Loading...
HomeMy WebLinkAbout2014-01-14; City Council; 21473; Approval to Advetise Bids for Northwest Quadrant Storm Drain Program - Valley Street, Highland Drive, Linda Lane Project 6608CITY OF CARLSBAD - AGENDA BILL AB# MTG. DEPT. 21.473 1/14/2014 PW-UTIL APPROVAL OF PLANS AND SPECIFICATIONS AND AUTHORIZATION TO ADVERTISE TO RECEIVE BIDS FOR THE NORTH WEST QUADRANT STORM DRAIN PROGRAM (VALLEY STREET, HIGHLAND DRIVE AND LINDA LANE), PROJECT NO 6608 DEPT. DIRECTOR CITY ATTY. CITY MGR. RECOMMENDED ACTION: Adopt Resolution No. 2014-004 approving plans and specifications and authorizing the City Clerk to advertise for bids for the Northwest Quadrant Storm Drain Improvement Program (Valley Street, Highland Drive and Linda Lane), Project No. 6608. ITEM EXPLANATION: The Northwest Quadrant Storm Drain Improvement Program is a multi-year program to address non- master drainage plan needs within the northwest quadrant of the City. Carlsbad Operations and Maintenance staff was interviewed regarding their field observations and knowledge of drainage issues throughout the northwest quadrant. Site locations were identified and prioritized based on recommendations from field observations. The projects in the program and their status are listed on Exhibit 3 for reference. Three drainage improvement locations are included this fiscal year and their locations are shown on Exhibit 2. Following are descriptions ofthe drainage improvements included in the project: • Valley Street: Improvements at this location include construction of cross-gutter, storm drain inlets to connect to an existing storm drain system and surface improvements to direct storm flows to the inlets. • Highland Drive south of Magnolia Avenue: Development of vacant lots and the addition of hardscape on this street have increased runoff to existing low spots. Storm drain inlets will be installed at the low spots and an 18-inch diameter pipeline will be installed to convey the storm flows from the low spots to the City's storm drain collection system. • Linda Lane: Surfacing groundwater has created a nuisance requiring significant maintenance work on an ongoing basis. Inlets will be installed at the cul-de-sac and an 18-inch diameter pipeline will be installed to convey the surface water and storm flow to the existing storm drain pipeline in Monroe Street. A portion of the existing cross gutter damaged by nuisance run-off will be removed and replaced. DEPARTMENT CONTACT: Sherri Howard 760-602-2756 Sherri.Howard@carlsbadca.gov FOR CLERK USE. / COUNCIL ACTION: APPROVED CONTINUED TO DATE SPECIFIC • DENIED CONTINUED TO DATE UNKNOWN • CONTINUED • RETURNED TO STAFF • WITHDRAWN • OTHER - SEE MINUTES • AMENDED • REPORT RECEIVED • FISCAL IMPACT: Table 1 shows the current status ofthe Northwest Quadrant Storm Drain Improvement Program. More specifically, the current status ofthe programs shows the expenditures of previously completed storm drain improvements and the funds available to complete the projects in Valley Street, Highland Drive and Linda Lane. TABLE 1 - SUMMARY OF PROJECT EXPENSES NORTHWEST QUADRANT STORM DRAIN IMPROVEMENT PROGRAM, PROJEa NO. 6608 TASK DESCRIPTION APPROPRIATED TO DATE EXPENDITURES/ ENCUMBRANCES TO DATE REMAINING BALANCES Design $1,151,850 $610,468 $541,382 Construction, Inspection, Materials Testing $4,079,254 $1,340,148 $2,739,106 Environmental Mitigation 8i Monitoring $18,000 $1,335 $16,665 TOTAL $5,249,104 $1,951,951 $3,297,153 An Engineer's Estimate ofthe construction cost for the Northwest Quadrant Storm Drain Improvement Program (Valley Street, Highland Drive and Unda Lane) was prepared by RBF Consultants, the consulting engineer of wbrk for this project, on October 18, 2013, and totals $675,000. The total estimated project cost is shown in Table 2. TABLE 2 - ESTIMATE OF PROJECT COST NORTHV\/EST QUADRANT STORM DRAIN IMPROVEMENT PROGRAM (VALLEY STREET, HIHLAND DRIVE AND LINDA LANE), PROJECT NO. 6608 ESTIMATED COSTS Construction Contract (Engineer's Estimate) $675,000 Construction Contingency $100,000 Construction Management and Inspection (10%) $67,500 Material and Geotechnical Testing During Construction (5%) $33,750 TOTAL ESTIMATED CONSTRUCTION COSTS $876,250 PROJECT NO. 6608 AVAILABLE BAUNCE $3,297,153 ADDITIONAL APPROPRIATION ANTICIPATED FOR CONSTRUCTION None The project is funded by both General Fund and Gas Tax Funds which require payment of prevailing wages. Constructing the drainage improvements at the three locations using one contract is more efficient than separating the project into multiple contracts. The cost savings derived from bidding the projects as one contract are due to the similarity of construction techniques on each drainage system, the proximity ofthe projects to one another, and savings realized by ordering larger quantities of materials. staff recommends to Council approving the plans and specifications and authorizing the City Clerk to advertise for bids for the construction of Northwest Quadrant Storm Drain Improvement Program (Valley Street, Highland Drive, and Linda Lane), Project No. 6608. ENVIRONMENTAL IMPACT: The project is exempt from the California Environmental Quality Act (CEQA) per State CEQA Guidelines Section 15302(c), concerning replacement or reconstruction of existing facilities involving negligible or no expansion of capacity. EXHIBITS: 1. Resolution No. 2014-004 approving plans and specifications, and authorizing the City Clerk to advertise for bids for the Northwest Quadrant Storm Drain Improvement Program, (Valley Street, Highland Drive and Linda Lane), Project No. 6608. 2. Location Map. 3. Northwest Quadrant Storm Drain Improvement Program Project List. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 RESOLUTION NO. 2014-004 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD, CALIFORNIA, APPROVING PLANS AND SPECIFICATIONS AND AUTHORIZING THE CITY CLERK TO ADVERTIZE FOR BIDS FOR THE NORTHWEST QUADRANT STORM DRAIN IMPROVEMENT PROGRAM (VALLEY STREET, HIGHLAND DRIVE AND LINDA LANE), PROJECT NO. 6608^ ^ WHEREAS, the City Council of the City of Carlsbad, California, has determined it necessary, desirable, and in the public interest to construct the Northwest Quadrant Storm Drain Improvement Program (Valley Street, Highland Drive and Linda Lane), Project No. 6608; and WHEREAS, the plans and specifications for furnishing of all labor, materials, tools, equipment, transportation, and other expenses necessary or incidental to the Northwest Quadrant Storm Drain Improvement Program (Valley Street, Highland Drive and Linda Lane), Project No. 6608, have been prepared and are on file in the Public Works Department ofthe City of Carlsbad and are incorporated herein by reference; and WHEREAS, funding for said project has been appropriated from the General Fund and Gas Tax Funds to cover all project costs and is sufficient. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carlsbad, California, as follows: 1. That the above recitations are true and correct. 2. That the plans, specifications and contract documents for the Northwest Quadrant Storm Drain Improvement Program (Valley Street, Highland Drive and Unda Lane), Project No. 6608, are on file in the Public Works Department of the City of Carlsbad and are hereby approved. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 3. The City Clerk of the City of Carlsbad is hereby authorized and directed to publish, in accordance with State law, a Notice to Contractors Inviting Bids for the Northwest Quadrant Storm Drain Improvement Program (Valley Street, Highland Drive and Unda Lane), Project No. 6608, in accordance with the plans, specifications, and contract documents referred to herein. /// /// /// /// /// /// /// /// /// /// /// /// /// /// /// /// /// /// /// /// r 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 PASSED, APPROVED AND ADOPTED at a Regular Meeting ofthe City Council ofthe City of Carlsbad on the 14th day of Januarv, 2014, by the following vote to wit: AYES: NOES: Council Members Hall, Packard, Wood, Blackburn. None. ABSENT: Council Member Douglas. MATTHALL, Mayor ATTEST: BARBARA ENGLESON,^ty Clerk ^^^^^^^^ LOCATION MAP NOT TO SCALE LEGEND: SITES VALLEY STREET - EAST SIDE HIGHLAND DRIVE LINDA LANE PROJECT NAME NORTHWEST QUADRANT STORM DRAIN IMPROVEMENT PROGRAM PROJECT NUMBER 6608 EXHIBIT PLOnED ey:- SCOir EVANS PLOT DATE: 10/1/13 PATH-. D:\UT1UVES DEPARTUENT\DEaGN DIVISION\HOWARD\6608\6608-4.DWG 1 Exhibit 3 NORTHWEST QUADRANT STORM DRAIN IMPROVEMENT PROGRAM PROJECT LIST Number Site Location Status 1 Mountain View and Pacific Avenue Complete 2 Madison Street, Grand Avenue to Arbuckle Place Complete 3 Oak Avenue and Lincoln Street Pre-Design 4 Roosevelt Street n/o Beech Avenue Complete 5 Roosevelt Street & Madison Street, Carlsbad Village Drive to Grand Avenue Complete 6 Ocean Street north of Oak Avenue Pre-Design 7 Valley Street and Buena Vista Way Authorization to Bid 8 Valley Street north of Carlsbad Village Drive East Authorization to Bid 8A Valley Street north of Carlsbad Village Drive West Complete 9 Cynthia Lane to Pio Pico Drive Complete 10 Pio Pico Drive and Forest Avenue Complete 11 Elmwood Street and Laguna Drive Design 12 Wilson Street north of Buena Vista Way Design 13 Macarthur Avenue and Sunnyhill Drive Design 14 Chestnut Avenue and Pio Pico Drive Complete 15 Chestnut Avenue and Adams Street Complete 16 Adams Street and Palm Avenue Pre-Design 17 Adams Street north of Magnolia Avenue Pre-Design 18 Adams Street north of Tamarack Avenue Pre-Design 19 Basswood Avenue and Valley Street Design 20 Linda Lane Cul de Sac's Authorization to Bid 21 Donna Drive west of Chestnut Avenue Pre-Design 22 Palisades Drive and East Pointe Avenue Pre-Design 23 Calavo Court Complete 24 Ridgecrest Drive Complete 25 Adams Street south of Hoover Street Complete 26 Park Drive, Monroe Street to Woodvale Drive Complete 27 Monroe Street, Alder Drive and Sunnyhill Drive Complete 28 Park Drive, Cove Drive to Marina Drive 6611 29 Sevilla Way Removed from Program 30 Park Drive east of Valencia Avenue Complete 31 Harrison Street south of Chinquapin Avenue Complete 32 Crest Drive Drainage Project Complete 33 Hillside Drive downdrain west of Park Drive Complete 34 Highland Drive between Magnolia and Chinquapin Complete Number Site Location Status 35 Highland between Tamarack and Magnolia Authorization to Bid 36 Chinquapin downdrain west side railroad Complete 37 Grand Avenue Jefferson Street to State Street Alley Design 38 2521 Crest (Northwest side) Complete 39 Chinquapin Avenue cul de sac west side RR Complete 40 Olive Avenue at west of RR Complete 41 Roosevelt Street at Laguna Drive Pre-Design 42 Madison Street Arbuckle to Laguna Design 43 Washington Street south of Carlsbad Village Drive Pre-Design 44 Pontiac Avenue and Southhampton Road Complete