RECOMMENDED ACTION:
Adopt a Resolution approving the Carlsbad TransNet Local Street Improvement Program of Projects for
Fiscal Years (FY) 2016-17 through 2020-21, for inclusion in the 2016 San Diego Association of
Governments Regional Transportation Improvement Program.
ITEM EXPLANATION:
The 2016 Regional Transportation Improvement Program (RTIP) is a program of proposed highway,
arterial roadway, transit, and bikeway projects for FY 2016-17 through 2020-21. The San Diego
Association of Governments (SANDAG) is required by state and federal laws to develop and adopt the
RTIP every two years.
Each member agency of SANDAG that desires to expend TransNet and/or certain federal or state funds
must approve a program of projects once every two years. In addition to projects with these funding
sources, the program of projects also includes regionally significant capacity increasing projects,
regardless of the funding source. The federal Metropolitan Planning and Air Quality Conformity
Regulations also require inclusion of all regionally significant capacity increasing road projects for air
quality emissions analysis.
The approval process includes consideration of the Carlsbad Program of Projects at a Public Hearing and
adoption of the attached Resolution. The adopted Resolution approving the Carlsbad Program of
Projects is due to SANDAG by June 24, 2016. The Carlsbad Program of Projects is then incorporated into
the draft 2016 RTIP as assembled and submitted to the state by SANDAG by July 22, 2016. The proposed
Carlsbad Program of Projects for FY 2016-17 through 2020-21, which is attached as Attachment A to the
Resolution, includes projects with the following funding types:
• Federal-SAFETEA-LU, High Priority Project
• Federal-Highway Bridge Program
• SANDAG-TransNet Local
• Local-City Funds
• Local-Private Funds
DEPARTMENT CONTACT: Marshall Plantz 760-602-2766 Marshaii.Piantz@carlsbadca.gov
FOR CLERK USE. ~ COUNCIL ACTION: APPROVED CONTINUED TO DATE SPECIFIC D
DENIED D CONTINUED TO DATE UNKNOWN D
CONTINUED D RETURNED TO STAFF D
WITHDRAWN D OTHER-SEE MINUTES D
AMENDED D REPORT RECEIVED D
2
Approval of 2016 City of Carlsbad RTIP
May3, 2016
Page2 of2
The federal funding included in the Carlsbad Program of Projects consists of Federal SAFETEA-LU, High
Priority Project funds for Poinsettia Lane Reach E. The city is also set to receive Federal Highway Bridge
Program funding which is programmed by Caltrans, and therefore is not listed as a funding line item on
the Carlsbad Program of Projects.
TransNet funds are programmed for a variety of projects including bridge improvement, roadway
improvement, pavement management program, traffic signal improvement and safety lighting projects.
The Carlsbad Program of Projects also includes various capacity increasing roadway projects located
along regionally significant arterials, regardless of the funding source. The projects in this category
include various roadway segments and intersection improvements. The majority of these projects are
funded by local city funds such as Traffic Impact Fees and/or funding from the adjacent private
development.
The Program of Projects may be revised as needed on a quarterly basis during the two year period
between the adoption of the 2016 RTIP and the subsequent 2018 RTIP.
FISCAL IMPACT:
Approving the RTIP is a requirement under state law for receiving TransNet, state or federal funds.
Approval of the RTIP ensures eligibility for funding and programs the funding for future obligation.
Inclusion in the RTIP, however, is not a guarantee that projects will receive the stated funding. The
amounts shown are the best available estimates of anticipated funding. In the event that funding falls
short or is not available, the City Council is not obligated to proceed with a project just because it is
included in the RTIP.
ENVIRONMENTAL IMPACT:
This activity is statutorily exempt from CEQA pursuant to CEQA Guidelines, Section 15276, which states
that CEQA does not apply to the adoption of a Regional Transportation Improvement Program.
However, individual projects developed pursuant to these programs shall remain subject to CEQA.
EXHIBITS:
1. Resolution approving the Carlsbad TransNet Local Street Improvement Program of Projects for Fiscal
Years 2016-17 through 2020-21, for inclusion in the 2016 San Diego Association of Governments
Regional Transportation Improvement Program.
2
3
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
RESOLUTION NO. 2016-086
A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD,
CALIFORNIA, APPROVING THE CARLSBAD TRANSNET LOCAL
STREET IMPROVEMENT PROGRAM OF PROJECTS FOR FISCAL
YEARS 2016-17 THROUGH 2020-21, FOR INCLUSION IN THE 2016
SAN DIEGO ASSOCIATION OF GOVERNMENTS REGIONAL
TRANSPORTATION IMPROVEMENT PROGRAM
WHEREAS, on Nov~ 4, 2004, the voters of San Diego County approved the San Diego
Transportation Improvement Program Ordinance and Expenditure Plan (TransNet Extension
Ordinance); and
WHEREAS, the TransNet Extension Ordinance provides that the San Diego Association of
Governments (SANDAG), acting as the Regional Transportation Commission, shall approve on a
biennial basis a multi-year program of projects submitted by local jurisdictions identifying those
transportation projects eligible to use transportation sales tax (TransNet) funds; and
WHEREAS, the City of Carlsbad was provided with an estimate of annual TransNet local
improvement revenues for Fiscal Years (FY) 2016-17 through 2020-21; and
WHEREAS, the City of Carlsbad has held a noticed Public Hearing with an agenda item that
clearly identified the proposed list of projects prior to approval of the projects by its authorized
legislative body in accordance with Section S(A) of the TransNet Extension Ordinance and Rule 7
ofthe SANDAG Board Policy 31.
NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carlsbad, California,
as follows:
1. That the above recitations are true and correct.
4
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
2. That pursuant to Section 2(C)(l) of the TransNet Extension Ordinance, the City of
Carlsbad certifies that no more than 30 percent of its annual revenues from the TransNet funds
shall be spent on local street and road maintenance related projects.
3. That pursuant to Section 4(E)(3) of the TransNet Extension Ordinance, the City of
Carlsbad certifies that all new projects, or major reconstruction projects, funded by TransNet
revenues shall accommodate travel by pedestrians and bicyclists, and that any exception to this
requirement permitted under the Ordinance and proposed shall be clearly noticed as part of the
City of Carlsbad's Public Hearing process.
4. That pursuant to Section 8 ofthe TransNet Extension Ordinance, the City of Carlsbad
certifies that the required minimum annual level of local discretionary funds to be expended for
street and road purposes will be met throughout the 5-year period consistent with the most
recent Maintenance of Effort Requirements adopted by SANDAG.
5. That pursuant to Section 9A of the TransNet Extension Ordinance, the City of
Carlsbad certifies that it will extract $2,357, plus all applicable annual increases, from the private
sector for each newly constructed residential housing unit in the City of Carlsbad, and shall
contribute such exactions to the Regional Transportation Congestion Improvement Program
(RTCIP).
6. That pursuant to Section 13 of the Transnet Extension Ordinance, the City of Carlsbad
certifies that is has established a separate Transportation Improvement Account for TransNet
Revenue with interest earned expended only for those purposes for which the funds were
allocated.
5
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
7. That pursuant to Section 18 of the TransNet Extension Ordinance, the City of
Carlsbad certifies that each project of $250,000 or more will be clearly designated during
construction with TransNet project funding identification signs.
8. That the City of Carlsbad does hereby certify that all other applicable provisions of
the TransNet Extension Ordinance and the SANDAG Board Policy 31 have been met.
9. That the City of Carlsbad agrees to indemnify, hold harmless and defend SANDAG,
the San Diego County Regional Transportation Commission, and all officers and employees
thereof against all causes of action or claims related to local TransNet funded projects.
10. That the Carlsbad TransNet Local Street Improvement Program of Projects for FY
2016-17 through 2020-21 attached to this Resolution as Attachment A is hereby approved for
inclusion in the 2016 SANDAG RTIP.
Ill
Ill
Ill
Ill
Ill
Ill
Ill
Ill
Ill
Ill
Ill
Ill
6
1 PASSED, APPROVED AND ADOPTED at a regular meeting of the Carlsbad City Council held
2 on the 3rct day of May, 2016 by the following vote, to wit:
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
AYES: Halt Wood, Schumacher, Blackburn, Packard.
NOES: None.
ABSENT: None.
ATTEST:
BARBARA ENGLESON, fjty Clerk
(SEAL)
7
Table 1
2016 Regional Transportation Improvement Program
San Diego Region (in $000s)
Project Title:
Proje<;t Description: El Camino Real from Tamarack Ave. to Chestnut Ave.-In Carlsbad, widen El
Camino Real to prime arterial standards with three travel lanes, bike lanes and
sidewalks in each direction including intersection improvements at Tamarack
Avenue and Chestnut Avenue
Capacity Status: Cl Exempt Category: Non-Exempt
Est Total Cost: $12,374 Open to Traffic: Sep 2016
TOTAL PRIORi 16/17 17/18 18/19 19/20
TransNet-LSI Carry Over $3,951 $1,965 j $1,986
Local Funds $3,851 $3,851 I
Local RTCIP $4,572 $4,572 j
TOTAL $12,374 $10,388 $1,986
Project Title: El Camino Real and Cannon Road
Project Description: El Camino Real and Cannon' Road -In Carlsbad, along the east/north-bound side
of El Camino Real just south of Cannon Road; widen to provide three through
lanes, a right turn lane and a sidewalk approaching the intersection with Cannon
Road
Capacity Status: Cl . Exempt Category: Non-Exempt
Est Total Cost: $2,049 Open to T raffle: Jun 2018
TOTAL PRIOR·· 16/17 17/18 18/19 19/20
Local Funds $2,049; $849' $1,200
TOTAL $2,049; $849: $1,200
Project Title: El Camino Real -Lisa Street to Crestview Drive
Project Description: El Camino Real from Lisa Street to Crestview Drive -.in Carlsbad, along the west
side of El Camino Real, roadway widening to provide .three southbound through
lanes, curb, gutter and sidewalk per Prime Arterial standards
Capacity Status: Cl Exempt Category: Non-Exempt
Est Total Cost: $2,188 Open to Traffic: Jun 2016
TOTAL. PRIOR~ 16/17 17/18 18/19 19/20
Local Funds $2,188. $2,1881:
TOTAL $2,188 $2,188
*Pending final SANDAG approval
20/21 i PE
$1,225
$1,225
RTP PG NO: B-34
RAS (M-38)
20/21. PE
$325
$325
RTP PG NO: A-29
RAS (TA 4-66)
20/21 PE
$170
$170
RW CON
$3,951
$60 $2,566
$4,572
$60 $11,089
RW CON
$1,724
$1,724
RW CON
$2,018
$2,018
Wednesday, April6, 2016
8
Table 1
2016 Regional Transportation Improvement Program
San Diego Region (in $000s)
Carlsbad, City of
Project Ti.tle: College Boulevard Reach A
Project Description: College Boulevard from Badger Lane to Cannon Road -in Carlsbad, from Badger
Lane .to Cannon Road, construct a new segment of College Blvd. to provide
4-lane roadway with raised median, bike lanes and sidewalks/trails in
accordance with Major Arterial standards
Capacity Status: Cl · Exempt Category: Non-Exempt
Est Total Cost: $11,952 Open to Traffic: Jun 2018
TOTAL PRIOR: 16/17 17/18 18/19 19/20
Local Funds $11,952 $2,774 i $5,178 $4,000
TOTAL, $11,952 $2,774 :: $5,178 $4,000
Project Title: Poinsettia Lane Reach E
Project Description: Poinsettia Lane from Cassia Drive to Skimmer Court-construct a new 4-lane
roadway with median, bike lanes, and sidewalks/trails to major arterial standards
Capacity Status: Cl · Exempt Category: Non-Exempt ..
Est Total Cost: $13,136 Open to Traffic: Jun 2018
HPP
Local Funds $8,740 $1,700
TOTAL $1,700
Project Title: Carlsbad Blvd. Bridge over Encina Power Station
Project Description: Carlsbad Blvd. from Encina Power Plant to Warm water outfall channel -In
Carslbad, Carlsbad Blvd bridge over the Encina Power Plant warm water
discharge channel, upgrade bridge railings on the bridge, (local match to HBP
funding)._
RTP PG NO: B-34
RAS (M-38)
20/21 ;! PE
$2,774
$2,774
RTP PG NO: B-34
RW CON
$9,178
$9,178
EARMARK NO: CA366, CA517
RAS (M-38)
RW CON
$1,436
$1,260 $10,440
$1,260 $11,876
RAS (M-38)
TransNet-LSI: CR
Capacity Status: NCI Exempt Category: Safety -Guardrails, median barriers, crash cushions
PRIOR 16/17 17/18 18/19 19/20 20/21 PE RW CON
TransNet-L (Cash) $8 $8 $8
TransNet-LSI Carry Over $215 $215 $25 $190
TOTAL $223. $8 $215 $33 $190
*Pending final SANDAG approval
Wednesday, AprilS, 2016
9
Table 1
2016 Regional Transportation Improvement Program
San Diego Region (in $000s)
Project Description: Carlsbad Blvd. from Mountain View to State -0.6 mlles NW of Carlsbad Village
Drive, upgrade the bridge railings on the Carlsbad Blvd. Bridge over the San
Diego Northern Railway (SDNR) railroad (local match to HBP funding, part of
CAL44)
TransNet-LSI: Maint
Capacity Status: NCJ
Est Total Cost: $549
TransNet-LSI
TransNet-LSI Carry Over
TOTAL
• Exempt Category: Safety -Guardrails, median barriers, crash cushions
TOTAL PRIOR" 16/17 17/18 18/19 19/20 20/21 PE
$467 $467' $50
$82 $82 ~
$549 $549 ; $50
Project Title: Pavement Management-Overlay RAS {M-38)
Project Description: Street locations by year as follows: FY 16/17 roadways -Haymar Drive, College TransNet-LSI: CR
Boulevard, AvenidaEncinas and El Camino Real. FY17f18 El Camino Real,
Rancho Santa Fe and El Fuerte Street. FY 18/19-Palomar Airport Road, Carlsbad
Village Drive, Pio Pico. FY's 19/20-FY 20/21 have not been modeled and therefore
the streets have not been identified. -In Carlsbad, on various streets throughout
the City, pavement overlay 1 inch or greater and miscellaneous roadw<3y section
spot repairs.
Capacity Status: NCI Exempt Category: Safety -Pavement resurf<:lcing and/or rehabilitation
Est Total Cost: $33,890
TOTAL PRIOR] 16/17 17/18 18/19 19/20
TransNet-L (Cash) $946 $946 i
TransNet-LSI $6,000. $1,500 $1,500 $1,500
TransNet-LSI (Cash) $1,531 •. $34 j $1,497
TransNet-LSI Carry Over $5,063 $5,060 i $3
Local Funds $20,350 $13,100 i $1,450 $1,450 $1,450 $1,450
TOTAL $33,890. $19,140 : $2,950 $2,950 $2,950 $2,950
Project Title: Pavement Management -Seal
Project Description: Various minor/local roadways within each area encompassed by the streets
included in the overlay program for that year-In Carlsbad, along various
roadways construct/apply street sealing and construct minor roadway pavement
section repairs ..
20/21
$1,500
$1,450
$2,950
Capacity Status: NCI Exempt Category: Safety -Pavement resurfacing and/or rehabilitation
Est Total Cost: $7,550
TOTAL PRIOR 16/17 17/18 18/19 19/20 20/21
Local Funds $7,550. $3,800 $750 $750 $750 $750 $750
TOTAL $7,550 . $3,800 $750 $750 $750 $750 $750
*Pending final SANDAG approval
PE
PE
RW
RW
RW
CON
$417
$82
$499
CON
$946
$6,000
$1,531
$5,063
$20,350
$33,890
CON
$7,550
$7,550
Wednesday, April6, 2016
10
Table 1
2016 Regional Transportation Improvement Program
San Diego Region (in $000s)
Carlsbad, City of
Project Title: Avenida Encinas -Widen from Palomar Airport Road to Embarcadero Lane
Project Description: Avenida Encinas from Palomar Airport Rd. to Embarcadero Lane -In Carlsbad,
Avenida Encinas from Palomar Airport Road southerly to existing improvements
adjacent to the Embarcadero Lane; roadway widening and parkway
construction/improvements.
Capacity Status: Cl Exempt Category: Non-Exempt
Es!TotaiCost: $5,402 Open to Traffic: Jun 2019
TOTAL. PRIORi 16/17 17/18 18/19 19/20
Local Funds $5,402 $2,605; $51 $1,746 $1,000
TOTAL. $5,402 $2,605 i $51 $1,746 $1,000
Project Title: El Camino Real Left Turn Lane to westbound Tamarack Ave.
Project Description: El Camino Real and Tamarack Avenue-at the intersection of El Camino Real and
Tamarack Avenue construct a second left turn Jane frorn El Camino Real to
westbound Tamarack
Capacity Status: Cl Exempt Category: Non-Exempt
Est Total Cost: $286 Open to Traffic: Sep 2016
TOTAL PRIOR' 16/17 17/18 18/19 19/20
Local Funds $286 $286'
TOTAL $286. $286
Project Title: El Camino Real Widening -La Costa Avenue to Arena! Road
Project Description: El Camino Real from La Costa Ave to Arena! Rd. -In Carlsbad, along El Camino
Real from 700 feet north of La Costa Avenue to Arena! Road, widening along the
southbound side of the roadway to provide three travel lanes and a bike lane in
accordance with Prime Arterial Standards
Capacity Status: Cl Exempt Category: Non-Exempt
Est Total Cost: $2,550 · Open to Traffic: Jun 2018
TOTAL PRIORl 16/17 17/18 18/19 19/20
Local Funds $1,925 $1,925
Local RTCIP $625 $625 ·: ' TOTAL· $2,550 $625 l $1,925
*Pending final SANDAG approval
RTP PG NO: B-34
20/21 < PE
$400
$400
RTP PG NO: A-29
RAS (T A 4-66)
20/21' PE
$70
$70
RTP PG NO: B-35
RAS (M-38)
20/21; PE
$625
$625
RW CON
$60 $4,942
$60 $4,942
RW CON
$216
$216
RW CON
$1,925
$1,925
Wednesday, April6, 2016
11
Table 1
2016 Regional Transportation Improvement Program
San Diego Region (in $000s)
Carlsbad, City of
Project Title: El Camino Real Widening -Cassia to
Project Description: El Camino Real from Cassia Road to Camino Vida Roble-In Carlsbad, widen El
Camino Real from 900 feet north of Cassia Road to Camino Vida Roble, along
the northbound/east side. of the roadway to provide three travel lanes and a bike
lane in accordance with Prime Arterial standards
Capacity Status: Cl · Exempt Category: Non-Exempt
Est Total Cost $2,820 Open to Traffic: Dec 2018
PRIOR[, 16/17 17/18 18/19
TransNet-LSI $60
TransNet-LSI Carry Over $2,760 $325 $2,435
TOTAL $2,820 $325 $2,495
Project Description: Palomar Airport Road between 1-5 and Paseo Del Norte-widening along
eastbound Palomar Airport Road to provide a dedicated right turn lane to
southbound Paseo Del Norte
Capacity Status: Cl Exempt Category: Non-Exempt
Est Total Cost: $564 Open to Traffic: Dec 2017
TOTAL PRIORT 16/17 17/18 18/19
TransNet-LSI Carry Over $451 $451
Local Funds $113 $113)
TOTAL $564 $113 l $451
Project Title: Palomar Airport Road and Paseo Del Norte Left Turn Lane
19/20
19/20
Project Description: Palomar Airport Road between 1-5 and Paseo Del Norte-lengthen the left turn
pocket along eastbound Palomar Airport Road to northbound Paseo Del Norte
Capacity Status: Cl Exempt Category: Non-Exempt
Est Total Cost: $233 Open to Traffic: Dec 2017
TOTAL PRIOR,: 16/17 17/18 18/19 19/20
TransNet-LSI Carry Over $233 $233
TOTAL $233. $233
*Pending final SANDAG approval
20/21 ~ PE RW
$425 $1,350
$425 $1,350
20/21 '· PE
$64
$64
RTP PG NO: 8-35
RAS (M-38)
TransNet-LSI: CR
20/21. PE
$30
$30
RW
RW
CON
$60
$985
$1,045
-" -·~ CON
$451
$49
$500
CON
$203
$203
Wednesday, April6, 2016
12
Table 1
2016 Regional Transportation Improvement Program
San Diego Region (in $000s)
Carlsbad, City of
Project Title: Carlsbad Boulevard Realignment
Project Description: Carlsbad Boulevard from Palomar Airport Road to City limit -In Carlsbad, from
Palomar Airport Road to the southerly City limit, study the realignment of Carlsbad
Blvd including the relocation of the southbound lanes of Carlsbad Blvd to the east
and the construction of complete street and multi use trail improvements along
the coastal corridor.
Capacity Status: NCI Exempt Category: Other -Engineering studies
Est Total Cost: $4,497
TOTAL PRIOR: 16/17 17/18 18/19 19/20
TransNet-LSI $3,464 $1,967 ; $672 $574 $251
TransNet-LSI Carry Over $1,033 $1,033 ~
TOTAL $4,497 $3,000 $672 $574 $251
*$1.497M spent on CB20
20/21 PE
$3,464
$1,033
$4,497
Project Title: EI.Camino Real and College Blvd. Intersection Improvements RAS (M-38)
Project Description: El Camino Real from El Camino Real to College Blvd -In Carlsbad, on El Gamino
Real, improve El Camino Real along the southbound approach to the intersection
with College Blvd. to provide three thru lanes and a signal controlled right tum
lane.
Capacity Statu~:~: NGI Exempt Category: Other -Intersection channelization projects
Est Total Cost: $515
TOTAL PRIOR~ 16/17 17/18 18/19 19/20
Local Funds $515 $515
TOTAL $515. $515
Project Title: El Camino Real-Cannon Road to Tamarack Avenue
Project Description: El Camino Real from Cannon. Road to Tamarack ~widen along both sides of El
Camino Real from Cannon Road to Tamarack Avenue excluding the limits of
Project CB04C, to provide a raised median, three travel lanes, bike lane, curb,
gutter and walkway along both sides per Prime Arterial Standards and a new
traffic signal at Lisa Street
Capacity Status: Cl Exempt Category: Non-Exempt
Est Total Cost: $10,000 Open to Traffic: Jun 2016
16/17
*Pending final SANDAG approval
20/21; PE
$71
$71
RAS (T A 4-66)
~
RW CON
RW CON
$34 $410
$34 $410
$10,000
Wednesday, Apri16, 2016
13
Project Title:
Table 1
2016 Regional Transportation Improvement Program
San Diego Region (in $000s)
co
Carlsbad CATS (part of Lump Sum V12)
Project Description: From to -Develops an implementation strategy for livable streets. The plan will be
tested by implementing up to five pilot projects. The plan is city-wide with up toten
priority locations to be identified during the project lifecycle. -#1223028
Capacity Status: NCI Exempt Category: Air Quality -Bicycle and pedestrian facilities
Est Total Cost:
TOTAL PRIOR 16/17 17/18 18/19 19/20
TransNet-BPNS
Local Funds
TOTAL
Project Title: Active Village Campaign (part of Lump Sum V12)
Project Description: From to-Develops a multi-media campaign to promote the benefits of walking
and biking in Carlsbad and Carlsbad Village, and aims to increase bicycling and
walking for everyday trips, improve connectivity and create a pilot program that is
scalable for other cities in the region.-#1223029
20/21 ..
Capacity Status: NCI Exempt Category: Air Quality -Bicycle and pedestrian facilities
Est Total Cost:
TOTAL. PRIOR • 16/17 18/19 19/20 20/21'
TransNet-BPNS
Local Funds
TOTAL,
PE RW CON
CON
Project Title: ADA Improvements TransNet-LSI: CR
Project Description: Roadways in the northwest quadrant of the City of Carlsbad adjacent to public
facilities inlcuding: Carlsbad Blvd, State Street, Roosevelt Street, Carlsbad Village
Drive, Oak Ave., Chestnut Ave, Harding Street-In Carlsbad, various roadways in
the northwest quadrant of the City of Carlsbad ,construct Priority Level 1 and
Priority Level 2 ADA Improvements per the City of Carlsbad Transition Plan for
Public Rights-of-way
Capacity Status: NCI
Est Total Cost: $1,670
TransNet-LSI Carry Over
*Pending final SANDAG approval
Exempt Category: Safety -Safety Improvement Program
PRIOR 16/17 17/18 18/19 19/20
$750 $500 $250 $170
$750 $500 $250 $170
20/21 PE RW CON
$175 $1,495
$175 $1,495
Wednesday, Apri16, 2016
14
Carlsbad, City of
Table 1
2016 Regional Transportation Improvement Program
San Diego Region (in $000s)
Project Description: Management System for Arterial roadways throughout the City of Carlsbad and the
County-City of Carlsbad annual operations and maintenance cost share for the
Regional Arterial Management System, (RAMS). TransNet-LSI RAMS of $12 is
programmed in FY 20171 TransNet-LSI RAMS of $12 is programmed in FY 2018
Capacity Status: NCJ · Exempt Category: Other -Traffic signal synchronization projects
Est Total Cost: $59
TransNet-LSI
TOTAL -·-PRIOR~ 16/17 17/18 18/19
$59 $35' $12 $12
TOTAL $59 $35 $12 $12
Carlsbad Boulevard and Tamarack Avenue Pedestrian Improvement Project
of Lump Sum V17)
19/20
Project Description: Carlsbad Blvd. from at Tamarack Avenue to -In Carlsbad, at the intersection of
Carlsbad Blvd and Tamarack Avenue, reconfigure the intersection and the
approaches to the intersection and provide enhanced facilities for pedestrians,
transit users and bicyclists; SANDAG approved TransNeUATP swap on October
23,2015
20/21.!
Capacity Status: NCI
EstTotal Cost: $2,900
Exempt Category: Air Quality -Bicycle and pedestrian facilities
-·~ .. -. " . -
TOTAL PRIOR] 16/17 17/18 18/19 19/20
TransNet-BPNS $1,054 $1,054
Local Funds $1,654 $14 j $1,010 $234 $397
TDA -Bicycles $192 $3! $38 $56 $95
TOTAL $2,900 $17 .. $2,102 $290 $492
Improvements -
Project Description: Cannon Road from Carlsbad Blvd to Avenida Encinas -Construct complete street
improvements including the reconfiguration of the curbline and the addition of
medians, pedestrian crossings and parkway improvements.
20/21
Capacity Status: NC! Exempt Category: Other -Transportation enhancement activities
Est Total Cost: $1,000
TOTAL PRIOR 16/17 17/18 18/19 19/20 20/21:
TransNet-LSI $1,000 $1,000
TOTAL $1,000 $1,000
*Pending final SANDAG approval
PE RW CON
$59
$59
PE RW CON
$1,054
$500 $1 '154
$192
$500 $2,400
PE RW CON
$100 $900
$100 $900
Wednesday, AprilS, 2016
15
Carlsbad, City of
Table 1
2016 Regional Transportation Improvement Program
San Diego Region (in $000s)
Project Title: Carlsbad Village Drive and Grand Avenue Improvements
Project Description: Carlsbad Village Drive and Grand Avenue from Washington Street to State Street-
provide mid block pedestrian crossing improvements and sidewalk/parkway
improvements at the approaches to the railroad track crossings.
Capacity Status: NCI Exempt Category: Safety -Safety Improvement Program
Est Total Cost: $1,320
16/17 17/18 18/19 19/20
TransNet-LSI $1,320
TOTAL .. $1,320 $1,320
Project Title: Chestnut Avenue Complete Street Improvements Valley Street to 1-5
Project Description: Chestnut Avenue from Valley Street to 1-5 -complete street improvements
including sidewalk improvements and traffic calming features such as bulb outs
and medians.
RAS (M-38)
TransNet-LSI: CR
$150
TransNet-LSI: CR
Capacity Status: NCI Exempt Category: Other -Transportation enhancement activities
Est Total Cost: $1,080
TOTAL PRIORii 16/17 17/18 18/19 19/20 20/21 PE
TransNet-LSI Carry Over $1,080 .• $1,080 $125
TOTAL $1,080. $1,080 $125
Project Title: Kelly Drive and Park Drive Complete Street Improvements TransNet-LSI: CR
Project Description: Kelly Drive (lnd Park Drive from El Camino Real to Neblina Drive-complete street
improvements including new curblines, sidewalk and multi use trail
improvements and traffic; calming features such as bulb outs and medians.
Capacity Status: NCI : Exempt Category: Other -Transportation enhancement activities
' -. --
TOTAL PRIOR 16/17 17/18 18/19 19/20
TransNet-LSI Carry Over $3,875' $2,360 $1,515
TOTAL $3,875. $2,360 $1,515
Project Description: Valley Street from Chestnut Avenue to Buena Vista Way-improve the right of way
to include pedestrian crossings, curbline bulbouts, parking and bike lanes.
20/21 11
Capacity Status:. NCI Exempt Category: Air Quality -Bicycle and pedestrian facilities
Est Total Cost: $1,645
TOTAL PRIOR r---------------------·--~~~ $1,645
16/17 17/18 18/19 19/20
$1,645
20/21:
TransNet-LSI
TOTAL. $1,645 $1,645
* Pending final SANDAG approval
PE
$390
$390
PE
$200
$200
RW
RW
RW
$1,170
CON
$955
$955
CON
$1,445
$1,445
Wednesday, AprilS, 2016
16
Carlsbad, City of
Project Title:
Table 1
2016 Regional Transportation Improvement Program
San Diego Region (in $000s)
Adaptive Traffic Signal Program RAS (M-38)
Project Description: Aviara Parkway-Poinsettia to Palomar Airport Road, Cannon Road -1-5 to TransNet-LSI: CR
Faraday and Rancho Santa Fe-Calle Barcelona to San Elijo.-.In Carlsbad, along
Aviara Parkway, Cannon Road and Rancho Santa Fe Road, construct fiber optic
communications upgrades and install traffic measuring systems and adaptive
signal control systems to implement adpative traffic signal control along these
roadways.
Capacity Status: NCI Exempt Category: Other -Traffic signal synchronization projects
Est Total Cost: $1,200
TOTAL PRIOR.. 16/17 17/18 18/19 19/20
TransNet-LSI Carry Over $1,200 $1,200
TOTAL' $1,200 $1,200
Project Description: includes the following intersections: 1)0ak and Roosevelt, 2)0ak and Harding,
3)Pine and Harding, 4) Walnut and Roosevelt, 5)Walnut and Madison, 6)Chesntut
and Roosevelt, ?)Chestnut and Madison, B)Chestnut and Harding, and
9)Magnolia and Madison. -In Carlsbad, at nine intersection locations in the
Village and Barrio, construct medians and traffic circles a key intersections to
calm traffic.
Capacity Status: NCI Exempt Category: Safety -Adding medians
. ·--.... ·-
Est Total Cost: $1,500
TOTAL PRIORi 16/17 17/18 18/19 19/20
TransNet-LSI Carry Over $1,025 $145 $440 $440
Local Funds $475 $355 $60 $60
TOTAL $1,500. $500 $500 $500
Project Description: Carlsbad Blvd. from State Street to Tamarack Avenue-install pedestrian roadway
lighting.
Capacity Status: NCI
Est Total Cost: $1,325
TransNet-LSI Carry Over
TOTAL
*Pending final SANDAG approval
Exempt Category: Safety -Lighting improvements.
TOTAL PRIORj 16/17 17/18
$1,325. $610 $715
$1,325 $610 $715
20/21. PE
20/21 PE
$120
$60
$180
TransNet-LSI: CR
$100
RW CON
$1,200
$1,200
RW CON
$905
$415
$1,320
RW CON
$1,225
$1,225
Wednesday, April6, 2016
17
Carlsbad, City of
Project Title:
Table 1
2016 Regional Transportation Improvement Program
San Diego Region (in $000s)
State Street improvements at northwest corner with Grand Avenue
Project Description: State Street from Grand Avenue to Christiansen Ave, -widen the roadway to
accommodate additional on street parking, close a driveway access and
reconstruction the parkway to conform with the new curbline.
TransNet-LSI: CR
Capacity Status: NCJ Exempt Category: Other -Transportation enhancement activities
Est Total Cost: $325
TOTAL PRIORi 16/17 17/18 18/19 19/20 20/21 PE
TransNet-LSI Carry Over $325 $325 $50
TOTAL $325, $325 $50
Project Title: Christiansen Avenue Improvements TransNet-LSI: CR
Project Description: Christiansen Avenue from Washington Street to Carlsbad. Blvd.-construct new
curb line, s_idewalk and parkway improvements ..
Capacity Status: NCJ Exempt Category: Other -Transportation enhancement activities
Est Total Cost: $310
TOTAL PRIOR 16/17 17/18 18/19 19/20
TransNet-LSI Carry Over $310 $310
TOTAL $310 $310
Project Title: Chestnut Avenue Complete Street Improvements-1-5 to the Railroad
Project Description: Chestnut Avenue from 1-5 to Railroad -prepare a project study report to identify the
scope of work for the construction of complete street improvements including
traffic calming and pedestrian improvements.
Capacity Status: NCJ Exempt Category: Other -Engineering studies
TOTAL PRIORi 16/17 17/18 18/19 19/20
TransNet-LSI Carry Over $85 $85
$85 $85
20/21' PE
$60
$60
TransNet-LSI: CR
PE
$85
$85
RW
RW
Project Description: All streets with public street lights throughout the City. -In Carlsbad, on the streets
throughout the City, replace light bulbs with LED bulbs.
TransNet-LSI: Main!
Capacity Status: NCI Exempt Category: Safety -Lighting improvements
Est Total Cost: $3,645
TOTAL PRIOR 16/17 17/18 18/19 19/20 20/21 PE RW
TransNet-LSI $1,995 $1,170 $825 $300
TransNet-LSI Carry Over $1,650 $825 $825
TOTAL $3,645. $1,170 $825 $825 $825 $300
*Pending final SANDAG approval
CON
$250
$250
CON
CON
$1,695
$1,650
$3,345
Wednesday, April6, 2016
18
RTIP Fund Types
Federal Fundina
HPP
IM
Local Fundina
Local Funds AC
RTCIP
TDA
TDA-B
TransNet-BPNS
TransNet-L (Cash)
TransNet-LSG
TransNet-LSI
TransNet-LSI Carrv Over
TransNet-LSI (Cash)
*Pending final SANDAG approval
Table 1
2016 Regional Transportation Improvement Program
San Diego Region (in $000s)
High Priority Program under SAFETEA-LU
Interstate Maintenance Discretionary
Local Funds-Advanced Construction; mechanism to advance local funds to be reimbursed at
a later fiscal year with federal/state funds
Regional Transportation Congestion Improvement Program
Transportation Development Act
Transportation Development Act-Bicycle & Pedestrian Facilities
Prop. A Extension Local Transportation Sales Tax-Bicycle, Pedestrian and Neighborhood
Safety Proqram
TransNet-L funds which agencies have received payment, but have not spent
Prop. A Extension Local Transportation Sales Tax-Local Smart Growth
Prop. A Extension Local Transportation Sales Tax-Local System Improvements
TransNet -LSI funds previously programmed but not requested/paid in year of allocation
TransNet -LSI funds which agencies have received payment, but have not spent
Wednesday, April6, 2016
19
AFFIDAVIT OF MAILING
NOTICE OF PUBLIC HEARING
m: cmc~~
DATE OF PUBLIC HEARING: . s /3 II~ --~=~~~~~~~---~.--------------
SUBJECT: Carlsbad:./ 7rait;sl1e.C; l.o~ sw~T: /m. br'oVt:?meV\t:::: . , . r
LOCATION: .t~oo t2trlsba.cf...; Vj.l~~ · Dn:ve--
DATE NOTICES MAILED TO PROPERTY OWNERS:--~-...--~-~---
NUMBER MAILED: ---~,..-----
I declare under penalty of peljury under the laws of the State .of California that I am
employed by the City of Carl_?bad and the foregoing is true and correct.
CITY CLERK'S OFFICE
~ /(Date)
SENT TO FOR PUBL CATION VIA E-MAIL TO: [Biinion Tribune .
0 CoastNews
PUBUCATION DATE: Union Tribune H-~:2..¥ b
Coast News ______ ,-________ ~---------
I declare under penalty of perjury under the laws of the State of California that I am
employed by the City of Carlsbad in the City Clerk's Office and the foregoing is true and
oo~ct ·
Date: If: /-z /1 b r I
Attachments: 1) Mailing Labels
2) Notice w/ attachments
~· ·(Signatu~
20
Bill To:
CITY OF CARLSBAD-CU00474981
1200 Carlsbad Village Dr
Carlsbad,CA 92008-1989
STATE OF ILLINOIS
COUNTY OF Cook
wtht San i!Jit.9o
llnion~iEribunt
PROOF of Publication
The Undersigned, declares under penalty of perjury under the
laws of the State of California: That he/she is and at all times
herein mentioned was a citizen of the United States, over the
age of twenty-one years, and that he/she is not a party to, nor
interested in the above entitled matter; that he/she is Chief
Clerk for the publisher of
Proof of Publication of
San Diego Union-Tribune
a newspaper of general circulation, printed and published
daily in the City of San Diego, County of San Diego, and
which newspaper is published for the dissemination of local
news and intelligence of a general character, and which
newspaper at all the times herein mentioned had and still
has a bona fide subscription list of paying subscribers, and
which newspaper has been established, printed and
published at regular intervals in the said City of San Diego,
County of San Diego, for a period exceeding one year next
preceding the date of publication of the notice hereinafter
referred to, and which newspaper is not devoted to nor
published for the interests, entertainment or instruction of a
particular class, profession, trade, calling, race, or
denomination, or any number of same; that the notice of
which the annexed is a printed copy, has been published in
said newspaper in accordance with the instruction of the
person(s) requesting publication, and not in any supplement
thereof on the following dates, to wit:
April 22, 2016
I certify under penalty of perjury under the laws of the State of
California that the foregoing is true and correct.
Dated in the City of Chicago, State of Illinois
on this 22nd of April 2016.
Brittany Ger
San Diego U ion-Tribune
Legal Advertising
See Attached
4102666
21
Bill To:
CITY OF CARLSBAD-CU00474981
1200 Carlsbad Village Dr
Carlsbad, CA 92008-1989
Sold To:
CITY OF CARLSBAD-CU00474981
1200 Carlsbad Village Dr
Carlsbad, CA 92008-1989
GTV OF U\RLSBAD
tiTY UlWiCil
PUBi!S_.H; .ArJri~ 2'2, 20·~6
4102666
Carlsbad Program of Projects
Fiscal Years 2016/17 to 2020/21
Marshall Plantz
5/3/16
The Carlsbad Program of Projects
•A program of transportation projects over the next
five years.
•Part of the Regional Transportation Improvement
Program (RTIP).
The Regional Transportation Improvement Program
(RTIP)
•Multi-year planning and funding document
•Supports the development of the Regional
Transportation Plan (RTP)
•Ability to receive/access funding from
Federal, State and TransNet sources.
Types of Projects
•Projects with Federal or State funds
•Projects with TransNet funds
•Locally Funded and Capacity Increasing
Projects with Federal Funds
Federal funds
–Carlsbad Blvd. Bridge at Power Plant ($1,425,000)
–Poinsettia Lane Reach E ($1,436,000)
Projects with TransNet Funds
TransNet funds over the next five years-
–ADA Improvement Program ($1,670,000)
–Adaptive Traffic Signal Program –($1,200,000)
–Carlsbad Blvd. and Tamarack Avenue Improvements ($1,054,000)
–Carlsbad Blvd. Bridge at the Power Plant ($215,000)
–Carlsbad Blvd. Pedestrian Roadway Lighting –North of Tamarack Avenue ($1,325,000)
–Carlsbad Blvd. Realignment ($1,497,000)
–Carlsbad Village and Barrio Traffic Circles –($1,025,000)
–Carlsbad Village Drive and Grand Avenue Improvements ($1,320,000)
–Chestnut Avenue Improvements –Valley Street to I-5 ($1,080,000)
–Chestnut Avenue Improvements -I-5 to Railroad ($85,000)
–Christiansen Avenue Improvements ($310,000)
Projects with TransNet Funds
TransNet funds over the next five years-
–El Camino Real, Cassia Rd. to Camino Vida Roble ($2,820,000)
–El Camino Real, Tamarack Ave. to Chestnut Ave. ($1,986,000)
–Kelly Drive and Park Drive Improvements –ECR to Neblina ($3,875,000)
–Palomar Airport Road and Paseo Del Norte right turn ($451,000)
–Palomar Airport Road and Paseo Del Norte left turn ($233,000)
–Pavement Management ($7,500,000)
–State Street Improvement at Grand Avenue ($325,000)
–Street Light Bulb Replacement Program –($3,645,000)
–Terramar Coastal Improvement –Cannon Road ($1,000,000)
–Traffic Signal –Regional Arterial Management System ($24,000)
–Valley Street Improvements –Chestnut to Buena Vista Way ($1,645,000)
Projects that are Locally funded
and Capacity Increasing
–Avenida Encinas –PAR to Embarcadero ($5,402,000)
–College Blvd. –Reach A ($11,952,000)
–El Camino Real and Cannon Road ($2,049,000)
–El Camino Real and College Blvd. Intersection ($515,000)
–El Camino Real –La Costa Avenue to Arenal Road ($2,550,000)
–Poinsettia Lane Reach E ($11,700,000)
Local funds
Next Steps
•Adopt a Resolution approving the Carlsbad
Program of Projects.
•Submit the Resolution to SANDAG by June 24th.
•SANDAG assembles the RTIP and release the
draft on July 22nd.
•SANDAG Board adopts the RTIP for the region
on September 23rd.
•SANDAG submits the RTIP to the State.