HomeMy WebLinkAbout2014-06-03; City Council; 21612; Contract for Northwest Quadrant Storm Drain Program Valley Street, Highland Drive, Linda Lane Project 6608CITY OF CARLSBAD - AGENDA BILL
AB#
MTG.
DEPT.
21.612
6/3/2014
PW- UTIL
AWARD OF CONTRACT FOR THE
NORTHWEST QUADRANT STORM DRAIN
PROGRAM (VALLEY STREET, HIGHLAND
DRIVE AND UNDA LANE), PROJECT NO 6608
DEPT.DIRECTOR
CITY ATTY.
CITY MGR. kf)
RECOMMENDED ACTION:
Adopt Resolution No. 2014-109 awarding the contract for the Northwest Quadrant Storm
Drain Program (Valley Street, Highland Drive and Linda Lane), Project No 6608.
ITEM EXPLANATION:
The Northwest Quadrant Storm Drain Improvement Program is a multi-year program to address non-
master drainage plan needs within the northwest quadrant ofthe city. City of Carlsbad Operations and
Maintenance staff was interviewed regarding their field observations and knowledge of drainage issues
throughout the northwest quadrant. Site locations were identified and prioritized based on
recommendations from field observations. The projects in the program and their status are listed on
Exhibit 2 for reference.
Three drainage improvement locations are included in this plan set and their locations are shown on
Exhibit 3. The following are descriptions ofthe drainage improvements included in the project:
• Valley Street: Improvements at this location include construction of cross-gutter, storm drain
inlets to connect to an existing storm drain system and surface improvements to direct storm
flows to the inlets.
• Highland Drive south of Magnolia Avenue: Development of vacant lots and the addition of
hardscape on this street have increased runoff to existing low spots. Storm drain inlets will be
installed at the low spots and an 18-inch diameter pipeline will be installed to convey the storm
flows from the low spots to the City's storm drain collection system.
• Linda Lane: Surfacing groundwater has created a nuisance requiring significant maintenance work
on an ongoing basis. Inlets will be installed at the cul-de-sac and an 18-inch diameter pipeline will
be installed to convey the surface water and storm flow to the existing storm drain pipeline in
Monroe Street. A portion of the existing cross gutter damaged by nuisance run-off will be
removed and replaced.
DEPARTMENT CONTACT: Slierri Howard 760-602-2756 / Slierri.Howard@carlsbadca.gov
FOR CLERK USE.
COUNCIL ACTION: APPROVED CONTINUED TO DATE SPECIFIC •
DENIED • CONTINUED TO DATE UNKNOWN •
CONTINUED • RETURNED TO STAFF •
WITHDRAWN • OTHER - SEE MINUTES •
AMENDED • REPORT RECEIVED •
On January 14, 2014, the City Council adopted Resolution No. 2014-004, which approved the plans and
specifications and authorized the advertisement for bids for the Northwest Quadrant Storm Drain
Program (Valley Street, Highland Drive and Linda Lane), Project No 6608. Plans and specifications are on
file in the Public Works Department of the City of Carlsbad. On March 11, 2014, ten (10) sealed bids were
received, opened and witnessed for the construction of this project as shown in the following Table 1.
TABLE 1
THE NORTHWEST QUADRANT STORM DRAIN PROGRAM
(VALLEY STREET, HIGHLAND DRIVE AND LINDA LANE), PROJECT NO 6608
CONTRACTOR BID LUMP SUM
1. Southland Paving, Inc. $558,178
2. CCL Contracting Inc. $576,723
3. Palm Engineering Construction Company Inc. $625,440
4. New Century Construction $627,412
5. Lonerock, Inc. $648,905
6. Piperin Corporation $675,015
7. Ramona Paving and Construction Company $687,407
8. Mode Engineering $742,900
9. JC Baldwin Construction $995,315
10. Just Construction, Inc. $1,110,455
The apparent low bidder at the bid opening was Just Construction, Inc. with a bid total of $504,900. Just
Construction, Inc. made a material math error within the bid documents, which changed their total bid to
$1,110,455. Southland Paving, Inc. is the confirmed low bidder and their bid documents are responsive
Staff recommends awarding the contract to the lowest responsive bidder. Southland Paving, Inc. for the
construction of Northwest Quadrant Storm Drain Program (Valley Street, Highland Drive and Linda Lane),
Project No 6608.
FISCAL IMPACT:
Table 2 shows the current status ofthe Northwest Quadrant Storm Drain Improvement Program. More
specifically, the current status of the programs shows the expenditures of previously completed storm
drain improvements and the funds available to complete the projects in Valley Street, Highland Drive
and Linda Lane.
TABLE 2 - SUMMARY OF PROJECT EXPENSES
NORTHWEST QUADRANT STORM DRAIN IMPROVEMENT PROGRAM,
PROJECT NO. 6608
TASK DESCRIPTION APPROPRIATED
TO DATE
EXPENDITURES/
ENCUMBRANCES
TO DATE
REMAINING
BALANCES
Design $1,126,000 $725,977 $400,023
Construction, Inspection, Materials Testing $4,079,254 $1,381,316 $2,697,938
Environmental Mitigation & Monitoring $18,000 $1,335 $16,665
TOTAL $5,223,254 $2,108,628 $3,114,626
On October 18, 2013, an Engineer's Estimate of the construction of Northwest Quadrant Storm Drain
Program (Valley Street, Highland Drive and Linda Lane), Project No 6608, prepared by RBF Consultants,
the consulting engineer of work for this project, for a total of $675,000. A summary of the estimated
construction costs and available funds is shown in Table 3.
TABLE 3 - PROJECT CONSTRUCTION COST ESTIMATE
NORTHWEST QUADRANT STORM DRAIN PROGRAM (VALLEY STREET, HIGHLAND
DRIVE AND LINDA LANE), Project No. 6608
ESTIMATED
COSTS
Construction Contract $558,178
Construction Contingency $75,000
PROJECT NO. 6608 COST TOTAL $633,178
PROJECT NO. 6608 AVAILABLE BALANCE $3,114,626
ADDITIONAL APPROPRIATION ANTICIPATED FOR CONSTRUCTION OF PROJECT NO.
6608 None
The project is funded by Gas Tax Funds, which require payment of prevailing wages. Sufficient funds are
available for the project. No additional appropriation is required.
ENVIRONMENTAL IMPACT:
The project is exempt from the California Environmental Quality Act (CEQA) per State CEQA Guidelines
Section 15302(c), concerning replacement or reconstruction of existing facilities involving negligible or
no expansion of capacity.
EXHIBITS:
1. Resolution No. 2014-109 awarding the contract for the Northwest Quadrant Storm Drain
Improvement Program, (Valley Street, Highland Drive and Linda Lane), Project No. 6608
2. Northwest Quadrant Storm Drain Improvement Program Project List
3. Location Map
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
EXHIBIT 1
RESOLUTION NO. 2014-109
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD,
CALIFORNIA, AWARDING THE CONTRACT FOR THE NORTHWEST
QUADRANT STORM DRAIN IMPROVEMENT PROGRAM, (VALLEY
STREET, HIGHLAND DRIVE AND LINDA LANE), PROJECT NO. 6608
WHEREAS, the City Council of the City of Carlsbad, California, has determined it
necessary, desirable, and in the public interest to construct the Northwest Quadrant Storm
Drain Improvement Program (Valley Street, Highland Drive and Linda Lane), Project No. 6608;
and
WHEREAS, the plans and specifications for furnishing of all labor, materials, tools,
equipment, transportation, and other expenses necessary or incidental of said project have been
prepared and are on file in the City of Carlsbad and are incorporated by reference herein; and
WHEREAS, this project is exempt from environmental review per CEQA Section 15301(b)
- minor alteration of existing facilities of public utility services involving negligible or no expansion
and Section 15302(c) - replacement or reconstruction of existing utility systems and/or facilities
involving negligible or no expansion of capacity; and
WHEREAS, on January 14, 2014, the City Council adopted Resolution No. 2043-0004,
which approved the plans and specifications and authorized the advertisement for bids for the.
Northwest Quadrant Storm Drain Program (Valley Street, Highland Drive and Linda Lane), Project
No. 6608; and
WHEREAS, on March 11, 2014, 10 sealed bids were received, opened and witnessed for
the construction of this project; and
WHEREAS, the lowest responsive and responsible bid to construct said project was
submitted by Southland Paving, Inc. in the total amount of $558,178; and
A
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
WHEREAS, Section 3.28.040 (c)(5) of the Carlsbad Municipal Code authorizes the city
manager to approve change orders in the amount up to $75,000 for Project No. 6608.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carlsbad,
California, as follows:
1. That the above recitations are true and correct.
2. That the bid in the amount of $558,178 submitted by Southland Paving, Inc. for
the construction of Northwest Quadrant Storm Drain Program (Valley Street, Highland Drive and
Linda Lane), Project No. 6608 is accepted and the Mayor is hereby authorized to execute the
contract with Southland Paving, Inc.
3. That the plans, specifications and contract documents on file in the City of
Carlsbad are hereby approved.
//
//
//
//
//
//
//
//
//
//
//
5
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
PASSED, APPROVED AND ADOPTED at a Regular Meeting ofthe City Council ofthe City
of Carlsbad on the 3^*^ day of June, 2014, by the following vote to wit:
AYES:
NOES:
Council Members Hall, Packard, Wood, Schumacher and Blackburn.
None.
ABSENT: None.
MATT HALL, Mayor
ATTEST:
(\7 -•
B^^^9/^RA ENGLESON, Clerk
EXHIBIT 2
NORTHWEST QUADRANT STORM DRAIN IMPROVEMENT PROGRAM PROJECT LIST
Number Site Location Status
1 Mountain View and Pacific Avenue Complete
2 Madison Street, Grand Avenue to Arbuckle Place Complete
3 Oak Avenue and Lincoln Street Pre-Design
4 Roosevelt Street n/o Beech Avenue Complete
5 Roosevelt Street & Madison Street, Carlsbad Village Drive to Grand
Avenue Complete
6 Ocean Street nortti of Oak Avenue Pre-Design
7 Valley Street and Buena Vista Way Award
8 Valley Street north of Carlsbad Village Drive East Award
8A Valley Street north of Carlsbad Village Drive West Complete
9 Cynthia Lane to Pio Pico Drive Complete
10 Pio Pico Drive and Forest Avenue Complete
11 Elmwood Street and Laguna Drive Design
12 Wilson Street north of Buena Vista Way Design
13 Macarthur Avenue and Sunnyhill Drive Design
14 Chestnut Avenue and Pio Pico Drive Complete
15 Chestnut Avenue and Adams Street Complete
16 Adams Street and Palm Avenue Pre-Design
17 Adams Street north of Magnolia Avenue Pre-Design
18 Adams Street north of Tamarack Avenue Pre-Design
19 Basswood Avenue and Valley Street Design
20 Linda Lane Cul de Sac's Award
21 Donna Drive west of Chestnut Avenue Pre-Design
22 Palisades Drive and East Pointe Avenue Pre-Design
23 Calavo Court Complete
24 Ridgecrest Drive Complete
25 Adams Street south of Hoover Street Complete
26 Park Drive, Monroe Street to Woodvale Drive Complete
27 Monroe Street, Alder Drive and Sunnyhill Drive Complete
28 Park Drive, Cove Drive to Marina Drive 6611
29 Sevilla Way Removed from Program
130 Park Drive east of Valencia Avenue Complete
r — — -
31 Harrison Street south of Chinquapin Avenue Complete
32 Crest Drive Drainage Project Complete
33 Hillside Drive downdrain west of Park Drive Complete
34 Highland Drive between Magnolia and Chinquapin Complete
1
Number Site Location Status
35 Highland between Tamarack and Magnolia Award
36 Chinquapin downdrain west side railroad Complete
37 Grand Avenue Jefferson Street to State Street Alley Design
38 2521 Crest (Northwest side) Complete
39 Chinquapin Avenue cul de sac west side RR Complete
40 Olive Avenue at west of RR Complete
1 41 Roosevelt Street at Laguna Drive Pre-Design
42 Madison Street Arbuckle to Laguna Design
43 Washington Street south of Carlsbad Village Drive Pre-Design
44 Pontiac Avenue and Southhampton Road Complete
45 2300 Ocean Street Complete
May 2014
6
LOCATION MAP
NOT TO SCALE
LEGEND
SITES
VALLEY STREET - EAST SIDE
HIGHLAND DRIVE
UNDA LANE
PROJECT NAME NORTHWEST QUADRANT
STORM DRAIN IMPROVEMENT PROGRAM
PROJECT
NUMBER
6608
EXHIBIT
PtOTTED BY: SCOTT EVANS PLOT DATE:W/1/I3 PATH:D:\UWTIES DEPARTtilENTMXSIGN DIVISION\fiOWARD\660B\660B-4.DW;