Loading...
HomeMy WebLinkAbout2011-07-26; City Council; 20634; CONTRACT PIPE REPLACEMENT PROGRAMCITY OF CARLSBAD - AGENDA BILL AB# 20.634 MTG. 7/26/1 1 DEPT. ENG AWARD OF CONTRACT FOR THE CORRUGATED METAL PIPE REPLACEMENT PROGRAM LJ/"M i w DDAC 1 AMEZ/CI f^Ak/IIMf"^ DCAI UII^LJI AKir\ā€” HULLY bKAb LANc/bL uAMINU KbAL, rlloHLANU DRIVE/JAMES DRIVE AND MALLORCA PLACE, PROJECT NO. 6607 DEPT. HEADb/[JfC^ CITYATTY. rfZ^' CITY MGR. ( Uā€” ' RECOMMENDED ACTION: Adopt Resolution No. 2011-175 accepting bids and awarding the contract to New Century Construction, Inc. for the Corrugated Metal Pipe (CMP) Replacement Program - Holly Brae Lane/El Camino Real, Highland Drive/James Drive and Mallorca Place, Project No. 6607. ITEM EXPLANATION: The CMP Replacement Program was established as a five-year program to replace, repair or remediate deteriorated CMP storm drain systems throughout the City. The pipelines included in the program were identified after City staff inspected the interior of the storm drain pipe and assessed the condition of CMP pipelines. The program includes the replacement or remediation of 25 storm drain pipelines. The program has had six pipelines systems added in the last year based on condition assessments. The Holly Brae Lane to El Camino Real project will construct a new curb inlet to replace an outdated and unsafe inlet and install a cured-in-place liner into an existing deteriorated storm drain pipeline that conveys runoff from Holly Brae Lane down to El Camino Real a distance of 420 feet. The Highland Drive to James Drive project will construct a new standard inlet to replace an undersized non- standard inlet and install 160 feet of cured-in-place liner into an existing deteriorated storm drain pipeline from the new inlet to a catch basin. The project also includes the installation of a cleanout at the junction of the pipeline to a larger pipeline in James Drive that will allow maintenance crews access for routine cleaning and inspection. A pipeline added to the program in 2011, the Mallorca Place project will install 155 feet of cured-in-place liner into a damaged pipeline that was discovered during routine maintenance activities. During the bid period, 133 feet of cured-in-place liner for a pipeline in Monroe Street at Alder Avenue was added to the project and program after crews observed that the pipeline had deteriorated. DEPARTMENT CONTACT: Sherri Howard, (760) 602-2756, Sherri.Howard@carlsbadca.gov FOR CITY CLERKS COUNCIL ACTION: USE ONLY. APPROVED DENIED CONTINUED WITHDRAWN AMENDED 4 D D D CONTINUED TO DATE SPECIFIC CONTINUED TO DATE UNKNOWN RETURNED TO STAFF OTHER - SEE MINUTES D D D D Page 2 On June 21, 2011, three (3) sealed bids were received for the construction of this project as shown on the following table. CONTRACTOR 1 . New Century 2. Charles King 3. Don Hubbard Construction, Inc. Company, Inc. Contracting Company v ,.RTQIM. ā€¢,, AMOUNT OF BID $151,615 $168,902 $179,860 All bid documents submitted by New Century Construction, Inc. have been reviewed by staff and were found to be in order. Staff recommends awarding the construction contract to New Century Construction, Inc. in the amount of $151,615. ENVIRONMENTAL IMPACT: The project is exempt from the California Environmental Quality Act (CEQA) per state CEQA Guidelines Section 15301(b) - minor alteration of existing facilities of public utility services involving negligible or no expansion. FISCAL IMPACT: Table 1 shows the current status of the CMP Replacement Program: TABLE 1 - CMP REPLACEMENT PROGRAM - PROJECT NO. 6607 TASK DESCRIPTION Design Construction, Inspection, Materials Testing Environmental Mitigation & Monitoring Real Property Acquisition TOTAL APPROPRIATED TO DATE $543,476 $1,712,224 $31,000 $29,300 $2,316,000 EXPENDITURES/ ENCUMBRANCES/ OBLIGATIONS TO DATE $466,497 $989,277 $90 $24,300 $1,480,164 REMAINING BALANCES $76,979 $722,947 $30,910 $5,000 $835,836 An Engineer's Estimate of the construction cost for the CMP Replacement Program - Holly Brae Lane/El Camino Real, Highland Drive/James Drive and Mallorca Place, was prepared by staff on March 11, 2011, and totals $133,000. The estimate was increased during the bid period to $150,000 with the addition of 133 lineal feet of pipe lining. The total estimated construction cost is shown in Table 2. Page 2 TABLE 2 - PROJECT CONSTRUCTION COST ESTIMATE CMP REPLACEMENT PROGRAM - HOLLY BRAE LANE/EL CAMINO REAL, HIGHLAND DRIVE/JAMES DRIVE AND MALLORCA PL, PROJECT NO. 6607 Construction Contract Construction Contingency Construction Management and Inspection Testing TOTAL ESTIMATED CONSTRUCTION COSTS PROJECT AVAILABLE BALANCE ADDITIONAL APPROPRIATION ANTICIPATED FOR CONSTRUCTION ESTIMATED COSTS $151,615 $30,000 $16,000 $8,000 $205,615 $835,836 -0- Sufficient funds have been appropriated from the Infrastructure Replacement Fund (IRF) to fund this project. Annually, funds are added to the project through the Capital Improvement Program. This funding source is not subject to State or Federal restrictions regarding prevailing wage. Therefore, pursuant to Carlsbad Municipal Code Section 3.28.130, prevailing wages are not required for the construction of CMP Replacement Program, Project No. 6607. EXHIBITS: 1. 2. 3. Location Maps. CMP Replacement Program Project List. Resolution No. 2011-175 accepting bids and awarding the contract to New Century Construction, Inc. for the Corrugated Metal Pipe Replacement Program - Holly Brae Lane/El Camino Real, Highland Drive/James Drive and Mallorca Place, Project No. 6607. LOCATION MAP NOT TO SCALE SHEET J OF 2 PROJECT NAME CORRUGATED METAL PIPE REPLACEMENT PROGRAM PROJECT NUMBER 6607 EXHIBIT 1 DRAW BY: SCOTT CVAHS. CARLSBAD I/TUBES KPT. 3/14/tl C \UHU7KS DCPMTUO1T\KSKN OM9CH\HOW*XD\OIP RtPLM&KNT PROCRAHWALLCKA-HtCHUWl.DK 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 LOCATION MAP NOT TO SCALE SHEET 2 OF 2 PROJECT NAME CORRUGATED METAL PIPE REPLACEMENT PROGRAM PROJECT NUMBER 6607 EXHIBIT 1 K SCOTT [VMS, OWLSBAO UTILITIES OEPT1 J/14/II O \UDUTES D£P/(RTVfNr\DRffiN Om30N\HOIKWD\aMP RCPUCBiOiT PKXSUI\fUiiafKA-HCHUWD.DWC 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 Exhibit 2 CMP Replacement Program Project List Fiscal Year 2008/2009 2009/2010 2010/2011 2011/2012 2012/2013 Added to Drogram 2010/2011 Site No. 3 10 15 19 and 20 21 23 25 31 13 and 77 14 68 and 69 70 and 71 43 60 86 and 87 6 29 34 42 47 and 48 35 38 39 and 40 57 and 66 63 Site Westfieid Shopping Center north end of Monroe Street State Street from Laguna Drive to Beech Avenue In driveway off Park Drive just south of May Court Easement off Via Libertad On Oak Avenue from Lincoln Street to Washington Street Entrance to Flower Fields Apartments off Avenida de Anita Highland Drive to James Drive between Tamarack Avenue and Chinquapin Avenue On Carlsbad Village Drive between Victoria Avenue & Chatham Road Easement on the west side of ECR to Cameo Road From Holly Brae Lane in an easement to ECR Easement between Alder Avenue and ECR Easement between Alder Avenue and ECR Easement off Van Allen Way At the end of cul-de-sac on Badajoz Place to an easement In an Easement southwest of Hoover Street to the Agua Hedionda Lagoon Crossing Jefferson Street between I-5 and Marron Road Easement east of the corner of Oak Avenue & Washington Street crossing RR Crossing Highland Drive at Adams Street Crossing Adams Street just down from Highland Drive On Costa Del Mar to an easement - entrance to La Costa Resort Crossing Bruce Road at 1729 to 1751 Bruce Road Easement off Cannon Road on Strawberry Fields From Garfield Street between Date Avenue and Olive Avenue in an easement to Agua Hedionda Lagoon Easement off La Costa Avenue at #2433 La Costa Avenue Easement at Romeria Street and Gibraltar Street Mallorca Place to La Costa Avenue Portion to Remove and Replace Campground Cavern Fill and Ponto Interchange Storm Drain Abandonment Mallorca Place to La Costa Avenue Portion to line Highland Drive/Etmwood Street at Buena Vista Way Carlsbad Blvd north of Batiquitos Lagoon Alder Avenue Monroe Street at Sunnyhill Drive Status Complete Complete Private ** Complete Complete Private ** Award of Contract Complete Complete Award of Contract Complete Complete Private ** Design Design Design Design Design Design Private ** Complete* Private " Complete* Complete* Complete* Complete* Complete* Award of Contract* Design Complete Award of contract* * - Moved forward at request of Operations and Maintenance due to condition ** - Removed from program Updated June 27, 2011 1 RESOLUTION NO. 2011-175 2 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF ā€ž CARLSBAD, CALIFORNIA, ACCEPTING BIDS AND6 AWARDING A CONTRACT FOR CONSTRUCTION OF THE CORRUGATED METAL PIPE REPLACEMENT PROGRAM - 4 HOLLY BRAE LANE/EL CAMINO REAL, HIGHLAND DRIVE/JAMES DRIVE AND MALLORCA PLACE, PROJECT 5 NO. 6607. 6 WHEREAS, on May 10, 2011, the City Council of the City of Carlsbad approved plans 7 for construction of the Corrugated Metal Pipe Replacement Program - Holly Brae Lane/El Camino 8 Real, Highland Drive/James Drive and Mallorca Place, Project No. 6607; and 9 WHEREAS, three (3) sealed bids were received on June 21, 2011 by the City of 10 Carlsbad for the construction of said project; and 11 WHEREAS, the lowest responsive and responsible bid to construct said project was 12 submitted by New Century Construction, Inc., in the amount of $151,615; and 13 WHEREAS, there are sufficient funds available to complete the project; and 14 WHEREAS, subsection 3.28.040(C)(5) of the Carlsbad Municipal Code authorizes the 15 City Manager to approve change orders in the amount equal to the contingency set at the time of 16 project award. 17 NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carlsbad, 18 California, as follows: 10 1. That the above recitations are true and correct. 20 3. That the low bid of $151,615 submitted by New Century Construction, for the 21 construction of the Corrugated Metal Pipe Replacement Program - Holly Brae Lane/El Camino 22 Real, Highland Drive/James Drive and Mallorca Place, Project No. 6607, is accepted and the 23 Mayor is hereby authorized to execute a contract with New Century Construction, Inc. for the 24 Corrugated Metal Pipe Replacement Program - Holly Brae Lane/El Camino Real, Highland 25 Drive/James Drive and Mallorca Place, Project No. 6607. 4. That the City Manager is hereby authorized to approve construction change 27 orders up to $30,000. ,, , 28 / 1 5. That the award of this contract is contingent upon the bidder submitting the 2 lowest responsible bid executing the required contract and submitting the required bonds and 3 insurance policies, as described in the contract, within twenty (20) days of adoption of this 4 resolution. The City Manager may grant reasonable extensions of time. 5 /// 6 /// 7 /// 8 /// 9 /// 10 /// 11 /// 12 /// 13 /// 14 /// 15 /// 16 /// 17 /// 18 /// 19 /// 20 /// 21 /// 22 /// 23 /// 24 /// 25 /// 26 /// 27 /// F 28 ° 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 PASSED, APPROVED AND ADOPTED at a Regular Meeting of the City Council of the City of Carlsbad on the 26th day of July, 2011, by the following vote to wit: AYES: Council Members Hall, Blackburn, Douglas and Packard. NOES: None. ABSENT: Council Member Kulchin. MAff (HALL,'Mayor ATTEST: LORRAINE M. WOOD, City Clerk (SEAL) '