HomeMy WebLinkAbout2016-05-03; City Council; 22283; Approve Carlsbad Transnet local street improvement program FY 2016-17 through 2020-21 for inclusion in 2016 SD Assoc. of Governments Regional Transportation Improvement Program1 CITY OF CARLSBAD-AGENDA BILL (\ -·· AB# 22,283 . APPROVE THE CARLSBAD TRANSNET LOCAL DEPT. DIREcrOR v·/'\1 I • I, MTG. 5/3/16 STREET IMPROVEMENT PROGRAM OF CITY ATTY. 1/S DEPT. PW-TRAN PROJECTS FOR FISCAL YEARS 2016-17 CITYMGR. It L-THROUGH 2020-21, FOR INCLUSION IN THE 2016 SAN DIEGO ASSOCIATION OF GOVERNMENTS REGIONAL TRANSPORTATION IMPROVEMENT PROGRAM RECOMMENDED ACTION: Adopt a Resolution approving the Carlsbad TransNet Local Street Improvement Program of Projects for Fiscal Years (FY) 2016-17 through 2020-21, for inclusion in the 2016 San Diego Association of Governments Regional Transportation Improvement Program. ITEM EXPLANATION: The 2016 Regional Transportation Improvement Program (RTIP) is a program of proposed highway, arterial roadway, transit, and bikeway projects for FY 2016-17 through 2020-21. The San Diego Association of Governments (SANDAG) is required by state and federal laws to develop and adopt the RTIP every two years. Each member agency of SANDAG that desires to expend TransNet and/or certain federal or state funds must approve a program of projects once every two years. In addition to projects with these funding sources, the program of projects also includes regionally significant capacity increasing projects, regardless of the funding source. The federal Metropolitan Planning and Air Quality Conformity Regulations also require inclusion of all regionally significant capacity increasing road projects for air quality emissions analysis. The approval process includes consideration of the Carlsbad Program of Projects at a Public Hearing and adoption of the attached Resolution. The adopted Resolution approving the Carlsbad Program of Projects is due to SANDAG by June 24, 2016. The Carlsbad Program of Projects is then incorporated into the draft 2016 RTIP as assembled and submitted to the state by SANDAG by July 22, 2016. The proposed Carlsbad Program of Projects for FY 2016-17 through 2020-21, which is attached as Attachment A to the Resolution, includes projects with the following funding types: • Federal-SAFETEA-LU, High Priority Project • Federal-Highway Bridge Program • SANDAG-TransNet Local • Local-City Funds • Local-Private Funds DEPARTMENT CONTACT: Marshall Plantz 760-602-2766 Marshaii.Piantz@carlsbadca.gov FOR CLERK USE. ~ COUNCIL ACTION: APPROVED CONTINUED TO DATE SPECIFIC D DENIED D CONTINUED TO DATE UNKNOWN D CONTINUED D RETURNED TO STAFF D WITHDRAWN D OTHER-SEE MINUTES D AMENDED D REPORT RECEIVED D 2 Approval of 2016 City of Carlsbad RTIP May3, 2016 Page2 of2 The federal funding included in the Carlsbad Program of Projects consists of Federal SAFETEA-LU, High Priority Project funds for Poinsettia Lane Reach E. The city is also set to receive Federal Highway Bridge Program funding which is programmed by Caltrans, and therefore is not listed as a funding line item on the Carlsbad Program of Projects. TransNet funds are programmed for a variety of projects including bridge improvement, roadway improvement, pavement management program, traffic signal improvement and safety lighting projects. The Carlsbad Program of Projects also includes various capacity increasing roadway projects located along regionally significant arterials, regardless of the funding source. The projects in this category include various roadway segments and intersection improvements. The majority of these projects are funded by local city funds such as Traffic Impact Fees and/or funding from the adjacent private development. The Program of Projects may be revised as needed on a quarterly basis during the two year period between the adoption of the 2016 RTIP and the subsequent 2018 RTIP. FISCAL IMPACT: Approving the RTIP is a requirement under state law for receiving TransNet, state or federal funds. Approval of the RTIP ensures eligibility for funding and programs the funding for future obligation. Inclusion in the RTIP, however, is not a guarantee that projects will receive the stated funding. The amounts shown are the best available estimates of anticipated funding. In the event that funding falls short or is not available, the City Council is not obligated to proceed with a project just because it is included in the RTIP. ENVIRONMENTAL IMPACT: This activity is statutorily exempt from CEQA pursuant to CEQA Guidelines, Section 15276, which states that CEQA does not apply to the adoption of a Regional Transportation Improvement Program. However, individual projects developed pursuant to these programs shall remain subject to CEQA. EXHIBITS: 1. Resolution approving the Carlsbad TransNet Local Street Improvement Program of Projects for Fiscal Years 2016-17 through 2020-21, for inclusion in the 2016 San Diego Association of Governments Regional Transportation Improvement Program. 2 3 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 RESOLUTION NO. 2016-086 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD, CALIFORNIA, APPROVING THE CARLSBAD TRANSNET LOCAL STREET IMPROVEMENT PROGRAM OF PROJECTS FOR FISCAL YEARS 2016-17 THROUGH 2020-21, FOR INCLUSION IN THE 2016 SAN DIEGO ASSOCIATION OF GOVERNMENTS REGIONAL TRANSPORTATION IMPROVEMENT PROGRAM WHEREAS, on Nov~ 4, 2004, the voters of San Diego County approved the San Diego Transportation Improvement Program Ordinance and Expenditure Plan (TransNet Extension Ordinance); and WHEREAS, the TransNet Extension Ordinance provides that the San Diego Association of Governments (SANDAG), acting as the Regional Transportation Commission, shall approve on a biennial basis a multi-year program of projects submitted by local jurisdictions identifying those transportation projects eligible to use transportation sales tax (TransNet) funds; and WHEREAS, the City of Carlsbad was provided with an estimate of annual TransNet local improvement revenues for Fiscal Years (FY) 2016-17 through 2020-21; and WHEREAS, the City of Carlsbad has held a noticed Public Hearing with an agenda item that clearly identified the proposed list of projects prior to approval of the projects by its authorized legislative body in accordance with Section S(A) of the TransNet Extension Ordinance and Rule 7 ofthe SANDAG Board Policy 31. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carlsbad, California, as follows: 1. That the above recitations are true and correct. 4 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 2. That pursuant to Section 2(C)(l) of the TransNet Extension Ordinance, the City of Carlsbad certifies that no more than 30 percent of its annual revenues from the TransNet funds shall be spent on local street and road maintenance related projects. 3. That pursuant to Section 4(E)(3) of the TransNet Extension Ordinance, the City of Carlsbad certifies that all new projects, or major reconstruction projects, funded by TransNet revenues shall accommodate travel by pedestrians and bicyclists, and that any exception to this requirement permitted under the Ordinance and proposed shall be clearly noticed as part of the City of Carlsbad's Public Hearing process. 4. That pursuant to Section 8 ofthe TransNet Extension Ordinance, the City of Carlsbad certifies that the required minimum annual level of local discretionary funds to be expended for street and road purposes will be met throughout the 5-year period consistent with the most recent Maintenance of Effort Requirements adopted by SANDAG. 5. That pursuant to Section 9A of the TransNet Extension Ordinance, the City of Carlsbad certifies that it will extract $2,357, plus all applicable annual increases, from the private sector for each newly constructed residential housing unit in the City of Carlsbad, and shall contribute such exactions to the Regional Transportation Congestion Improvement Program (RTCIP). 6. That pursuant to Section 13 of the Transnet Extension Ordinance, the City of Carlsbad certifies that is has established a separate Transportation Improvement Account for TransNet Revenue with interest earned expended only for those purposes for which the funds were allocated. 5 1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 7. That pursuant to Section 18 of the TransNet Extension Ordinance, the City of Carlsbad certifies that each project of $250,000 or more will be clearly designated during construction with TransNet project funding identification signs. 8. That the City of Carlsbad does hereby certify that all other applicable provisions of the TransNet Extension Ordinance and the SANDAG Board Policy 31 have been met. 9. That the City of Carlsbad agrees to indemnify, hold harmless and defend SANDAG, the San Diego County Regional Transportation Commission, and all officers and employees thereof against all causes of action or claims related to local TransNet funded projects. 10. That the Carlsbad TransNet Local Street Improvement Program of Projects for FY 2016-17 through 2020-21 attached to this Resolution as Attachment A is hereby approved for inclusion in the 2016 SANDAG RTIP. Ill Ill Ill Ill Ill Ill Ill Ill Ill Ill Ill Ill 6 1 PASSED, APPROVED AND ADOPTED at a regular meeting of the Carlsbad City Council held 2 on the 3rct day of May, 2016 by the following vote, to wit: 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 AYES: Halt Wood, Schumacher, Blackburn, Packard. NOES: None. ABSENT: None. ATTEST: BARBARA ENGLESON, fjty Clerk (SEAL) 7 Table 1 2016 Regional Transportation Improvement Program San Diego Region (in $000s) Project Title: Proje<;t Description: El Camino Real from Tamarack Ave. to Chestnut Ave.-In Carlsbad, widen El Camino Real to prime arterial standards with three travel lanes, bike lanes and sidewalks in each direction including intersection improvements at Tamarack Avenue and Chestnut Avenue Capacity Status: Cl Exempt Category: Non-Exempt Est Total Cost: $12,374 Open to Traffic: Sep 2016 TOTAL PRIORi 16/17 17/18 18/19 19/20 TransNet-LSI Carry Over $3,951 $1,965 j $1,986 Local Funds $3,851 $3,851 I Local RTCIP $4,572 $4,572 j TOTAL $12,374 $10,388 $1,986 Project Title: El Camino Real and Cannon Road Project Description: El Camino Real and Cannon' Road -In Carlsbad, along the east/north-bound side of El Camino Real just south of Cannon Road; widen to provide three through lanes, a right turn lane and a sidewalk approaching the intersection with Cannon Road Capacity Status: Cl . Exempt Category: Non-Exempt Est Total Cost: $2,049 Open to T raffle: Jun 2018 TOTAL PRIOR·· 16/17 17/18 18/19 19/20 Local Funds $2,049; $849' $1,200 TOTAL $2,049; $849: $1,200 Project Title: El Camino Real -Lisa Street to Crestview Drive Project Description: El Camino Real from Lisa Street to Crestview Drive -.in Carlsbad, along the west side of El Camino Real, roadway widening to provide .three southbound through lanes, curb, gutter and sidewalk per Prime Arterial standards Capacity Status: Cl Exempt Category: Non-Exempt Est Total Cost: $2,188 Open to Traffic: Jun 2016 TOTAL. PRIOR~ 16/17 17/18 18/19 19/20 Local Funds $2,188. $2,1881: TOTAL $2,188 $2,188 *Pending final SANDAG approval 20/21 i PE $1,225 $1,225 RTP PG NO: B-34 RAS (M-38) 20/21. PE $325 $325 RTP PG NO: A-29 RAS (TA 4-66) 20/21 PE $170 $170 RW CON $3,951 $60 $2,566 $4,572 $60 $11,089 RW CON $1,724 $1,724 RW CON $2,018 $2,018 Wednesday, April6, 2016 8 Table 1 2016 Regional Transportation Improvement Program San Diego Region (in $000s) Carlsbad, City of Project Ti.tle: College Boulevard Reach A Project Description: College Boulevard from Badger Lane to Cannon Road -in Carlsbad, from Badger Lane .to Cannon Road, construct a new segment of College Blvd. to provide 4-lane roadway with raised median, bike lanes and sidewalks/trails in accordance with Major Arterial standards Capacity Status: Cl · Exempt Category: Non-Exempt Est Total Cost: $11,952 Open to Traffic: Jun 2018 TOTAL PRIOR: 16/17 17/18 18/19 19/20 Local Funds $11,952 $2,774 i $5,178 $4,000 TOTAL, $11,952 $2,774 :: $5,178 $4,000 Project Title: Poinsettia Lane Reach E Project Description: Poinsettia Lane from Cassia Drive to Skimmer Court-construct a new 4-lane roadway with median, bike lanes, and sidewalks/trails to major arterial standards Capacity Status: Cl · Exempt Category: Non-Exempt .. Est Total Cost: $13,136 Open to Traffic: Jun 2018 HPP Local Funds $8,740 $1,700 TOTAL $1,700 Project Title: Carlsbad Blvd. Bridge over Encina Power Station Project Description: Carlsbad Blvd. from Encina Power Plant to Warm water outfall channel -In Carslbad, Carlsbad Blvd bridge over the Encina Power Plant warm water discharge channel, upgrade bridge railings on the bridge, (local match to HBP funding)._ RTP PG NO: B-34 RAS (M-38) 20/21 ;! PE $2,774 $2,774 RTP PG NO: B-34 RW CON $9,178 $9,178 EARMARK NO: CA366, CA517 RAS (M-38) RW CON $1,436 $1,260 $10,440 $1,260 $11,876 RAS (M-38) TransNet-LSI: CR Capacity Status: NCI Exempt Category: Safety -Guardrails, median barriers, crash cushions PRIOR 16/17 17/18 18/19 19/20 20/21 PE RW CON TransNet-L (Cash) $8 $8 $8 TransNet-LSI Carry Over $215 $215 $25 $190 TOTAL $223. $8 $215 $33 $190 *Pending final SANDAG approval Wednesday, AprilS, 2016 9 Table 1 2016 Regional Transportation Improvement Program San Diego Region (in $000s) Project Description: Carlsbad Blvd. from Mountain View to State -0.6 mlles NW of Carlsbad Village Drive, upgrade the bridge railings on the Carlsbad Blvd. Bridge over the San Diego Northern Railway (SDNR) railroad (local match to HBP funding, part of CAL44) TransNet-LSI: Maint Capacity Status: NCJ Est Total Cost: $549 TransNet-LSI TransNet-LSI Carry Over TOTAL • Exempt Category: Safety -Guardrails, median barriers, crash cushions TOTAL PRIOR" 16/17 17/18 18/19 19/20 20/21 PE $467 $467' $50 $82 $82 ~ $549 $549 ; $50 Project Title: Pavement Management-Overlay RAS {M-38) Project Description: Street locations by year as follows: FY 16/17 roadways -Haymar Drive, College TransNet-LSI: CR Boulevard, AvenidaEncinas and El Camino Real. FY17f18 El Camino Real, Rancho Santa Fe and El Fuerte Street. FY 18/19-Palomar Airport Road, Carlsbad Village Drive, Pio Pico. FY's 19/20-FY 20/21 have not been modeled and therefore the streets have not been identified. -In Carlsbad, on various streets throughout the City, pavement overlay 1 inch or greater and miscellaneous roadw<3y section spot repairs. Capacity Status: NCI Exempt Category: Safety -Pavement resurf<:lcing and/or rehabilitation Est Total Cost: $33,890 TOTAL PRIOR] 16/17 17/18 18/19 19/20 TransNet-L (Cash) $946 $946 i TransNet-LSI $6,000. $1,500 $1,500 $1,500 TransNet-LSI (Cash) $1,531 •. $34 j $1,497 TransNet-LSI Carry Over $5,063 $5,060 i $3 Local Funds $20,350 $13,100 i $1,450 $1,450 $1,450 $1,450 TOTAL $33,890. $19,140 : $2,950 $2,950 $2,950 $2,950 Project Title: Pavement Management -Seal Project Description: Various minor/local roadways within each area encompassed by the streets included in the overlay program for that year-In Carlsbad, along various roadways construct/apply street sealing and construct minor roadway pavement section repairs .. 20/21 $1,500 $1,450 $2,950 Capacity Status: NCI Exempt Category: Safety -Pavement resurfacing and/or rehabilitation Est Total Cost: $7,550 TOTAL PRIOR 16/17 17/18 18/19 19/20 20/21 Local Funds $7,550. $3,800 $750 $750 $750 $750 $750 TOTAL $7,550 . $3,800 $750 $750 $750 $750 $750 *Pending final SANDAG approval PE PE RW RW RW CON $417 $82 $499 CON $946 $6,000 $1,531 $5,063 $20,350 $33,890 CON $7,550 $7,550 Wednesday, April6, 2016 10 Table 1 2016 Regional Transportation Improvement Program San Diego Region (in $000s) Carlsbad, City of Project Title: Avenida Encinas -Widen from Palomar Airport Road to Embarcadero Lane Project Description: Avenida Encinas from Palomar Airport Rd. to Embarcadero Lane -In Carlsbad, Avenida Encinas from Palomar Airport Road southerly to existing improvements adjacent to the Embarcadero Lane; roadway widening and parkway construction/improvements. Capacity Status: Cl Exempt Category: Non-Exempt Es!TotaiCost: $5,402 Open to Traffic: Jun 2019 TOTAL. PRIORi 16/17 17/18 18/19 19/20 Local Funds $5,402 $2,605; $51 $1,746 $1,000 TOTAL. $5,402 $2,605 i $51 $1,746 $1,000 Project Title: El Camino Real Left Turn Lane to westbound Tamarack Ave. Project Description: El Camino Real and Tamarack Avenue-at the intersection of El Camino Real and Tamarack Avenue construct a second left turn Jane frorn El Camino Real to westbound Tamarack Capacity Status: Cl Exempt Category: Non-Exempt Est Total Cost: $286 Open to Traffic: Sep 2016 TOTAL PRIOR' 16/17 17/18 18/19 19/20 Local Funds $286 $286' TOTAL $286. $286 Project Title: El Camino Real Widening -La Costa Avenue to Arena! Road Project Description: El Camino Real from La Costa Ave to Arena! Rd. -In Carlsbad, along El Camino Real from 700 feet north of La Costa Avenue to Arena! Road, widening along the southbound side of the roadway to provide three travel lanes and a bike lane in accordance with Prime Arterial Standards Capacity Status: Cl Exempt Category: Non-Exempt Est Total Cost: $2,550 · Open to Traffic: Jun 2018 TOTAL PRIORl 16/17 17/18 18/19 19/20 Local Funds $1,925 $1,925 Local RTCIP $625 $625 ·: ' TOTAL· $2,550 $625 l $1,925 *Pending final SANDAG approval RTP PG NO: B-34 20/21 < PE $400 $400 RTP PG NO: A-29 RAS (T A 4-66) 20/21' PE $70 $70 RTP PG NO: B-35 RAS (M-38) 20/21; PE $625 $625 RW CON $60 $4,942 $60 $4,942 RW CON $216 $216 RW CON $1,925 $1,925 Wednesday, April6, 2016 11 Table 1 2016 Regional Transportation Improvement Program San Diego Region (in $000s) Carlsbad, City of Project Title: El Camino Real Widening -Cassia to Project Description: El Camino Real from Cassia Road to Camino Vida Roble-In Carlsbad, widen El Camino Real from 900 feet north of Cassia Road to Camino Vida Roble, along the northbound/east side. of the roadway to provide three travel lanes and a bike lane in accordance with Prime Arterial standards Capacity Status: Cl · Exempt Category: Non-Exempt Est Total Cost $2,820 Open to Traffic: Dec 2018 PRIOR[, 16/17 17/18 18/19 TransNet-LSI $60 TransNet-LSI Carry Over $2,760 $325 $2,435 TOTAL $2,820 $325 $2,495 Project Description: Palomar Airport Road between 1-5 and Paseo Del Norte-widening along eastbound Palomar Airport Road to provide a dedicated right turn lane to southbound Paseo Del Norte Capacity Status: Cl Exempt Category: Non-Exempt Est Total Cost: $564 Open to Traffic: Dec 2017 TOTAL PRIORT 16/17 17/18 18/19 TransNet-LSI Carry Over $451 $451 Local Funds $113 $113) TOTAL $564 $113 l $451 Project Title: Palomar Airport Road and Paseo Del Norte Left Turn Lane 19/20 19/20 Project Description: Palomar Airport Road between 1-5 and Paseo Del Norte-lengthen the left turn pocket along eastbound Palomar Airport Road to northbound Paseo Del Norte Capacity Status: Cl Exempt Category: Non-Exempt Est Total Cost: $233 Open to Traffic: Dec 2017 TOTAL PRIOR,: 16/17 17/18 18/19 19/20 TransNet-LSI Carry Over $233 $233 TOTAL $233. $233 *Pending final SANDAG approval 20/21 ~ PE RW $425 $1,350 $425 $1,350 20/21 '· PE $64 $64 RTP PG NO: 8-35 RAS (M-38) TransNet-LSI: CR 20/21. PE $30 $30 RW RW CON $60 $985 $1,045 -" -·~ CON $451 $49 $500 CON $203 $203 Wednesday, April6, 2016 12 Table 1 2016 Regional Transportation Improvement Program San Diego Region (in $000s) Carlsbad, City of Project Title: Carlsbad Boulevard Realignment Project Description: Carlsbad Boulevard from Palomar Airport Road to City limit -In Carlsbad, from Palomar Airport Road to the southerly City limit, study the realignment of Carlsbad Blvd including the relocation of the southbound lanes of Carlsbad Blvd to the east and the construction of complete street and multi use trail improvements along the coastal corridor. Capacity Status: NCI Exempt Category: Other -Engineering studies Est Total Cost: $4,497 TOTAL PRIOR: 16/17 17/18 18/19 19/20 TransNet-LSI $3,464 $1,967 ; $672 $574 $251 TransNet-LSI Carry Over $1,033 $1,033 ~ TOTAL $4,497 $3,000 $672 $574 $251 *$1.497M spent on CB20 20/21 PE $3,464 $1,033 $4,497 Project Title: EI.Camino Real and College Blvd. Intersection Improvements RAS (M-38) Project Description: El Camino Real from El Camino Real to College Blvd -In Carlsbad, on El Gamino Real, improve El Camino Real along the southbound approach to the intersection with College Blvd. to provide three thru lanes and a signal controlled right tum lane. Capacity Statu~:~: NGI Exempt Category: Other -Intersection channelization projects Est Total Cost: $515 TOTAL PRIOR~ 16/17 17/18 18/19 19/20 Local Funds $515 $515 TOTAL $515. $515 Project Title: El Camino Real-Cannon Road to Tamarack Avenue Project Description: El Camino Real from Cannon. Road to Tamarack ~widen along both sides of El Camino Real from Cannon Road to Tamarack Avenue excluding the limits of Project CB04C, to provide a raised median, three travel lanes, bike lane, curb, gutter and walkway along both sides per Prime Arterial Standards and a new traffic signal at Lisa Street Capacity Status: Cl Exempt Category: Non-Exempt Est Total Cost: $10,000 Open to Traffic: Jun 2016 16/17 *Pending final SANDAG approval 20/21; PE $71 $71 RAS (T A 4-66) ~ RW CON RW CON $34 $410 $34 $410 $10,000 Wednesday, Apri16, 2016 13 Project Title: Table 1 2016 Regional Transportation Improvement Program San Diego Region (in $000s) co Carlsbad CATS (part of Lump Sum V12) Project Description: From to -Develops an implementation strategy for livable streets. The plan will be tested by implementing up to five pilot projects. The plan is city-wide with up toten priority locations to be identified during the project lifecycle. -#1223028 Capacity Status: NCI Exempt Category: Air Quality -Bicycle and pedestrian facilities Est Total Cost: TOTAL PRIOR 16/17 17/18 18/19 19/20 TransNet-BPNS Local Funds TOTAL Project Title: Active Village Campaign (part of Lump Sum V12) Project Description: From to-Develops a multi-media campaign to promote the benefits of walking and biking in Carlsbad and Carlsbad Village, and aims to increase bicycling and walking for everyday trips, improve connectivity and create a pilot program that is scalable for other cities in the region.-#1223029 20/21 .. Capacity Status: NCI Exempt Category: Air Quality -Bicycle and pedestrian facilities Est Total Cost: TOTAL. PRIOR • 16/17 18/19 19/20 20/21' TransNet-BPNS Local Funds TOTAL, PE RW CON CON Project Title: ADA Improvements TransNet-LSI: CR Project Description: Roadways in the northwest quadrant of the City of Carlsbad adjacent to public facilities inlcuding: Carlsbad Blvd, State Street, Roosevelt Street, Carlsbad Village Drive, Oak Ave., Chestnut Ave, Harding Street-In Carlsbad, various roadways in the northwest quadrant of the City of Carlsbad ,construct Priority Level 1 and Priority Level 2 ADA Improvements per the City of Carlsbad Transition Plan for Public Rights-of-way Capacity Status: NCI Est Total Cost: $1,670 TransNet-LSI Carry Over *Pending final SANDAG approval Exempt Category: Safety -Safety Improvement Program PRIOR 16/17 17/18 18/19 19/20 $750 $500 $250 $170 $750 $500 $250 $170 20/21 PE RW CON $175 $1,495 $175 $1,495 Wednesday, Apri16, 2016 14 Carlsbad, City of Table 1 2016 Regional Transportation Improvement Program San Diego Region (in $000s) Project Description: Management System for Arterial roadways throughout the City of Carlsbad and the County-City of Carlsbad annual operations and maintenance cost share for the Regional Arterial Management System, (RAMS). TransNet-LSI RAMS of $12 is programmed in FY 20171 TransNet-LSI RAMS of $12 is programmed in FY 2018 Capacity Status: NCJ · Exempt Category: Other -Traffic signal synchronization projects Est Total Cost: $59 TransNet-LSI TOTAL -·-PRIOR~ 16/17 17/18 18/19 $59 $35' $12 $12 TOTAL $59 $35 $12 $12 Carlsbad Boulevard and Tamarack Avenue Pedestrian Improvement Project of Lump Sum V17) 19/20 Project Description: Carlsbad Blvd. from at Tamarack Avenue to -In Carlsbad, at the intersection of Carlsbad Blvd and Tamarack Avenue, reconfigure the intersection and the approaches to the intersection and provide enhanced facilities for pedestrians, transit users and bicyclists; SANDAG approved TransNeUATP swap on October 23,2015 20/21.! Capacity Status: NCI EstTotal Cost: $2,900 Exempt Category: Air Quality -Bicycle and pedestrian facilities -·~ .. -. " . - TOTAL PRIOR] 16/17 17/18 18/19 19/20 TransNet-BPNS $1,054 $1,054 Local Funds $1,654 $14 j $1,010 $234 $397 TDA -Bicycles $192 $3! $38 $56 $95 TOTAL $2,900 $17 .. $2,102 $290 $492 Improvements - Project Description: Cannon Road from Carlsbad Blvd to Avenida Encinas -Construct complete street improvements including the reconfiguration of the curbline and the addition of medians, pedestrian crossings and parkway improvements. 20/21 Capacity Status: NC! Exempt Category: Other -Transportation enhancement activities Est Total Cost: $1,000 TOTAL PRIOR 16/17 17/18 18/19 19/20 20/21: TransNet-LSI $1,000 $1,000 TOTAL $1,000 $1,000 *Pending final SANDAG approval PE RW CON $59 $59 PE RW CON $1,054 $500 $1 '154 $192 $500 $2,400 PE RW CON $100 $900 $100 $900 Wednesday, AprilS, 2016 15 Carlsbad, City of Table 1 2016 Regional Transportation Improvement Program San Diego Region (in $000s) Project Title: Carlsbad Village Drive and Grand Avenue Improvements Project Description: Carlsbad Village Drive and Grand Avenue from Washington Street to State Street- provide mid block pedestrian crossing improvements and sidewalk/parkway improvements at the approaches to the railroad track crossings. Capacity Status: NCI Exempt Category: Safety -Safety Improvement Program Est Total Cost: $1,320 16/17 17/18 18/19 19/20 TransNet-LSI $1,320 TOTAL .. $1,320 $1,320 Project Title: Chestnut Avenue Complete Street Improvements Valley Street to 1-5 Project Description: Chestnut Avenue from Valley Street to 1-5 -complete street improvements including sidewalk improvements and traffic calming features such as bulb outs and medians. RAS (M-38) TransNet-LSI: CR $150 TransNet-LSI: CR Capacity Status: NCI Exempt Category: Other -Transportation enhancement activities Est Total Cost: $1,080 TOTAL PRIORii 16/17 17/18 18/19 19/20 20/21 PE TransNet-LSI Carry Over $1,080 .• $1,080 $125 TOTAL $1,080. $1,080 $125 Project Title: Kelly Drive and Park Drive Complete Street Improvements TransNet-LSI: CR Project Description: Kelly Drive (lnd Park Drive from El Camino Real to Neblina Drive-complete street improvements including new curblines, sidewalk and multi use trail improvements and traffic; calming features such as bulb outs and medians. Capacity Status: NCI : Exempt Category: Other -Transportation enhancement activities ' -. -- TOTAL PRIOR 16/17 17/18 18/19 19/20 TransNet-LSI Carry Over $3,875' $2,360 $1,515 TOTAL $3,875. $2,360 $1,515 Project Description: Valley Street from Chestnut Avenue to Buena Vista Way-improve the right of way to include pedestrian crossings, curbline bulbouts, parking and bike lanes. 20/21 11 Capacity Status:. NCI Exempt Category: Air Quality -Bicycle and pedestrian facilities Est Total Cost: $1,645 TOTAL PRIOR r---------------------·--~~~ $1,645 16/17 17/18 18/19 19/20 $1,645 20/21: TransNet-LSI TOTAL. $1,645 $1,645 * Pending final SANDAG approval PE $390 $390 PE $200 $200 RW RW RW $1,170 CON $955 $955 CON $1,445 $1,445 Wednesday, AprilS, 2016 16 Carlsbad, City of Project Title: Table 1 2016 Regional Transportation Improvement Program San Diego Region (in $000s) Adaptive Traffic Signal Program RAS (M-38) Project Description: Aviara Parkway-Poinsettia to Palomar Airport Road, Cannon Road -1-5 to TransNet-LSI: CR Faraday and Rancho Santa Fe-Calle Barcelona to San Elijo.-.In Carlsbad, along Aviara Parkway, Cannon Road and Rancho Santa Fe Road, construct fiber optic communications upgrades and install traffic measuring systems and adaptive signal control systems to implement adpative traffic signal control along these roadways. Capacity Status: NCI Exempt Category: Other -Traffic signal synchronization projects Est Total Cost: $1,200 TOTAL PRIOR.. 16/17 17/18 18/19 19/20 TransNet-LSI Carry Over $1,200 $1,200 TOTAL' $1,200 $1,200 Project Description: includes the following intersections: 1)0ak and Roosevelt, 2)0ak and Harding, 3)Pine and Harding, 4) Walnut and Roosevelt, 5)Walnut and Madison, 6)Chesntut and Roosevelt, ?)Chestnut and Madison, B)Chestnut and Harding, and 9)Magnolia and Madison. -In Carlsbad, at nine intersection locations in the Village and Barrio, construct medians and traffic circles a key intersections to calm traffic. Capacity Status: NCI Exempt Category: Safety -Adding medians . ·--.... ·- Est Total Cost: $1,500 TOTAL PRIORi 16/17 17/18 18/19 19/20 TransNet-LSI Carry Over $1,025 $145 $440 $440 Local Funds $475 $355 $60 $60 TOTAL $1,500. $500 $500 $500 Project Description: Carlsbad Blvd. from State Street to Tamarack Avenue-install pedestrian roadway lighting. Capacity Status: NCI Est Total Cost: $1,325 TransNet-LSI Carry Over TOTAL *Pending final SANDAG approval Exempt Category: Safety -Lighting improvements. TOTAL PRIORj 16/17 17/18 $1,325. $610 $715 $1,325 $610 $715 20/21. PE 20/21 PE $120 $60 $180 TransNet-LSI: CR $100 RW CON $1,200 $1,200 RW CON $905 $415 $1,320 RW CON $1,225 $1,225 Wednesday, April6, 2016 17 Carlsbad, City of Project Title: Table 1 2016 Regional Transportation Improvement Program San Diego Region (in $000s) State Street improvements at northwest corner with Grand Avenue Project Description: State Street from Grand Avenue to Christiansen Ave, -widen the roadway to accommodate additional on street parking, close a driveway access and reconstruction the parkway to conform with the new curbline. TransNet-LSI: CR Capacity Status: NCJ Exempt Category: Other -Transportation enhancement activities Est Total Cost: $325 TOTAL PRIORi 16/17 17/18 18/19 19/20 20/21 PE TransNet-LSI Carry Over $325 $325 $50 TOTAL $325, $325 $50 Project Title: Christiansen Avenue Improvements TransNet-LSI: CR Project Description: Christiansen Avenue from Washington Street to Carlsbad. Blvd.-construct new curb line, s_idewalk and parkway improvements .. Capacity Status: NCJ Exempt Category: Other -Transportation enhancement activities Est Total Cost: $310 TOTAL PRIOR 16/17 17/18 18/19 19/20 TransNet-LSI Carry Over $310 $310 TOTAL $310 $310 Project Title: Chestnut Avenue Complete Street Improvements-1-5 to the Railroad Project Description: Chestnut Avenue from 1-5 to Railroad -prepare a project study report to identify the scope of work for the construction of complete street improvements including traffic calming and pedestrian improvements. Capacity Status: NCJ Exempt Category: Other -Engineering studies TOTAL PRIORi 16/17 17/18 18/19 19/20 TransNet-LSI Carry Over $85 $85 $85 $85 20/21' PE $60 $60 TransNet-LSI: CR PE $85 $85 RW RW Project Description: All streets with public street lights throughout the City. -In Carlsbad, on the streets throughout the City, replace light bulbs with LED bulbs. TransNet-LSI: Main! Capacity Status: NCI Exempt Category: Safety -Lighting improvements Est Total Cost: $3,645 TOTAL PRIOR 16/17 17/18 18/19 19/20 20/21 PE RW TransNet-LSI $1,995 $1,170 $825 $300 TransNet-LSI Carry Over $1,650 $825 $825 TOTAL $3,645. $1,170 $825 $825 $825 $300 *Pending final SANDAG approval CON $250 $250 CON CON $1,695 $1,650 $3,345 Wednesday, April6, 2016 18 RTIP Fund Types Federal Fundina HPP IM Local Fundina Local Funds AC RTCIP TDA TDA-B TransNet-BPNS TransNet-L (Cash) TransNet-LSG TransNet-LSI TransNet-LSI Carrv Over TransNet-LSI (Cash) *Pending final SANDAG approval Table 1 2016 Regional Transportation Improvement Program San Diego Region (in $000s) High Priority Program under SAFETEA-LU Interstate Maintenance Discretionary Local Funds-Advanced Construction; mechanism to advance local funds to be reimbursed at a later fiscal year with federal/state funds Regional Transportation Congestion Improvement Program Transportation Development Act Transportation Development Act-Bicycle & Pedestrian Facilities Prop. A Extension Local Transportation Sales Tax-Bicycle, Pedestrian and Neighborhood Safety Proqram TransNet-L funds which agencies have received payment, but have not spent Prop. A Extension Local Transportation Sales Tax-Local Smart Growth Prop. A Extension Local Transportation Sales Tax-Local System Improvements TransNet -LSI funds previously programmed but not requested/paid in year of allocation TransNet -LSI funds which agencies have received payment, but have not spent Wednesday, April6, 2016 19 AFFIDAVIT OF MAILING NOTICE OF PUBLIC HEARING m: cmc~~ DATE OF PUBLIC HEARING: . s /3 II~ --~=~~~~~~~---~.-------------- SUBJECT: Carlsbad:./ 7rait;sl1e.C; l.o~ sw~T: /m. br'oVt:?meV\t:::: . , . r LOCATION: .t~oo t2trlsba.cf...; Vj.l~~ · Dn:ve-- DATE NOTICES MAILED TO PROPERTY OWNERS:--~-...--~-~---­ NUMBER MAILED: ---~,..----- I declare under penalty of peljury under the laws of the State .of California that I am employed by the City of Carl_?bad and the foregoing is true and correct. CITY CLERK'S OFFICE ~ /(Date) SENT TO FOR PUBL CATION VIA E-MAIL TO: [Biinion Tribune . 0 CoastNews PUBUCATION DATE: Union Tribune H-~:2..¥ b Coast News ______ ,-________ ~--------- I declare under penalty of perjury under the laws of the State of California that I am employed by the City of Carlsbad in the City Clerk's Office and the foregoing is true and oo~ct · Date: If: /-z /1 b r I Attachments: 1) Mailing Labels 2) Notice w/ attachments ~· ·(Signatu~ 20 Bill To: CITY OF CARLSBAD-CU00474981 1200 Carlsbad Village Dr Carlsbad,CA 92008-1989 STATE OF ILLINOIS COUNTY OF Cook wtht San i!Jit.9o llnion~iEribunt PROOF of Publication The Undersigned, declares under penalty of perjury under the laws of the State of California: That he/she is and at all times herein mentioned was a citizen of the United States, over the age of twenty-one years, and that he/she is not a party to, nor interested in the above entitled matter; that he/she is Chief Clerk for the publisher of Proof of Publication of San Diego Union-Tribune a newspaper of general circulation, printed and published daily in the City of San Diego, County of San Diego, and which newspaper is published for the dissemination of local news and intelligence of a general character, and which newspaper at all the times herein mentioned had and still has a bona fide subscription list of paying subscribers, and which newspaper has been established, printed and published at regular intervals in the said City of San Diego, County of San Diego, for a period exceeding one year next preceding the date of publication of the notice hereinafter referred to, and which newspaper is not devoted to nor published for the interests, entertainment or instruction of a particular class, profession, trade, calling, race, or denomination, or any number of same; that the notice of which the annexed is a printed copy, has been published in said newspaper in accordance with the instruction of the person(s) requesting publication, and not in any supplement thereof on the following dates, to wit: April 22, 2016 I certify under penalty of perjury under the laws of the State of California that the foregoing is true and correct. Dated in the City of Chicago, State of Illinois on this 22nd of April 2016. Brittany Ger San Diego U ion-Tribune Legal Advertising See Attached 4102666 21 Bill To: CITY OF CARLSBAD-CU00474981 1200 Carlsbad Village Dr Carlsbad, CA 92008-1989 Sold To: CITY OF CARLSBAD-CU00474981 1200 Carlsbad Village Dr Carlsbad, CA 92008-1989 GTV OF U\RLSBAD tiTY UlWiCil PUBi!S_.H; .ArJri~ 2'2, 20·~6 4102666 Carlsbad Program of Projects Fiscal Years 2016/17 to 2020/21 Marshall Plantz 5/3/16 The Carlsbad Program of Projects •A program of transportation projects over the next five years. •Part of the Regional Transportation Improvement Program (RTIP). The Regional Transportation Improvement Program (RTIP) •Multi-year planning and funding document •Supports the development of the Regional Transportation Plan (RTP) •Ability to receive/access funding from Federal, State and TransNet sources. Types of Projects •Projects with Federal or State funds •Projects with TransNet funds •Locally Funded and Capacity Increasing Projects with Federal Funds Federal funds –Carlsbad Blvd. Bridge at Power Plant ($1,425,000) –Poinsettia Lane Reach E ($1,436,000) Projects with TransNet Funds TransNet funds over the next five years- –ADA Improvement Program ($1,670,000) –Adaptive Traffic Signal Program –($1,200,000) –Carlsbad Blvd. and Tamarack Avenue Improvements ($1,054,000) –Carlsbad Blvd. Bridge at the Power Plant ($215,000) –Carlsbad Blvd. Pedestrian Roadway Lighting –North of Tamarack Avenue ($1,325,000) –Carlsbad Blvd. Realignment ($1,497,000) –Carlsbad Village and Barrio Traffic Circles –($1,025,000) –Carlsbad Village Drive and Grand Avenue Improvements ($1,320,000) –Chestnut Avenue Improvements –Valley Street to I-5 ($1,080,000) –Chestnut Avenue Improvements -I-5 to Railroad ($85,000) –Christiansen Avenue Improvements ($310,000) Projects with TransNet Funds TransNet funds over the next five years- –El Camino Real, Cassia Rd. to Camino Vida Roble ($2,820,000) –El Camino Real, Tamarack Ave. to Chestnut Ave. ($1,986,000) –Kelly Drive and Park Drive Improvements –ECR to Neblina ($3,875,000) –Palomar Airport Road and Paseo Del Norte right turn ($451,000) –Palomar Airport Road and Paseo Del Norte left turn ($233,000) –Pavement Management ($7,500,000) –State Street Improvement at Grand Avenue ($325,000) –Street Light Bulb Replacement Program –($3,645,000) –Terramar Coastal Improvement –Cannon Road ($1,000,000) –Traffic Signal –Regional Arterial Management System ($24,000) –Valley Street Improvements –Chestnut to Buena Vista Way ($1,645,000) Projects that are Locally funded and Capacity Increasing –Avenida Encinas –PAR to Embarcadero ($5,402,000) –College Blvd. –Reach A ($11,952,000) –El Camino Real and Cannon Road ($2,049,000) –El Camino Real and College Blvd. Intersection ($515,000) –El Camino Real –La Costa Avenue to Arenal Road ($2,550,000) –Poinsettia Lane Reach E ($11,700,000) Local funds Next Steps •Adopt a Resolution approving the Carlsbad Program of Projects. •Submit the Resolution to SANDAG by June 24th. •SANDAG assembles the RTIP and release the draft on July 22nd. •SANDAG Board adopts the RTIP for the region on September 23rd. •SANDAG submits the RTIP to the State.