Loading...
HomeMy WebLinkAbout2014-10-21; City Council; 21766; Approve Bids for Nortwest Quadrant Storm Drain Program Madison Street Project 6608CITY OF CARLSBAD - AGENDA BILL 21,766 APPROVAL OF PLANS AND SPECIFICATIONS AND AUTHORIZATION TO ADVERTISE TO RECEIVE BIDS FOR THE NORTHWEST QUADRANT STORM DRAIN PROGRAM (MADISON STREET), PROJECT NO. 6608 DEPT.DIRECTOR MTG. 10-21-14 APPROVAL OF PLANS AND SPECIFICATIONS AND AUTHORIZATION TO ADVERTISE TO RECEIVE BIDS FOR THE NORTHWEST QUADRANT STORM DRAIN PROGRAM (MADISON STREET), PROJECT NO. 6608 CITY ATTY. %lf DEPT. PW-UTIL APPROVAL OF PLANS AND SPECIFICATIONS AND AUTHORIZATION TO ADVERTISE TO RECEIVE BIDS FOR THE NORTHWEST QUADRANT STORM DRAIN PROGRAM (MADISON STREET), PROJECT NO. 6608 CITY MGR. Ji^^ RECOMMENDED ACTION: Adopt Resolution No. 2014-249 approving plans and specifications and authorizing the City Clerk to advertise for bids for the Northwest Quadrant Storm Drain Improvement (Madison Street), Project No. 6608. ITEM EXPLANATION: The Northwest Quadrant Storm Drain Improvement Program is a multi-year program to address non- master drainage plan needs within the northwest quadrant of the city. CaHsbad Operations and Maintenance staff was interviewed regarding their field observations and knowledge of drainage issues throughout the northwest quadrant. Site locations were identified and pnoritized based on recommendations from field observations. The projects in the program and their status are listed on Exhibit 3 for reference. The improvements included in this segment are construction of a curb Inlet, storm drain cleanout, storm drain pipeline and paving on Madison Street between Arbuckle Place and Laguna Dnve. FISCAL IMPACT: Table 1 shows the current status ofthe Northwest Quadrant Storm Drain Improvement Program. More specifically, the current status of the program shows the expenditures of previously completed storm drain improvements and the funds available to complete the project in Madison Street. DEPARTMENT CONTACT: Shern Howard 760-602-2756 Shern.Howard@carlsbadca.gov FOR CLERK USE. COUNCIL ACTION: APPROVED CONTINUED TO DATE SPECIFIC • DENIED • CONTINUED TO DATE UNKNOWN • CONTINUED • RETURNED TO STAFF • WITHDRAWN • OTHER - SEE MINUTES • AMENDED • REPORT RECEIVED • Approval of Plans and Specs 10/21/14 Page 2 of 3 TABLE 1 - SUMMARY OF PROJECT EXPENSES NORTHWEST QUADRANT STORM DRAIN IMPROVEMENT PROGRAM, PROJECT NO. 6608 TASK OESCRIPTION APPROPRIATED TO DATE EXPENDITURES/ ENCUMBRANCES TO DATE REMAINING BALANCES Design $1,123,000 $757,279 $365,721 Construction, Inspection, Materials Testing $4,212,594 $2,390,328 $1,822,266 Environmental Mitigation & Monitonng $18,000 $1,574 $16,426 TOTAL $5,353,594 $3,149,181 $2,204,413 An Engineer's Estimate ofthe construction cost forthe Northwest Quadrant Storm Drain Improvement Program (Madison Street) was prepared by RBF Consulting, the consulting engineer of work for this project, and totals $197,000. The total estimated project cost is shown in Table 2. TABLE 2 - ESTIMATE OF PROJECT COST NORTHWEST QUADRANT STORM DRAIN IMPROVEMENT PROGRAM (MADISON STREET), PROJECT NO. 6608 ESTIMATED COSTS Construction Contract (Engineer's Estimate) $197,000 Construction Contingency $50,000 Construction Management and Inspection $20,000 Material and Geotechnical Testing Dunng Construction $10,000 TOTAL ESTIMATED CONSTRUCTION COSTS $277,000 PROJECT NO. 6608 AVAILABLE BALANCE $2,204,413 ADDITIONAL APPROPRIATION ANTICIPATED FOR CONSTRUCTION None The project is funded by Gas Tax Funds which requires payment of prevailing wages. ENVIRONMENTAL IMPACT: The project is exempt from the California Environmental Quality Act (CEQA) per State CEQA Guidelines Section 15301(b), concerning operation, repair and maintenance of existing facilities of both investor and publicly owned utilities used to provide public utility services. PUBLIC NOTIFICATION: None. Approval of Plans and Specs 10/21/14 Page Sof 3 EXHIBITS: 1. Resolution No. 2014-249 approving plans and specifications, and authonzing the City Clerk to advertise for bids for the Northwest Quadrant Storm Drain Improvement Program (Madison Street), Project No. 6608. 2. Location Map. 3. Northwest Quadrant Storm Drain Improvement Program Project List. EXHIBIT 1 1 RESOLUTION NO. 2014-249 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD, 2 CALIFORNIA, APPROVING PLANS AND SPECIFICATIONS AND AUTHORIZING THE CITY CLERK TO ADVERTISE FOR BIDS FOR THE NORTHWEST QUADRANT STORM DRAIN (MADISON STREET), 4 PROJECTNO. 6608. 3 5 6 7 8 9 10 27 28 WHEREAS, the City Council of the City of Cartsbad, California, has determined it necessary, desirable, and in the public interest to construct the Northwest Quadrant Storm Drain Improvement Program (Madison Street), Project No. 6608; and WHEREAS, the plans and specifications for furnishing of all labor, matenals, tools, 11 equipment, transportation, and other expenses necessary or incidental to the Northwest Quadrant Storm Drain Improvement Program (Madison Street), Project No. 6608, have been 13 prepared and are on file in the Public Works Department of the City of Cartsbad and are 14 incorporated herein by reference; and 15 WHEREAS, funding for said project has been appropnated from the Gas Tax Funds to 16 17 cover all project costs and is sufficient. 18 NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Cartsbad, California, as follows: 1. That the above recitations are true and correct. 2. That the plans, specifications and contract documents for the Northwest Quadrant Storm Drain Improvement Program (Madison Street), Project No. 6608, are on file in the Public Works Department ofthe City of Cartsbad and are hereby approved. 20 21 22 23 24 25 3. The City Clerk of the City of Carlsbad is hereby authonzed and directed to 26 publish, in accordance with State law, a Notice to Contractors Inviting Bids for the Northwest 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 PASSED, APPROVED AND ADOPTED at a Regular Meeting ofthe City Council ofthe City of Carlsbad on the 21st day of October 2014, by the following vote to wit: AYES: NOES: ABSENT: Council Members Hall, Packard, Schumacher, Blackburn. None. Council Member Wood. MATT HALL, Mayor ATTEST: BARBARA ENGLESON,c€:ity Clerk LOCATION MAP wor TO SCALE PROJECT NAME NORTHWEST QUADRANT STORM DRAIN IMPROVEMENT PROGRAM (MADISON STREET) PROJECT NUMBER 6608 EXHIBIT ORAHN 8K SCOrr EVANS: CMLSBAO UIWES DEPT. 3/16/11 C\UnunES l»VWnSMr\CESKN nVtS»NVN0«IW»\6a»-2DNC Exhibit 3 NORTHWEST QUADRANT STORM DRAIN IMPROVEMENT PROGRAM PROJECT LIST Number Site Location Status 1 1 Mountain View and Pacific Avenue Compiete 2 Madison Street, Grand Avenue to Arbuckle Place Complete 3 Oak Avenue and Lincoln Street Pre^Design 4 Roosevelt Street n/o Beech Avenue Complete 5 Roosevelt Street & Madison Street, Cartsbad Village Drive to Grand Avenue Complete 6 Ocean Street north of Oak Avenue Pre-Design 7 Valley Street and Buena Vista Way Construction 8 Valley Street north of Carlsbad Village Drive East Construction 8A Valley Street north of Cartsbad Village Drive West Complete 9 Cynthia Lane to Pio Pico Drive Complete 10 Pio Pico Drive and Forest Avenue Complete 11 Eimwood Street and Laguna Drive Design 12 Wilson Street north of Buena Vista Way Design 13 Macarthur Avenue and Sunnyhill Drive Design 14 Chestnut Avenue and Pio Pico Drive (Omplete 15 Chestnut Avenue and Adams Street Complete 16 Adams Street and Palm Avenue Pre-Design 17 Adams Street north of Magnolia Avenue Pre-Design 18 Adams Street north of Tamarack Avenue Pre-Design 19 Basswood Avenue and James Drive Construction 20 Linda Lane Cul de Sac's Construction 21 Donna Drive west of Chestnut Avenue Pre-Design [ 22 Palisades Drive and East Pointe Avenue Pre-Design j 23 Calavo Court Complete 24 Ridgecfest Drive Complete 25 Adams Street south of Hoover Street Complete 26 Park Drive, Monroe Street to Woodvale Drive Comptete 27 Monroe Street, Alder Drive and Sunnyhill Drive Complete 28 Pari^ Drive, Cove Drive to Marina Drive 6611 29 Sevilla Way Removed from Program 30 Park Drive east of Valencia Avenue Complete 31 Harrison Street south of Chinquapin Avenue Complete 32 Crest Drive Drainage Project Complete 33 Hillside Drive downdrain west of Park Drive Complete 34 Highland Drive between Magnolia and Chinquapin Complete 7 Number Site Location Status 35 Highland between Tamarack and Magnolia Construction 36 Chinquapin downdrain westside railroad Complete 37 Grand Avenue Jefferson Street to State Street Alley Design 38 2521 Crest (Northwest side) Complete 39 Chinquapin Avenue cul de sac west side RR Complete 40 Olive Avenue at west of RR Complete 41 Roosevelt Street at Laguna Drive Pre-Design 42 Madison Street Arbuckle to Laguna Bidding 43 Washington Street south of Carisbad Village Drive Pre-Design 44 Pontiac Avenue and Southampton Road Compiete 45 Charter Oak Pre-Design 46 Basswood Ditches Pre-Design 47 Highland South Pre-Design