Loading...
HomeMy WebLinkAbout2011-12-06; City Council; 20743; AMENDMENT NO. 4 PSOMAS SEWER LIFT STATIONCITY OF CARLSBAD - AGENDA BILL ^1P^ (M/^ AB# 20,743 MTG. 12/6/11 DEPT. UTIL APPROVAL OF AMENDMENT NO. 4 TO PROFESSIONAL SERVICE AGREEMENT WITH PSOMAS FOR THE HOME PLANT SEWER LIFT STATION REPLACEMENT, PROJECT NO. 5509 DEPT. DIRECTOR CITY ATTORNEY CITY MANAGER S> > C^^^S > ^r ^^/ /%X i^-- RECOMMENDED ACTION: Adopt Resolution No. 2011-272 approving Amendment No. 4 to Professional Services Agreement with Psomas for the Home Plant Sewer Lift Station Replacement, Project No. 5509. ITEM EXPLANATION: The existing Home Plant Sewer Lift Station (HPLS) is located within an area encompassed by Carlsbad Boulevard, Buena Vista Lagoon, and the railroad tracks in north Carlsbad (Exhibit 1). The HPLS is in need of replacement to meet capacity needs, meet current code requirements, enhance structural integrity, and decrease the amount of maintenance required. Current maintenance issues include the accumulation of significant amount of sand, rags, and grease, and limited emergency storage capacity. The project includes the construction of a new force main which will improve the reliability and operational efficiency of the system. The alignment of the new force main runs from the lift station site easterly to its connection to the Vista/Carlsbad Interceptor Sewer at the intersection of Laguna Avenue and Jefferson Street. Through the approval of Resolution 2009-142, the City into entered a Professional Service Agreement with Psomas for preparing reports to comply with California Environmental Quality Act (CEQA) requirements, obtaining necessary permits, and preparing construction documents. Since entering that agreement, the staff directed Psomas to include additional features, including a wastewater emergency storage structure and a new force main, increasing the lift stations performance and reliability, and reducing risk of potential wastewater spills at this site. The additional engineering efforts and extension of time necessary to address the additional features was provided through Amendments No. 1 through No. 3 to the agreement. Amendment No. 4 to the Psomas agreement is necessary to provide engineering and environmental services that were not anticipated to complete the final design phase of the project. These additional services were triggered as a result of the City's permit and environmental review process. Tasks include a more in depth hydrologic analysis for the storm water management plan, additional biological field work, and updated biological report as well as design refinements to the lift station site. ENVIRONMENTAL IMPACT: Pursuant to Public Resources Code Section 21065, approval of an amendment to a professional service agreement, does not constitute a "project" within the meaning of CEQA in that it has no potential to cause either a direct physical change in the environment, or a reasonably foreseeable indirect physical change in the environment, and therefore does not require environmental review. DEPARTMENT CONTACT: Mark Biskup, (760) 602-2763, mark.biskup@carlsbadca.gov FOR CITY CLERKS USE ONL Y \ COUNCIL ACTION:APPROVED DENIED CONTINUED WITHDRAWN AMENDED t^ Dn D CONTINUED TO DATE SPECIFIC CONTINUED TO DATE UNKNOWN RETURNED TO STAFF OTHER - SEE MINUTES D D D O Page 2 FISCAL IMPACT: Table 1 PROJECT COST SUMMARY FOR THE HOME PLANT SEWER LIFT STATION AND FORCE MAIN REPLACEMENT (PROJECT NO. 5509) DESIGN AND ENVIRONMENTAL PHASE Preliminary Studies and Engineering and Environmental Staff Cost Engineering & Environmental Consultant Services (Psomas Agreement Including Amendments to Date) Engineering & Environmental Consultant Services (Psomas Agreement Amendment No. 4 ) Easement Acquisition DESIGN & ENVIRONMENTAL SUBTOTAL CONSTRUCTION PHASE Engineer's Construction Cost Estimate (plus 15% contingency) Construction Management and Inspection CONSTRUCTION PHASE SUBTOTAL TOTAL PROJECT COST CURRENT APPROPRIATION $20,000 $368,817 $67,370 $63,000 $519,187 $2,841,000 280,000 $3,121,000 $3,640,187 $4,139,000 No additional appropriation is necessary as sufficient funds are currently appropriated from the City's Sewer Replacement Fund for the completion of the project. EXHIBITS: 1. Location Map. 2. Resolution No.2011-272 .approving Amendment No. 4 to Extend and Amend Agreement for Professional Engineering Services with Psomas for the Home Plant Lift Station, Project No. 5509. Amendment No. 4 to Amend and Extend Agreement for Professional Engineering Services with Psomas for the Home Plant Lift Station Project No. 5509. LOCATION MAP SITE NOT TO SCALE PACIFIC OCEAN SITE PROJECT NAME HOME PLANT LIFT STATION AND FORCE MAIN REPLACEMENT PROJECT NUMBER 5509 EXHIBIT 1 DRAWN BY: SCOTT EVANS, CARLSBAD ENGINEERING DEPT. 10/06/11 C:\CAPITAL\LOCATIONUAPS\5509.DWG 1 RESOLUTION NO. 2011-272 2 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF 3 CARLSBAD, CALIFORNIA, APPROVING AMENDMENT NO. 4 TO THE PROFESSIONAL SERVICES AGREEMENT WITH 4 PSOMAS FOR THE HOME PLANT SEWER LIFT STATION REPLACEMENT. PROJECT NO. 5509. 5 6 WHEREAS, the City Council of the City of Carlsbad, California, has determined it 7 necessary and in the public interest to approve Amendment No. 4 to the agreement for 8 professional eservices with Psomas for the design of Home Plant Sewer Lift Station Replacement, g Project No. 5509; and WHEREAS, On June 10, 2008, the City entered into an agreement with Psomas in the amount of $290,938 to provide engineering design and environmental services; and11 WHEREAS, three (3) subsequent amendments have been authorized to Psomas for the 12 total amount of $77,879; and 13 WHEREAS, City staff and Psomas have negotiated fees in an amount not-to-exceed 14 $67,370 to provide additional engineering and environmental services for the project, as described in this Amendment No. 4 to Professional Services Agreement; and 16 WHEREAS, funds have been appropriated from the Sewer Replacement Fund and are 17 sufficient for the completion of this project. 18 NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carlsbad, 19 California, as follows: 20 1 • That the above recitations are true and correct. 21 2. That Amendment No. 4 to Agreement with Psomas in an amount not-to-exceed 22 $67,370 to the agreement for professional services with Psomas for the design of Home Plant Sewer Lift Station Replacement, Project No. 5509 is approved and the Mayor is hereby authorized and directed to execute said amendment. 24 25 26 27 28 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 PASSED, APPROVED AND ADOPTED at a Regular Meeting of the City Council of the City of Carlsbad on the 6th day of December 2011, by the following vote to wit: AYES: Council Members Hall, Kulchin, Blackburn, Douglas, Packard. NOES: None. ABSENT: None. MATT (HALL, Mayor (SEAL) WOOD, City Clerk PWENG690 AMENDMENT NO. 4 TO EXTEND AND AMEND AGREEMENT FOR PROFESSIONAL ENGINEERING SERVICES FOR THE HOME PLANT LIFT STATION (PSOMAS) This Amendment No. 4 is entered into and effective as of the fr day of , 2011, amending the agreement dated June 17, 2009, (the "Agreement") by and between the City of Carlsbad, a municipal corporation, ("City"), and Psomas, a California corporation, ("Contractor") (collectively, the "Parties"). RECITALS A. On April 26th, 2010, the Parties executed Amendment No.1 to the Agreement to include engineering design services for the Home Plant Lift Station Hybrid Alternative; and B. On June 18th , 2010, the Parties executed Amendment No. 2 to the Agreement to include engineering design services for the Home Plant Lift Station Force Main; and C. On July 19th, 2011, the Parties executed Ratification of Amendment No. 3 to Extend the Agreement for Professional Engineering Services for the Home Plant Lift Station; and D. The Parties desire to alter the Agreement's scope of work to include additional engineering design services including efforts in hydrologic analysis, soils investigation and completion of the final design phase for the Home Plant Lift Station; and E. The Parties desire to extend the Agreement for a period of one (1 ) year; and F. The Parties have negotiated and agreed to a supplemental scope of work and fee schedule, which is attached to and incorporated by this reference as Exhibit "A", Scope of Services and Fee. NOW, THEREFORE, in consideration of these recitals and the mutual covenants contained herein, City and Contractor agree as follows: 1. In addition to those services contained in the Agreement, as may have been amended from time to time, Contractor will provide those services described in Exhibit "A". 2. City will pay Contractor for all work associated with those services described in Exhibit "A" on a time and materials basis not-to-exceed sixty seven thousand three hundred seventy dollars ($67,370). Contractor will provide City, on a monthly basis, copies of invoices sufficiently detailed to include hours performed, hourly rates, and related activities and costs for approval by City. 3. Contractor will complete all work described in Exhibit "A" by December 16, 2012. 4. All other provisions of the Agreement, as may have been amended from time to time, will remain in full force and effect. 5. All requisite insurance policies to be maintained by Contractor pursuant to the Agreement, as may have been amended from time to time, will include coverage for this Amendment. City Attorney Approved Version 5/12/1 1 6. The individuals executing this Amendment and the instruments referenced in it on behalf of Contractor each represent and warrant that they have the legal power, right and actual authority to bind Contractor to the terms and conditions of this Amendment. CONTRACTOR PSOMASLj_California corporate CITY OF CARLSBAD, a municipal corporation of the State of California By: (sign here) \J , f' Mayor (print name/title) ATTEST: By: (sign here)>RRAlftE M. WOOD City Clerk (print name/title) If required by City, proper notarial acknowledgment of execution attached. If a corporation, Agreement must be signed by one corporate, following two groups: i'-iV^^. _ ^ must be Ffrojrfeach of the Group A Chairman, President, or Vice-President Group B Secretary, Assistant Secretary, CFO or Assistant Treasurer Otherwise, the corporation must attach a resolution certified by the secretary or assistant secretary under corporate seal empowering the officer(s) signing to bind the corporation. APPROVED AS TO FORM: RONALD R. BALL, City Attorney BY: Assistant City Attorney City Attorney Approved Version 5/12/11 7 P S O M A S August 1,201 i EXHIBIT A Balancing the Natural and Built Environmer Mr. Mark Biskup Associate Engineer CITY OF CARLSBAD UTILITIES DEPARTMENT 1635 Faraday Avenue Carlsbad, CA 92008 Re: Home Plant Lift Station Rehabilitation Additional Service Request W.O. #5CAR060100 Dear Mr. Biskup: This additional service request has been prepared to cover costs associated with additional work as described below: 90% Design Submittal • After the 50% Design Submittal, significant site plan changes requested by the City included relocating the valve and meter vaults to the landscaped area on the northeast portion of the site. This resulted in a relocation of the pump station wetwell, along with the emergency storage structure and control building, and modifications to pavement limits. These site plan changes required modifications to the site grades, mechanical plans, and sections, resulting in significant engineering and drafting efforts. 100% Design Submittal • After the 90% Design Submittal, the request was made to relocate the valve vault back to the paved area adjacent to the wetwell. As before, this requires a modification to the site grades and mechanical plans and sections, resulting in significant engineering and drafting efforts. • The CUP submittal triggered comments that resulted in additional effort. The City has new requirements regarding hydromodification. As a result, we are preparing a more in-depth hydrologic analysis of the site and designing new BMPs using the City's online calculator. As a result, an infiltration basin will be used, which will affect the site plan and grading. • A soils update letter has been requested addressing the suitability of onsite soils for percolation. As a result, our geotechnical engineer is requesting two (2) borings be taken on the site and percolation testing be performed. P S O M A S Mr. Mark Biskup Page 2 August 1,2011 W.O. 5CAR060100 CUP comments also included the need for an updated biological report with additional site/vegetation field work. To cover this cost, we are requesting an additional: $67,000 We have attached a copy of the estimated fees with this letter. Should you have any questions regarding this letter, please do not hesitate to call. Thank you, P S O M A S Michael A. Pollard, PE C61695 Project Manager MAP:cjc Attachment City of Carlsbad EXTRA SERVICES FOR PLAN CHANGES Project Budget askl: Project Management Management: 1 hour per week for additional 3 months 1,920 1,920 nvoicing, Billing, Progress Reports 'roject Schedule and Updates Coordination Meetings (Assume 2 additional)920 Subtotal Taak 1 -Project Management 1»3.MO Task 2: Investigations 3He Visit (Assume 2) Research & obtain record maps, franchise utilities data Coordinate geotechnical: Review report Coordinate Survey Qeotechnicai Subconsuttant (Ninyo & Moore. Percolation tests) iupplemental ground survey work Itle Reports (Assume 4) Coordinate NCTD Review flow data & master plan Jrepare & plot base files Subtotal Task St - Investigation T.S89 Task 3: CEQA Compliance 'errrtit Coordination Reports 7,550 25 3,480 3,480 Reimbursabtes Subtotal Task 3 - CEQA Compilancg 13,740 3S9 14.WB 'ask 4: Permitting 'errrtil Acquisition Plan 3repare and submit permit applications and plans to reviewing agencies (Excluding CUP) Obtain Encroachment Permits from Agencies and City of Carlsbad Meetings (Assume 2) CUP: Prepare application CUP: :UP: CUP: CUP: CUP: CUP: CUP: CUP: CUP: CUP: CUP: General Into (Data additional to design plans) Site Information (Data additional to design plans) Grading & Drainage (Data additional to design plans) Streets & Utilities (Data additional to design plans) Water Facilities (Data additional to design plans) Landscape additional requirements and research Building Elevations (Data additional to design plans) Constraints Map (Data additional to design plans) Colored Site/Elevation Plan (Data additional to design plans) Req'd Docs and Submillal Items (Land Use Form, EIA Form. Disci Slml) Req'd Docs and Submittal Items (2 Title Reports) PS O M A S Page 1 of 3 City of Carlsbad EXTRA SERVICES FOR PLAN CHANGES Project Budget Personnel Hours Task Description CUP: Req'd Docs and Submittal Items (Project Desc/Explanation Sheet, Notice of Time .imils on Discretionary Applications, Hazardous waste & susbstance form) $190 $168 *140 $230 $175 $80 T3 I CUP: Req'd Docs and Submittal Items (Color board with bldg materials, color samples of glass, wood, etc) t ubtotal Task 4 - Perm ittlnfl Task 5: Prepare Contract Documents .1 Preliminary Design Report Hybrid Alternative exhibit tybrid alternative evaluation matrix fybrid alternative addendum discussion Additional meeting Respond to comments SuBtotat Task 5. t: Preliminary OaslBn Report .2 Develop the 50% Design Package Title Sheet jotss, Legends, Abbreviations (1 sheet) Demo sheets: 2 sheets 'ump Station Site Plan : 2 sheets Sections: 2 sheets Detail sheet: : 2 sheets WPCP / Erosion Control Plans: 2 sheets Electrical Sheets (5 sheets) Structural Sheets (11 sheets) .andscape sheets (2 sheets) TOG for Specifications Cost Estimates Calculations (Pump station, sewer, etc) SWMP QA/QC 50% Submittal Subtotal Taak S.Z: Develop tha 50% Oe»iqn Package 5.3 Develop the 90% Design Packajiejiianan uyilgn!. iiuni iian \m(tSn vjim a. iiiei 32 7,120 Modify grading & paving plan 4,160 Modify detail sheets, sections, inverts, site piping 7,040 Subtotal Task B.3; Dav&lop the 90V. D»stqn P»ckM« '88 18,380 5.4 J3evelop the 100% Design PackaaeJUB Pidii uuilytii. nun Sofa \rnwQ vws & nieifer H tu paveu anM!». nuu bump 7,040 Modify grading & paving plan based on site changes and hydromodification. Modify to all Irain to BMP. Adjust entrance slope.3,760 3,760 Modify detail sheets, sections, inverts, site piping PS O M AS Page 2 of 3 City of Carlsbad EXTRA SERVICES FOR PLAN CHANGES Project Budget $170 J140 Hydro-modification requirements. (Hydrology calcs, Coord vwTeda, using online calculator, xaord w/Brown& Caldwell. sizing BMP'E 38 4,880 Subtotal Taak S.4: Dwtop tft« 100*, De»tan Package JZ.7M 22,720 5.5 Develop the Final Design Package Address City Comments and advance plans, specs, estimate and bid schedule Electrical (Vtoraes Pham) Structural (R2H) CWQC Final Submittal Subtotal Taak S.S: Davatop tho FinatDMian PacKag» 5.6 Emergency Storage Structure Design (50% through final) Structural (R2H) Subtotal Task B.6; Emergency Storaaa Structure 5.7 Noise Study Noise Study for CUP Application Subconsultant Subtotal Task 8.7: Noise Study Task 999 - Reimbursatiles Reimbursable fees Subtotal Task 999 . Reimburaabtes 71 11D 160 11 390 58.580 8.790 67.370 PS O M AS Page 3 of 3