Loading...
HomeMy WebLinkAbout2014-06-24; City Council; 21653; Contract for Northwest Quadrant Storm Drain Program, Concrete Repair Program Basswood Avenue, James Drive Project 6608 6013AB# MTG. DEPT. CITY OF CARLSBAD - AGENDA BILL 10 21,653 6/24/2014 PW-UTIL AWARD OF CONTRACT FOR THE NORTHWEST QUADRANT STORM DRAIN PROGRAIVI AND CONCRETE REPAIR PROGRAM IN THE AMOUNT OF $327,999.90 (BASSWOOD AVENUE AND JAMES DRIVE), PROJECT NOS. 6608 AND 6013 DEPT. DIRECTOR CITY ATTY. CITY MGR. 1^ RECOMMENDED ACTION: Adopt Resolution No. 2014-153 awarding the contract for the Northwest Quadrant Storm Drain Improvement Program and Concrete Repair Program in the amount of $327,999.90 (Basswood Avenue and James Drive), Project Nos. 6608 and 6013. ITEM EXPLANATION: The Northwest Quadrant Storm Drain improvement Program is a multi-year program to address non- master drainage plan needs within the northwest quadrant of the city. City of Carlsbad Operations and Maintenance staff was interviewed regarding their field observations and knowledge of drainage issues throughout the northwest quadrant. Site locations were identified and prioritized based on recommendations from field observations. The projects in the program and their status are listed on Exhibit 3 for reference. The improvements included in this segment are construction of curb inlets, storm drain cleanouts, storm drain pipeline, cross-gutter, and sidewalk repairs. The improvements also include overlay of one half of Basswood Avenue and a portion of James Drive. On February 25, 2014, the City Council adopted Resolution No. 2014-029, which approved the plans and specifications and authorized the advertisement for bids for the Northwest Quadrant Storm Drain Program and Concrete Repair Program (Basswood Avenue and James Drive), Project Nos. 6608 and 6013. Plans and specifications are on file in the Public Works Department of the City of Carlsbad. On April 17, 2014, eleven (11) sealed bids were received, opened and witnessed forthe construction of this project as shown in the following Table 1. DEPARTMENT CONTACT: Sherri Howard 760-602-2756 Sherri.HowardPcarlsbadca.gov FOR CLERK USE. K COUNCIL ACTION: APPROVED K CONTINUED TO DATE SPECIFIC • DENIED • CONTINUED TO DATE UNKNOWN • CONTINUED • RETURNED TO STAFF • WITHDRAWN • OTHER - SEE MINUTES • AMENDED • REPORT RECEIVED • TABLE 1 THE NORTHWEST QUADRANT STORM DRAIN PROGRAM AND CONCRETE REPAIR PROGRAM (BASSWOOD AVENUE AND JAMES DRIVE), PROJECT NOS. 6608 AND 6013 CONTRACTOR BID LUMP SUM 1. Vailston Company Inc. $304,132.78 2. Burtech Pipeline $327,999.90 3. Palm Engineering Construction $344,235.00 4. SLS construction Inc. $348,924.90 5. Dick Miller Inc. $349,943.00 6. Just Construction $350,000.00 7. Underground Pipeline Solutions $355,278.20 8. Schilling Paradise $393,140.00 9. New Century Construction $410,385.00 10. CCL Contracting Inc. $415,485.00 11. Piperin Corporation $420,470.00 The apparent low bidder at the bid opening was Vailston Company Inc. with a bid total of $304,132.78. Vailston Company Inc. made a material error within the bid documents by incorrectly filling out the Designation of Subcontractor Form. Contractors are allowed 24 hours after the bid opening to submit the form. A properly completed form was not submitted during that time. Burtech Pipeline is the confirmed low bidder and their bid documents are responsive. Staff recommends awarding the contract to the lowest responsive bidder, Burtech Pipeline for the construction of Northwest Quadrant Storm Drain Program and Concrete Repair Program (Basswood Avenue and James Drive), Project Nos. 6608 and 6013. FISCAL IMPACT: Table 2 shows the current status of the Northwest Quadrant Storm Drain Improvement Program and Concrete Repair Program. More specifically, the current status ofthe programs shows the expenditures of previously completed storm drain improvements and the funds available to complete the projects in Basswood Avenue and James Drive. TABLE 2 - SUMMARY OF PROJECT EXPENSES NORTHWEST QUADRANT STORM DRAIN IMPROVEMENT PROGRAM, PROJECT NO. 6608 TASK DESCRIPTION APPROPRIATED TO DATE EXPENDITURES/ ENCUMBRANCES TO DATE REMAINING BALANCES Design $1,126,000 $730,033 $395,967 Construction, Inspection, Materials Testing $4,079,252 $1,381,893 $2,697,359 Environmental Mitigation & Monitoring $18,000 $1,574 $16,426 TOTAL $5,223,252 $2,113,500 $3,109,752 CONCRETE REPAIR PROGRAM, PROJECT NO. 6013 TASK DESCRIPTION APPROPRIATED TO DATE EXPENDITURES/ ENCUMBRANCES TO DATE REMAINING BALANCES Design $130,800 $56,719 $74,081 Construction, Inspection, Materials Testing $1,369,200 $927,338 $441,862 TOTAL $1,500,000 $984,057 $515,943 A summary ofthe estimated construction costs and available funds is shown in Table 3. TABLE 3 - PROJECT CONSTRUCTION COST ESTIMATE NORTHWEST QUADRANT STORM DRAIN IMPROVEMENT PROGRAM (BASSWOOD AVENUE AND JAMES DRIVE), PROJECT NO. 6608 ESTIMATED COSTS Construction Contract (Engineer's Estimate) $320,074.90 Construction Contingency $50,000 Construction Management and Inspection $30,000 Material and Geotechnical Testing During Construction $15,000 TOTAL ESTIMATED CONSTRUCTION COSTS $415,074.90 PROJECT NO. 6608 AVAILABLE BALANCE $3,109,748 ADDITIONAL APPROPRIATION ANTICIPATED FOR CONSTRUCTION None CONCRETE REPAIR PROGRAM (BASSWOOD AVENUE AND JAMES DRIVE), PROJECT NO. 6013 ESTIMATED COSTS Construction Contract (Engineer's Estimate) $7,925 Construction Contingency $2,000 Construction Management and Inspection $1,500 Material and Geotechnical Testing During Construction $750 TOTAL ESTIMATED CONSTRUCTION COSTS $12,175 PROJECT NO. 6013 AVAIUBLE BAUNCE $515,940 ADDITIONAL APPROPRIATION ANTICIPATED FOR CONSTRUCTION None The project is funded by Gas Tax Funds which require payment of prevailing wages. Sufficient funds are available for the project. No additional appropriation is required. Staff recommends to Council awarding the contract to Burtech Pipeline for the construction of Northwest Quadrant Storm Drain Improvement Program and Concrete Repair Program (Basswood Avenue and James Drive), Project Nos. 6608 and 6013. ENVIRONMENTAL IMPACT: The project is exempt from the California Environmental Quality Act (CEQA) per State CEQA Guidelines Section 15301(b), concerning operation, repair and maintenance of existing facilities of both investor and publicly owned utilities used to provide public utility services. EXHIBITS: 1. Resolution No. 2014-153 awarding the contract for the Northwest Quadrant Storm Drain Improvement Program and Concrete Repair Program in the amount of $327,999.90 (Basswood Avenue and James Drive), Project No. 6608 and 6013. 2. Northwest Quadrant Storm Drain Improvement Program Project List. 3. Location Map. 1 RESOLUTION NO. 2014-153 3 2 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD, CALIFORNIA, AWARDING THE CONTRACT FOR THE NORTHWEST QUADRANT STORM DRAIN IMPROVEMENT PROGRAM AND 4 CONCRETE REPAIR PROGRAM IN THE AMOUNT OF $327,999.90 (BASSWOOD AVENUE AND JAMES DRIVE), PROJECT NOS. 6608 5 AND 6013 18 19 20 23 24 25 26 27 28 WHEREAS, the City Council of the City of Carlsbad, California, has determined it 8 necessary, desirable, and in the public interest to construct the Northwest Quadrant Storm ^ Drain Improvement Program and Concrete Repair Program (Basswood Avenue and James Drive), Project Nos. 6608 and 6013; and 11 WHEREAS, the plans and specifications for furnishing of all labor, materials, tools, 12 equipment, transportation, and other expenses necessary or incidental of said project have 14 been prepared and are on file in the City of Carlsbad and are incorporated by reference herein; 15 and 16 WHEREAS, this project is exempt from environmental review per CEQA Section 17 15301(b), concerning operation repair and maintenance for existing facilities of both investor and publicly owned utilities used provide public utility services; and WHEREAS, on February 25, 2014, the City Council adopted Resolution No. 2014-029, 21 which approved the plans and specifications and authorized the advertisement for bids for the 22 Northwest Quadrant Storm Drain Program and Concrete Repair Program (Basswood Avenue and james Drive), Project Nos. 6608 and 6013; and WHEREAS, on April 17, 2014, 11 sealed bids were received, opened and witnessed for the construction of this project; and 1 WHEREAS, the lowest responsive and responsible bid to construct said project was 2 submitted by Burtech Pipeline in the total amount of $327,999.90; and WHEREAS, Section 3.28.040 (c)(5) of the Carlsbad Municipal Code authorizes the city 4 manager to approve change orders in the amount up to $50,000 for Project No. 6608 and 5 $2,000 for Project No. 6013. 6 7 NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carlsbad, 8 California, as follows: ^ 1. That the above recitations are true and correct. 2. That the bid in the amount of $327,999.90 submitted by Burtech Pipeline for the construction of Northwest Quadrant Storm Drain Program and Concrete Repair Program (Basswood Avenue and James Drive), Project Nos. 6608 and 6013 is accepted and the Mayor is 14 hereby authorized to execute the contract with Burtech Pipeline. 15 3. That the award of this contract is contingent upon the bidder submitting the lowest responsible bid executing the required contract and submitting the required bonds and 17 insurance policies, as described in the contract, within twenty (20) days of adoption of this 18 resolution. The City Manager may grant reasonable extensions of time. 19 20 // 21 // 10 11 12 13 22 23 24 25 26 27 28 // // // // If? 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 PASSED, APPROVED AND ADOPTED at a Regular Meeting ofthe City Council of the City of Carlsbad on the 24th day of June 2014, by the following vote to wit: AYES: NOES: Council Members Hall, Packard, Wood, Schumacher, Blackburn. None. ABSENT: None. MATT HALL, Mayor ATTEST: ^^l?^ARA ENGLESON, City^lerk •O; EXHIBIT 2 NORTHWEST QUADRANT STORM DRAIN IMPROVEMENT PROGRAM PROJECT LIST Number Site Location Status 1 1 Mountain View and Pacific Avenue Complete 2 Madison Street, Grand Avenue to Arbuckle Place Complete 3 Oak Avenue and Lincoln Street Rre-Design 4 Roosevelt Street n/o Beech Avenue Compiete c Roosevelt Street & Madison Street, Carlsbad Village Drive to Grand Complete Q Avenue Complete 6 Ocean Street north of Oak Avenue Rre-Design 7 Valley Street and Buena Vista Way Award 8 Valley Street north of Carlsbad Village Drive East Award 8A Valley Street north of Carlsbad Village Drive West Complete 9 Cynthia Lane to Rio Pico Drive Complete 10 Rio Pico Drive and Forest Avenue Complete | L__ 11 Eimwood Street and Laguna Drive Design 12 Wilson Street north of Buena Vista Way Design 13 Macarthur Avenue and Sunnyhill Drive Design t—-j 14 Chestnut Avenue and Rio Rico Drive Complete Chestnut Avenue and Adams Street Complete 16 Adams Street and Ralm Avenue Rre-Design 17 Adams Street north of Magnolia Avenue Rre-Design 18 Adams Street north of Tamarack Avenue Rre-Design 1 19 Basswood Avenue and Valley Street Design t__ 1 Linda Lane Cul de Sac's Award 21 Donna Drive west of Chestnut Avenue Rre-Design | • 22 Palisades Drive and East Rointe Avenue Rre-Design 23 Calavo Court Complete 1 24 Ridgecrest Drive Complete f 25 Adams Street south of Hoover Street Complete : 26 Park Drive, Monroe Street to Woodvale Drive Complete 1 27 Monroe Street, Alder Drive and Sunnyhill Drive Complete ~28^ Park Drive, Cove Drive to Marina Drive 6611 29 Sevilla Way Removed from Program 30 Park Drive east of Valencia Avenue Complete 31 Harrison Street south of Chinquapin Avenue Complete ^2 Crest Drive Drainage Project Complete 33 Hillside Drive downdrain west of Park Drive Complete 34 Highland Drive between Magnolia and Chinquapin Complete 6 Number Site Location Status 35 Highland between Tamarack and Magnolia Award 36 Chinquapin downdrain west side railroad Complete 37 Grand Avenue Jefferson Street to State Street Alley Design 38 2521 Crest (Northwest side) Complete 39 Chinquapin Avenue cul de sac west side RR Complete 40 Olive Avenue at west of RR Complete 41 Roosevelt Street at Laguna Drive Rre-Design 42 Madison Street Arbuckle to Laguna Design 43 Washington Street south of Carlsbad Village Drive Rre-Design 44 Rontiac Avenue and Southhampton Road Complete [45 2300 Ocean Street Complete May 2014 LOCATION MAP NOT TO SCALE LEGEND SITE BASSWOOD AVENUE PROJECT NAME NORTHWEST QUADRANT STORM DRAIN IMPROVEMENT PROGRAM PROJECT NUMBER 6608 EXHIBIT PLOTTED BY: SCOTT EVANS PLOT DATE:10/1/13 PATH:D:\UVUTIES DEPARTUENADESIGN DIVISK»I\HOWARD\B608\6608-4.DWG