Loading...
HomeMy WebLinkAbout2014-07-22; City Council; 21692; Accepting Bids, Authorizing Construction Fire Station 3 3465 Trailblazer Way Project 4003CITY OF CARLSBAD - AGENDA BILL AB# 21.692 ADOPTION OF RESOLUTION ACCEPTING BIDS AND AUTHORIZING THE EXECUTION OF A CONTRACT FOR CONSTRUCTION OF FIRE STATION NO. 3, LOCATED AT 3465 TRAILBLAZER WAY, PROJECT NO. 4003 DEPT. DIR. MTG. 7/22/14 ADOPTION OF RESOLUTION ACCEPTING BIDS AND AUTHORIZING THE EXECUTION OF A CONTRACT FOR CONSTRUCTION OF FIRE STATION NO. 3, LOCATED AT 3465 TRAILBLAZER WAY, PROJECT NO. 4003 CITY ATTY. DEPT. PW-PEM ADOPTION OF RESOLUTION ACCEPTING BIDS AND AUTHORIZING THE EXECUTION OF A CONTRACT FOR CONSTRUCTION OF FIRE STATION NO. 3, LOCATED AT 3465 TRAILBLAZER WAY, PROJECT NO. 4003 CITY MGR. lh RECOMMENDED ACTION; Adopt Resolution No. 2014-184 accepting bids and authorizing the mayor to award a contract for the construction of Fire Station No. 3, located at 3465 Trailblazer Way, Project No. 4003. ITEM EXPLANATION: The proposed Fire Station No. 3 is planned to replace an existing fire station on the northeast corner of Chestnut Avenue and Catalina Drive at 3701 Catalina Drive. The new fire station will be located at Cannon Road and Wind Trail Way at 3465 Trailblazer Way and will be 10,400 square feet including a three bay, double deep, apparatus room, office and administrative spaces, dormitories, shower and locker facilities (men's and women's), kitchen, dining room, shop and equipment support spaces. Site features include perimeter fencing, an emergency generator, rolling security gate, landscaping and concrete paving. Off-site work includes a new cul-de-sac street together with associated storm drain and utility improvements. On August 23, 2011, the Carisbad City Council approved an agreement with WLC Architects to perform the preliminary design, final design, plan and specification preparation, and bid assistance services for Fire Station No. 3. Plans and specifications have been completed and are on file in the Engineering Department for the construction of Fire Station No. 3. On July 8, 2014, the City received 3 sealed bids for the construction of Fire Station No. 3 which are summarized in Table 1: CONTRACTOR NAME BASE BID Keeton $5,817,000 Erickson Hall $6,298,000 TB Penick $6,591,078 DEPARTMENT CONTACT: Patrick McGarry, (760) 434-2949 patrick.mcgarrY@carlsbadca.gov FOR CITY CLERKS USE ONLY X COUNCIL ACTION: APPROVED X CONTINUED TO DATE SPECIFIC • DENIED • CONTINUED TO DATE UNKNOWN • CONTINUED • RETURN ED TO STAFF • WITHDRAWN • OTHER-SEE MINUTES • AMENDED • staff has completed their review of the bid documents submitted by the low bidder, Keeton, and found them to be in order. Staff recommends that the Council award the contract for the construction of Fire Station No. 3 to Keeton in the amount of $5,817,000, which is the total ofthe base bid and alternate bid item. The architect's estimate for the combined base bid and alternate bid item for the construction of the project was $6,600,000. The second lowest bidder has issued a protest regarding the validity of the lowest bidder's Bid Bond. The City Attorney's office reviewed the Bid Bond and has deemed the Bond to be enforceable. ENVIRONMENTAL IMPACT: On November 21, 2012, the Planning Commission adopted Resolution No. 6929 adopting a Negative Declaration (ND) and approved Resolution No. 6930 approving Conditional Use Permit CUP 12-07 for Carlsbad Fire Station No. 3. Furthermore, pursuant to Public Resources Code Section 21065, accepting bids and authorizing the award of a contract for construction of the fire station does not constitute a "project" within the meaning of the California Environmental Quality Act (CEQA) in that it has no potential to cause either a direct physical change in the environment, or a reasonably foreseeable indirect physical change in the environment, and therefore does not require environmental review. FISCAL IMPACT: Table 1 shows the project cost for Fire Station No. 3 with the understanding that payment of prevailing wages is not required. Fire Station No. 3 is funded with $8,352,000 from the Public Facilities Fees Fund. This project has been previously appropriated in full and no additional appropriation is required. TABLE 1 - ESTIMATED PROJECT COSTS FOR FIRE STATION NO. 3 DESCRIPTION BUDGET EXPENDITURES/ ENCUMBERANCES AVAILABLE BALANCE PREUMINARY AND FINAL DESIGN (completed) $617,500 $608,706 $8,794 CONSTRUCTION $7,284,500 $16,054 $7,268,446 ENVIRONMENTAL & REPORTS $85,000 $0 $85,000 MISCELLANEOUS $365,000 $0 $365,000 Total Project Cost $8,352,000 $624,760 $7,727,240 The preliminary estimated annual maintenance and operating budget for the new Fire Station No. 3 is projected to cost an additional $8,000 per year when compared to the current annual operating costs of the existing Fire Station No. 3. No additional salaries, benefits or training will be required to staff the facility. This represents an $8,000 yearly net increase to the city's General Fund operating budget in order to operate and maintain the new Fire Station No. 3. EXHIBITS: 1. Resolution No. 2014-184 accepting bids and awarding a contract for the construction of Fire Station No.3, located at 3465 Trailblazer Way, Project No. 4003. 2. Location Map. 3 13 14 15 16 17 20 21 22 27 1 RESOLUTION NO. 2014-184 2 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD, CAUFORNIA, ACCEPTING BIDS AND EXECUTING A CONTRACT FOR FIRE STATION NO. 3, LOCATED AT 3465 TRAILBLAZER WAY, 4 PROJECT NO. 4003. 5 ^ WHEREAS, Fire Station No. 3 is necessary to meet the standards of coverage for fire protection within the City of Carlsbad; and 8 WHEREAS, Public Contract Code ("PCC") §20101 authorizes cities to pre-qualify 9 contractors who wish to bid on public works contracts; and authorizes staff to release 11 invitations to bid to the qualified contractors; and 12 WHEREAS, city staff prequalified six contractors to submit bids for the Fire Station No. 3 project in accordance with PCC §20101; and WHEREAS, on December 17, 2013, through Resolution No. 2013-291 the City Council of the City of Carisbad approved the plans and specifications for furnishing of all labor, materials, tools, equipment, transportation, and other expenses necessary or incidental to Fire Station No. 18 3, Project No. 4003, and 19 WHEREAS, three (3) sealed bids were received on July 8, 2014 by the City of Carlsbad for the construction of Fire Station No. 3, Project 4003, and WHEREAS, the lowest responsible bid for the project was submitted by Keeton, in the amount of $5,817,000; and 23 24 WHEREAS, funding for said project has previously been appropriated from the Public 25 Facility Fees in the amount of $8,352,000 to cover remaining project costs and is sufficient; and 26 WHEREAS, payment of prevailing wages will not be required as part of the construction contract. 28 3 1 NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carisbad, 2 California, as follows: 3 1. That the above recitations are true and correct. 4 2. That the bid amount of $5,817,000 submitted by Keeton for the construction of 5 Fire Station No. 3, is accepted and the City Manager is hereby authorized to execute a contract 6 7 with Keeton. 8 3. That the City Manager is hereby authorized to approve construction change orders up to $581,700 for Project 4003. 4. That the award of this contract is contingent upon Keeton executing the required contract and submitting the required bonds and insurance policies, as described in the contract within twenty (20) days of adoption of the resolution with the understanding that the City 9 10 11 12 13 14 Manager may grant reasonable extensions of time. 15 // 16 17 18 19 20 22 23 24 25 26 27 28 // // // // 21 // // // // // // 4 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 PASSED, APPROVED AND ADOPTED at a Regular Meeting ofthe City Council ofthe City of Carlsbad on the 22nd day of July 2014, by the following vote to wit: AYES: NOES: Council Members Hall, Packard, Wood, Schumacher, Blackburn. None. ABSENT: None. MATT HALL Mayor ATTEST: BARBARA ENGLESONrSv Clerk y>t\mpi'% Exhibit 2 LOCATION MAP \ o Ul Ul. AVALON AV O o 71 D to <>{. RO SUTTER ST rjBURON AV O CHELSEA Cl COj. a X o a: m 2 Q O Q y. Al X O s -6-> < % T REGEH"^ EL CAMINO REAL CINDY AV ^ouR PE'^'^® sr /^ORtHFORKAV .y 5^" SUMMIT tRWLCT 9^' § VIA -¥0 D Or UJ ^ FROST AV O\ARD; CT .HHCHCT Si: o O # to J DR Z i. @ NOT ro SCALE VICINITY • - MAP PACIFIC OCEAN \ J:\R& PROJECT NAME fmrsTATtmw). 3 EXHIBIT