Loading...
HomeMy WebLinkAbout2012-11-06; City Council; 21035; Palomar and College Improvements PN 6028 6029CITY OF CARLSBAD - AGENDA BILL ± AB# MTG. 11/06/12 21.Q35 DEPT. TRANS ACCEPTANCE OF BIDS AND AWARD OF CONTRACT FOR CONSTRUCTION OF PALOMAR AIRPORT ROAD AND COLLEGE BOULEVARD IMPROVEMENTS, PROJECT NOS. 6028 AND 6029 DEPT. DIRECTOR CITY ATTORNEY CITY MANAGER 0^ 3C RECOMMENDED ACTION: Adopt Resolution No. 2012-240 accepting bids and awarding a contract for the construction of Palomar Airport Road and College Boulevard improvements, Project Nos. 6028 and 6029. ITEM EXPLANATION: The proposed improvements are located at the intersection of Palomar Airport Road and College Boulevard. This project will install new storm drain facilities within the public right of way on College Boulevard and Palomar Airport Road. Additionally, to improve traffic operation; the right turn only lane on westbound Palomar Airport Road will be lengthened to accommodate drivers when making the turning movement to northbound College Boulevard. On August 28, 2012, City Council approved Resolution No. 2012-195, authorizing the advertisement for bids for the Palomar Airport Road and College Boulevard improvements, Project Nos. 6028 and 6029. Six (6) sealed bids were received on October 9, 2012, which are summarized as follows: CONTRACTOR 6028 6029 BID TOTAL 1. Pal General Engineering Inc. $94,834 $164,108 $258,942 2. HTA Engineering & Construction $72,636 $211,000 $283,636 3. Schilling Paradise $76,805 $237,335 $314,140 4. BertW. Salas $103,250 $222,375 $325,625 5. Ted Enterprises $83,140 $271,402\ $354,542 6. New Century Construction $97,381 $276,515 $373,896 A seventh bid was submitted by Blue Pacific Engineering & Construction, but was without a schedule B, therefore staff is recommending that the bid be determined to be non-responsive. Staff has completed its review of the contract documents and has determined that the lowest bid was Pal General Engineering Inc. with $258,942. Staff recommends that Pal General Engineering Inc. be awarded the contract. ENVIRONMENTAL IMPACT: The project is exempt from the California Environmental Quality Act (CEQA) per CEQA Guidelines Section 15301(c) - minor alteration of existing facilities including streets, sidewalks, gutters, and similar facilities involving negligible or no expansion. A Notice of Exemption was filed with the San Diego County Clerk on June 18, 2012. DEPARTMENT CONTACT: Brandon Miles 760-602-2745 Brandon.Miles@carlsbadca.gov FOR CITY CLERKS USE ONLY COUNCIL ACTION: APPROVED X CONTINUED TO DATE SPECIFIC • DENIED CONTINUED TO DATE UNKNOWN • CONTINUED • RETURNED TO STAFF • WITHDRAWN • OTHER-SEE MINUTES • AMENDED • Page 2 FISCAL IMPACT: The improvements for the intersection of Palomar Airport Road and College Boulevard have two funding sources. Project No. 6028 is funded by the Traffic Impact Fee (TIF) program and is appropriated for roadway improvements. Project No. 6029 is funded by the General Capital Construction (GCC) program and is appropriated for the storm drain improvements. Both funding sources are outlined in tables 1, 2, and 3 below. Table 1 shows the current status of the Palomar Airport Road at College Boulevard improvements. TABLE 1 - PALOMAR AIRPORT ROAD AT COLLEGE BOULEVARD IMPROVEMENTS - PROJECT NOS. 6028 AND 6029 FUNDING SOURCES APPROPRIATED TO DATE EXPENDITURES/ ENCUMBRANCES TO DATE REMAINING BAtANCSS Traffic Impact Fee (TIF) - 6028 $495,500 $117,348 $378,152 General Capital Construction (GCC) - 6029 $250,500 $23,463 $227,037 TOTAL $746,000 $140,811 $605,189 The estimated project funding totals for construction of improvements are shown in Tables 2 and 3 below. TABLE 2 - PALOMAR AIRPORT ROAD AT COLLEGE BOULEVARD IMPROVEMENT ROADWAY IMPROVEMENTS - PROJECT NO. 6028 ESTIMATED COSTS Construction Contract (Pal General Engineering Inc.) $94,834 Construction Contingency (15%) $14,225 Construction Management and Inspection (10%) $9,483 TOTAL ESTIMATED CONSTRUCTION COST $118,542 Remaining Balance (6028) - TIF $378,152 ADDITIONAL APPROPRIATION ANTICIPATED FOR CONSTRUCTION $0 TABLE 3 - PALOMAR AIRPORT ROAD AT COLLEGE BOULEVARD IMPROVEMENT STORM DRAIN IMPROVEMENTS - PROJECT NO. 6029 ESTIMATED COSTS Construction Contract (Pal General Engineering Inc.) $164,108 Construction Contingency (15%) $24,616 Construction Management and Inspection (10%) $16,411 TOTAL ESTIMATED CONSTRUCTION COST $205,135 Remaining Balance (6029) - GCC $227,037 ADDITIONAL APPROPRIATION ANTICIPATED FOR CONSTRUCTION $0 Page 3 The improvements for the intersection of Palomar Airport Road and College Boulevard have sufficient TIF and GCC funds available to complete this project. EXHIBITS: Resolution No. 2012-240 accepting bids and award of contract for construction of Palomar Airport Road and College Boulevard improvements, Project Nos. 6028 and 6029. 3 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 RESOLUTION NO. 2012-240 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD, CALIFORNIA, ACCEPTING BIDS AND AWARDING CONSTRUCTION CONTRACT FOR CONSTRUCTION OF PALOMAR AIRPORT ROAD AND COLLEGE BOULEVARD PROJECT NOS. 6028 AND 6029. \ WHEREAS, the City Council of the City of Carlsbad, California, has determined it necessary, desirable, and in the public interest to repair the storm drain and enhance traffic operations at the intersection of Palomar Airport Road and College Boulevard; and WHEREAS, the project is exempt from the Califomia Environmental Quality Act (CEQA) pursuant to CEQA Guidelines Section 15301(c); and WHEREAS, on August 28, 2012, the City Council approved contract documents and specifications for fumishing of ali labor, materials, tools, equipment, transportation, and other expenses necessary or incidental to the Palomar Airport Road and College Boulevard improvements, Project Nos. 6028 and 6029; and WHEREAS, seven (7) sealed bids were received on October 9, 2012 for the project; and WHEREAS, the bid submitted by Blue Pacific Engineering & Construction was missing schedule B; and WHEREAS, the lowest responsive, responsible bid for the project was submitted by Pal General Engineering Inc. in the amount of $258,942; and WHEREAS, there are sufficient funds available in the Traffic Impact Fee (TIF) and General Capital Construction (GCC) programs (CIP Nos. 6028 and 6029) account for construction of the project. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carlsbad, California, as follows: 1. That the above recitations are true and correct. 2. That the bid submitted by Blue Pacific Engineering & Construction is non- responsive. 2. That the bid submitted by Pal General Engineering Inc. in the amount of $258,941.54 is hereby accepted and the Mayor is hereby authorized to execute the contract for the construction of the Palomar Airport Road and College Boulevard improvements, Project Nos. 6028 and 6029, in accordance with the specifications and contract documents referred to herein. 1 3. That the City Manager is hereby authorized to approve construction change 2 orders up to the contingency amount of $38,841 to Pal General Engineering Inc.for the Palomar 3 Airport Road and College Boulevard improvements. Project Nos. 6028 and 6029. 4 4. That the aware of this contract is contingent upon Pal General Engineering Inc. 5 executing the required contract and submitting the required bonds and insurance policies, as 6 described in the contract, within twenty (20) calendar days of adoption of this resolution. The 7 City Manager may grant reasonable extensions of time. 8 /// 9 /// 10 /// 11 /// 12 /// 13 /// 14 /// 15 /// 16 /// 17 /// 18 /// 19 /// 20 /// 21 /// 22 /// 23 /// 24 /// 25 /// 26 /// 27 /// 28 PASSED, APPROVED AND ADOPTED at a Regular Meeting of the City Council of the City of Carlsbad on the 6th day of November, 2012, by the following vote to wit: AYES: NOES: Council Members Hall, Kulchin, Blackburn, Douglas and Packard. None. ABSENT: None. 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 MATVHALL, Mayor ATTEST: (SEAL) \ ..•