Loading...
HomeMy WebLinkAbout2014-02-25; City Council; 21510; Approval to Bid Northwest Quadrant Storm Drain, Concrete Repair Basswood Avenue, James Drive Project 6608 6013CITY OF CARLSBAD - AGENDA BILL AB# 21,510 APPROVAL OF PLANS AND SPECIFICATIONS AND AUTHORIZATION TO ADVERTISE TO RECEIVE BIDS FOR THE NORTHWEST QUADRANT STORM DRAIN PROGRAM AND CONCRETE REPAIR PROGRAM (BASSWOOD AVENUE AND JAMES DRIVE), PROJECT NOS. 6608 AND 6013 DEPT.DIRECFOR ( MTG. 2/25/2014 APPROVAL OF PLANS AND SPECIFICATIONS AND AUTHORIZATION TO ADVERTISE TO RECEIVE BIDS FOR THE NORTHWEST QUADRANT STORM DRAIN PROGRAM AND CONCRETE REPAIR PROGRAM (BASSWOOD AVENUE AND JAMES DRIVE), PROJECT NOS. 6608 AND 6013 CITY ATTY. DEPT. PW-UTIL APPROVAL OF PLANS AND SPECIFICATIONS AND AUTHORIZATION TO ADVERTISE TO RECEIVE BIDS FOR THE NORTHWEST QUADRANT STORM DRAIN PROGRAM AND CONCRETE REPAIR PROGRAM (BASSWOOD AVENUE AND JAMES DRIVE), PROJECT NOS. 6608 AND 6013 CITY MGR. RECOMMENDED ACTION; Adopt Resolution No. 2014-029 approving plans and specifications and authorizing the City Clerk to advertise for bids for the Northwest Quadrant Storm Drain Improvement Program and Concrete Repair Program (Basswood Avenue and James Drive), Project Nos. 6608 and 6013. ITEM EXPLANATION; The Northwest Quadrant Storm Drain Improvement Program is a multi-year program to address non- master drainage plan needs within the northwest quadrant of the city. Carlsbad Operations and Maintenance staff was interviewed regarding their field observations and knowledge of drainage issues throughout the northwest quadrant. Site locations were identified and prioritized based on recommendations from field observations. The projects in the program and their status are listed on Exhibit 3 for reference. The improvements included in this segment are construction of curb inlets, storm drain cleanouts, storm drain pipeline, cross-gutter and sidewalk repairs. The improvements also include overlay of one half of Basswood Avenue and a portion of James Drive. FISCAL IMPACT: Table 1 shows the current status of the Northwest Quadrant Storm Drain Improvement Program and Concrete Repair Program. More specifically, the current status of the programs shows the expenditures of previously completed storm drain improvements and the funds available to complete the projects in Basswood Avenue and James Drive. DEPARTMENT CONTACT: Sherri Howard 760-602-2756 Sherri.Howard(S)carlsbadca.gov FOR CLERK USE. X COUNCIL ACTION: APPROVED X CONTINUED TO DATE SPECIFIC • DENIED • CONTINUED TO DATE UNKNOWN • CONTINUED • RETURNED TO STAFF • WITHDRAWN • OTHER - SEE MINUTES • AMENDED • REPORT RECEIVED • TABLE 1 - SUMMARY OF PROJECT EXPENSES NORTHWEST QUADRANT STl PRC ORM DRAIN IMPROVEMENT PROGRAM, )JECTNO.6608 TASK DESCRIPTION APPROPRIATED TO DATE EXPENDITURES/ ENCUMBRANCES TO DATE REMAINING BALANCES Design $1,126,000 $667,889 $458,108 Construction, Inspection, Materials Testing $4,079,252 $1,375,846 $2,703,407 Environmental Mitigation & Monitoring $18,000 $1,335 $16,665 TOTAL $5,223,252 $2,045,070 $3,178,182 CONCRETE REPAIR PROGRAM, PROJECT NO. 6013 TASK DESCRIPTION APPROPRIATED TO DATE EXPENDITURES/ ENCUMBRANCES TO DATE REMAINING BALANCES Design $130,800 $50,377 $80,424 Construction, Inspection, Materials Testing $1,369,200 $905,083 $464,116 TOTAL $1,500,000 $955,460 $544,540 An Engineer's Estimate of the construction cost for the Northwest Quadrant Storm Drain Improvement Program and Concrete Repair Program (Basswood Avenue and James Drive) was prepared by Harris and Associates, the consulting engineer of work for this project, and totals $437,000. The total estimated project cost is shown in Table 2. TABLE 2 - ESTIMATE OF PROJECT COST NORTHWEST QUADRANT STORM DRAIN IMPROVEMENT PROGRAM (BASSWOOD AVENUE AND JAMES DRIVE), PROJECT NO. 6608 ESTIMATED COSTS Construction Contract (Engineer's Estimate) $422,000 Construction Contingency $50,000 Construction Management and Inspection $50,000 Material and Geotechnical Testing During Construction $25,000 TOTAL ESTIMATED CONSTRUCTION COSTS $547,000 PROJECT NO. 6608 AVAILABLE BALANCE $3,178,182 ADDITIONAL APPROPRIATION ANTICIPATED FOR CONSTRUCTION None CONCRETE REPAIR PROGRAM (BASSWOOD AVENUE AND JAMES DRIVE), PROJECT NO. 6013 ESTIMATED COSTS Construction Contract (Engineer's Estimate) $15,000 Construction Contingency $2,000 Construction Management and Inspection $1,500 Material and Geotechnical Testing During Construction $750 TOTAL ESTIMATED CONSTRUCTION COSTS $19,250 PROJECT NO. 6013 AVAILABLE BALANCE $544,540 ADDITIONAL APPROPRIATION ANTICIPATED FOR CONSTRUCTION None The project is funded by Gas Tax Funds which require payment of prevailing wages. Staff recommends to Council approving the plans and specifications and authorizing the City Clerk to advertise for bids for the construction of Northwest Quadrant Storm Drain Improvement Program and Concrete Repair Program (Basswood Avenue and James Drive), Project Nos. 6608 and 6013. ENVIRONMENTAL IMPACT: The project is exempt from the California Environmental Quality Act (CEQA) per State CEQA Guidelines Section 15301(b), concerning operation, repair and maintenance of existing facilities of both investor and publicly owned utilities used to provide public utility services. EXHIBITS: Resolution No. 2014-029 approving plans and specifications, and authorizing the City Clerk to advertise for bids for the Northwest Quadrant Storm Drain Improvement Program and Concrete Repair Program (Basswood Avenue and James Drive), Project No. 6608 and 6013. 2. Location Map. 3. Northwest Quadrant Storm Drain Improvement Program Project List. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 RESOLUTION NO. 2014-029 A RESOLUTION OF THE CITY COUNCIL OF THE CiTY OF CARLSBAD, CAUFORNIA, APPROVING PLANS AND SPECIFICATIONS AND AUTHORIZING THE CITY CLERK TO ADVERTISE FOR BIDS FOR THE NORTHWEST QUADRANT STORM DRAIN PROGRAM AND CONCRETE REPAIR PROGRAM (BASSWOOD AVENUE AND JAMES DRIVE). PROJECT NOS. 6608 AND 6013. WHEREAS, the City Council of the City of Carlsbad, California, has determined it necessary, desirable, and in the public interest to construct the Northwest Quadrant Storm Drain Improvement Program and Concrete Repair Program (Basswood Avenue and James Drive), Project Nos. 6608 and 6013; and WHEREAS, the plans and specifications for furnishing of all labor, materials, tools, equipment, transportation, and other expenses necessary or incidental to the Northwest Quadrant Storm Drain Improvement Program and Concrete Repair Program (Basswood Avenue and James Drive), Project Nos. 6608 and 6013, have been prepared and are on file in the Public Works Department of the City of Carlsbad and are incorporated herein by reference; and WHEREAS, funding for said project has been appropriated from the Gas Tax Funds to cover all project costs and is sufficient. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carlsbad, California, as follows: 1. That the above recitations are true and correct. 2. That the plans, specifications and contract documents for the Northwest Quadrant Storm Drain Improvement Program and Concrete Repair Program (Basswood Avenue and James Drive), Project Nos. 6608 and 6013, are on file in the Public Works Department of the City of Carlsbad and are hereby approved. 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 3. The City Clerk of the City of Carlsbad is hereby authorized and directed to publish, in accordance with State law, a Notice to Contractors Inviting Bids for the Northwest Quadrant Storm Drain Improvement Program and Concrete Repair Program (Basswood Avenue and James Drive), Project Nos. 6608 and 6013, in accordance with the plans, specifications, and contract documents referred to herein. /// /// /// /// /// /// /// /// /// /// /// /// /// /// /// /// /// /// /// /// PASSED, APPROVED AND ADOPTED at a Regular Meeting of the City Council of the City of Carlsbad on the 25th day of February 2014. by the following vote to wit: AYES: NOES: Council Members Hall, Packard, Wood, Blackburn. None. ABSENT: None. 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 MATH-HALL, Mayor ATTEST: BARBARA ENGLESON, City Clerk LOCATION MAP NOT TO SCALE LEGEND: SITE BASSWOOD AVENUE pAonc OCUN PROJECT NAME f^QRTHWEST QUADRANT STORM DRAIN IMPROVEMENT PROGRAM PROJECT NUMBER 6608 EXHIBIT PL071ED Btt SCOTT EVHNS PLOT DATE:10/I/I3 PA1H:D:\mmES OGRMTMENTVOESGM OniSnNV<01KUW\6MS\MOB-4LONC -7 Exhibit 3 NORTHWEST QUADRANT STORM DRAIN IMPROVEMENT PROGRAM PROJECT UST Number Site Location Status 1 • Mountaih¥iewand Pacific Avenue Complete 2 Madison Street, Grand Avenue to Arbuckle Place Complete 3 Oak Avenue and Lincoln Street Pre-Design 4 Roosevelt Street n/o Beech Avenue Complete Rppidyelt Street & Madison Street, Carlsbad Village Drive to Grand Avferiue, Complete 6 Ocean Street north of Oak Avenue Pre-DesIgn 7 Valley Street and Buena Vista Way Biding 8 Valley Street north of Carlsbad Village Drive East Bidding SA Valley Street north of Carlsbad Village Drive West Complete 9 Cynthia Lane to Pio Pico Drive Complete 10 Pio Pico Drive and Forest Avenue Cortiplete 11 Elmwood Street and Laguna Drive Design 12 Vyilson Street north of Buena Vista Way Design 13 Macarthur Avenue and Sunnyhill Drive Design 14 Chestnut Avenue and Pio Pico Drive Complete 15 Chestnut Avenue and Adams Street Complete 16 Adams Street and Palm Ayenuie Pre-Design 17 Adams Street north of Magnolia Avenue Pre-Design 18 Adams Street north of Tamarack Avenue Pre-Design 19 Basswood Avenue and James Drive Authorization to Bid 20 Linda Lane Cul de Sac's Bidding 21 Donna Drive west of Chestnut Avenue Pre-Design 22 Palisades Drive ahd East Pointe Avenue Pre-Design 23 Calavo Court Complete 24 Ridgecrest Drive . Complete 25 Adams Street south of Hoover Street Complete 26 Park Drive, Monroe Street to Woodvale Drive Complete 27 Monroe Street, Alder Drive and Sunnyhill Drive Complete 28 Park Drive, Cove Drive to Marina Drive 6611 29 Sevilla Way Removed from Program 30 Park Drive east of Valencia Avenue Complete 31 Harrison Street south of Chinquapin Avenue Complete 32 Crest Drive Drainage Project Complete 33 Hillside Drive downdrain west of Park Drive Complete 34 Highland Drive between Ma^hblia and Chinquapin Complete Number Site Location Status 35 Highland between Tamarack and Magnolia Bidding 36 Chinquapin downdrain west side railroad Complete 37 Grand Avenue Jefferson Street to State Street Alley Design 38 2521 Crest (Northwest side) Complete 39 Chinquapin Avenue cul de sac west side RR Complete 40 Olive Avenue at west of RR Complete 41 Roosevelt Street at Laguna Drive Pre-Design 42 Madison Street Arbuckle to Laguna Design 43 Washington Street south of Carlsbad Village Drive Pre-Design 44 Pontiac Avenue and Southampton Road Complete