Loading...
HomeMy WebLinkAbout2015-02-10; City Council; 21848; Award Contract Pavement Overlay Project 6001-14OLCITY OF CARLSBAD - AGENDA BILL 11 AB# 21,848 ACCEPTANCE OF BIDS AND AWARD OF CONTRACT FOR CONSTRUCTION OF THE PAVEMENT OVERLAY PROJECT NO. 6001-14OL DEPT.DIRECTDR J^rT MTG. 2/10/15 ACCEPTANCE OF BIDS AND AWARD OF CONTRACT FOR CONSTRUCTION OF THE PAVEMENT OVERLAY PROJECT NO. 6001-14OL CITY ATTY. fUc DEPT. PW-TRAN ACCEPTANCE OF BIDS AND AWARD OF CONTRACT FOR CONSTRUCTION OF THE PAVEMENT OVERLAY PROJECT NO. 6001-14OL CITY MGR. -^^^ ij) RECOMMENDED ACTION: Adopt Resolution No. 2015-031 accepting bids and awarding the contract to PAL General Engineering for construction ofthe Pavement Overlay Project No. 6001-14OL. ITEM EXPLANATION: The Pavement Overlay Project No. 6001-14OL is part of the city's ongoing Pavement Management Program. This road maintenance project will resurface portions of Carlsbad Village Drive (east of Concord), Calle Barcelona (east of El Camino Real), and five residential roadways in the southeast quadrant of the city by applying a rubberized asphalt concrete layer over the existing pavement. The roadways, as listed in Exhibit 2, were selected based on the existing condition ofthe pavement. On January 7, 2015, eleven (11) sealed bids were received for the construction of this project as shown on the following table. CONTRACTOR TOTAL BID PAL General Engineering $1,149,871 RJ Noble Company $1,161,981 TC Construction Company $1,187,191 Hardy & Harper, Inc. $1,202,000 All American Asphalt $1,217,217 SRM Contracting & Paving $1,219,990 Hazard Construction $1,254,827 George Weir Asphalt $1,265,435 Ramona Paving & Construction $1,267,733 ABC Construction Company $1,460,309 Pave-Tech Inc. $1,544,569 The lowest responsive bidder, PAL General Engineering, submitted a bid in the amount of $1,149,871. Staff has completed its review of the contract documents and has determined that they are in order. Staff recommends that PAL General Engineering be awarded the contract. DEPARTMENT CONTACT: Jonathan Schauble 760-602-2762 jonathan.schauble@carlsbadca.gov FOR CLERK USE. COUNCIL ACTION: APPROVED CONTINUED TO DATE SPECIFIC • DENIED • CONTINUED TO DATE UNKNOWN • CONTINUED • RETURNED TO STAFF • WITHDRAWN • OTHER - SEEiVIINUTES • AiVIENDED • REPORT RECEIVED • Pavement Overlay Award of Contract February, 10, 2015 Page 2 of 2 FISCAL IMPACT: The estimated construction cost for the Pavement Overlay Project is shown in the table below: Construction Contract $1,149,871 Construction Contingency $150,000 Construction Management, Inspection, and Materials Testing $150,000 TOTAL ESTIMATED PROJECT COST $1,449,871 Current Appropriation-Pavement Management, CIP No. 6001 $9,792,890 Current Year Expenditures/Encumbrances-Pavement Mgmt, CIP No. 6001 $3,113,647 TOTAL AVAILABLE PAVEMENT MANAGEMENT PROGRAM, CIP NO. 6001 $6,679,243 ADDITIONAL APPROPRIATION REQUESTED $0 There are sufficient funds available to complete the Pavement Overlay Project, as shown above. The funds used on this project are Pavement Management Program funds which consist of non-jurisdictional fees (generated from trash haulers). Gas Tax funds, and TransNet-Local funds available for drawdown from SANDAG. Remaining Pavement Management Program funds will be used on future pavement rehabilitation and resurfacing projects. ENVIRONMENTAL IMPACT: The project is exempt from the California Environmental Quality Act (CECJA) per State CEQA Guidelines Section 15301(c) - minor alteration of existing facilities including streets, sidewalks, gutters, and similar facilities involving negligible or no expansion. PUBLIC NOTIFICATION: None. EXHIBITS: 2015-031 accepting bids and awarding the contract to PAL General Resolution No. Engineering for the construction ofthe Pavement Overlay Project No. 6001-14OL. Street List for Pavement Overlay Project No. 6001-140L. 2^ RESOLUTION NO. 2015-031 1 2 3 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD, CALIFORNIA, ACCEPTING BIDS AND AWARDING THE CONTRACT TO 4 PAL GENERAL ENGINEERING FOR CONSTRUCTION OF THE PAVEMENT OVERLAY PROJECT NO. 6001-14OL 5 " 6 7 8 9 WHEREAS, the City Council of Carlsbad, California has determined that it is necessary, desirable, and in the public's best interest to construct the Pavement Overlay Project No. 6001- 140L; and .,Q WHEREAS, on November 18, 2014, the City Council of the City of Carlsbad approved 11 plans for the construction of the Pavement Overlay Project No. 6001-14OL; and "12 WHEREAS, eleven (11) sealed bids were received on January 7, 2015 by the City of 13 Carlsbad for the construction ofthe Pavement Overlay Project No. 6001-14OL; and 14 WHEREAS, the lowest responsive and responsible bid to construct said project was 15 submitted by PAL General Engineering in the amount of $1,149,871; and 16 yj WHEREAS, there are sufficient funds available in the Pavement Management Program 18 to complete the project; and ""^ WHEREAS, subsection 3.28.040(C)(5) of the Carlsbad Municipal Code authorizes the City Manager to approve change orders in the amount equal to the contingency set at the time ot 21 project award. 22 NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carlsbad, 24 California, as follows: 25 1. That the above recitations are true and correct. 26 27 28 J 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 2. That the low bid of $1,149,871 submitted by PAL General Engineering for the construction of the Pavement Overlay Project No. 6001-14OL is accepted and the Mayor is hereby authorized to execute a contract for this project. 3. That the City Manager is hereby authorized to approve construction change orders up to $150,000. 4. That the award of this contract is contingent upon the bidder submitting the lowest responsible bid executing the required contract and submitting the required bonds and insurance policies, as described in the contract, within twenty (20) days of adoption of this resolution. The City Manager may grant reasonable extensions of time. /// /// /// /// /// /// /// /// /// /// /// /// /// u 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 PASSED, APPROVED AND ADOPTED at a Regular Meeting ofthe City Council ofthe City of Carlsbad on the 10**' day of February, 2015, by the following vote to wit: AYES: NOES: Council Members Hall, Blackburn, Schumacher, Wood, Packard. None. ABSENT: None. MATT HALL, Mayor ATTEST: SHELLEY COLLINSJ Assistant City Clerk (SEAL) EXHIBIT 2 PAVEMENT OVERLAY PROJECT NO. 6001-14OL STREET LIST STREET NAME FROM TO CALLE BARCELONA CALLE BARCELONA CALLE BARCELONA CALLE BARCELONA CALLE BARCELONA EL CAMINO REAL PASEO ALISO PASEO AVELLANO PASEO ARRAYAN PASEO ALMENDRO PASEO ALISO PASEO AVELLANO PASEO ARRAYAN PASEO ALMENDRO RANCHO SANTA FE RD CARLSBAD VILLAGE CARLSBAD VILLAGE CARLSBAD VILLAGE CARLSBAD VILLAGE CONCORD PONTIAC VICTORIA CHATHAM PONTIAC VICTORIA CHATHAM TAMARACK PLAZUELA STREET MADRILENA WAY MADRILENAWAY LUCIA COURT BOLO PLACE PENDON COURT QUITASOL VISTOSA AN I LLO WAY AN I LLO WAY PALENQUE BOCA ST PALENQUE AN I LLO WAY LEVANTE END END END 6