AB# 21,716 APPROVAL OF PLANS AND SPECIFICATIONS AND
AUTHORIZATION TO ADVERTISE TO RECEIVE BIDS FOR THE
NORTH BATIQUITOS LIFT STATION PUMP REPLACEMENT,
PROJECT NO 5517
DEFT.DIRECTOR(J^I|f^ ^
MTG. 8/26/2014
APPROVAL OF PLANS AND SPECIFICATIONS AND
AUTHORIZATION TO ADVERTISE TO RECEIVE BIDS FOR THE
NORTH BATIQUITOS LIFT STATION PUMP REPLACEMENT,
PROJECT NO 5517
CITY ATTY. U (
DEPT. PW-UTIL
APPROVAL OF PLANS AND SPECIFICATIONS AND
AUTHORIZATION TO ADVERTISE TO RECEIVE BIDS FOR THE
NORTH BATIQUITOS LIFT STATION PUMP REPLACEMENT,
PROJECT NO 5517 CITY MGR. / 1^
RECOMMENDED ACTION:
Adopt Resolution No. 2014-209 approving plans and specifications and authorizing the City Clerk
to advertise for bids for the North Batiquitos Uft Station Pump Replacement, Project No. 5517.
ITEM EXPLANATION:
The North Batiquitos Sewer Lift Station is located near the south end of Gabbiano Lane and the
pedestrian trail along the north shoreline ofthe Batiquitos Lagoon. The lift station serves a sewer basin
generally south of Palomar Airport Road and north of the Batiquitos Lagoon between El Camino Real
and Interstate 5. The lift station pumps approximately 800,000 gallons of raw wastewater per day with
a peak flow capacity over 2,000 gallons per minute.
The existing lift station was constructed in 1997 in its current configuration with subsequent
improvements and repairs to the station's force main along with improvements to the wet well and dry
well ventilation. Most recently the reliability and efficiency of the pumps have diminished as has the
availability of pump parts for their repair. In consideration of the lift station's proximity to the lagoon
and sensitive environmental habitat, improved reliability is essential.
The project includes the replacement of the station's three (3) existing wastewater pumps and
reconfiguration of discharge manifold system including the replacement of miscellaneous valves and
appurtenances for the station's pumps. The stations wet well sump will be modified to improve
operation and access for future maintenance. In addition, a bridge crane assembly will be installed in
the pump room to allow for a safe and efficient removal and reinstallation of the heavy pumps and
appurtenances for future maintenance procedures at the station. The improvements will enhance
operational efficiency at the station, improve reliability and reduce the potential of a future station
failure and sewer overflow.
DEPARTMENT CONTACT: Mark Biskup 760-602-2763 mark.biskup(5)carlsbadca.gov
FOR CLERK USE.
COUNCIL ACTION: APPROVED CONTINUED TO DATE SPECIFIC •
DENIED • CONTINUEDTO DATE •
UNKNOWN
CONTINUED • RETURNED TO STAFF •
WITHDRAWN • OTHER- SEE MINUTES •
AMENDED • REPORT RECEIVED •
FISCAL IMPACT:
The following table provides a breakdown ofthe total project cost:
PROJECT COST SUMMARY FOR THE
NORTH BATIQUITOS UFT STATION PUMP REPLACEMENT EXTENSION PROJECT
(PROJECT NO. 5517)
DESIGN AND ENVIRONMENTAL PHASE
Engineering Services and Staff Overhead $80,000
Construction Cost Estimate $678,000
Construction Management and Inspection $68,000
TOTAL PROJECT COST $826,000
CURRENT APPROPRIATION $905,000
Based the engineer's estimate, there are sufficient sewer replacement funds available for the
construction ofthe North Batiquitos Lift Station Pump Replacement.
ENVIRONMENTAL IMPACT:
This project is exempt from California Environmental Quality Act (CEQA) review pursuant to CEQA
Guidelines section 15302(c) - replacement or reconstruction of an existing utility system located on the
same site with substantially the same purpose and capacity. A Notice of Exemption was filed with the
San Diego County Clerk on May 29, 2014.
EXHIBITS:
1. Resolution No. 2014-209 approving plans and specifications, and authorizing the Clerk to
advertise for bids forthe North Batiquitos Uft Station Pump Replacement, Project No. 5517
2. Location Map
1 RESOLUTION NO. 2014-209
3
2 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD,
CAUFORNIA, APPROVING PLANDS AND SPECIFICATIONS AND
AUTHORIZING THE CITY CLERK TO ADVERTISE FOR BIDS FOR THE
4 NORTH BATIQUITOS LIFT STATION PUMP REPLACEMENT, PROJECT
NO. 5517.
5
6
7
8
9
10
Public Works Department of the City of Carlsbad and are incorporated herein by reference; and
WHEREAS, the project is exempt from California Environmental Quality Act (CEQA)
pursuant to CEQA Guidelines section 15302(c) in that it is a replacement of an existing utility
WHEREAS, the North Batiquitos Lift Station's wastewater pumps and discharge manifold
along with miscellaneous appurtenances have reached their useful life and are in need of
replacement; and
WHEREAS, the plans and specifications for furnishing all labor, materials, tools,
11 equipment, transportation, and other expenses necessary or incidental to the North Batiquitos
12 Lift Station Pump Replacement, Project No. 5517 have been prepared and are on file in the
13
14
15
16
^-j system on the same site and a Notice of Exemption was filed with the San Diego County Clerk
18 on May 29, 2014; and
19 WHEREAS, funds in the Sewer Replacement Fund are sufficient for the project.
20
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carlsbad,
21
California, as follows that:
22
The above recitations are true and correct.
23
24 2. That the plans, specifications, and contract documents for the North Batiquitos
25 Lift Station, Project No. 5517 are on file in the Public Works Department of the City of Carlsbad
2^ and hereby approved
27
28
3
1 3. That the City Clerk of the City of Carlsbad is hereby authorized and directed to
2 publish, in accordance with state law, a Notice to Contractors Inviting bids for the Construction
3
of the North Batiquitos Lift Station Pump Replacement, Project No. 5517, in accordance with
4
the plans, specifications, and contract documents referred to herein.
5
6
7 //
8 //
9
10
11
12
13
14 //
17
18
19
20
23
24
25
26
27
28
//
//
//
//
15 //
16 //
//
//
//
21 //
22 //
//
//
//
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
PASSED, APPROVED AND ADOPTED at a Regular Meeting ofthe City Council ofthe City
of Carlsbad on the 26**^ day of August, 2014, by the following vote to wit:
AYES:
NOES:
Council Members Hall, Packard, Wood, Schumacher, Blackburn.
None.
ABSENT: None.
MATT HALL, Mayor
ATTEST:
^^^BARA ENGLESON,-!:^ Clerk
:: k. .-•
LOCATION MAP
PACIFIC
OCEAN
NOT TO SCALE
PROJECT NAME
NORTH BATIQUITOS LIFT STATION
PUMP REPLACEMENT
PROJECT
NUMBER
5517
EXHIBIT
2