HomeMy WebLinkAbout2014-08-26; City Council; 21712; Acceptance Bids, Award Contract El Camino Real Widening, Median Improvements, Undergrounding Utilitites, Upgrading Traffic Signals Project 3957 3643 3602 6303CITY OF CARLSBAD - AGENDA BILL AB# 21.712 ACCEPTANCE OF BIDS AND AWARD OF CONTRACT FOR CONSTRUCTION OF EL CAMINO REAL WIDENING, MEDIAN IMPROVEMENTS, UNDERGROUNDING UTILITIES, AND UPGRADING TRAFFIC SIGNALS, PROJECT NOS. 3957, 3643, 6302, 6303 DEPT. DIRECTOR Oif A MTG. 08-26-14 ACCEPTANCE OF BIDS AND AWARD OF CONTRACT FOR CONSTRUCTION OF EL CAMINO REAL WIDENING, MEDIAN IMPROVEMENTS, UNDERGROUNDING UTILITIES, AND UPGRADING TRAFFIC SIGNALS, PROJECT NOS. 3957, 3643, 6302, 6303 CITY ATTY. DEPT. PW-TRAN ACCEPTANCE OF BIDS AND AWARD OF CONTRACT FOR CONSTRUCTION OF EL CAMINO REAL WIDENING, MEDIAN IMPROVEMENTS, UNDERGROUNDING UTILITIES, AND UPGRADING TRAFFIC SIGNALS, PROJECT NOS. 3957, 3643, 6302, 6303 CITY MGR. lir RECOMMENDED ACTION: Adopt Resolution No. 2014-205 accepting bids and awarding a contract for the construction of El Camino Real widening, median improvements, undergrounding utilities, and upgrading traffic signals. Project Nos. 3957, 3643, 6302, and 6303. ITEM EXPLANATION: The subject project will widen El Camino Real from Tamarack Avenue to Chestnut Avenue and provide three lanes of travel in each direction, bike lanes, a new raised median, curb, gutter and sidewalk providing operational improvements, enhanced mobility and connectivity for all modes of travel. Additionally, this widening project will remove the existing utility poles and place the facilities underground as part of the Underground Utility District No. 19 which was formed by City Council on April 27, 2010. Also, both traffic signals along El Camino Real at the intersections of Tamarack Avenue and Chestnut Avenue will be upgraded. This project has obtained easements from adjacent property owners, environmental clearance, and regulatory agency permits to construct these improvements. On May 6, 2014, City Council approved Resolution No. 2014-078, authorizing the advertisement for bids for the construction of El Camino Real widening, median improvements, undergrounding utilities, and upgrading traffic signals. Project Nos. 3957, 3643, 6302, and 6303. Five sealed bids were received on July 10, 2014, which are summarized as follows: CONTRACTOR BID TOTAL 1. Sierra Pacific West, Inc. $7,774,086.00 2. Los Angeles Engineering, Inc. $8,930,590.00 3. TC Construction Company $8,991,876.50 4. Southland Paving, Inc. $9,850,157.30 5. LB Civil Construction $9,889,932.30 DEPARTMENT CONTACT: Brandon Miles, 760-602-2745 Brandon.Miles@carlsbadca.gov FOR CLERK USE. COUNCIL ACTION: APPROVED CONTINUED TO DATE SPECIFIC • DENIED • CONTINUEDTO DATE UNKNOWN • CONTINUED • RETURNED TO STAFF • WITHDRAWN • OTHER - SEE MINUTES • AMENDED • REPORT RECEIVED • During the bid evaluation, Sierra Pacific West, Inc. requested a relief of bid due to an error in their bid document calculations and forms. In accordance with Public Contract Code 5101 (b) and 5103, City Council can provide relief to the bidder if a mistake was made and written notification is received within five working days. Sierra Pacific West, Inc. made a clerical error and failed to include a portion of the work in the bid while compiling their bid numbers. As specified in the Public Contract Code, they provided a satisfactory level of detail in a letter within five working days of how the mistake occurred to support relief of bid. Staff has completed its review of the contract documents and determined that Los Angeles Engineering, Inc. is responsive and responsible with a bid of $8,930,590. Staff recommends that the City Council grant relief of bid to Sierra Pacific West, Inc. and award the project to the next lowest responsive and responsible bidder Los Angeles Engineering, Inc. FISCAL IMPACT: Four funding sources will be utilized for the El Camino Real widening, median improvements, undergrounding utilities, and upgrading traffic signals. The Project Nos. and funding sources include: • 3957 - El Camino Real Widening Tamarack Avenue to Chestnut Avenue - Traffic Impact Fees, TransNet- Local, and TransNet-Miscellaneous 3643 - El Camino Real Median Improvements - Public Facilities Fees and Gas Tax 6302 - Traffic signal upgrades at El Camino Real and Chestnut Avenue - Infrastructure Replacement 6303 - Traffic signal upgrades at El Camino Real and Tamarack Avenue - Infrastructure Replacement Table 1 shows the current status of El Camino Real Widening Project. TABLE 1 - EL CAMINO REAL WIDENING - PROJECT NOS. 3957, 3643, 6302, 6303 FUNDING SOURCES APPROPRIATED TO DATE EXPENDITURES/ ENCUMBRANCES TO DATE REMAINING AVAIUBLE BALANCES Traffic Impact Fees - 3957-1 $8,563,023 $1,336,809 $7,226,214 TransNet - 3957-2 & 3957-3 $4,270,885 $105,006 $4,165,879 Public Facilities Fee and Gas Tax - 3643 $2,044,500 $144,389 $1,900,111 Infrastructure Replacement - 6302 & 6303 $476,000 $0 $476,000 TOTAL $15,354,408 $1,586,204 $13,768,204 The estimated project funding totals for construction of improvements are shown in Table 2 below. TABLE 2 - EL CAMINO REAL WIDENING - PROJECT NOS. 3957, 3643, 6302, 6303 EL CAMINO REAL WIDENING - PROJECT NOS. 3957, 3643, 6302, 6303 ESTIMATED COSTS Construction Contract (Los Angeles Engineering, Inc.) $8,930,590 Construction Contingency (15%) $1,339,589 Construction Management and Inspection (10%) $893,059 TOTAL ESTIMATED CONSTRUCTION COST $11,163,238 Remaining Available Balance (3957, 3643, 6302, 6303) $13,768,204 ADDITIONAL APPROPRIATION ANTICIPATED FOR CONSTRUCTION $0 There are sufficient remaining appropriations to construct the widening of El Camino Real from Tamarack Avenue to Chestnut Avenue. These funding sources are subject to State and Federal restrictions and the payment of prevailing wages is required for this project. ENVIRONMENTAL IMPACT: A Mitigated Negative Declaration (MND) and Mitigation Monitoring and Reporting Program were prepared for the El Camino Real Road Widening project (CDP 07-22 / HDP 07-02 / SUP 07-04 / HMP 07-08) and this project is within the scope ofthe MND. The Notice of Intent (NOI) to adopt a Mitigated Negative Declaration was published in the newspaper November 1, 2007, and sent to the County Clerk's Office for a 30-day public review (October 30, 2007 - November 30, 2007). One comment letter was received during the 30-day review period. The MND was approved by the Planning Commission on June 3, 2009 in compliance with the California Environmental Quality Act (CEQA) Guidelines Section 15074. EXHIBITS: 1. Resolution No. 2014-205 accepting bids and award of contract for construction of El Camino Real widening, median improvements, undergrounding utilities, and upgrading traffic signals. Project Nos. 3957, 3643, 6302, 6303 2. Location map EXHIBIT 1 1 RESOLUTION NO. 2014-205 2 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD, CALIFORNIA, ACCEPTING BIDS AND AWARDING OF CONTRACT FOR CONSTRUCTION OF EL CAMINO REAL WIDENING, MEDIAN 4 IMPROVEMENTS, UNDERGROUNDING UTILITIES, AND UPGRADING TRAFFIC SIGNALS, PROJECT NOS. 3957, 3643, 6302, 6303. 5 " ^ WHEREAS, the City Council ofthe City ofCarlsbad, California, has determined it necessary, ^ desirable, and in the public interest to improve operations, enhance mobility and provide 8 connectivity for all modes of travel with the construction of El Camino Real widening, median 9 improvements, undergrounding utilities, and upgrading traffic signals from Tamarack Avenue to 10 Chestnut Avenue; and \\ WHEREAS, on May 6, 2014, the City Council approved contract documents and 12 specifications for furnishing of all labor, materials, tools, equipment, transportation, and other ^2 expenses necessary or incidental to the El Camino Real widening, median improvements, undergrounding utilities, and upgrading traffic signals. Project Nos. 3957, 3643, 6302, 6303; and WHEREAS, Five sealed bids were received on July 10, 2014 for the project; and WHEREAS, within five working days, a letter from the apparent lowest bidder. Sierra Pacific West, Inc. stating a clerical error was made during bid assembly in which information critical to the amount of the bid was inadvertently omitted. The bidder requested a relief of bid that complied with Public Contract Code Section 5101 (b) and 5103; and WHEREAS, the next lowest responsive and responsible bid for the project was submitted by Los Angeles Engineering, Inc. in the amount of $8,930,590; and WHEREAS, funding for said project has been appropriated from the Traffic Impact Fee 22 (TIF), Public Facilities Fees and Gas Tax, TransNet (Local and Miscellaneous) and Infrastructure 23 Replacement funds and are sufficient. 24 NOW, THEREFORE, BE IT RESOLVED bythe CityCouncil ofthe City of Carlsbad, California, 25 as follows: 26 1. That the above recitations are true and correct. 27 2. That City Council grants a relief of bid to Sierra Pacific West, Inc. and awards the 2g project to next lowest bidder. ^ 14 15 16 17 18 19 20 21 1 3. That the bid submitted by Los Angeles Engineering, Inc. in the amount of 2 $8,930,590 is hereby accepted and the Mayor is hereby authorized to execute the contract for 3 the construction of El Camino Real widening, median improvements, undergrounding utilities, 4 and upgrading traffic signals, Project Nos. 3957, 3643, 6302, 6303, in accordance with the specifications and contract documents referred to herein. 4. That the City Manager is hereby authorized to approve construction change orders up to the contingency amount of $1,339,589 to Los Angeles Engineering, Inc. for the of El Camino Real widening, median improvements, undergrounding utilities, and upgrading traffic signals. Project Nos. 3957, 3643, 6302, 6303. 5. That the award ofthis contract is contingent upon Los Angeles Engineering, Inc. executing the required contract and submitting the required bonds and insurance policies, as described in the contract, within twenty (20) calendar days of adoption of this resolution. The City Manager may grant reasonable extensions of time. // 5 6 7 8 9 10 11 12 13 14 15 16 17 18 // 21 22 23 24 // // // 19 /// 20 // // // // 25 // 26 // 27 28 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 PASSED, APPROVED AND ADOPTED at a Regular Meeting ofthe City Council ofthe City of Carlsbad on the 26**' day of August, 2014, by the following vote to wit: AYES: NOES: Council Members Hall, Packard, Wood, Schumacher, Blackburn. None. ABSENT: None. MATT HALL, Mayor ATTEST: ^^R^{\BARA ENGLESON, City'Clerk :0 LOCATION MAP NOT TO SCALE PROJECT NAME CAMINO REAL ROAD WIDENING, MEDIAN IMPROVEMENTS, UNDERGROUNDING UTILITIES & UPGRADING TRAFFIC SIGNALS FROM TAMARACK AVENUE TO CHESTNUT AVENUE DRAm BY: SCOTT EVANS, CARLSBAD ENGINEERING DEPT. 8/18/08 0 \rRANSPORTA'nON DEPARmENT\LOCAVON UAI^957.Dm; PROJECT NUMBER 3957,3643, 6302 & 6303 EXHIBIT 2 7