Loading...
HomeMy WebLinkAbout2014-04-08; City Council; 21555; Authorize Appropriation Funds for Light Fixtures Village Area Project 4018CITY OF CARLSBAD - AGENDA BILL AB# 21.555 AUTHORIZE APPROPRIATION OF FUNDS AND TO PURCHASE AND INSTALL DECORATIVE LED STREET LIGHT FIXTURES FOR THE VILLAGE AREA, PROJECT NO. 4018 DEPT. DIRECTOR U) MTG. 4/8/14 AUTHORIZE APPROPRIATION OF FUNDS AND TO PURCHASE AND INSTALL DECORATIVE LED STREET LIGHT FIXTURES FOR THE VILLAGE AREA, PROJECT NO. 4018 CITY ATTY. DEPT. PW-TRAN AUTHORIZE APPROPRIATION OF FUNDS AND TO PURCHASE AND INSTALL DECORATIVE LED STREET LIGHT FIXTURES FOR THE VILLAGE AREA, PROJECT NO. 4018 CITY MGR. ^ RECOMMENDED ACTION: Adopt Resolution No. 2014-058 to authorize appropriation of funds and to purchase and install one hundred and ten (110) decorative LED street light fixtures to complete the Village Safety Lighting project, Project No. 4018. ITEM EXPLANATION: As part of the FY2013-14 budget process. City Council approved the appropriation of $210,000 for the Village Safety Lighting project as a Capital Improvement Program project. Staff has studied the lighting needs through collaboration with Urban Place and recommends purchase and installation of decorative LED street light fixtures to replace the existing street light fixtures In the Village area. LED fixtures have proven to be cost effective and are becoming the industry standard for street lighting. The proposed LED fixtures incorporate adaptive control for improved cost efficiency and light output control. The installation of an adaptive control gateway will offer the ability to control light output so that individual lights can be brighter where more light is needed and dimmed in areas where ambient light is available. This will result in reduced energy bills and provide more accurate energy billing since costs will be associated with actual usage and not at a flat rate, as is the case with the current lighting system. Staff has identified the need to purchase 110 new decorative LED street light fixtures to complete the Village Safety Lighting project. This includes fixtures for four new street light poles on State Street that are currently being installed. Carlsbad Municipal Code Section 3.28.100 allows the Purchasing Officer to buy goods and/or services directly from a vendor at a price established by another public agency when the other agency has made their purchase in a competitive manner. The City of San Diego conducted a thorough and competitive bid process for this specific light fixture. They received bids on August 6, 2013 and selected the bid submitted by Southern Contracting Company for purchase and installation of decorative LED street light fixtures in the City of San Diego. The City of San Diego contract has a "piggyback" procurement clause that allows other public agencies to procure identical equipment and/or services at the costs outlined In the contract. Staff has received a quote from Southern Contracting Company honoring the procurement clause to furnish and install the 110 new fixtures in the City of Carlsbad for a total amount of $209,678. DEPARTMENT CONTACT: Doug Bilse 760-602-7504 doug.bilse@carlsbadca.gov FOR CLERK USE. K COUNCIL ACTION: APPROVED K CONTINUED TO DATE SPECIFIC • DENIED CONTINUED TO DATE UNKNOWN • CONTINUED • RETURNED TO STAFF • WITHDRAWN • OTHER - SEE MINUTES • AMENDED • REPORT RECEIVED • FISCAL IMPACT: The project cost breakdown is as follows: 110 decorative LED street light fixtures in the Village $209,678 4 street light poles on State Street $25,000 Total Project Cost $234,678 Total Amount Appropriated for this Project $210,000 Additional Appropriation Required $24,678 A total of $210,000 in General Capital Construction funds were appropriated in the 2013/14 Capital Improvement Program. Due to the 4 new street light poles proposed for State Street, the total project cost is $234,678. An additional appropriation of $24,678 from the General Capital Construction fund is required to complete the project. ENVIRONMENTAL IMPACT: The project is exempt from the California Environmental Quality Act (CEQA) per State CEQA Guidelines Section 15301(c) - minor alteration of existing facilities, including streets, sidewalks, gutters, and similar facilities involving negligible or no expansion. EXHIBITS: 1. Resolution No. 2014-058 authorizing appropriation of funds and the purchase and installation of 110 decorative LED street light fixtures in the Village. 2. City of San Diego Bid #K-13-5977-DBl-3-C "Piggyback" Procurement Clause. 3. Southern Contracting Company price quote dated March 3, 2014. 4. General Electric Evolve LED Light Fixture photo. 1 RESOLUTION NO. 2014-058 23 24 25 26 27 28 WHEREAS, the City Council of the City of Carlsbad, California, has determined it 2 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD, CAUFORNIA, AUTHORIZING THE APPROPRIATION OF ADDITIONAL FUNDS AND THE PURCHASE AND INSTALLATION OF 110 4 DECORATIVE LED STREET LIGHTS IN THE DOWNTOWN VILLAGE, PROJECT NO 4018. 5 6 J necessary, desirable, and in the public interest to complete the Village Safety Lighting Project; 8 and ^ WHEREAS, Carlsbad Municipal Code Section 3.28.100 allows the Purchasing Officer to 10 buy goods and/or services directly from a vendor at a price established by another public 11 agency when the other agency has made their purchase in a competitive manner; and 12 WHEREAS, the Purchasing Officer has determined that it is in the best interests of the 14 City of Carlsbad to utilize a bid from the City of San Diego; and 15 WHEREAS, the City of San Diego Bid K-13-5977-DB1-3-C contains a "piggyback" procurement 1 /: clause that allows other public agencies to procure equipment and/or services from Southern 17 Contracting Company; and 18 WHEREAS, a cost proposal in the amount of $209,677 has been submitted by Southern 19 2Q Contracting Company to the City of Carlsbad; and 21 WHEREAS, additional funds in the amount of $24,678 need to be appropriated in order 22 to complete the Village Safety Lighting Project. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carlsbad, California, as follows that: 1. The above recitations are true and correct. 1 2. The cost proposal submitted by Southern Contracting Company, in the amount 2 of $209,677 is hereby accepted and the Mayor is hereby authorized to execute a contract on 3 behalf of the City for the completion of the Village Safety Lighting project. 4 ^ 3. The Administrative Services Director is hereby authorized to appropriate $24,678 6 from the General Capital Construction fund to Project No. 4018 for completion of this project. 7 // // // // // 8 9 10 11 12 13 // 14 // 15 16 17 18 19 22 23 24 25 26 27 28 // // // // 20 // 21 // // // // // 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 PASSED, APPROVED AND ADOPTED at a Regular Meeting ofthe City Council ofthe City of Carlsbad on the 8*^ day of April, 2014, by the following vote to wit: AYES: NOES: Council Members Hall, Packard, Wood, Schumacher and Blackburn. None. ABSENT: None. MATT HALL, Mayor ATTEST: AAtmRA ENGLESON, Ctt/Clerk EyHi3L\ ^ City of San Diego CITY CONTACT; Damian Singleton. Contract Specialist. Email; Dsingleton(g),sandiego.gov Phone No. (619) 533-3482. Fax No. (619^ 533-3633 ADDENDUM "1" REQUEST FOR PROPOSAL (RFP) FOR POST TOP PEDESTRIAN STREETLIGHT CONVERSION PROJECT DESIGN-BUILD CONTRACT BID NO.: SAP NO. (WBS/IO/CC):_ CLIENT DEPARTMENT:. COUNCIL DISTRICT: PROJECT TYPE: K-13-5977-DB1-3-C B-13139 2115 IH PROPOSAL DUE: 12:00 NOON AUGUST 6, 2013 CITY OF SAN DIEGO PUBLIC WORKS CONTRACTING GROUP 1010 SECOND AVENUE, SUITE 1400, MS 614C SAN DIEGO, CA 92101 July 25,2013 ADDENDUM "1" Post Top Pedestrian Streetlight Conversion Project Design-Build Contract Page 1 of 247 10.10. Project Schedule 10.10.1. The City has established the following tentative milestones for the Project: a. QECB phase funding deadline of: March 15, 2014 b. Issue Notice of Completion June 2014 For the Contract Time refer to Contract Front End Volume 1, Notice Inviting Bids (see Attachments). 10.11. Acknowledgement of Addenda The Design-Builder shall confirm in its Proposal the receipt of all addenda issued to this RFP. Failure to acknowledge all addenda issued, will result in the Proposal being considered non-responsive and ineligible for further consideration. 10.12. The agreement, terms and conditions are included in The City's Front End Contract Documents Volume 1 and 2, The GREENBOOK Part 1, The WHITEBOOK e.g., the City Supplement and the Funding Agency Provisions as included in the Contract. 10.13. Qualified Energy Conservation Bonds (QECB) deadlines dictate a requirement to spend $3.5 million dollars for lights purchased and installed by March 15 2014. See Attachment A-3. 10.14. Piggyback Procurement. It is intended that any other public agency (e.g. city, county, district, public authority, public agency, municipality, or other political subdivision of Califomia) located in the State of Califomia has an option to procure identical equipment and/or services as set forth in the Proposal. The City of San Diego incurs no financial responsibility in connection with orders issued by another public agency. The participating public agency shall accept sole responsibility for placing orders or making payments to file vendor. Request for Proposal (Rev. March 2011) 12 j Page Post Top Pedestrian Streetlight Conversion Project Design-Build Contract July 25,2013 ADDENDUM "1" Page 22 of 247 "7 Post Top Pedestrian Streetlight Conversion Project Design-Build Contract uc N0.222252 559 Twin Oaks Valley Road • Phone 760-744-0760 • P.O. Box 445 • San Marcos, CA 92079 Fax 760-744 6475 Municipal Street Lighting Retrofit Project Phase Two Piggyback Procurement Clause Piggyback Procurement It is intended that any other public agency (e.g., city, county, district, public authority, public agency, municipality, or other political subdivision of California) located in state of California shall have an option to procure identical equipment and/or services as set forth in this Proposal. The City of San Diego shall incur no financial responsibility in connection with orders issued by another public agency. The participating pubhc agency shall accept sole responsibiHty for placing orders or making payments to file vendor. Timothy Preside! ride outhern Contracting Company OCT 0 h 2013 Date Tony Helnri Director, pfellc Works City of San Diego Lorie Cosio-Azar Project Officer City of San Diego Date Date P Souffjem Contracting Company uc N0.222252 559 Twin Oaks Valley Road • Phone 760-744-0760 • P.O. Box 445 • San Marcos, CA 92079 Fax 760-744-6475 March 3, 2014 Ms. Heidi Versteeg Engineering Technician II Transportation / ITS City of Carlsbad 405 Oak Av Carlsbad, CA 92008 Subject: Piggyback proposal for Adaptive Controlled Decorative Post Top Luminaires Dear Ms. Versteeg, Thank you for the opportunity to supply and install 110 decorative post top luminaires to the City of Carlsbad. We have developed our quotation for turnkey procurement, installation and commissioning based on our existing City of San Diego Decorative Post Top Replacement Project Involving the conversion of 3,000 HPS acorn-style luminaires. Though the luminaire unit pricing is identical, Carlsbad will receive its luminaires with a black finish. The system will include the following at the specified unit prices: Description ml^jgPpPT:'^: Unit Price Extended Install 70-86 Watt LED on Standard Poles EPAS 0 CSC 41 H 7ABIack012 110 $1,396.43 $153,607.30 Install Wireless Mesh Nodes ELWN0DXRG5 110 $191.00 $21,010.00 Commissioning Support / Training ELWGOCXXGC LS $5,000.00 $5,000.00 Recycling n/a 110 $10.00 $1,100.00 Traffic Control n/a LS $11,000.00 $11,000.00 Engineering and Design of Mesh Network n/a LS $12,500.00 $12,500.00 Install Gateway Interface and system on City-owned computers n/a LS $5,460.20 $5,460.20 TOTAL $209,677.50 We have included a copy of the San Diego GE Post Top Specifications for reference. The part #s have been slightly modified to comply with the new GE part numbering schema and the specified black color. We look forward to receiving a purchase order form Carlsbad, placing our order, then getting these lights installed and commissioned before school is out. Sincerely, f. James Filanc, LEED AP Director, Business Development Southern Contracting Company Oj GE Lighting Solutions "Gateway" EPAS 0 B5 A 41 B 7 A XXXX D2 (to match CCDC Blue Color / with diffused upper lens, upper band for U1 BUG Rating) tvoive Avery StreetDreams™ (EPAS) magination at work