Loading...
HomeMy WebLinkAbout2013-06-11; City Council; 21259; AWARD CONTRACT PARK DRIVE NORTHWEST QUADRANT STORM DRAIN AND CONCRETE REPAIR PROGRAMS PROJECT NOS 5030 6608 6013CITY OF CARLSBAD CITY COUNCIL AND CARLSBAD MUNICIPAL WATER DISTRICT-AGENDA BILL 13 AB# 21.259 AWARD OF CONTRACT FOR THE PARK DRIVE WATER PIPELINE REPLACEMENT, SURFACE IMPROVEMENTS, NORTHWEST QUADRANT STORM DRAIN PROGRAM AND CONCRETE REPAIR PROGRAM, PROJECT NO'S. 5030, 6608 AND 6013 DEPT. DIRECTOR^ MTG. 6/11/13 AWARD OF CONTRACT FOR THE PARK DRIVE WATER PIPELINE REPLACEMENT, SURFACE IMPROVEMENTS, NORTHWEST QUADRANT STORM DRAIN PROGRAM AND CONCRETE REPAIR PROGRAM, PROJECT NO'S. 5030, 6608 AND 6013 CITY ATTORNEY DEPT. PW-Utilities AWARD OF CONTRACT FOR THE PARK DRIVE WATER PIPELINE REPLACEMENT, SURFACE IMPROVEMENTS, NORTHWEST QUADRANT STORM DRAIN PROGRAM AND CONCRETE REPAIR PROGRAM, PROJECT NO'S. 5030, 6608 AND 6013 CITY MGR. RECOMMENDED ACTION: City Council of the City of Cartsbad adopt Resolution No. 7013-144 to reimburse the Cartsbad Municipal Water District (CMWD) for the actual costs for city project improvements for the Park Drive Water Pipeline Replacement, Surface Improvements, Northwest Quadrant Storm Drain Program and Concrete Repair Program, Project No's. 5030, 6608 and 6013. Board of Directors of Carlsbad Municipal Water District adopt Resolution No. 1472 awarding the contract for the Park Drive Water Pipeline Replacement, Surface Improvements, Northwest Quadrant storm Drain Program and Concrete Repair Program, Project No's. 5030, 6608 and 6013. ITEM EXPLANATION: The project is located on Park Drive and extends from Adams Street to 200 feet southeriy of Cove Drive. The project is the replacement of a potable water pipeline and roadway section that was damaged when the potable water pipeline abruptly failed. Pipeline repairs include replacing the CMWD's existing 12-inch diameter water pipeline in Park Drive. The City of Cartsbad's improvements include pavement repairs requiring complete removal and replacement of the pavement section and the underlying subgrade, construction of an 18-inch diameter storm drain pipeline, and sidewalk upgrades to bring the area into compliance with the requirements of the Americans with Disabilities Act. The water pipeline replacement and pavement repairs are funded through the Water-Capital Replacement Program. The improvements made to the drainage system are funded by the Northwest Quadrant Storm Drain Program. The sidewalk upgrades including pedestrian ramps are funded through the Concrete Repair Program. On January 8, 2013, the City Council adopted Resolution No. 2013-019 and the Board of Directors adopted Resolution No. 1461, which approved the plans and specifications and authorized the advertisement for bids for the Park Drive Water Pipeline Replacement, Surface Improvements, Northwest Quadrant Storm Drain Program and Concrete Repair Program, Project No's. 5030, 6608 and 6013. Plans and Specifications are on file in the Engineering Division of the City of Cartsbad. On March 26, 2013, seven (7) sealed bids were received, opened and witnessed for the construction of this project as shown in the following Table 1. DEPARTMENT CONTACT: Sherri Howard 760-602-2756 sherri.howard@carlsbadca.gov FOR SECRETARY USE. BOARD ACTION: APPROVED CONTINUED TO DATE SPECIFIC • DENIED d CONTINUED TO DATE UNKNOWN • CONTINUED • RETURNED TO STAFF • WITHDRAWN • OTHER - SEE MINUTES • AMENDED • REPORT RECEIVED • TABLE 1 PARK DRIVE WATER PIPELINE REPLACEMENT, SURFACE IMPROVEMENTS, NORTHWEST QUADRANT STORM DRAIN PROGRAM AND CONCRETE REPAIR PROGRAM, PROJECT NO'S. 5030, 6608 AND 6013 CONTRACTOR BID LUMPSUM 1. Schilling Paradise, Inc $789,617.00 2. Lonerock $863,770.00 3. Ramona Paving and Construction $874,525.00 4. GRFCO, Inc. $908,225.00 5. Basile Construction $932,731.73 6. HPS Mechanical $958,680.00 7. Wier Construction $1,015,535.00 On April 23, 2013, Schilling Paradise, Inc. submitted a letter requesting to withdraw their bid because they had bid an item incorrectly. Staff reviewed the bid documents and the support information provided by the contractor and recommends that the Board not allow the bid to be withdrawn because: • The error is not clerical in nature • The CMWD was not informed of the error in the five (5) working day period provided by the Public Contract Code. staff recommends awarding the contract to the lowest responsive bidder. Schilling Paradise, Inc. for the construction of Park Drive Water Pipeline Replacement, Surface Improvements, Northwest Quadrant Storm Drain Program and Concrete Repair Program, Project No's. 5030, 6608 and 6013. FISCAL IMPACT: An Engineer's Estimate of the construction cost of Park Drive Water Pipeline Replacement, Surface Improvements, Northwest Quadrant Storm Drain Program and Concrete Repair Program, Project No's. 5030, 6608 and 6013 was prepared by TY LIN on November 29, 2012, and totals $756,120. The project's construction contract will be with CMWD. CMWD will be reimbursed by the City of Cartsbad for the actual costs associated with the Northwest Quadrant Storm Drain Program and Concrete Repair Program improvements. A summary of estimated construction costs and available funds is shown in Table 2. TABLE 2 - PROJECT CONSTRUCTION COST ESTIMATE PARK DRIVE WATER PIPELINE AND SURFACE IMPROVEMENTS, Project No. 5030 ESTIMATED coirs'^.:-' Construction Contract $637,967 Construction Contingency $100,000 PROJECT NO. 5030 COST TOTAL $737,067 PROJECT NO. 5030 AVAILABLE BALANCE $SS0,4§7 ADDITIONAL APPROPRIATION ANTICIPATED FOR CONSTRUCTION OF PROJECT NO. 5030 None NORTHWEST QUADRANT STORM DRAIN PROGRAM, Project No. 6608 ESTIMATED COSTS Construction Contract $96,285 Construction Contingency $30,000 PROJECT NO. 660S COSTTOTAL PROJECT NO. 6608 AVAILABLE BAUNCE $i,352,975 ADDITIONAL APPROPRIATION ANTICIPATED FOR CONSTRUCTION OF PROJECT NO. 6608 None CONCRETE REPAIR PROGRAM, Project No. 6013 ESTIMATED COSTS Construction Contract $55,365 Construction Contingency $20,000 PROJECT NO. 6013 COST TOTAL $75,365 PROJECT NO. 6013 AVAILABLE BALANCE $320,915 ADDITIONAL APPROPRIATION ANTICIPATED FOR CONSTRUCTION OF PROJECT NO. 6013 None SUMMARY OF TOTAL PROJECT COSTS ESTIMATED COSTS Total Construction Contract Project No. 5030, 6608 and 6013 $789,617 Total Construction Contingency Project No. 5030, 6608 and 6013 $150,000 PROJECT TOTAL $939,617 Sufficient funds have previously been appropriated from the Water - Capital Replacement and Gas Tax Funds to fund this project. No additional appropriation is required. CMWD's funding is subject to State restrictions regarding prevailing wage. Therefore, pursuant to Carlsbad Municipal Code Section 3.28.130, prevailing wages are required for the construction of Park 3 Drive Water Pipeline Replacement, Surface Improvements, Northwest Quadrant Storm Drain Program and Concrete Repair Program, Project No's. 5030, 6608 and 6013. ENVIRONMENTAL IMPACT: The project is exempt from the California Environmental Quality Act (CEQA) per State CEQA Guidelines Section 15301(b) - minor alteration of existing facilities of public utility services involving negligible or no expansion and Section 15302(c) - replacement or reconstruction of existing utility systems and/or facilities involving negligible or no expansion of capacity. EXHIBITS: City Council of the City of Cartsbad Resolution No. 2013-144 to reimburse the Cartsbad Municipal Water District (CMWD) for the actual costs for city project improvements for the Park Drive Water Pipeline Replacement, Surface Improvements, Northwest Quadrant Storm Drain Program and Concrete Repair Program, Project No's. 5030, 6608 and 6013. Board of Directors of CMWD Resolution No. 1472 awarding the contract for the Park Drive Water Pipeline Replacement, Surface Improvements, Northwest Quadrant Storm Drain Program and Concrete Repair Program, Project No's. 5030, 6608 and 6013. Location Map 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 RESOLUTION NO. 2013-144 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD, CALIFORNIA, TO REIMBURSE THE CARLSBAD MUNICIPAL WATER DISTRICT FOR THE ACTUAL COSTS FOR CITY PROJECT IMPROVEMENTS FOR THE PARK DRIVE WATER PIPELINE REPLACEMENT, SURFACE IMPROVEMENTS, NORTHWEST QUADRANT STORM DRAIN PROGRAM AND CONCRETE REPAIR PROGRAM. PROJECT NO'S. 5030. 6608 AND 6013. WHEREAS, the City Council of the City of Carisbad, California, has determined it necessary, desirable, and in the public interest to construct sidewalk, curb, gutter, storm drain facilities, remove and replace potable water pipeline, and remove and replace damaged pavement in Park Drive from Adams Street to 200 feet southerly of Cove Drive; and WHEREAS, the plans and specifications for furnishing of all labor, materials, tools, equipment, transportation, and other expenses necessary or incidental of said project have been prepared and are on file in the City of Carisbad and are incorporated by reference herein; and WHEREAS, this project is exempt from environmental review per CEQA Section 15301(b) - minor alteration of existing facilities of public utility services involving negligible or no expansion and Section 15302(c) - replacement or reconstruction of existing utility systems and/or facilities involving negligible or no expansion of capacity; and WHEREAS, the City of Carlsbad has agreed to reimburse the Cartsbad Municipal Water District (CMWD) for the actual costs for city project improvements from the Northwest Quadrant Storm Drain Program, Project No. 6608 and Concrete Repair Program, Project No. 6013; and WHEREAS, on January 1, 2013, the City Council adopted Resolution No. 2013-019, which approved the plans and specifications and authorized the advertisement for bids for the Park Drive Water Pipeline Replacement, Surface Improvements, Northwest Quadrant Storm Drain Program and Concrete Repair Program, Project No's. 5030, 6608 and 6013; and 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 WHEREAS, on March 26, 2013 seven (7) sealed bids were received, opened and witnessed for the construction of this project; and WHEREAS, the lowest responsive and responsible bid to construct said project was submitted by Schilling Paradise, Inc. in the total amount of $789,617, which included $637,967 for Project No. 5030, $96,285 for Project No. 6608, and $55,365 for Project No. 6013; and WHEREAS, Section 3.28.040 (c)(5) of the Cartsbad Municipal Code authorizes the City Manager to approve change orders for the City of Carlsbad's share of the total project cost in the amount up to $30,000 for Project No. 6608, and $20,000 for Project No. 6013; and WHEREAS, the CMWD will fund Project No. 5030 from the water replacement fund, and the City of Carlsbad will fund Project No. 6608, and Project No. 6013 from the Gas Tax funds, and there are sufficient funds available to complete the improvements for Project No. 6608 and Project No. 6013. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carisbad, California, as follows: 1. That the above recitations are true and correct. 2. That the plans, specifications and contract documents on file in the City of Carisbad are hereby approved. 3. That the Administrative Services Director is authorized to reimburse $96,285 from the Northwest Quadrant Storm Drain Program (Project No. 6608), and $55,365 from the Concrete Repair Program (Project No. 6013) to the CMWD for the Park Drive Water Pipeline Replacement and Surface Improvement Project (Project No. 5030). 4. That the Administrative Services Director is authorized to reimburse up to $30,000 from the Northwest Quadrant Storm Drain Program (Project No. 6608) and up to $20,000 6 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 from the Concrete Repair Program (Project No. 6013) to the CMWD for the Park Drive Water Pipeline Replacement and Surface Improvement Project (Project No. 5030) for construction contingencies. /// /// /// /// /// /// /// /// /// /// /// /// /// /// /// /// /// /// /// /// PASSED, APPROVED AND ADOPTED at a Joint Special Meeting of the Carlsbad City Council and Carlsbad Municipal Water District Board of Directors held on the 11^^ day of June, 2013, by the following vote to wit: AYES: NOES: Council Members Hall, Packard, Wood, Blackburn and Douglas. None. ABSENT: None. 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 RESOLUTION NO. 1472 A RESOLUTION OF THE BOARD OF DIRECTORS OF CARLSBAD MUNICIPAL WATER DISTRICT, AWARDING THE CONTRACT FOR THE PARK DRIVE WATER PIPELINE REPLACEMENT, SURFACE IMPROVEMENTS, NORTHWEST QUADRANT STORM DRAIN PROGRAM AND CONCRETE REPAIR PROGRAM, PROJECT NO'S. 5030. 6608 AND 6013. WHEREAS, the Board of Directors of the Carlsbad Municipal Water District (CMWD), California has determined it necessary, desirable, and in the public interest to construct sidewalk, curb, gutter, storm drain facilities, remove and replace potable water pipeline, and remove and replace damaged pavement in Park Drive from Adams Avenue to 200-feet southerly of Cove Drive; and WHEREAS, on January 1, 2013, the Board of Directors adopted Resolution No. 1461, which approved the plans and specifications for furnishing of all labor, materials, tools, equipment, transportation, and other expenses necessary or incidental of said project have been prepared and are on file in the City of Carisbad and are incorporated by reference herein; and WHEREAS, this project is exempt from environmental review per CEQA Section 15301(b) - minor alteration of existing facilities of public utility services involving negligible or no expansion and Section 15302(c) - replacement or reconstruction of existing utility systems and/or facilities involving negligible or no expansion of capacity; and WHEREAS, on March 26, 2013, seven (7) sealed bids were received, opened and witnessed for the construction of this project; and WHEREAS, the lowest responsive and responsible bid to construct said project was submitted by Schilling Paradise, Inc. in the total amount of $789,617, which included $637,967 for Project No. 5030, $96,285 for Project No. 6608, and $55,365 for Project No. 6013; and 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 WHEREAS, Schilling Paradise, Inc. submitted a letter requesting to withdraw their bid, however, staff recommends that the Board of Directors accept the bid because the error claimed is not clerical in nature, and the CMWD was not informed of the error in the five (5) working day period provided by the Public Contract Code; and WHEREAS, Subsection 3.28.040(C)(6) of the Carlsbad Municipal Code authorizes the Executive Manager to approve change orders up to $100,000 for Project No. 5030; and WHEREAS, sufficient funds exist in the Water-Capital Replacement fund for Project No. 5030, and the City of Carlsbad will reimburse CMWD for the costs associated with Project No. 6608, and Project No. 6013 from the Gas Tax funds. NOW, THEREFORE, BE IT RESOLVED by the Carlsbad Municipal Water District Board of the City of Cartsbad, California, as follows: 1. That the above recitations are true and correct. 2. That the bid in the amount of $789,617 submitted by Shilling Paradise, Inc. for the Park Drive Water Pipeline Replacement, Surface Improvements, Northwest Quadrant Storm Drain Program and Concrete Repair Program, Project No's. 5030, 6608 and 6013 is accepted and the President is hereby authorized to execute a contract with Schilling Paradise, Inc. 3. That the Executive Manager is hereby authorized to approve construction change orders up to $100,000 for Project No. 5030. 4. That the award of this contract is contingent upon the bidder submitting the lowest responsible bid executing the required contract and submitting the required bonds and insurance policies, as described in the contract, within twenty (20) days of adoption of this resolution. The Executive Manager may grant reasonable extensions of time. /// 10 PASSED, APPROVED AND ADOPTED at a Joint Special Meeting of the Cartsbad Municipal Water District Board of Directors and the Carlsbad City Council held on the 11*^ day of June, 2013, by the following vote to wit: AYES: NOES: Council Members Hall, Packard, Wood, Blackburn and Douglas. None. ABSENT: None. 9 10 11 12 13 14 15 16 17 l: 19 20 21 22 23 24 25 26 27 28 S2 MATT HALL, President ATTEST: cretary o"a\.SBAo% N^t^^ -T CL ^ LOCATION MAP SITE NOT TO SCALE VICINITY MAP NOT TO SCALE PROJECT NAME PARK DRIVE WATER PIPELINE AND SURFACE IMPROVEMENTS SOUTH OF ADAMS STREET PROJECT NUMBER 5030 EXHIBIT PLOTTED BY: SCOTT EVANS PLOT DAm:12/4/12 PATH:C: \UVUWS DEPARTMENT\DESIGN DIVISION\PLUMMER\PARK DRIVE WATERUNE IMPR0VEMENTS\5Q30.DWG