Loading...
HomeMy WebLinkAbout2014-04-22; City Council; 21571; Approval Contract, Specifications, Authorization for Bids for 2014 Concrete Replacement Project 6013-14CITY OF CARLSBAD - AGENDA BILL AB# 21,571 APPROVAL OF CONTRACT DOCUMENTS AND SPECIFICATIONS AND AUTHORIZATION TO ADVERTISE FOR BIDS FOR 2014 CONCRETE REPLACEMENT PROJEa NO. 6013-14 DEPT.DIRECTOR r5»V MTG. 4/22/14 APPROVAL OF CONTRACT DOCUMENTS AND SPECIFICATIONS AND AUTHORIZATION TO ADVERTISE FOR BIDS FOR 2014 CONCRETE REPLACEMENT PROJEa NO. 6013-14 CITY ATTY. /£< DEPT. PW-TRAN APPROVAL OF CONTRACT DOCUMENTS AND SPECIFICATIONS AND AUTHORIZATION TO ADVERTISE FOR BIDS FOR 2014 CONCRETE REPLACEMENT PROJEa NO. 6013-14 CITY MGR. RECOMMENDED ACTION: Adopt Resolution No. 2014-069 approving the contract documents and specifications and authorizing the City Clerk to advertise for bids for the 2014 Concrete Replacement Project No. 6013-14. ITEM EXPLANATION: As part of the City's annual Concrete Replacement Program, staff has assessed deterioration, cracking, and uplifting of concrete improvements within the public right-of-way. A list of locations was produced to identify the curbs, gutters, sidewalks, curb ramps, and driveway approaches in need of replacement. Staff recommends approving the project and authorizing the City Clerk to advertise for bids for the construction of the 2014 Concrete Replacement Project No. 6013-14. FISCAL IMPACT: The total estimated cost for the 2014 Concrete Replacement Project is $260,000. 2014 CONCRETE REPLACEMENT PROJECT ESTIMATED COSTS Construction Contract Estimate $200,000 Construction Contingency (15%) $30,000 Inspection, Testing, and Construction Management (15%) $30,000 TOTAL ESTIMATED COST $260,000 The Concrete Replacement Program has a balance of $541,000 in Gas Tax funds available to complete this project. The remaining funds will be carried forward for future concrete replacement projects. ENVIRONMENTAL IMPACT: The project is exempt from the California Environmental Quality Act (CEQA) per CEQA Guidelines Section 15301(c) - minor alteration of existing facilities including streets, sidewalks, gutters, and similar facilities involving negligible or no expansion. EXHIBITS: 1. Resolution No. 2014-069 approving the contract documents and specifications and authorizing the City Clerk to advertise for bids for the 2014 Concrete Replacement Project No. 6013-14. DEPARTMENT CONTACT: Jon Schauble 760-602-2762 Jon.schauble@carlsbadca.gov FOR CLERK USE. COUNCIL ACTION: APPROVED CONTINUED TO DATE SPECIFIC • DENIED • CONTINUED TO DATE UNKNOWN • CONTINUED • RETURNED TO STAFF • WITHDRAWN • OTHER - SEE MINUTES • AMENDED • REPORT RECEIVED • 1 RESOLUTION NO. 2014-069 2 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD, CALIFORNIA, APPROVING THE CONTRACT DOCUMENTS AND SPECIFICATIONS AND AUTHORIZING THE CITY CLERK TO ADVERTISE 4 FOR BIDS FOR THE 2014 CONCRETE REPLACEMENT PROJECT NO. 6013-14. 3 WHEREAS, the City Council of the City of Carlsbad, California, has determined it necessary, desirable, and in the public interest to replace damaged concrete in accordance with 5 6 7 g the City's ongoing Concrete Replacement Program; and 9 WHEREAS, the contract and specifications for furnishing of all labor, materials, tools, equipment, transportation, and other expenses necessary or incidental to the 2014 Concrete Replacement Project No. 6013-14, have been prepared and are on file in the Public Works Department of the City of Carlsbad and are incorporated herein by reference; and WHEREAS, the project is exempt from the California Environmental Quality Act (CEQA) 10 11 12 13 14 25 per CEQA Guidelines Section 15301(c); and 16 WHEREAS, sufficient funds are available for completion ofthe concrete repairs. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carlsbad, California, as follows: 1. That the above recitations are true and correct. 2. That the contract documents and specifications for the 2014 Concrete Replacement Project No. 6013-14 are on file in the Public Works Department of the Cityof 17 18 19 20 21 22 23 Carlsbad and are hereby approved 24 3. The City Clerk of the City of Carlsbad is hereby authorized and directed to publish, in accordance with State law, a Notice to Contractors Inviting Bids for the construction of 26 the 2014 Concrete Replacement Project No. 6013-14, in accordance with the specifications 27 and contract documents referred to herein. 28 2^ 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 PASSED, APPROVED AND ADOPTED at a Regular Meeting ofthe City Council ofthe City of Carlsbad on the 22""* day of April, 2014, by the following vote to wit: AYES: NOES: Council Members Packard, Wood, Schumacher and Blackburn. None. ABSENT: Council Member Hall. MARK PAC'KARD, Mayor Pro Tem ATTEST: BARBARA (SEAL) JARA ENGLESON, d^y Clerk -it.--