Cost Funding Source Design Construction Total Cost = $ 8,000 $ 202,000 $210,000 Gas Tax Gas Tax GENERAL PLAN CONSISTENCY: Provide traffic control devices along all roadway segments and at intersections. Circulation Element, Streets & Traffic Control, Policy C.7. ANTICIPATED ENVIRONMENTAL REVIEW: The project is exempt from environmental review per CEQA Guidelines Section 15301 - Minor alteration of existing facilities involving negligible or no expansion. -El Fuerte and Loker-Traffic Signal.docx CAPITAL PROJECT DESCRIPTION NORTH AGUA HEDIONDA INTERCEPTOR SEWER INVERTED SIPHON REHABILITATION PROJECT NO PROJEECT NAME PROJECT LOCATION MAP: NORTH AGUA HEDIONDA INTERCEPTOR SEWER INVERTED SIPHON REHABILITATION PROJECT LOCATION: Inverted siphon under the Bristol Cove channel. PROJECT DESCRIPTION: This project includes an investigative phase to assess the condition of the pipeline as well as a construction phase which would include the anticipated method of the pipeline rehabilitation (e.g. slip lining the pipeline with polymer pipeline.). PROJECT NEED: The existing 3 barrel inverted siphon cast iron pipelines which were constructed in 1965 cross under the Bristol Cove channel on the north shore of the Agua Hedionda Lagoon. The soils under the lagoon are highly corrosive and it is expected that the exterior of the cast iron pipelines have corroded. FINANCING: Purpose Design Construction Total Cost = Estimated Cost $ 15,024 $ 202,954 $217,988 Funding Source Sewer Replacement Sewer Replacement GENERAL PLAN CONSISTENCY: A City which maintains a system of public facilities adequate for the projected population. Land Use Element, Growth Management and Public Facilities, Goal,A.2. ANTICIPATED ENVIRONMENTAL REVIEW: The project is exempt from environmental review per CEQA Guidelines Section 15301(b) - Repair and maintenance of existing facilities involving negligible or no expansion. NAH-INVERTED SIPHON REHABILITATION.docx CAPITAL PROJECT DESCRIPTION OCCIDENTAL SEWER IMPROVEMENTS PROJEECT NAME PROJECT NO. PROJECT LOCATION MAP: OCCIDENTAL SEWER IMPROVEMENTS PROJECT LOCATION: Along Avenida Encinas from the Poinsettia Coaster Station to the Encina Water Pollution Control Facility. PROJECT DESCRIPTION: Rehabilitate or replace eight severely deteriorated manholes and replace and or repair multiple cracked and broken sections of 39-inch diameter pipeline. PROJECT NEED: Inspection of the Occidental Sewer has found severely damaged manholes and severely cracked pipe sections in need of repair. The sewer is jointly owned by the City of Carlsbad, Leucadia Wastewater District (LWD) and the City of Encinitas. According to a interagency agreement the City of Carlsbad is the lead agency responsible for maintenance. LWD and the City of Encinitas pay the City of Carlsbad for maintenance and repair costs based upon their ownership percentage which is as follows: Encinitas 19.7%, LWD 40.3%, Carlsbad 40%. FINANCING: Purpose Environmental Design Construction Total Cost = Estimated Cost $ 15,000 $ 27,247 $ 490,432 $ 532,679* Funding Source Sewer Replacement Sewer Replacement Sewer Replacement 'Carlsbad's share is 40% or $213,072 based on the current estimate. GENERAL PLAN CONSISTENCY: A City which maintains a system of public facilities adequate for the projected population. Land Use Element, Growth Management and Public Facilities, Goal,A.2. ANTICIPATED ENVIRONMENTAL REVIEW: Potential Mitigated Negative Declaration. OCCIDENTAL SEWER IMPROVEMENTS.docx CAPITAL PROJEECT DESCRIPTION ODOR AND CORROSION PREVENTION ASSESSMENT PROJECT NAME PROJECT NO. PROJECT LOCATION MAP: THROUGHOUT THE SEWER SERVICE AREA PROJECT LOCATION: Various locations within the city where odor complaints are most prevalent typically at sewer manholes and lift stations. PROJECT DESCRIPTION: Investigate the cause of odor complaints, perform air and liquid phase sampling as needed and develop recommendations for long term solutions. Incorporate short term mitigation improvements as appropriate. PROJECT NEED: The odor complaints are most prevalent during the hot weather, however the odors can create health and safety concerns or at a minimum a significant nuisance FINANCING: Purpose Study Total Cost = Estimated Cost $ 100,000 $ 100,000 Funding Source Sewer Replacement GENERAL PLAN CONSISTENCY: A City which ensures the timely provision of adequate public facilities and services to preserve the quality of life of residents. Land Use Element, Growth Management & Public Facilities, Goal A.1. ANTICIPATED ENVIRONMENTAL REVIEW: The investigative and recommendations phase of the project are exempt from environmental review per CEQA Guidelines Section 15262, Feasibility and Planning Studies. However, short or long term improvements may require additional CEQA review. ODOR AND CORROSION PREVENTION ASSESSMENT.docx OO CAPITAL PROJEECT DESCRIPTION RAISING BURIED STORM DRAIN CLEANOUTS PROJECT NAME PROJECT NO. PROJECT LOCATION MAP: Raise Buried Storm Drain Cleanouts PROJECT LOCATION: Throughout the city. PROJECT DESCRIPTION: Raise approximately 40 sunken and buried storm drain cleanouts. PROJECT NEED: The condition of the cleanouts is unknown. Raising the cleanouts will improve the ability of staff to contain spill events and perform other maintenance. FINANCING: Purpose Construction Total Cost = Estimated Cost $ 50,000 $ 50,000 Funding Source GCC GENERAL PLAN CONSISTENCY: To control storm water pollutants. Open Space & Conservation Element, Objective, B.1. ANTICIPATED ENVIRONMENTAL REVIEW: Potential Mitigated Negative Declaration. CN RAISING BURIED CLEANOUTS. docx CAPITAL PROJECT DESCRIPTION REPLACE FLOW METERS AT EIGHT LIFT STATIONS PROJECT NAME PROJECT NO. PROJECT LOCATION MAP: REPLACE FLOW METERS AT EIGHT LIFT STATIONS REPLACE FLOW METERS AT EIGHT LIFT STATIONS PROJECT LOCATION: The eight sewer lift stations are located at Chinquapin, Fox's, Villas, Poinsettia, Cannon, Simsbury, Knots and Sand Shell. PROJECT DESCRIPTION: Replace flow meters at the above locations with in-line Sparling-Tigermag flow meters. PROJECT NEED: Currently three flow meters are not working and the rest are failing. These old units are not recording accurate flow from the lift station to the SCADA system where the data is used to diagnose inefficiencies. FINANCING: Purpose Construction Total Cost = Estimated Cost $ 100,000 $100,000 Funding Source Sewer Replacement GENERAL PLAN CONSISTENCY: A City which maintains a system of public facilities adequate for the projected population. Land Use Element, Growth Management and Public Facilities, Goal, A.2. ANTICIPATED ENVIRONMENTAL REVIEW: The project is exempt from environmental review per CEQA Guidelines Section 15301(b) - Repair and maintenance of existing facilities. Replace-8-flow-meters.docx CAPITAL PROJECT DESCRIPTION RECYCLED WATER CONNECTION -ALGA ROAD PROJECT NAME PROJECT NO. PROJECT LOCATION MAP: RECYCLED WATER CONNECTION -ALGA ROAD PROJECT LOCATION: Alga Road just east of El Camino Real PROJECT DESCRIPTION: Currently La Costa Golf Course receives recycled water from Poinsettia Lane or from the Gafner treatment plant. Recycled water is put into lakes blended with potable water then pumped into the golf course irrigation system. Construction of a new recycled water connection from Alga Road to the golf course would allow the south course to be irrigated without blending in the lakes and pumping. This connection would also make it possible to serve the entire golf course demands without purchasing recycled water from Leucadia Wastewater District's Gafner treatment plant. PROJECT NEED: La Costa is planning a major golf course remodel including the installation of a new duel irrigation system and in addition the Leucadia Wastewater District recycled water purchase agreement has expired. This additional recycled water connection would increase recycled water sales to the golf course and thereby save potable water use. FINANCING: Purpose Design Construction Total Cost = Estimated Cost $ 10,000 $ 65,000 $ 75,000 Funding Source Water Replacement Water Replacement GENERAL PLAN CONSISTENCY: A city that conserves natural and man-made resources. Open Space & Conservation Element, Implementing Policies and Action Programs, Goal, A.6. ANTICIPATED ENVIRONMENTAL REVIEW: The project is exempt from environmental review per CEQA Guidelines Section 15302(c) - Replacement or reconstruction of existing facilities involving negligible or no expansion of capacity. Recycled Water Connection-Alga Rd.docx CAPITAL PROJECT DESCRIPTION MAERKLE RESERVOIR FLOATING COVER REPLACEMENT PROJECT NAME PROJECT NO. PROJECT LOCATION MAP:PROJECT LOCATION: Maerkle Reservoir. PROJECT DESCRIPTION: Project will first explore options for replacing the existing cover including the feasibility of adding photocells on the reservoir cover. PROJECT NEED: The existing cover was installed in 1996 and is approaching the end of its 20 year useful life. FINANCING: Purpose Environmental Design Construction Total Cost = Estimated Cost $130,000 $650,000 $9,220,000 $10,000,000 Funding Source Water Replacement Water Replacement Water Replacement GENERAL PLAN CONSISTENCY: A City which maintains a system of public facilities adequate for the projected population. Land Use Element, Growth Management and Public Facilities, Goal,A.2. ANTICIPATED ENVIRONMENTAL REVIEW: Potential Mitigated Negative Declaration. ^^» \J\ Maerkle Floating Cover Replacement.docx V Exhibit 9 1 RESOLUTION NO2011-147 2u A RESOLUTION OF THE CITY COUNCIL OF THE CITY 3 OF CARLSBAD, CALIFORNIA, APPROVING THE FY 4 2011-12 OPERATING AND CAPITAL BUDGETS OF THE ENCINA WASTEWATER AUTHORITY 5 6 WHEREAS, the City of Carlsbad is a member agency to the Encina Joint Powers 7 Agreement entered into on July 13, 1961, for the acquisition, construction, ownership, 8 operation and maintenance of the Encina Joint Sewer System; and 9 WHEREAS, the Encina Agreement requires approval for the budget of the 10 Encina Wastewater Authority (EWA) by the Member Agencies following the 11 recommendation of the Joint Advisory Committee (JAC); and 12 WHEREAS, the City Council of the City of Carlsbad desires to approve said budget and provide for the payment of its share such expenses in accordance with the 15 allocation provided in the Basic Agreement; and 16 WHEREAS, there are projected to be sufficient funds in the Sanitation fund for 17 the payments as they become due. 18 NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of 19 Carlsbad, California, as follows: 20 1. That the above recitations are true and correct. 21 2. That the City of Carlsbad's share of the Fiscal Year 2011-12 Operating Budget of the EWA as approved by JAC on May 25, 2011, in the amount of $3,159,311 24 for Wastewater Plant Operations and $727,914 for the Carlsbad Water Recycling 25 Facility Operations, and the Capital Budget of $1,994,444 is hereby approved. 26 27 28 Exhibit 9 1 3. That the City Manager is hereby authorized to make payment on behalf of 2 the City of Carlsbad to EWA in accordance with the budget as approved by JAC 3 pursuant to the Encina Basic Agreement. 4" 5 6 7 8 '" 9 10 /// 11 /// 12 /// 13 /// 14 /// 15 16 17 18 '" 19 '" 20 /// 21 /// 22 /// 23 /// 24 /// 25 26 27 28 1 2 3 4 5 6 7 8 9 10 11 12 13 14 16 17 18 19 20 21 22 23 24 25 26 27 28 PASSED, APPROVED AND ADOPTED at a Joint Special Meeting of the Carlsbad City Council, Carlsbad Municipal Water District Board of Directors, Carlsbad Housing and Redevelopment Commission held on the 21st day of June 2011, by the following vote to wit: AYES: Council Members Hall, Kulchin, Blackburn, Douglas, Packard. NOES: None. ABSENT: None. MATT HAIL, Mayor ATTEST: LORRAINE M. WOOD, City Clerk (SEAL) Exhibit 10 1 RESOLUTION NO.2Q11-148 2 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD, CALIFORNIA, APPROVING 3 ADJUSTMENTS TO THE FY 2010-11 OPERATING 4 BUDGET 5 WHEREAS, the city's self-insured Worker's Compensation Fund has 6 experienced higher than anticipated claims and settlements in FY 2010-11; and 7 WHEREAS, the Worker's Compensation Fund Balance has decreased more8 than anticipated, due to the higher claims and settlements; and WHEREAS, the Finance Department recommends increasing the Worker's 11 Compensation cash reserves to an appropriate level to meet ongoing obligations; and 12 WHEREAS, it is recommended that the General Fund provide a cash transfer of 13 $1,000,000 to the Workers Compensation Fund to increase cash reserves; 14 NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of 15 Carlsbad, California, as follows: 16 1. That the above recitations are true and correct. 17 2. That the City Council of the City of Carlsbad, California, does hereby 18 authorize an additional appropriation and transfer of $1,000,000 in Fiscal Year 20 2010-11 to the city's Worker's Compensation Fund. 21 /// 22 /// 23 /// 24 /// 25 /// 26 27 28 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 PASSED, APPROVED AND ADOPTED at a Joint Special Meeting of the Carlsbad City Council, Carlsbad Municipal Water District Board of Directors, Carlsbad Housing and Redevelopment Commission held on the 21st day of June 2011, by the following vote to wit: AYES: Council Members Hall, Kulchin, Blackburn, Douglas, Packard. NOES: None. ABSENT: None. 1A MATt^HALL, Mayor ATTEST: LORRAINE M. WOOD, City Clerk (SEAL) Exhibit 11 1 RESOLUTION NO. sos 2 A RESOLUTION OF THE HOUSING AND REDEVELOPMENT COMMISSION OF THE CITY 3 OF CARLSBAD, CALIFORNIA, APPROVING , ADJUSTMENTS TO THE FY 2010-11 OPERATING BUDGET 5 6 WHEREAS, the Section 8 Special Revenue Fund will not have a sufficient 7 budget appropriation to cover increased administrative charges from San Diego County 8 for Fiscal Year 2010-11; and 9 WHEREAS, the Finance Department recommends the additional appropriation of 10 $2,500 to cover the increased charges; and 11 NOW, THEREFORE, BE IT RESOLVED by the Housing and 12 Redevelopment Commission of the City of Carlsbad, California, as follows: 1. 1. That the above recitations are true and correct. 15 2. That the Housing and Redevelopment Commission of the City of 16 Carlsbad, California, does hereby authorize an additional appropriation of $2,500 17 in Fiscal Year 2010-11 from the Housing and Redevelopment Debt Service Fund balance. 19 /// 20 /// 21 " 22 23 24 '" 25 '" 26 /// 27 28 758 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 PASSED, APPROVED AND ADOPTED at a Joint Special Meeting of the Carlsbad Housing and Redevelopment Commission, Carlsbad City Council, Carlsbad Municipal Water District Board of Directors held on the 21st day of June 2011, by the following vote to wit: AYES: Commission Members Hall, Kulchin, Blackburn, Douglas, Packard. NOES: None. ABSENT: None. MATT HALL, Chairman ATTEST: dsA HILDABRAND, Secretary (SEAL) C f / Vo ',~ o: ESTABLISHED \\'~ \%:\ 1970 ]S = Exhibit 12 1 RESOLUTION NO. 1421 2 A RESOLUTION OF THE BOARD OF DIRECTORS OF CARLSBAD MUNICIPAL WATER DISTRICT (CMWD), 3 APPROVING ADJUSTMENTS TO THE FY 2010-11 4 OPERATING BUDGET. 5 WHEREAS, there are insufficient funds appropriated in the FY 2010-11 Operating 6 Budget for recycled water purchases from other agencies ; and 7 WHEREAS, the Finance Department recommends an additional appropriation of8 $462,171 to cover the increased charges; and 10 NOW, THEREFORE, BE IT RESOLVED by the Board of Directors of the 1 1 Carlsbad Municipal Water District as follows: 12 1 . That the above recitations are true and correct. 13 2. That the Board of Directors of Carlsbad Municipal Water District, does 14 hereby authorize an additional appropriation of $462,171 in Fiscal Year 2010-1 1 from the Recycled Water Operations Fund balance. 16 17 18 19 '" 20 21 /// 22 /// 23 /// 24 /// 25 /// 26 27 28 I(f0 1 2 3 4 5 6 7 8 9 10 11 12 13 14 16 17 18 19 20 21 22 23 24 25 26 27 28 PASSED, APPROVED AND ADOPTED at a Joint Special Meeting of the Carlsbad Municipal Water District Board of Directors, Carlsbad City Council, Carlsbad Housing and Redevelopment Commission held on the 21st day of June 2011, by the following vote to wit: AYES: Council Members Hall, Kulchin, Blackburn, Douglas, Packard. NOES: None. ABSENT: None. MATT HALL, Mayor ATTEST: IRAINEjM. WOOD, City Clerk (SEAL) Exhibit 13 1 RESOLUTION NO. 506 2 A RESOLUTION OF THE CITY OF CARLSBAD HOUSING AND REDEVELOPMENT COMMISSION APPROVING THE 3 ESTABLISHMENT OF A RESERVE FUND FOR THE TYLER 4 COURT AFFORDABLE SENIOR APARTMENTS, AND SETTING FORTH THE PURPOSE AND USE FOR SAID FUND. 5 6 WHEREAS, on September 30, 1999, the Redevelopment Agency of the City of Carlsbad purchased the Tyler Court Senior Apartment Complex for the purpose of providing permanent 7 affordable housing for very low income senior citizens in Carlsbad; and ° WHEREAS, the Redevelopment Agency has continuously owned said apartment complex since acquisition in 1999; and in WHEREAS, the Housing and Redevelopment Commission has previously determined that it is appropriate and necessary to contract for outside professional services for exclusive 11 day-to-day management of the Tyler Court Senior Apartments, which includes ongoing maintenance, repairs and capital improvements, and the Commission has subsequently 12 contracted for said services since acquisition in 1999 ; and 13 WHEREAS, from time to time, rental revenues may exceed operational costs in a given year resulting in surplus cash from the Tyler Court Senior Apartments, which is intended to be used for operations and/or repairs, renovations, capital improvements or other related activities , t- for said apartment complex only for as long as the Redevelopment Agency owns said complex; and 16 WHEREAS, the Commission desires to formally establish a reserve fund and set forth 17 the purpose and use for said funds for the Tyler Court Senior Apartments. 18 NOW, THEREFORE, BE IT HEREBY RESOLVED by the Housing and Redevelopment Commission of the City of Carlsbad, California, as follows: ~^ 1. The above recitations are true and correct. 21 2. The Housing and Redevelopment Commission hereby authorizes the Redevelopment Agency Executive Director and Finance Director to establish a 22 reserve fund for the Tyler Court Senior Apartments for deposits of surplus operating cash from said Agency-owned apartments. 23 3. The Housing and Redevelopment Commission hereby authorizes the use of said 24 Tyler Court Reserve Fund for the specific purpose of funding ongoing operations »- of the Tyler Court Senior Apartments and/or for the costs associated with repairs, maintenance, renovations/rehabilitation, capital improvements or other related 26 costs for said apartments as deemed appropriate by the Agency's Executive Director and/or designee. 27 28 Exhibit 13 1 4. The Agency Executive Director and Finance Director are authorized to 2 appropriate and/or distribute said funds from the Reserve Fund for costs related to the ongoing operation, maintenance, repair, renovation or other capital improvement program for the Tyler Court Senior Apartments for as long as the Agency owns said property. 5 5. If the Commission transfers ownership of the Tyler Court Senior Apartments to the City of Carlsbad or a private party for any reason, the Finance Director is 6 hereby authorized to accept and transfer the cash available in the Tyler Court Reserve Fund from the Carlsbad Redevelopment Agency to the City of Carlsbad's Housing Trust Fund for use by the City and/or Carlsbad Housing Authority to fund ongoing operations, maintenance, repairs, rehabilitation or other capital improvement projects related to the Tyler Court Senior Apartments, and/or to be o used to create additional affordable housing opportunities for low income households within the City of Carlsbad as determined to be appropriate by the City 10 Council. 11 //// 12 //// 13 //// 14 //// 15 16 17 18 "" 19 "" 20 //// 21 //// 22 //// 23 //// 24 //// 25 26 27 28 1(^3 1 PASSED, APPROVED AND ADOPTED at a Joint Special Meeting of the 2 Carlsbad Housing and Redevelopment Commission, Carlsbad City Council, Carlsbad 3 Municipal Water District Board of Directors held on the 21st day of June 2011, by the 4 following vote to wit: 5 " 6,. AYES: Commission Members Hall, Kulchin, Blackburn, Douglas, Packard. 7 NOES: None.8 9 ABSENT: None. 10 11 MATT HALL, Chairman 12 ATTEST:13 14 15 '•'"' HILDABRAND, Secretary 16 (SEAL) 19 20 21 22 23 24 25 26 27 28 17 ^«r/ ••?,'17 = o; ESTABLISHED \\ ; 18 \\\ 197° /Ij 1 2 3 4 5 NOW, THEREFORE, the City Council of the City of Carlsbad ordains as follows:6 SECTION 1: That section 13.10.030 of the Carlsbad Municipal Code is amended to Q read as follows:o 9 10 11 12 13 14 15 17 18 19 20 21 22 23 24 25 28 ORDINANCE NO. CS-150 AN ORDINANCE OF THE CITY COUNCIL OF THE CITY OF CARLSBAD, CALIFORNIA, AMENDING CARLSBAD MUNICIPAL CODE SECTIONS 13.10.030, 13.10.080, 13.10.090, 15.08.040(b) and 5.09.030(b) 13.10.030-Sewer capacity fee -Encina Treatment Plant Except as provided, every person who wishes to use the city sewer system and the Encina Treatment Plant shall pay to the city prior to the issuance of a sewer permit, a sewer capacity fee per equivalent dwelling unit. The amount of the sewer capacity fee shall be as set from time to time by a resolution of the City Council. The sewer capacity fee shall be adjusted annually by a resolution of the City Council by the percentage change in the Engineering News Record Los Angeles Construction Cost Index with the base index in effect in December 2003, except that the period from July 1, 2009 to June 30, 2011 shall not be counted in this adjustment. All sewer capacity fees shall be placed in the sewer construction fund and shall be used to pay for capital improvements of such system. SECTION 2: That section 13.10.080 of the Carlsbad Municipal Code is amended 1 fi to read as follows: 13.10.080 Sewer benefit area fees. Except as provided, every person who wishes to use the city's South Agua Hedionda Interceptor Sewer shall pay to the city, prior to the issuance of a sewer permit, a sewer benefit area fee of one thousand six hundred fifteen dollars per equivalent dwelling unit for sewer benefit area C; one thousand six hundred eighteen dollars per equivalent dwelling unit for sewer benefit area D; two thousand three hundred eighty-six dollars per equivalent dwelling unit for sewer benefit area E; and two thousand three hundred ninety- nine dollars per equivalent dwelling unit for sewer benefit area F.The fee established by this section shall apply to building permits issued thirty days following adoption of this section for residential developments, and commercial and industrial buildings. The sewer benefit area fees shall be adjusted annually effective July 1, according to the Engineering News Record Los Angeles Construction Cost Index with a base year index reported on April 1 of each year with a base year index of 7500, except that the period from July 1, 2009 to June 30, 2.011 shall not be counted in this adjustment. SECTION 3: That section 13.10.090 of the Carlsbad Municipal Code is amended to read as follows: 27 13.10.090 Sewer benefit area fees-Area H. Except as provided, every person who wishes to use the city's sewer facilities in sewer benefit area H shall pay to the city, prior to the issuance of a building permit, a sewer benefit area fee of eight hundred eight dollars per equivalent dwelling unit for sewer 1 2 3 benefit area H.Tfte fee established by this section shall apply to building permits issued thirty days following adoption of the ordinance codified in this section for residential developments, and commercial and industrial buildings. The sewer benefit area fees shall be adjusted annually effective September 1, by the annual change to the Engineering News Record Los Angeles Construction Cost Index with a base year index of April 1, 2004, except that the period from July 1, 2009 to June 30, 2011 shall not be counted in this adjustment. 5 SECTION 4: That section 15,08.040(b) of the Carlsbad Municipal Code is 7 amended to read as follows: 15.08.040 Fee. (b) A planned local drainage area fee shall be paid by the owner or developer prior to the issuance of any building permit or occupancy permit or prior to final or parcel map approval for a project, whichever occurs first. The planned local drainage area fees shall be adjusted annually based upon the July, 2008 Engineering News Record Los Angeles Construction Cost Index of 9335.69 based on the 1967 average = one hundred, except that the period from July 1, 2009 to June 30, 2011 shall not be counted in this 8 9 10 11 adjustment. 12 SECTION 5: That section 5.09.030(b) of the Carlsbad Municipal Code is 13 amended to read as follows:14 5.09.030 Imposition of tax-Amount. 15 (b) The developer of a mobile home park shall pay a license tax fee of one thousand one hundred fifty dollars for each mobile home space. The license tax for mobile home spaces shall be automatically increased or decreased on January 1st of each year by the same percentage as the percentage of increase or decrease in construction costs between December 1st of each of the two immediately preceding years, for which purpose construction costs and the increase or decrease therein shall be based on the Engineering News-Record Construction Cost Index. Except that the period from July 1, 2009 to June 30, 2010 shall not be counted in this adjustment. 20 EFFECTIVE DATE: This ordinance shall be effective thirty days after its adoption; 21 and the city clerk shall certify the adoption of this ordinance and cause it to be published at 22 least once in a newspaper of general circulation in the City of Carlsbad within fifteen days 23 after its adoption.24 25 26 27 28 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 INTRODUCED AND FIRST READ at a regular meeting of the Carlsbad City Council on the 21st day of June 2011, and thereafter PASSED AND ADOPTED at a regular meeting of the City Council of the City of Carlsbad on the day of , 2011, by the following vote, to wit: AYES: NOES: ABSENT: APPROVED AS TO FORM AND LEGALITY: RONALD R. BALL, City Attorney MATT HALL, Mayor ATTEST: LORRAINE M. WOOD, City Clerk Id) 13.10.030 - Sewer capacity fee—Encina Treatment Plant. Except as provided, every person who wishes to use the city sewer system and the Encina Treatment Plant shall pay to the city prior to the issuance of a sewer permit, a sewer capacity fee per equivalent dwelling unit. The amount of the sewer capacity fee shall be as set from time to time by a resolution of the city council. The sewer capacity fee shall be adjusted annually by a resolution of the city council by the percentage change in the Engineering News Record Los Angeles Construction Cost Index with the base index in effect in December 2003, except that the period from July 1, 2009 to June 30, 2011 shall not be counted in this adjustmenty The foo adjustment for the July 1, 2010—Juno 30, 2011 fiscal year shall bo hold in abeyance for a period of one year. Thereafter tho foe shall return to tho amount it would have been had there- boon no suspension unless prior to that time the city council adopts an ordinance specifying a different fee or formula. All sewer capacity fees shall be placed in the sewer construction fund and shall be used to pay for capital improvements of such system. 13.10.080 - Sewer benefit area fees. Except as provided, every person who wishes to use the city's South Agua Hedionda Interceptor Sewer shall pay to the city, prior to the issuance of a sewer permit, a sewer benefit area fee of one thousand six hundred fifteen dollars per equivalent dwelling unit for sewer benefit area C; one thousand six hundred eighteen dollars per equivalent dwelling unit for sewer benefit area D; two thousand three hundred eighty-six dollars per equivalent dwelling unit for sewer benefit area E; and two thousand three hundred ninety-nine dollars per equivalent dwelling unit for sewer benefit area F. The fee established by this section shall apply to building permits issued thirty days following adoption of this section for residential developments, and commercial and industrial buildings. The sewer benefit area fees shall be adjusted annually effective July 1, according to the Engineering News Record Los Angeles Construction Cost Index with a base year index reported on April 1 of each year with a base year index of 7500, except that the period from July 1, 2009 to June 30, 2011 shall not be counted in this adjustment. The foe adjustment for the July 1, 2010—Juno 30, 2011 fiscal year sholl bo held in abeyance for a period of one year. Thereafter the foo shall return to the amount it would have boon had thoro been no suspension unless prior to that time the city council odopts and ordinance specifying a different foe or formula. 13.10.090 - Sewer benefit area fees—Area H. Except as provided, every person who wishes to use the city's sewer facilities in sewer benefit area H shall pay to the city, prior to the issuance of a building permit, a sewer benefit area fee of eight hundred eight dollars per equivalent dwelling unit for sewer benefit area H. The fee established by this section shall apply to building permits issued thirty days following adoption of the ordinance codified in this section for residential developments, and commercial and industrial buildings. The sewer benefit area fees shall be adjusted annually effective September 1, by the annual change to the Engineering News Record Los Angeles Construction Cost Index with a base year index of April 1, 2004, except that the period from July 1, 2009 to June 30, 2011 shall not be counted in this adjustment. The fee adjustment for the July 1, 2010—Juno 30, 2011 fiscal yoar shall bo hold in abeyance for a period of one year. Thereafter the foe shall return to the amount it would have been had there been no suspension unless prior to thot time the city council adopts on ordinance specifying a different fee or formula. 170 ci 15.08.040 Fee (b) A planned local drainage area fee shall be paid by the owner or developer prior to the issuance of any building permit or occupancy permit or prior to final or parcel map approval for a project, whichever occurs first. The planned local drainage area fees shall be adjusted annually based upon the July, 2008 Engineering News Record Los Angeles Construction Cost Index of 9335.69 based on the 1967 average = one hundred, except that the period from July 1, 2009 to June 30, 2011 shall not be counted in this adjustment. Tho foo adjustment for tho July 1, 201-Q—Juno 30, 2011 fiscal year shall bo hold in abeyance for a period of one year. Thereafter the fee shall return to the amount it would have been had there boon no suspension unless prior to that time the city council adopts an ordinance specifying a different foo or n/ 5.09.030 Imposition of tax—Amount (b)The developer of a mobile home park shall pay a license tax fee of one thousand one hundred fifty dollars for each mobile home space. The license tax for mobile home spaces shall be automatically increased or decreased on January 1st of each year by the same percentage as the percentage of increase or decrease in construction costs between December 1st of each of the two immediately preceding years, for which purpose construction costs and the increase or decrease therein shall be based on the Engineering News—Record Construction Cost Index^T except that the period from July 1, 2009 to June 30, 2011 shall not be counted in this adjustment. The fee adjustment for the July 1, 2009—June 30, 2010 fiscal year shall be held in abeyance for a period of one year. Thereafter the fee shall return to the amount it would have been had there been no suspension unless prior to that time the city council adopts an ordinance specifying a different fee or formula.