HomeMy WebLinkAbout2015-08-25; City Council; 22059; Advertise Bids Poinsettia Lift Station Standby Pump 5529AB# 22,059 DATE 08-25-15 DEPT. PW-UTIL CITY OF CARLSBAD APPROVAL OF PLANS AND SPECIFICATIONS AND AUTHORIZATION TO ADVERTISE TO RECEIVE BIDS FOR THE POINSETTIA LIFT STATION STANDBY PUMP SYSTEM, PROJECT NO. 5529 RECOMMENDED ACTION: 1 CITYMGR Adopt Resolution No. 2015-210 approving plans and specifications and authorizing the City Clerk to advertise for bids for the Poinsettia Lift Station Standby Pump System, Project No. 5529. ITEM EXPLANATION: The Poinsettia Lift Station is located on the north side of Poinsettia Lane east of Alicante Road. The lift station serves the sewer collection area generally south of Palomar Airport Road and east of El Camino Real. Construction of the existing lift station was completed in 1999. Currently, the lift station pumps an average of 0.5 million gallons of raw wastewater per day which is expected to increase to 0.72 million gallons per day at build out. The station has a peak flow capacity of 1,550 gallons per minute. The lift station is of adequate capacity to service the tributary boundary for the foreseeable future, including peak wet weather events. However, the station lacks redundancy components that would prevent a wastewater spill as a result of an emergency event where the station is incapacitated. This project includes the installation of an engine driven standby pump with automated controls and a buried prefabricated 15,000 gallon storage basin. The standby pump system essentially acts as a redundant pump station, activating in the event the existing station fails to operate. The project makes the lift station more robust and capable of responding during emergency events in order to prevent wastewater spills. Additional value will be provided with this project as the trailer mounted, engine driven pump has the flexibility to be relocated to serve three additional Carlsbad lift stations including Foxes Landing Lift Station, Cannon Road Lift Station and North Batiquitos Lift Station. Along with its application to respond to emergency events, the standby pump may be used for scheduled service and improvements at the lift stations when a pump bypass system is necessary. DEPARTMENT CONTACT: Mark Biskup 760-603-7352/ mark.biskup@carlsbadca.gov FOR SECRETARY USE. vz[ BOARD ACTION: APPROVED CONTINUED TO DATE SPECIFIC D DENIED D CONTINUED TO DATE UNKNOWN D CONTINUED D RETURNED TO STAFF D WITHDRAWN D OTHER-SEE MINUTES D AMENDED D REPORT RECEIVED D 1 Advertise to Receive Bids-Poinsettia Standby Pump System August 25, 2015 Page 2 of 2 FISCAL IMPACT: A summary of current and projected project costs is as follows: PROJECT COST SUMMARY FOR THE POINSETTIA UFT STATION STANDBY PUMP SYSTEM (PROJECT NO. 5529) Engineering Services and Staff Overhead $126,870 Construction Cost Estimate $700,000 Construction Contingency $105,000 Construction Management and Inspection $70,000 TOTAL PROJECT COST $1,001,870 CURRENT APPROPRIATION $1,200,000 Based on the engineer's estimate, there are sufficient sewer replacement funds available for the Poinsettia Lift Station Standby Pump System. ENVIRONMENTAL IMPACT: The project is exempt from the California Environmental Quality Act (CEQA) per State CEQA Guidelines Section 15301(b) - Existing Facilities - operation, repair, maintenance or minor alteration to an existing sewer lift station. PUBLIC NOTIFICATION: None required. EXHIBITS: 1. Resolution No. 2015-210 approving plans and specifications and authorizing the City Clerk to advertise for bids for the Poinsettia Lift Station Standby Pump System, Project No. 5529. 2. Location Map. -6 % \j\J^ k^ 1 1 RESOLUTION NO. 2015-210 2 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD, CALIFORNIA, APPROVING PLANS AND SPECIFICATIONS AND AUTHORIZING THE CITY CLERK TO ADVERTISE FOR BIDS FOR THE 4 POINSETTIA LIFT STATION STANDBY PUMP SYSTEM, PROJECT NO. 5529. 5 " 6 y WHEREAS, the installation of a standby pump system will enhance the reliability of 8 Poinsettia Lift Station with improved redundancy reducing the potential of wastewater ^ overflow at that station; and WHEREAS, the plans and specifications for furnishing all labor, materials, tools, 11 equipment, transportation, and other expenses necessary or incidental to the Poinsettia Lift 12 Station Standby Pump System, Project No. 5529 have been prepared and are on file in the 24 Public Works Department ofthe City of Carlsbad and are incorporated herein by reference; and 15 WHEREAS, the project is exempt from California Environmental Quality Act (CEQA) per State CEQA Guidelines Section 15303(d)-New Construction of Small Structures; and WHEREAS, funds in the Sewer Replacement Fund are sufficient for the project. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carlsbad, California, as follows that: 17 18 19 20 21 1. The above recitations are true and correct. 22 2. That the plans, specifications, and contract documents for the Poinsettia Lift Station Standby Pump System, Project No. 5529 are on file in the Public Works Department of the City of Carlsbad and hereby approved. 3. That the City Clerk of the City of Carlsbad is hereby authorized and directed to 23 24 25 26 publish, in accordance with state law, a Notice to Contractors Inviting bids for the Construction 28 3 1 Poinsettia Lift Station Standby Pump System, Project No. 5529, in accordance with the plans, specifications, and contract documents referred to herein. // // // 2 3 4 5 6 7 // 8 // 9 10 11 12 13 14 // 17 18 19 20 23 24 25 26 27 28 // // // // 15 // 16 // // // // 21 // 22 // // // // 1 PASSED, APPROVED AND ADOPTED at a Regular Meeting ofthe City Council of the City 2 of Carlsbad on the 25th day of August, 2015, by the following vote to wit: 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 AYES: Council Members Halt Blackburn, Schumacher, Wood, Packard. NOES: None. ABSENT: None. ATTEST: (SEAL) LOCATION MAP NOT TO SCALE PROJECT NAME POINSETTIA LIFTSTATION STANDBY PUMP SYSTEM PROJECT NUMBER 5529 EXHIBIT 2 PLOTTED BY: SCOTT EVANS PLOT DATt:8/6/15 PA7H:0: \U7IU7?£S DEPARmENT\LOCAVOH UAPS\5529.DWG CD Executed Document(s) To Follow RECORDED REQUESTED BY DOC# 2015-0504503 1111111111111111111111111111111111111111111111111111111111111111111111 CITY OF CARLSBAD AND WHEN RECORDED PLEASE MAIL TO: City Clerk City of Carlsbad 1200 Carlsbad Village Drive Carlsbad, California 92008 Sep 24, 2015 03:09 PM OFFICIAL RECORDS Ernest J. Dronenburg, Jr , SAN DIEGO COUNTY RECORDER FEES: $0.00 PAGES: 1 Space above this line for Recorder's use. PARCEL NO: NOTICE OF COMPLETION Notice is hereby given that: 1. The undersigned is owner of the interest or estate stated below in the property hereinafter described. 2. The full name of the undersigned is City of Carlsbad, a municipal corporation. 3. The full address of the undersigned is 1200 Carlsbad Village Drive, Carlsbad, California 92008. 4. The nature of the title of the undersigned is: In fee. 5. A work or improvement on the property hereinafter described was completed on August 6, 2015. 6. The name of the contractor for such work or improvement is Ayala Engineering 7. The property on which said work or improvement was completed is in the City of Carlsbad, County of San Diego, State of California, and is described as follows: Poinsettia Lift Station Outfall Sewer Manhole Covers, Project No. 5503-9. 8. The street address of said property is 2422 Copper Way in the City of Carlsbad. VERIFICATION OF CITY CLERK I, the undersigned, say: I am the City Clerk of the City of Carlsbad, 1200 Carlsbad Village Drive, Carlsbad, California, 92008; the City Manager of said City on S'e~\Qe!.C 14, 20.15._, accepted the above described work as completed and ordered that a Notice of Completion be filed. I declare under penalty of perjury that the foregoing is true and correct Executed on ~:J}ep\eWl\?ev21, 20 IS:, at Carlsbad, California. A9Ji:l: 22,os?! R~o~ Q0\5-2!D Word\Masters\Forms\Nol!ce of Completion (City) 3/9/98 CITY OF CARLSBAD ACCEPTANCE OF PUBLIC IMPROVEMENTS COMPLETION OF PUBLIC IMPROVEMENTS The contractor has constructed the improvements required for Project No. 5503-9, Poinsettia Lift Station Outfall Sewer Manhole Covers, and has requested that the City of Carlsbad accept the public improvements. City forces have inspected the public improvements and found them to be satisfactory. The public improvements consist of: IMPROVEMENTS VALUE Sewer $10,500 PUBLIC WORKS DIRECTOR CERTIFICATION OF COMPLETION OF IMPROVEMENTS d ~;> -1 f!3 ·~/~ 1 ohle CITY MANAGER'S ACCEPTANCE OF PUBLIC IMPROVEMENTS The construction of the above described public improvements is deemed complete and hereby accepted. The City Clerk is hereby authorized to record the Notice of Completion and release the bonds in accordance with State Law and City Ordinances. The City of Carlsbad is hereby directed to commence maintaining the above described improvements. APPROVED AS TO FORM: Assistant City Attorney Word\Masters\Forms\Acceptance of Public Improvements (C1ty) 3/9/98