Loading...
HomeMy WebLinkAbout2012-04-24; City Council; 20872; Award Contract for Northwest Quadrant Storm Drain Improverment Program Mountain View-Pacific, Roosevelt -Beech to Laguna Drive, Madison-North of Grand Avenue and Harrison south of Chiquapin Avenue Project 6608CITY OF CARLSBAD - AGENDA BILL AB# 20,872 MTG. 04/24/12 DEPT. UTILITIES AWARD OF CONTRACT FOR THE NORTHWEST QUADRANT STORM DRAIN IMPROVEMENT PROGRAM (MOUNTAIN VIEW/PACIFIC AVENUE, ROOSEVELT STREET/BEECH AVENUE TO LAGUNA DRIVE, MADISON STREET/ NORTH OF GRAND AVENUE AND HARRISON STREET SOUTH OF CHINQUAPIN AVENUE), PROJECT NO. 6608 DEPT. DIRECTO CITY ATTORNEY CITY MANAGER RECOMMENDED ACTION: Adopt Resolution No. 2012-089 accepting bids and awarding the contract to Palm Engineering Construcfion Company, Inc. forthe Northwest Quadrant Storm Drain Improvement Program, (Mountain View/Pacific Avenue, Roosevelt Street/Beech Avenue to Laguna Drive, Madison Street/North of Grand Avenue and Harrison Street South of Chinquapin Avenue), Project No. 6608. ITEM EXPLANATION: The Northwest Quadrant Storm Drain Improvement Program is a multi-year program to address non- master drainage plan needs within the northwest quadrant of the City. Carisbad Operations and Maintenance staff was inten/iewed regarding their field observafions and knowledge of drainage issues throughout the northwest quadrant. Site locations were identified and prioritized based on recommendations from field observations. The locations of the sites are shown in Exhibit 1 Location Map. Their current status and current priority are shown in Exhibit 2. This project consists of four discrete locafions: • Mountain View at Pacific Avenue. Improvements at this location include construction of a cross gutter and re-grading the street using an asphalt pavement grinding technique and asphaltic concrete overiay to maintain positive drainage to existing downstream inlets. • Madison Street north of Grand Avenue. This location has drainage issues related to low spots in the pavement. The site has a myriad of shallow underground ufilities that preclude construction of an underground gravity fiow storm drain that would tie into the existing storm drain system in Grand Avenue. Improvements in this locafion include removal and replacement of sidewalk and curb and gutter to achieve positive surface drainage. These improvements require grinding and overiay of the existing street and a portion of a private parking lot to maintain positive surface flows to the gutter. • Roosevelt Street between Beech Avenue and Grand Avenue. The storm drain pipeline will be extended from the current inlet to the south a length of 245 linear feet. Included in these improvements is the installation of two curb inlets, a cleanout and connection to the existing storm drain system. • Harrison Street south of Chinquapin Avenue. Ponding water and surface flow of public drainage into private property will be mitigated by installing curb and gutter and re-grading the sidewalks and half the street over a length of approximately 475 feet. The existing asphaltic concrete curb and gutter will be removed and replaced with a new structural section, new concrete curb and gutter, addition of new sidewalk and asphalt pavement grinding and an asphalt concrete pavement overiay ofthe street to achieve positive drainage. DEPARTMENT CONTACT: Sherri Howard 760-602-2756 Sherri.Howard(5).carisbadca.gov FOR CITY CLERKS USE ONLY COUNCIL ACTION: APPROVED DENIED CONTINUED WITHDRAWN AMENDED • • • • CONTINUED TO DATE SPECIFIC • CONTINUED TO DATE UNKNOWN • RETURNED TO STAFF • OTHER - SEE MINUTES • Page 2 On January 10, 2012, through Resolution Number 2012-003, Agenda Bill 20,771, Council approved the plans and specifications and authorized the advertisement for bids for the Northwest Quadrant Storm Drain Improvement Program, (Mountain View/Pacific Avenue, Roosevelt Street/Beech Avenue to Laguna Drive, Madison Street/North of Grand Avenue and Harrison Street South of Chinquapin Avenue), Project No. 6608. On March 14, 2012 ten (10) sealed bids were received, opened and witnessed for the construction of the project. TABLE 1 NORTHWEST QUADRANT STORM DRAIN IMPROVEMENT PROGRAM (MOUNTAIN VIEW/PACIFIC AVENUE, ROOSEVELT STREET/BEECH AVENUE TO LAGUNA DRIVE, MADISON STREET/ NORTH OF GRAND AVENUE AND HARRISON STREET SOUTH OF CHINQUAPIN AVENUE), PROJECT NO. 6608 1. Palm Engineering Construcfion Company, Inc. $179,937.00 2. Crest Equipment $203,887.50 3. HTA $212,618.63 4. RMV $222,017.50 5. La Strada Contracting $232,346.10 6. Pjperin Corporafion $237,655.00 7. Burtech Pipeline, Inc Garcia Juarez $239,480.00 8. Bert W. Salas Inc. $266,889.00 9. New Century Construcfion $316,910.00 10. Afias-Allied $349,855.00 The Engineer's esfimate for this project is $300,000. All bid documents submitted by Palm Engineering Construction Company, Inc. have been reviewed by staff and were found to be in order. Staff recommends awarding the construcfion contract to Palm Engineering Construcfion Company, Inc. in the amount of $179,937.00 ENVIRONMENTAL IMPACT: The project is exempt from the California Environmental Quality Act (CEQA) per State CEQA , Guidelines Secfion 15301(b) - minor alteration of existing facilities of public ufility services involving negligible or no expansion and Secfion 15302(c) - replacement or reconstrucfion of exisfing ufility systems and/or facilifies involving negligible or no expansion of capacity. The Planning Director filed a Nofice of Exempfion on March 18, 2011. FISCAL IMPACT: Table 1 shows the current status ofthe Northwest Quadrant Storm Drain Improvement Program. More specifically, the current status of the program shows the expenditures of previously completed storm drain improvements and the funds available to complete the projects in Mountain View/Pacific Avenue, Roosevelt Street/Beech Avenue to Laguna Drive, Madison Street/North of Grand Avenue and Harrison Street South of Chinquapin Avenue. Page 3 TABLE 1 - SUMMARY OF PROJECT EXPENSES NORTHWEST QUADRANT STORM DRAIN IMPROVEMENT PROGRAM, PROJECT NO. 6608 TASK DESCRIPTION APPROPRIATED TO DATE EXPENDITURES/ ENCUMBRANCES TO DATE REMAINING BALANCES Design $668,469 $473,762 $194,707 Construction, Inspection, Materials Testing $1,906,365 . $821,229 $1,085,136 Environmental Mitigation & Monitoring $19,170 $10,549 $8,621 TOTAL $2,594,004 $1,305,540 $1,288,464 The total estimated project cost is shown in Table 2. TABLE 2 - ESTIMATE OF PROJECT COST NORTHWEST QUADRANT STORM DRAIN IMPROVEMENT PROGRAM (MOUNTAIN VIEW/PACIFIC AVENUE, ROOSEVELT STREET/BEECH AVENUE TO LAGUNA DRIVE, MADISON STREET/NORTH OF GRAND AVENUE AND HARRISON STREET SOUTH OF CHINQUAPIN AVENUE), PROJECT NO. 6608 ESTIMATED COSTS Construction Contract (Engineer's Esfimate) $179,937 Construction Contingency $40,000 Construction Management and Inspection (10%) $18,000 Material and Geotechnical Testing During Construction (5%) $9,000 TOTAL ESTIMATED CONSTRUCTION COSTS $246,937 PROJECT NO. 6608 AVAILABLE BALANCE $1,288,464 ADDITIONAL APPROPRIATION ANTICIPATED FOR CONSTRUCTION None The project is funded by both General Fund and Gas Tax Funds. These funding sources are not subject to State or Federal restrictions regarding prevailing wage. Therefore, pursuant to Carisbad Municipal Code Section 3.28.130, prevailing wages are not required for the construction of Northwest Quadrant Storm Drain Improvement Program (Mountain View/Pacific Avenue, Roosevelt Street/Beech Avenue to Laguna Drive, Madison Street/North of Grand Avenue and Harrison Street South of Chinquapin Avenue), Project No. 6608. Staff recommends awarding the contract to Palm Engineering Construcfion Company, Inc. for the construction of Northwest Quadrant Storm Drain Improvement Program (Mountain View/Pacific Avenue, Roosevelt Street/Beech Avenue to Laguna Drive, Madison Street/North of Grand Avenue and Harrison Street South of Chinquapin Avenue), Project No. 6608 for storm drain improvements. EXHIBITS: 1. Locafion Map. 2. Northwest Quadrant Storm Drain Improvement Program Project List. 3. Resolution No. 2012-089 accepting bids and awarding the contract to Palm Engineering Construction Company, Inc. for the Northwest Quadrant Storm Drain Improvement Program, (Mountain View/Pacific Avenue, Roosevelt Street/Beech Avenue to Laguna Drive, Madison Street/North of Grand Avenue and Harrison Street South of Chinquapin Avenue), Project No. 6608. 3 LOCATION MAP LEGEND: SITEI - MOUNTAIN VIEW DR. & PACIFIC AVE. SITE2 - MADISON ST NORTH OF GRAND AVE. SITE4 - ROOSEVELT ST NORTH OF BEECH AVE. SITE31 - HARRISON ST SOUTH OF CHINQAUPIN AVE. PACIFIC OCEAN NOT TO SCALE PROJECT NAME NORTHWEST QUADRANT STORM DRAIN PROGRAM PROJECT NUMBER 6608 EXHIBIT 1 PLOTTED BY: SCOTT EVANS PLOT DATE: 11/17/11 PATH:C:\UWVES DEPARTklENT\DESIGN DIVISION\HOWARD\6608\6608-3.DWG EXHIBIT 2 NORTHWEST QUADRANT STORM DRAIN IMPROVEMENT PROGRAM PROJECT LIST - FY 2011-12 Number Site Location Priority Status 1 Mountain View and Pacific Avenue 2 Award 2 Madison Street, Grand Avenue to Arbuckle Place 2 Award 3 Oak Avenue and Lincoln Street 7 Pre-Design 4 Roosevelt Street n/o Beech Avenue 2 Award 5 Roosevelt Street and Madison Street, Carlsbad Village Drive to Grand Avenue 2 Construction 6 Ocean Street north of Oak Avenue 3 Pre-Design 7 Valley Street and Buena Vista Way 3 Pre-Design 8 Valley Street north of Carisbad Village Drive 3 Pre-Design 9 Cynthia Lane to Pio Pico Drive 1 Complete 10 Pio Pico Drive and Forest Avenue 1 Complete 11 Elmwood Street and Laguna Drive 4 Pre-Design 12 Wilson Street north of Buena Vista Way 4 Pre-Design 13 Macarthur Avenue and Sunnyhill Drive 4 Pre-Design 14 Chestnut Avenue and Pio Pico Drive 1 Complete 15 Chestnut Avenue and Adams Street 1 Complete 16 Adams Street and Palm Avenue 6 Pre-Design 17 Adams Street north of Magnolia Avenue 6 Pre-Design 18 Adams Street north of Tamarack Avenue 6 Pre-Design 19 Basswood Avenue and Valley Street 4 Pre-Design 20 Linda Lane Cul de Sac's 5 Pre-Design 21 Donna Drive west of Chestnut Avenue 5 Pre-Design 22 Palisades Drive and East Pointe Avenue 5 Pre-Design 23 Calavo Court 5 Complete 24 Ridgecrest Drive 1 Complete 25 Adams Street south of Hoover Street 2 Pre-Design 26 Park Drive, Monroe Street to Woodvale Drive 7 Complete 27 Monroe Street, Alder Drive and Sunnyhill Drive 7 Complete 28 Park Drive, Cove Drive to Marina Drive * 6611 29 Sevilla Way 7 Removed from Program 30 Park Drive east of Valencia Avenue 7 Complete 31 Harrison Street south of Chinquapin Avenue 2 Award 32 Crest Drive Drainage Project 1 Complete 33 Hillside Drive downdrain west of Park Drive -Complete 34 Highland Drive between Magnolia and Chinquapin 3 Design * - Moved to separate CIP project due to project size and environmental considerations. March 29, 2012 5 RESOLUTION NO. 2012-089 1 2 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF 3 CARLSBAD, CALIFORNIA, ACCEPTING BIDS AND AWARDING THE CONTRACT TO PALM ENGINEERING CONSTRUCTION 4 COMPANY, INC. FOR THE NORTHWEST QUADRANT STORM DRAIN IMPROVEMENT PROGRAM (MOUNTAIN VIEW/PACIFIC 5 AVENUE, ROOSEVELT STREET/BEECH AVENUE TO LAGUNA DRIVE, MADISON STREET/NORTH OF GRAND AVENUE AND 6 HARRISON STREET SOUTH OF CHINQUAPIN AVENUE), PROJECT NO. 6608. 7 ^ ^ WHEREAS, the City Council of the City of Carisbad, California, has determined it 9 necessary, desirable, and in the public interest to construct the Northwest Quadrant Storm Drain 10 Improvement Program (Mountain View/Pacific Avenue, Roosevelt Street/Beech Avenue to Laguna 11 Drive, Madison Street/North of Grand Avenue and Harrison Street South of Chinquapin Avenue), 12 Project No. 6608; and 13 WHEREAS, on January 10, 2012, the City Council of the City of Carlsbad, through 14 Resolufion No. 2012-003, had previously approved the plans and authorized to advertise for bids 15 to construct the Northwest Quadrant Storm Drain Improvement Program (Mountain View/Pacific 16 Avenue, Roosevelt Street/Beech Avenue to Laguna Drive, Madison Street/North of Grand Avenue 17 and Harrison Street South of Chinquapin Avenue), Project No. 6608; and 18 WHEREAS, ten (10) sealed bids were received on March 14, 2012, by the City of 19 Carisbad for the construction of said project; and 20 WHEREAS, the lowest responsive and responsible bid was submitted by Palm 21 Engineering Construcfion Company, Inc. in the amount of $179,937; and 22 WHEREAS, funding for said project has been appropriated from the General Fund and 23 Gas Tax Funds to cover all project costs and is sufficient; and 24 WHEREAS, Section 3.28.040 (c)(5) of the Carisbad Municipal Code authorizes the City 25 Manager to approve change orders in the amount equal to the contingency set at the time of 26 project award. 27 NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carisbad, 28 California, as follows: 6^ 1 1. That the above recitations are true and correct. 2 2. That the low bid of $179,937 submitted by Palm Engineering Construction 3 Company, Inc. for the construction of the Northwest Quadrant Storm Drain Improvement Program 4 (Mountain View/Pacific Avenue, Roosevelt Street/Beech Avenue to Laguna Drive, Madison 5 Street/North of Grand Avenue and Harrison Street South of Chinquapin Avenue), Project No. 6 6608, is accepted and the Mayor is hereby authorized to execute a contract with Palm Engineering 7 Construcfion Company, Inc. for said project 8 3. That the City Manager is hereby authorized to approve construction change 9 orders up to $40,000. 10 4. That the award of this contract is contingent upon the bidder submitting the 11 lowest responsible bid execufing the required contract and submitting the required bonds and 12 insurance policies, as described in the contract, within twenty (20) days of adoption of this 13 resolution. The City Manager may grant reasonable extensions of fime. 14 /// 15 /// 16 /// /// /// /// /// /// /// /// /// /// /// 17 18 19 20 21 22 23 24 25 26 27 /// 28 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 PASSED, APPROVED AND ADOPTED at a Regular Meefing of the City Council of the City of Carisbad on the 24*^ day of April, 2012, by the following vote to wit: AYES: NOES: Council Members Hall, Kulchin, Blackburn and Packard. None. ABSENT: Council Member Douglas. WOOD, City Clerk (SEAL)