Loading...
HomeMy WebLinkAbout2016-08-23; City Council; ; Acceptance of bids and award of contract to NEWEST Construction Inc for construction of Foxes Landing Lift Station Replacement Project No. 5526Meeting Date To: From: Staff Contact: Subject CITY COUNCIL Staff Report August 23, 2016 Mayor and City Council v Kevin Crawford, City Manager\Y Mark Biskup, Associate Engineer mark.biskup@carlsbadca.gov CA Review If> Acceptance of bids and award of contract to NEWEST Construction, Inc. for construction of the Foxes Landing Lift Station Replacement, Project No. 5526. Recommended Action Adopt a Resolution accepting bids and awarding a contract to NEWEST Construction, Inc. for construction ofthe Foxes Landing Lift Station Replacement, Project No. 5526. Executive Summary The Foxes Landing Sewer Lift Station is located adjacent and easterly of Interstate 5 on the north shore of the Agua Hedionda Lagoon (Lagoon). Portions of the sewer lift station and force main are in need of replacement or rehabilitation to improve operational reliability. A project to construct improvements at the Foxes Landing Sewer Lift Station has been bid and staff recommends award of a construction contract to NEWEST Construction, Inc. in the amount of $2,870,800. Discussion The Foxes Landing Lift Station was constructed in its current configuration in the 1960's. The lift station serves a sewer basin generally north of the Lagoon and east of Interstate 5, pumping approximately 1.25 million gallons of raw wastewater per day, with a peak flow capacity of over 2,000 gallons per minute. A new force main was installed in 1999, along with miscellaneous electrical and mechanical repairs to the station. The original force main was decommissioned for future rehabilitation at that time. Most recently, the reliability and efficiency of the lift station has declined and improvements are necessary to comply with the State Regional Water Quality Control Board's discharge requirements for sewer systems and current industry standards intended to eliminate sewer overflows and spills. The lift station's proximity to the Lagoon further reinforces the need for improved reliability. The project includes the construction of a new wet well with submersible pumps, the conversion of the old station structure to a wastewater emergency overflow basin and installation of a new odor control system. The original force main, now decommissioned, will be rehabilitated and made available for emergency backup and operational versatility. The overall project will enhance operational efficiency, improve reliability, increase emergency storage Item #4 August 23, 2016 Page 1 of 6 capacity, and provide redundancy of essential components; all reducing the potential of a station failure and sewer overflow. On April 16, 2016, through the adoption of Resolution No. 2016-51, the Carlsbad City Council approved plans and specifications and authorized the City Clerk to advertise to receive bids for the Foxes Landing Lift Station Replacement Project. On July 20, 2016, seven sealed bids were received for the construction of this project as shown in the following table. CONTRACTOR TOTAL BID 1. NEWEST Construction, Inc. $2,870,800 2. MMC, Inc. $2,884,511 3. sew Contracting $3,111,890 4. Caliagua, Inc. $3,117,047 5. Metro Builders & Engineers Group $3,156,300 6. Charles King Company, Inc. $3,535,800 7. Genesis Construction $3,591,843 The engineer's estimate was $2,950,000. NEWEST Construction, Inc. submitted the lowest bid in the amount of $2,870,800. Staff has completed the review of contract documents and has determined that NEWEST Construction, Inc. is the confirmed low bidder and their bid documents are responsive. Staff recommends that NEWEST Construction, Inc. be awarded the contract. Fiscal Analysis The following table provides a breakdown of the total project costs: TABLE 1-PROJECT CONSTRUCTION COST SUMMARY FOXES LANDING LIFT STATION REPLACEMENT PROJECT, PROJECT NO. 5526 Engineering Services, Staff Overhead & SDGE Relocation $452,900 Construction Contract {NEWEST Construction, Inc.) $2,870,800 Construction Contingency1 $430,620 Construction Management, Inspection & Material Testing $300,000 TOTAL PROJECT COST $4,054,320 CURRENT APPROPRIATION $4,100,000 1 A contingency of approximately 15 percent for the Construction Contract has been included to address unforeseen costs related to the complexity of interfacing the new station with the existing system and structures and working below groundwater levels. There are sufficient appropriations from the Sewer Replacement Fund for the construction of the Foxes Landing Lift Station Replacement Project. Item #4 August 23, 2016 Page 2 of 6 Next Steps Staff will provide the Public Works Contract to NEWEST Construction, Inc. for their execution and request that NEWEST Construction, Inc. provide the required bonds and proof of insurance. Once this task is complete, staff will schedule a pre-construction meeting with NEWEST Construction, Inc. and a Notice-to-Proceed will be issued. The duration of the Construction Contract is 220 working days, exclusive of rain days and Change Orders that may extend the Contract duration. Upon the successful completion of the project, staff will request that Council accept the construction of Foxes Landing Lift Station and direct the City Clerk to record a Notice of Completion and to release bonds. Environmental Evaluation {CEQA) The project is exempt from the California Environmental Quality Act {CEQA) per State CEQA Guidelines Section 15302{c) -Concerning replacement or reconstruction of existing facilities involving negligible or no expansion of capacity. A Notice of Exemption was filed in the Office of the San Diego County Clerk on Sept. 1, 2015 . Climate Action Plan Consistency This project/action is a continuation of a project/action that was started prior to adoption of the Climate Action Plan in September 2015. However, the project is consistent with the intent of Measure N, Action Item N-1, which states that the Utility shall "Improve water utilities (including water supply, wastewater, and recycled water) conveyance, treatment, and distribution, and other system improvements." This project will improve the energy efficiency of the lift station by providing more efficient pumps and replacement of the odor control system with a biological treatment process. Public Notification None required. Exhibits 1. A Resolution accepting bids and awarding the contract to NEWEST Construction, Inc. for the construction of the Foxes Landing Lift Station Replacement, Project No. 5526 2. Location Map Item #4 August 23, 2016 Page 3 of 6 RESOLUTION NO. 2016-173 A RESOLUTION OF THE CITY COUNCIL OF THE CITY OF CARLSBAD, CALIFORNIA, ACCEPTING BIDS AND AWARDING A CONTRACT TO NEWEST CONSTRUCTION, INC., FOR THE FOXES LANDING LIFT STATION REPLACEMENT, PROJECT NO. 5526. WHEREAS, the City Council of Carlsbad, California has determined it necessary, desirable, and in the public interest to construct the Foxes Landing Lift Station Replacement, Project No. 5526; and WHEREAS, on April 16, 2016, through the adoption of Resolution No. 2016-051, the Carlsbad City Council approved plans and specifications, and authorized the City Clerk to advertise to receive bids for the Foxes Landing Lift Station Replacement, Project No. 5526; and WHEREAS, seven sealed bids were received on July 20, 2016, by the City of Carlsbad for the construction of this project; and WHEREAS, the lowest responsive and responsible bid was submitted by NEWEST Construction, Inc. in the amount of $2,870,800; and WHEREAS, funds have been appropriated from the Sewer Replacement Fund and are sufficient for the completion of this project; and WHEREAS, this project is exempt from California Environmental Quality Act (CEQA) review pursuant to CEQA Guidelines section 15302(c) in that it is a replacement of an existing utility system on the same site involving negligible or no expansion of capacity and a Notice of Exemption was filed with the San Diego County Clerk on May 29, 2014. NOW, THEREFORE, BE IT RESOLVED by the City Council of the City of Carlsbad, California, as follows: 1. That the above recitations are true and correct. 2. That the bid in the amount of $2,870,800 submitted by NEWEST Construction, Inc., for the construction of the Foxes Landing Lift Station Replacement, Project No. 5526, is accepted and the Mayor is hereby authorized to execute a contract with NEWEST Construction, Inc. Item #4 August 23, 2016 Page 4 of 6 3. The City Manager is hereby authorized to approve construction Change Orders up to $430,620. 4. That the award of this contract is contingent upon the bidder submitting the lowest responsible bid executing the required contract and submitting the required bonds and insurance policies, as described in the contract, within 20 days of adoption of this Resolution. The City Manager may grant reasonable extensions of time. PASSED, APPROVED AND ADOPTED at a Regular Meeting of the City Council of the City of Carlsbad on the 23rd day of August, 2016, by the following vote, to wit: AYES: Hall, Wood, Schumacher, Blackburn, Packard. NOES: None. ABSENT: None. ;bu.I~L4<>=- BARBARA ENGLES N, City Clerk Item #4 August 23, 2016 Page 5 of 6 NOT TO SCALE AGUA HEDIONDA LAGOON PROJECT NAME PROJECT EXHIBIT FOXES LANDING LIFT STATION REPLACEMENT Ns;;~R 2 PLOTTE:D BY: SCOTT EVANS PLOT DATE::9/8/14 PA7H:D:\U11UTIES DEPARTMENT\LOCA110N MAPS\5526.D~ Item #4 August 23, 2016 Page 6 of 6