APPROVAL OF AGREEMENT WITH THE CITY OF VISTA
FOR THE PLANNING AND DESIGN OF REACHES
VC1 1 B - VC1 5 OF THE VISTA-CARLSBAD
INTERCEPTOR SEWER SYSTEM,
PROJECT NO. 3492, 3886, AND 3949
DEPT. DIRECTOR /^^
CITY ATTORNEY (^^
CITY MANAGER \Jj-
RECOMMENDED ACTION:
Adopt Resolution No. 2011-243 to approve and authorize a Project Agreement between the City of
Carlsbad and the City of Vista for funding of planning and design phase services for the Agua
Hedionda Sewer Lift Station and Vista/Carlsbad Interceptor Sewer, Reaches VC11B - VC15, Project
No. 3492, 3886, and 3949.
ITEM EXPLANATION:
Background
The Vista/Carlsbad Interceptor Sewer was constructed in the early 1960's and extends northeasterly
from the Encina Water Pollution Control Facility to the City of Vista (see Exhibit 1). This interceptor
sewer is identified as pipeline Reaches VC1 through VC15 and includes the Buena Vista and Agua
Hedionda sewer lift stations. On February 26, 2002, the City of Vista and the City of Carlsbad entered
into an agreement for the ownership, operation, and maintenance of the Vista/Carlsbad Interceptor
Sewer. The ownership agreement requires the preparation of a project agreement each time a portion
of the interceptor sewer system is in need of rehabilitation, replacement or upsizing.
Project Description
This project includes improvements to reaches VC11B through VC15 of the Vista/Carlsbad interceptor
sewer system that includes the Agua Hedionda Sewer Lift Station, an adjacent wood trestle bridge
supporting the sewer across Agua Hedionda Lagoon and approximately 2-miles of sewer pipeline.
The Agua Hedionda Sewer Lift Station is the City's largest sewer lift station and is located adjacent to
the lagoon and railroad tracks on property owned by NRG Energy. This portion of the interceptor
sewer has been identified for replacement in the sewer master plans for both Carlsbad and Vista.
A Project Agreement has been prepared that identifies the role of each agency during the project and
also includes estimated project costs and payment provisions (see Exhibit 3). Because of the
significant size and complexity of the project, this project agreement addresses only those activities
performed prior to construction. A second project agreement will be prepared at a later date to
address construction activities and costs once these costs are better defined.
ENVIRONMENTAL IMPACT:
Pursuant to Public Resources Code Section 21065, the action to approve and authorize a Project
Agreement between the City of Carlsbad and the City of Vista for funding of planning and design
phase services will not result in a commitment to approve the sewer project nor authorize its development.
DEPARTMENT CONTACT: Terry Smith, (760) 602-2765, terrv.smith@carlsbadca.gov
FOR CITY CLERKS USE ONLY
COUNCIL ACTION: APPROVED
DENIED
CONTINUED
WITHDRAWN
AMENDED *
D
Dn
CONTINUED TO DATE SPECIFIC
CONTINUED TO DATE UNKNOWN
RETURNED TO STAFF
OTHER -SEE MINUTES
D
D
D
D
Page 2
Accordingly, it does not constitute a "project" within the meaning of CEQA in that it has no potential to
cause either a direct physical change in the environment, or a reasonably foreseeable indirect physical
change in the environment, and therefore does not require environmental review.
Actual approval of plans to construct the Agua Hedionda Sewer Lift Station and Vista/Carlsbad
Interceptor Sewer, Reaches VC11B - VC15, Project No. 3492, 3886, and 3949 will be subject to the
adoption of a proposed Mitigated Negative Declaration (MND) and Mitigation Monitoring and Reporting
Program (MMRP). Review of these CEQA documents by the Planning Commission, Housing and
Redevelopment Commission, and City Council for the project identified as the Agua Hedionda Sewer Lift
Station, Force Main and Gravity Sewer Replacement project (POP 00-02(C)/SP 144(L)/RP 10-26/CDP 10-
17/HDP 10-05/SUP 10-02/HMP 10-03) is pending and will be reviewed in compliance with the California
Environmental Quality Act (CEQA) Guidelines, Section 15074.
FISCAL IMPACT:
The City of Vista and the City of Carlsbad entered into an agreement for the ownership, operation, and
maintenance of the Vista/Carlsbad Interceptor Sewer on February 26, 2002. In accordance with the
terms of the ownership agreement, a Project Agreement has been developed for the planning and
design phase of the project that identifies the roles for both Carlsbad and Vista, an estimate of project
costs and the provisions for payment. As identified in the ownership agreement, project costs will be
shared by each city in accordance with their percentage ownership, which varies by reach. Carlsbad's
share of the project costs are 30.9% for reaches VC11B to VC13 and 43.9% for reaches VC14 and
VC15, while Vista is responsible for 69.1% and 56.1% respectively.
Carlsbad has appropriated 100% of the funding for the project, which is listed in the current Capital
Improvement Program as $46,230,000. Of this amount, the project budget for planning and design
phase services is $4,000,000. As agreed upon in the Project Agreement, Vista will make an initial
payment to Carlsbad in the amount of $2,366,060 within 30 days of receipt of invoice from Carlsbad
for work already performed. Staff will invoice the City of Vista upon Council approval of the project
agreement. Subsequent to the initial payment, Carlsbad will invoice Vista quarterly for their share of
on-going expenses through the completion of the planning and design phase.
On September 13, 2011, the Project Agreement was approved and accepted by Vista's City Council.
EXHIBITS:
1. Location Map.
2. Resolution No. 2011-243 to approve and authorize a Project Agreement between the
City of Carlsbad and the City of Vista for funding of planning and design phase services for the
Agua Hedionda Sewer Lift Station and Vista/Carlsbad Interceptor Sewer, Reaches VC11B -
VC15, Project No. 3492, 3886 and 3949.
3. Letter and Resolution from City of Vista approving agreement.
4. Agreement for Planning and Design Phase Services for the Agua Hedionda Sewer Lift Station
and Vista/Carlsbad Interceptor Sewer, Reaches VC11B - VC15, Project No. 3492, 3886, and
3949.
LOCATION MAP
BUENA
VISTA
METER STATION
EXISTING
LAGOON BRIDGE
VC11B
EXISTING
AGUA HEDIONDA
LIFT STATION
LEGEND:
VC11B-VC15
VC1-VC11A
ENCINA WATER
POLLUTION
CONTROL FACILITY
PROJECT NAME
AGUA HEDIONDA LIFT STATION & VISTA/CARLSBAD
INTECEPTOR SEWER REACHES VC11B THROUGH VC15
PROJECTNUMBER
CP3492,
3886 & 3949
EXHIBIT
1
DRAWN BY: SCOTT EVAN& CARLSBAD UTILITIES DEPT. 1/13/11 C:\UTIUTIES DEPARTMENT\DESIGN DIVISION\SUnH\VC SEWER LOCATION UAP.DWG
1
RESOLUTION NO. 2011-243
2
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF
3 CARLSBAD, CALIFORNIA, TO APPROVE AND AUTHORIZE A
PROJECT AGREEMENT BETWEEN THE CITY OF CARLSBAD
4 AND THE CITY OF VISTA FOR FUNDING OF PLANNING AND
DESIGN PHASE SERVICES FOR THE AGUA HEDIONDA SEWER
5 LIFT STATION AND VISTA/CARLSBAD INTERCEPTOR SEWER,
REACHES VC11B - VC15. PROJECT NO. 3492. 3886. AND 3949.
6 WHEREAS, the Agua Hedionda Sewer Lift Station and Reaches VC11B through VC15 of the
7 Vista Carlsbad Interceptor Sewer have been identified for replacement in the current sewer master
8 plan; and
g
WHEREAS, on February 26, 2002, the Carlsbad City Council entered into an agreement with
the City of Vista titled "Agreement for Ownership, Operation and Maintenance of the Vista/Carlsbad
11 Interceptor Sewer"; and
12 WHEREAS, the Cities of Carlsbad and Vista jointly own the Agua Hedionda Lift Station and
13 the Vista Carlsbad Interceptor Sewer and the February 26, 2002 agreement requires a separate project
14 agreement to be prepared and executed by Vista and Carlsbad for all future improvements to the Vista
15 Carlsbad Interceptor Sewer; and
16 WHEREAS, the Vista City Council approved the Project Agreement at their meeting held on
17 September 13, 2011; and
18 WHEREAS, the City Council of the City of Carlsbad, California, has determined it necessary
19 and in the public interest for the City of Carlsbad to enter into a Project Agreement between the City of
20 Carlsbad and the City of Vista for the planning and design phase services for the Agua Hedionda
21 Sewer Lift Station and Vista/Carlsbad Interceptor Sewer, Reaches VC11B - VC15, Project No. 3492,
22 3886 and 3949;
23 NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carlsbad,
24 California, as follows:
_,. 1. That the above recitations are true and correct,^o
2. That the Mayor of the City of Carlsbad is hereby authorized and directed to execute26
the Project Agreement with the City of Vista for planning and design phase services for the Agua
Hedionda Sewer Lift Station and Vista/Carlsbad Interceptor Sewer, Reaches VC11B - VC15.
28
1 PASSED, APPROVED AND ADOPTED at a Regular Meeting of the City Council
2 of the City of Carlsbad on the 11th day of October 2011, by the following vote to wit:
3 ..
AYES: Council Members Hall, Kulchin, Blackburn, Douglas, Packard.
4"
5 NOES: None.
6
7
9
10
ABSENT: None.
11 MATT tfALL.'Mayor
12 ATTEST:
13
14
15
UNE M. WOOD, City Clerk
16 (SEAL)
17
18
19
20
21
22
23
24
25
26
27
28
CITY OF VISTA
* l ' f p " * ! * DEPARTMENT
September 14, 2011
Terry L. Smith
Senior Civil Engineer
City of Carlsbad
1635 Faraday Avenue
Carlsbad, CA 92008
RE: Agreement between the City of Vista and City of Carlsbad for
Planning and Design Phase Services for the Agua Hedionda
Sewer Lift Station and Vista/Carlsbad Interceptor Sewer,
Reaches VC 11 B-VC1 5
Dear Mr. Smith:
At its September 13, 2011 meeting, the City Council adopted Resolution No. 2011-145,
approving the above-referenced agreement. Attached is a copy of the resolution for your file.
Enclosed are two (2) originals of the agreement for counter-signature. As soon as the
document is fully executed, please keep one original for your file, and return one original to:
City Clerk
City of Vista
200 Civic Center Drive
Vista, CA 92084
Thank you for your attention to the above. Should you have any questions, please contact
Steve Jepsen, Sanitation Program Manager, at (760) 639-61 1 1 .
Sincerely,
Rita R. Turnbull
Administrative Secretary
Office of the City Clerk
rturnbull@citvofvista.com
enc.
c: Steve Jepsen, Engineering Department
P: (760) 726-1340 www.cityofvista.com F: (760) 639-6132 \O
200 Civic Center Drive, Vista, California 92084-6275
RESOLUTION NO. 2011-145
A RESOLUTION OF THE CITY COUNCIL OF THE CHARTERED CITY OF VISTA, CALIFORNIA,
APPROVING AN AGREEMENT FOR PLANNING AND DESIGN PHASE SERVICES FOR THE
AGUA HEDIONDA SEWER LIFT STATION AND VISTA/CARLSBAD SEWER INTERCEPTOR
REACHES VC11B-VC15
The City Council of the chartered City of Vista does resolve as follows:
1. Findings. The City Council hereby finds and declares the following:
A. On July 13, 1961, the Vista Sanitation District and the City of Carlsbad entered into a
Basic Agreement pursuant to Chapter 5 of Division 7 of Title 1 of the California Government Code to
acquire, construct and operate a Joint Sewer System; and
B. On February 26, 2002, the City Council entered into an agreement for ownership
operation and maintenance of the Vista/Carlsbad Interceptor Sewer, pursuant to Chapter 5 of Division
7 of Title 1 of the California Government Code; and
C. The Cities of Vista and Carlsbad jointly own the Vista/Carlsbad Interceptor Sewer and
the February 26, 2002 agreement requires a separate project agreement to be prepared and
executed by Vista and Carlsbad for ail future improvements to the Vista/Carlsbad Interceptor Sewer;
and
D. The Cities of Vista and Carlsbad desire to enter into a project agreement for the
planning and design phase services for the Agua Hedionda Sewer Lift Station and Vista/Carlsbad
Interceptor Sewer Reaches VC11B-VC15.
2. Action.
A. The Project Agreement between Vista and Carlsbad for planning and design phase
services for the Agua Hedionda Sewer Lift Station and Vista/Carlsbad Interceptor Sewer Reaches
VC11B-VC15, is hereby approved.
B. The City Manager is authorized to disburse funds from CIP No. 8125 to reimburse
Carlsbad for design expenses they have incurred and to make progress reimbursement payments to
Carlsbad for the balance of the design phase services, including easement acquisition.
C. The Mayor is hereby authorized to execute the Agreement on behalf of the City.
(Continued on next page.)
RESOLUTION NO. 2011-145
CITY COUNCIL OF THE CHARTERED CITY OF VISTA
PAGE 2
3. Adoption.
PASSED AND ADOPTED by the City Council of the City of Vista at a meeting held on
September 13 2011, by the following vote:
AYES: MAYOR RITTER, AGUILERA, GRONKE, LOPEZ, COWLES
NOES: NONE
ABSTAIN: NONE
JUDY ilTER, MAYOR
APPROVED AS TO FORM:
DAROLD PIEPER, CITY ATTORNEY ATTEST:
MARCI KILIAN, CITY CLERK
By:.
APPROVED
Martin A. Grover
1026090211
AGREEMENT FOR PLANNING AND DESIGN PHASE SERVICES
FOR THE AGUA HEDIONDA SEWER LIFT STATION AND
VISTA/CARLSBAD INTERCEPTOR SEWER, REACHES VC11B - VC15
THIS AGREEMENT for the Agua Hedionda Sewer Lift Station and Vista/Carlsbad
Interceptor Sewer, Reaches VC1 IB VC15 ("Agreement") is made and entered into as of the
" day of Cl <LJ-€> JQJL^^ , 20 _ , by and between the City of Vista, a charter city
("Vista"), and the City of Carlsbad, a charter city ("Carlsbad"), collectively, ("the Parties").
RECITALS
WHEREAS, on February 26, 2002, the Parties entered into an agreement for the
ownership, operation and maintenance of the Vista/Carlsbad Interceptor Sewer ("Ownership
Agreement"), the terms of which are incorporated herein by this reference; and
WHEREAS, the existing Agua Hedionda Sewer Lift Station and Vista/Carlsbad
Interceptor Sewer was built in the early 1960's and does not have adequate capacity to convey
the sewage flows projected for this basin; and
WHEREAS, the Sewer Master Plans for the Parties include a recommendation that
pipeline reaches VC11B - VC15 of the Vista/Carlsbad Interceptor Sewer and Agua Hedionda
Sewer Lift Station be replaced with larger pipelines and pumps, respectively, to increase the
capacity necessary to convey future sewer flows; and
WHEREAS, Carlsbad has completed a Preliminary Design Report dated September
2008, a copy of which has been provided to Vista, and has selected a consultant to prepare the
final design for the replacement of the Agua Hedionda Sewer Lift Station and pipeline reaches
VC1 IB - VC15 of the Vista/Carlsbad Interceptor Sewer; and
WHEREAS, Carlsbad is in the process of obtaining environmental clearance through the
California Environmental Quality Act (CEQA) process and plans, specifications and cost
estimates for the Project have been prepared and are approximately 90% complete; and
WHEREAS, the Parties are entering into this Agreement in order to establish the roles
and responsibilities of each Party during the planning and design phase of the Project and to
define the cost share, accounting procedures and payment schedule for the Parties. The phrase
"Planning and Design Phase", as used throughout this Agreement, shall be considered to include
all Project activities occurring prior to the Award of the construction contract; and
WHEREAS, the Parties intend to execute a subsequent project agreement prior to
soliciting bids for construction to address responsibilities and cost sharing for construction of the
Project .
8/15/2011 -
NOW THEREFORE, THE PARTIES HERETO AGREE TO THE FOLLOWING:
SECTION 1. PROJECT DESCRIPTION
The Agua Hedionda Sewer Lift Station and Vista/Carlsbad Interceptor Sewer, Reaches
VC1 IB - VC15 (the "Project") is a sewer project that will replace existing facilities to increase
the capacity and improve the reliability within the lower portion of the Vista/Carlsbad
Interceptor Sewer System. The Project begins at the north shore of the Agua Hedionda Lagoon
and extends southerly a distance of approximately 2.3-miles to the Encina Water Pollution
Control Facility, as shown on Exhibit "A". The major elements of the Project are defined in the
September 2008 Preliminary Design Report and are summarized as follows:
A. Replace the existing wood trestle sewer bridge across Agua Hedionda Lagoon
with a new steel support bridge that will clear span the existing channel, being approximately
140-feet in length. The new sewer support bridge will be designed to allow lightweight
maintenance vehicles to pass over the bridge to allow for access to the interceptor sewer north of
the lagoon, which will allow for improved inspection and maintenance capabilities as well as
improved emergency response. In addition, the Project will replace approximately 1400 linear
feet of existing 42-inch diameter sewer pipe with a 54-inch diameter pipe. The Project will
relocate a portion of an existing 12-inch diameter high pressure gas line that conflicts with the
proposed northerly abutment of the new bridge. The existing wood trestle sewer support
structure will be removed as part of the project.
B. Construct a new sewer lift station at a location adjacent to the existing lift station
on the south shore of Agua Hedionda Lagoon. The lift station will be capable of pumping the
ultimate peak wet weather sewage flows for the basin, estimated at 33 million gallons per day
(mgd) in the current master plans. In addition to the structure containing the pumps and motors,
the lift station will also have standby pumps, an emergency generator, a grinder installed in a
vault, an electrical control building and odor control facilities. The facility will be designed to
comply with local and resource agency permit requirements, including the California Coastal
Commission. The existing lift station facility will be removed at the completion of the project.
C. Construct a new force main and gravity sewer that will operate in parallel to the
existing 42-inch diameter gravity flow sewer, providing increased system reliability. The new
force main will be approximately 4000 linear feet of 30-inch diameter pipe and will be
manufactured from High Density Polyethylene (HDPE). The force main will discharge into a
new 54-inch diameter gravity sewer that will be constructed in Avenida Encinas, being
approximately 7000-feet in length, extending from Cannon Road to the Encina Water Pollution
Control Facility. These pipelines will be installed using several different methods of
construction, including open-trench excavation with shoring, horizontal directional drilling
(HDD) and microtunneling. The existing interceptor has been inspected and found to be in good
condition; however, the manholes were determined to need rehabilitation, and the rehabilitation
work was performed separate from this project in 2009.
-2- 8/15/2011
10
SECTION 2. RESPONSIBILITIES OF CARLSBAD
Carlsbad shall be the Lead Agency for the Planning and Design Phase of the Project and
will be responsible for studies, design, permitting, property acquisition, environmental
compliance, bidding and administration of the project. As Lead Agency, Carlsbad shall have
authority to approve contracts and agreements in accordance with this agreement, Carlsbad's
policies and applicable law. Carlsbad's purchasing policies shall apply to implementation and
performance of construction contracts, professional services agreements and any other activity
under this agreement. Carlsbad shall provide Vista the opportunity to review and comment on
any proposal for services that exceeds $30,000.
Carlsbad shall have authority to acquire all necessary easements and permits required to
construct and maintain the facility. At a minimum, easements for Project facilities will be
acquired from the North County Transit District, Cabrillo Power (a.k.a., NRG Energy) and San
Diego Gas & Electric. The City of Carlsbad and the City of Vista shall be named as Grantee on
all easements acquired for the project.
Carlsbad staff shall notify Vista of milestone design review meetings and submittals and
shall keep Vista staff informed about any significant project developments, particularly those
that may lead to amendments.
SECTION 3. RESPONSIBILITIES OF VISTA
Vista shall provide an engineering representative to attend milestone design review
meetings and shall provide written comments to Carlsbad within 10-days of the meeting. Vista
agrees to make payment to Carlsbad for completed work, as agreed to in Section 4 herein, within
30 days of the invoice date.
Vista agrees to perform additional services, if any, at Vista's expense as necessary to
comply with funding requirements as a result of Vista's selected method of financing the Project.
Anticipated costs may be, but are not limited to, site investigations, permitting, environmental
review and additional project administration / reporting.
SECTION 4. ALLOCATION OF COSTS
Allocation of Project costs between the Parties varies by reach as defined in the
Ownership Agreement. Furthermore, an estimate of all Project costs is shown in Table 1 of
Exhibit "B", which has been developed from plans that are considered to be approximately 90%
complete.
Vista acknowledges that Carlsbad has incurred significant expenses to-date during the
preparation of studies, design and environmental compliance for the Project as shown in Table 2
of Exhibit "B". Additionally, the allocation of these expenditures between the Parties is shown
in Table 3 of Exhibit "B" and identifies Vista's share of Project costs incurred through the end of
calendar year 2010 as $2,366,060. Upon execution of this agreement by the Parties, Vista agrees
to pay to Carlsbad this amount in full within 30-days of the invoice date. Subsequent to the first
invoice, Carlsbad shall invoice Vista for all work performed during the first half of calendar year
2011 and shall then submit invoices to Vista quarterly thereafter for ongoing Project activities
performed until work is deemed complete in accordance with Section 5 herein.
-3- 8/15/2011
I/
Vista shall pay Carlsbad within 30-days of the date of the invoice on all amounts not in
dispute. All invoices shall include backup documentation to support each line item on the
invoice.
It is understood that Carlsbad's cost for project management and administration shall be
included in the overall cost of the Project and shall be paid by each Party as defined in Section 5
herein. Allowable costs shall be actual costs for work performed by Carlsbad Engineering
Department staff and reasonable expenses. Carlsbad staff costs will be billed at their hourly fully
burdened rate.
SECTIONS. COST ACCOUNTING
Carlsbad shall be responsible for the administration and accounting of all expenditures
related to the Project. The Parties agree that Vista will pay to Carlsbad its allocated portion of
actual and estimated costs as shown in Tables 1, 2 and 3 of Exhibit "B" and stated in Section 4
herein. Final accounting of Planning and Design Phase costs will be made after the Award of the
construction contract by the Carlsbad City Council. Carlsbad will issue a final invoice for
Planning and Design Phase work to Vista within 30-days of Award.
The Parties acknowledge that the Planning and Design Phase work activities and related
costs are typically spread throughout multiple reaches at any given time, making it difficult to
allocate costs to specific reaches with different ownership percentages. Therefore, the Parties
agree to distribute the total of all Planning and Design Phase costs for the Project to each
respective ownership reach by utilizing the ratio of the estimated total project costs for each
reach divided by the overall total Project cost. These cost percentages are calculated and shown
in Table 1 of Exhibit "B" and result in 65% of the Planning and Design Phase costs being
distributed to Reaches VC1 IB through VC13 and the remaining 35% of the costs being allocated
to Reaches VC14 and VC15. The costs shall then be shared by each Party in accordance with the
terms of Section 4 herein.
SECTION 6. COUNTERPARTS
This Agreement may be executed in any number of counterparts, each of which shall be
deemed an original, but all of which, taken together, shall constitute one and the same
instrument.
(Continued on Next Page)
-4- 8/15/201:
SECTION 7. ENTIRE AGREEMENT
This Agreement, together with any other written document referred to, embody the entire
agreement and understanding between the Parties relating to the subject matter hereof. In case of
conflict between this Agreement and the Ownership Agreement, the terms of the Ownership
Agreement shall prevail.
IN WITNESS WHEREOF, each Party hereto has pursuant to resolution duly passed and
adopted by its respective governing body this AGREEMENT and caused it to be executed and be
effective on the date first above written.
CITY OF VISTA, a chartered municipal
corporation. ^_
By:
CITY OF CARLSBAD, a chartered
municipal corporation
JUDY,R\TTER, Mayor
ATTEST:
MARCI KILIAN, City Clerk
ATTEST'
LORRAINE M. WOOD, City Clerk
APPROVED AS TO FORM:
DAROLD PIEPER, City Attorney
BY:
APPROVED AS TO FORM
RONALD R. BALL,
BY: A) A
-5-8/15/2011
EXHIBIT A
L4GOON BR/DGi
VC11B
AGUA HEDIONDA
LIFT STATION
LEGEND:
VC11B-VC15
VC1-VC11A
END PROJECT AT
ENCINA WATER
POLLUTION
CONTROL FACILITY.
PROJECT NAME
AGUA HEDIONDA LIFT STATION & VISTA/CARLSBAD
INTECEPTOR SEWER REACHES VC11B THROUGH VC15
PROJECT
NUMBER
CP3492,
3886 & 3949
EXHIBIT
A
DRAWN BY: SCOTT EVANS: CARLSBAD UTILITIES DEPT. 1/13/11 C:\UTIUTlESDEPARTHENT\DESIGNDIVISION\SUITH\VC11-15LOCATiONUAP.DWG I'i
EXHIBIT "B"
TABLE 1
AGUA HEDIONDA LIFT STATION AND V/C INTERCEPTOR REPLACEMENT PROJECT, REACHES VC11B - VC15
ESTIMATED PROJECT COSTS
Pre-Construction Construction
Phase Phase Costs Management
Reach 11B $700,000 $600,000
AHLS& Reach 12-13 ! $1,900,000 $1,500,000
Reaches 14-15 ; $1,400,000 $1,300,000
$4,000,000 $3,400,000
Percentage of
Total Est. Cost Overall Project
Reach 11B $6,128,500 13%
AHLS& Reach 12-13 $23,699,920 52%
Reaches 14-15 $1 6,092,000 35%
Total $45,920,420 100.0%
(1) Outside Costs:
SDGE Gas Line Relocation Costs $300,000
Electrical Feed to Lift Station $200,000
NRG Property Acquisition $750,000
SDGE Property Acquisition $1 00,000
NCTD Flagging Costs $200,000
TOTAL $1,550,000
Sub-Total of Construction Change Order Outside
Soft Costs Cost Budget Costs (1)
$1,300,000 $3,935,000 $393, 500 $500,000
$3,400,000: $17,824,000 $1,425,920, $1,050,000!
$2,700,000 $12,400,000 $992,000 $0
$7,400,000; $34,159,000 $2,811,420 $1,550,000|
:%of Project
Cost by Vista's Carlsbad's
Ownership Ownership Ownership
Reach Percentage Percentage
fit n°/ RQ 1 o/_ on O%
35.0% 56.1% 43.9%
100.0% i
I
;._.. ._ . ._^__. . ... _.j .. . .
Reach 1 1 B ; !
AHLS :
AHLS , '
AHLS I _[ '
Reach 1 1 B I
!
Vista's
Ownership Vista's Cost Carlsbad's
Total Percentage Share Cost Share
$6,128,500' 69.1%. $4,234,794; $1,893,707
$23,699,920 69.1%! $16,376,6451 $7,323,275
$16,092,000| 56.1%: $9,027,612! $7,064,388
$45,920,420 $29,639,050 $16,281,370
i
May 31, 2011
EXHIBIT "B1
TABLE 2
AGUA HEDIONDA LIFT STATION & V/C INTERCEPTOR
REPLACEMENT PROJECT, REACHES VC11B - VC15
EXISTING PROJECT EXPENDITURES THRU DEC. 31, 2010
Description | | |
A DESIGN CONSULTANTS
Krieger and Stewart Study - March 2000
Dokken Engineering - Bridge Alignment Support
Brown & Caldwell Alignment & Site Study - June 2006
Brown & Caldwell Preliminary Design Report - Sept. 2008
Brown & Caldwell Preliminary Design Amendment No. 1
Brown & Caldwell Preliminary Design Amendment No. 2
Brown & Caldwell Final Design (PS&E and Environmental)
Brown & Caldwell Final Design Amendment No. 1
Brown & Caldwell Final Design Amendment No. 2 (time extention)
Subtotal
B MANHOLE REHAB CONSTRUCTION CONTRACT
Socal Pacific Contractors
Construction Inspection
Misc. Costs
Subtotal
C CARLSBAD PROJECT MGMT. STAFF (2005 - 12/31/10)
D MISC. EXPENDITURES
TOTAL
TOTAL COST
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
$
83,000
2,984
99,960
294,641
36,058
37,600
2,382,281
98,230
-
3,034,754
290,465
25,704
28,730
344,899
269,707
16,108
3,665,468
May 31, 2011
EXHIBIT "B1
TABLE 3
AGUA HEDIONDA LIFT STATION AND V/C INTERCEPTOR REPLACEMENT PROJECT, REACHES VC11B -VC15
DISTRIBUTION OF PROJECT COSTS
(Inception through 12/31/2010)
Project No.
3886
3492
3949
* Percentage
Project Phase
Reach VC11B
AHLS and Reach VC12 & VC13
Reach VC14 & VC15
TOTAL
Developed from Table 1
Actual
Expenditures
Reported
$735,687
$1,920,583
$1,009,198
$3,665,468
Percentage of
Overall
Project *
13%
52%
35%
100%
'
Corrected
Expenditure
Amount
$476,511
$1,906,043
$1,282,914r - - - r
$3,665,468
Vista
Ownership
Percentage
69.1%
69.1%
56.1%
Carlsbad
Ownership
Percentage
30.9%
30.9%
43.9%
Vista Cost
Share
$329,269
$1,317,076
$719,715
$2,366,060
Carlsbad Cost
Share
$147,242
$588,967
$563,199
$1,299,408