Loading...
HomeMy WebLinkAbout2017-03-18; City Council; ; 2017 City Council Goals Workshop IICA Review� CITY COUNCIL Staff Report Meeting Date: March 18, 2017 To: Mayor and City Council From: Kevin Crawford, City ManageiJ,<--1 Staff Contact: Subject: Jason Haber, Assistant to the City Manager Jason.haber@carlsbadca.gov or 760-434-2958 2017 City Council Goals Workshop II Recommended Action Receive public comment on 2017 City Council goals and priorities. Executive Summary This report contains an overview and quarterly status report on the 2016 City Council Goals. A summary of the 2017 goal-setting process, as well as an overview of the public and Council comments heard at the February 21, 2017 Council Goals Workshop are also included. This item delivers on City Council direction to schedule a Saturday workshop to provide the public with an additional opportunity to offer public comment on goals and priorities to be considered for inclusion in the 2017 City Council Goals. Background Each year, prior to development of the fiscal year budget, the City Council meets to discuss key strategic goals and priorities. On February 16, 2016, the City Council adopted a resolution affirming six Council Goals focused on a three to five year planning horizon. The adopted 2016 City Council Goals are as follows: •Become a leader in multi-modal transportation systems and creative approaches to moving people and goods through and within Carlsbad. •Plan for a new city hall that will meet the future workplace and operational needs of the city and the community. •Promote education to increase civic engagement and attract and retain talent in Carlsbad. •Enhance Carlsbad's coastline to ensure an exceptional experience in all the ways people want to enjoy it. •Lower the railroad tracks in a trench through the Village to improve safety, community connectivity, quality of life and economic value. •Enhance the health and vitality of the Village and Barrio, two neighborhoods that represent the historic heart of Carlsbad. On February 21, 2017 the City Council held its first 2017 City Council Goals Workshop. The Council received a quarterly status report on the 2016 City Council Goals Work Plan (Exhibit 1), took public comment on goals and priorities for 2017, and engaged in discussion with staff and among the Council. Three supplemental memos pertaining to: 1. City Hall Goal, 2. Railroad Trench Goal, and 3. Hub Park Lease were provided in support of the February 21, 2017 staff report, and are attached (Exhibit 2). Item #1 March 18, 2017 Page 1 of 102 At the February 21, 2017 City Council Goals Workshop, Council directed staff to hold a Saturday workshop to provide an opportunity for the community to provide additional public comment on the 2017 City Council Goals. Discussion The following topics were raised during public comment at the Council Goals Workshop on February 21, 2017 for consideration in adopting the 2017 City Council Goals: 1. Environmental Sustainability a. Sustainability advisory group / Environmental commission b. Support greenhouse gas emissions reduction policies and initiatives c. Increase investments in local renewable energy generation d. Enhance green practices in public property management 2. Hub park and trails development 3. Ethics ordinance 4. Community Choice Energy 5. Improved traffic and road construction management 6. Preserve an open and natural coastline a. Conservation as open space b. Improved access c. Improved facilities and infrastructure 7. Fight NRG's development of the Carlsbad Energy Center Project (peaker power plant) 8. Develop local groundwater. resources 9. Become a leader in thorough and early public engagement in the city planning process through the use of modern, geographically aware communication tools and technologies. Individual Council members also offered comments suggesting the following initiatives be considered for inclusion as 2017 City Council Goals: 1. Sage Project Partnership (SDSU) 2. Growth Management Plan Update 3. Campaign Finance Reform 4. Sustainability Commission 5. Continued focus on quality of life projects, such as the railroad double tracking grade separation 6. Volunteer/citizen engagement and marketplace tool development Next Steps At the City Council workshop on March 21, 2017 Council will be asked to discuss and provide direction to staff regarding adoption of the 2017 City Council Goals. Upon receiving Council direction, staff will prepare a resolution for the City Council to formally adopt the 2017 City Council Goals at the March 28, 2017 Council meeting. Following adoption of the 2017 City Council Goals resolution, a FY 2017-18 Council Goals Work Plan will be developed and brought to Council for adoption at the City Council workshop on April 18, 2017. Fiscal Analysis None. Item #1 March 18, 2017 Page 2 of 102 Environmental Evaluation (CEQA) The proposed action does not qualify as a "project" under the California Environmental Quality Act (CEQA) per State CEQA Guidelines Section 15378, as it does not result in a direct or reasonably foreseeable indirect physical change in the environment. Public Notification None. Exhibits 1. FY 2016-17 City Council Strategic Policy Goals Work Plan — January 2017 Status Report 2. Three Supplemental Memos from the February 21, 2017 Council Goals Workshop Item #1 March 18, 2017 Page 3 of 102 (City of 40 440 Carlsbad rj m' 4 City Council Goals FY 2016-17 Work Plan Status Report January 2017 Item #1 March 18, 2017 Page 4 of 102 Exhibit 1 Introduction Each year, the Carlsbad City Council meets to discuss goals and priorities. These goals are ambitious and center around long term, policy oriented direction that will help achieve the Carlsbad Community Vision. The goals are developed with the full understanding that the day to day core services of the city account for the vast majority of resources and energy. Having a limited number of future oriented goals lets staff know where to focus available resources, while maintaining a consistently high level of service to the community. Together, the steady pursuit of audacious goals and the commitment to providing excellent service are ultimately how the City of Carlsbad fulfills its mission: to enhance the lives of all who live, work and play in our city by setting the standard for providing top quality, efficient local government services Strategic Planning Process Although the strategic planning process is a continual loop of public input, goals, strategies, tactics and evaluation, having an annual plan accomplishes several important things: it provides a framework for operationalizing the City Council's policy direction; it allows staff to recommend resource allocations for the annual city budget; and it helps ensure city staff and the City Council share a common vision of where the city is going and how it will get there. Community Vision Council Policy Goals Ii •zi, *Alio Work Plan & Budget Item #1 March 18, 2017 Page 5 of 102 Community Vision These nine core values make up the Carlsbad Community Vision. They were developed in collaboration with the community and drive both the day to day work of the city and its long term planning. Small town feel, beach community character and connectedness — Enhance Carlsbad's defining attributes—its small town feel and beach community character. Build on the city's culture of civic engagement, volunteerism and philanthropy. Open space and the natural environment — Prioritize protection and enhancement of open space and the natural environment. Support and protect Carlsbad's unique open space and agricultural heritage. Access to recreation and active, healthy lifestyles — Promote active lifestyles and community health by furthering access to trails, parks, beaches and other recreation opportunities. The local economy, business diversity and tourism — Strengthen the city's strong and diverse economy and its position as an employment hub in north San Diego County. Promote business diversity, increased specialty retail and dining opportunities, and Carlsbad's tourism. Walking, biking, public transportation and connectivity — Increase travel options through enhanced walking, bicycling and public transportation systems. Enhance mobility through increased connectivity and intelligent transportation management. Sustainability — Build on the city's sustainability initiatives to emerge as a leader in green development and sustainability. Pursue public/private partnerships, particularly on sustainable water, energy, recycling and foods. History, the arts and cultural resources — Emphasize the arts by promoting a multitude of events and productions year-round and cutting-edge venues to host world class performances, and celebrate Carlsbad's cultural heritage in dedicated facilities and programs. High quality education and community services — Support quality, comprehensive education and lifelong learning opportunities, provide housing and community services for a changing population, and maintain a high standard for citywide public safety. Neighborhood revitalization, community design and livability— Revitalize neighborhoods and enhance citywide community design and livability. Promote a greater mix of uses citywide, more activities along the coastline and link density to public transportation. Revitalize the downtown Village as a community focal point and a unique and memorable center for visitors, and rejuvenate the historic Barrio neighborhood. Item #1 March 18, 2017 Page 6 of 102 Core City Services This report does not address performance of the city's day to day services. The delivery of those services is addressed in the annual resident survey results and the city budget. Although these services remain fairly consistent from year to year, they are adjusted — adding services and even reducing services — based on community needs. Public Safety Police, fire, emergency preparedness, emergency medical, traffic safety, crime prevention Community Services Parks, recreation, trails, open space, libraries, cultural arts, classes, camps, special events, arts education Community & Economic Development Land use, development services, building inspection, code compliance, affordable housing, neighborhood services Public Works Streets and traffic, infrastructure, water, sewer, drainage, trash, environmental sustainability Governance Public records, community outreach and engagement, legal, management, clerk services Administrative Services Finance, human resources, information technology, purchasing, risk management, utility billing Item #1 March 18, 2017 Page 7 of 102 City Council Strategic Policy Goals Become a leader in multimodal transportation systems and creative approaches to moving people and goods through and within Carlsbad. The City Council expects Carlsbad to become a leader in the broad array of plans and systems that support more efficient and effective means of moving people and goods around and through Carlsbad and the region, including technology that improves traffic signal coordination and vehicle operation. Major regional projects, including the McClellan-Palomar Airport master plan update, double tracking of the railroad, widening of 1-5 and reconfiguration of the 1-5/78 interchange, require continued policy-level involvement to ensure Carlsbad's interests are reflected in project design and implementation. Plan for a new city hall that will meet the future workplace and operational needs of the city and the community. Plan for a new city hall that will be a point of pride for citizens while greatly improving efficiency and effectiveness by centralizing an employee base that is currently spread through many facilities. A strategic approach to locating city operational functions will provide better coordination among city functions and enhanced customer service. Promote education to increase civic engagement and attract and retain talent in Carlsbad. The City Council will take a stewardship role in encouraging the development of high quality educational experiences that foster economic development, civic engagement and community leadership. This broad goal includes partnering with local school districts, working to attract an institution of higher education, and cultivating a community with life and workplace skills that will support Carlsbad's vision for the future. Item #1 March 18, 2017 Page 8 of 102 .011.0"P Enhance Carlsbad's coastline to ensure an exceptional experience in all the ways people want to enjoy it. The Carlsbad coastline is a critical element of the city's identity. The City Council is committed to making policy decisions to ensure Carlsbad's coastline maintains the character the community loves while enhancing access, amenities and mobility to a level consistent with Carlsbad's high-quality community standards. This includes partnering with State Parks, which currently controls most of Carlsbad's beaches. This goal also includes physical changes that will enhance natural beauty, better manage traffic flow, expand walking and biking opportunities, improve safety and create a uniquely Carlsbad experience. Lower the railroad tracks in a trench through the Village to improve safety, community connectivity, quality of life and economic The busy rail line that runs through the core of the community divides Carlsbad. Railroad traffic, which will increase significantly in coming years, has adverse effects on the City of Carlsbad, especially in the area between the Agua Hedionda and Buena Vista lagoons. With the planned addition of a second, parallel track through the Village and Barrio, the city has an opportunity to lower the tracks below street level, similar to what has been done in other coastal communities. Achieving this goal would improve safety and increase coastal access. Without this change, the future quality of life and business climate in the Village would be irreparably harmed, the Barrio would remain cut off from the coast, and public safety would be severely compromised. Enhance the health and vitality of the Village and Barrio, two neighborhoods that represent the historic heart of Carlsbad. The city has made significant investments in the revitalization of the Village and Barrio, starting with "Redevelopment" and continuing with public-private partnerships and city funded infrastructure improvements. A new Village and Barrio Master Plan is nearing completion, and achieving the vision developed with the community through the master planning process will require continued policy focus and investment. Item #1 March 18, 2017 Page 9 of 102 FY 2016-17 City Council Goals Quarterly Status Reports - February 2017 The following describes how city staff has operationalized the City Council's policy direction over the past quarter. Progress on specific strategies and tactics is included along with schedule updates and information. OEN Become a leader in multimodal transportation systems and creative approaches to moving people and goods 0 • through and within Carlsbad. Team Lead Craig Williams, Public Works Strategy #1 Improve Traffic Signal Effectiveness and Mobility on Existing Roadways Traffic Signal Effectiveness • Fiber optic conduit now runs uninterrupted from the city's Traffic Management Center (TMC) at the Faraday Administration Center to the intersection of El Camino Real and Palomar Airport Road. • In 2016, the city had planned to extend the fiber network down El Camino Real to Alga Road. This effort has been temporarily suspended in order to coordinate with a broader city-wide fiber network effort to most effectively serve our community and satisfy city-wide communication needs. Together with IT, Economic Development, City Attorneys' Office, Communications, and Real Estate, staff is exploring how fiber optic conduit distribution can provide the foundation for a broader city-wide communications network. • Four pilot projects were proposed to test the effectiveness of Adaptive Traffic Systems (ATS), and three corridors have been completed: 1) on Aviara Parkway, between Poinsettia Lane and Palomar Oaks Road, 2) along El Camino Real, between Palomar Airport Road and Alga Road, and 3) on Cannon Road, from Paseo del Norte to Grand Pacific Drive. Sufficient data and feedback were obtained after three pilots, such that the 4th pilot was unnecessary. The development and release of an RFP for the installation of permanent ATS is expected in early 2017. • New technology to facilitate the use of connected ("smart cars") and autonomous ("self-driving") vehicles continues to be explored. The city has been approached by several companies related to connected Item #1 March 18, 2017 Page 10 of 102 vehicles and staff are currently coordinating efforts with IT, Economic Development, and the City Attorneys' office. Proposals will be considered along with costs and opportunities. • Automated traffic measuring and monitoring equipment has been installed at 16 intersections to automatically monitor traffic flow and congestion levels. Sixteen (16) additional intersections will be completed in 2017, for a total of 32 defined intersections at the end of 2017. Multimodal Mobility Improvements • Staff is implementing the new Mobility Element of the General Plan. Interim Traffic Impact Analysis guidelines are complete, and the Multi- modal Level of Service (MMLOS) evaluation methodology is in final stages. Development of an Evaluation and Monitoring Manual is in early stages. • The Sustainable Mobility Plan won a $300,000 grant from Caltrans; contract negotiations have taken longer than early projections. Phase 1 work is complete -- this work collected previous active transportation plans and current asset maps, in order to produce compendium maps showing existing active transportation and transit networks and gaps. Following execution of the Caltrans agreement, the City will release an RFP for Phase 2 work, including development of a multi-modal CIP project list, a Safe Routes to School plan, and a Design Guide, in 2017. • The first task of the Transportation Demand Management (TDM) program — to develop an internal City TDM program - is well underway. Consultant work on updating the Traffic Impact Fee program is also underway. • Public Works and GIS staff have been collaborating to identify and refine the existing inventory within our multi-modal transportation network, and have developed performance measures to demonstrate annual progress to address gaps. This work will feed directly into the sustainable Mobility Plan. • Most tasks concerning Multi-modal Mobility Improvements are on schedule to be complete by December 2017. While most tasks for the Sustainable Mobility Plan and the TDM program will be completed in 2017, the final tasks will extend into 2018. Item #1 March 18, 2017 Page 11 of 102 Strategy #2 Collaborate with Regional Partners to Improve Transportation in Carlsbad Improve connections to transit and transit alternatives • Staff recently selected Kimley-Horn as a consultant to investigate best practices and the feasibility for a trolley system service in the region. This task is on schedule to be complete by December 2017. Partnering to Improve Transportation Options • Staff is continuing their work to enhance partner coordination and involvement on major regional transportation projects. Strategy #3 Improve Transportation Sustainability to Meet Climate Action Plan Goals Lead efforts to decrease "vehicle miles traveled," thereby decreasing greenhouse gas emissions • In collaboration with SANDAG, a consultant (Steer Davies Gleeve) was recently selected to assist in developing a TDM program, and the first stage of this program is underway. • Staff has identified the city's State Street parking lot (south of Carlsbad Village Drive) and Stagecoach Community Park (in Southeast Carlsbad) as the first locations to install electric vehicle charging stations for public use. Through a partnership with NRG subsidiary, EVGO, the underground infrastructure will be provided at no cost to taxpayers. The FY 16/17 city budget includes funding for the charging station installations. • The city is monitoring State Office of Planning and Research (OPR) efforts to develop new Traffic Impact Analysis Guidelines consistent with SB 743, and will update our final approach once state direction is finalized. This work is part of the Evaluation and Monitoring Manual described in Multimodal Mobility Improvements in Strategy #1. • Most efforts within this strategy are on schedule to be completed by December 2017. The Sustainable Mobility Plan final work will be completed in early 2018. Item #1 March 18, 2017 Page 12 of 102 Plan for a new city hall that will meet the future 0"fbi workplace and operational needs of the city and the gwallIP" community. TeamLead Curtis Jackson, City Manager's Office Strategy #1 Determine future space needs for city staff and community meeting space • Staff has completed a draft Request for Proposal (RFP) to conduct a Space Needs, Place Making, and Design services analysis for a new City Hall. • The RFP will focus on analyzing current and future workplace efficiency, staff adjacency, spatial efficiency, community outreach, city hall locational assessments, future city operations & civic center trends, construction and labor cost savings, and conceptual design alternatives. • The RFP will also study space need requirements for a new City Council Chamber and other city/community meeting space(s). • Staff will provide the draft RFP to the City Council for review and input by the end of the 1st Quarter of 2017. • The final RFP will be presented to City Council for an authorization to release the RFP by the end of 2' quarter 2017. Strategy #2 City Hall Funding Analysis • With the help of outside legal counsel & city finance staff, a source, allowed use, and expected availability of funds analysis for a city hall project has been completed. • The funding analysis will be presented to City Council by the end of 2nd quarter 2017. Strategy #3 Evaluate Potential City Hall Locations • Once the Space Needs, Place Making, and Design Services analysis is completed, the results will be presented to and reviewed by the City Council. Using that analysis, staff then will evaluate & identify potential city hall locations, including working with the public to obtain input. • Originally anticipated for completion by May 2017, this task is now expected to be completed by the end of 2017. Item #1 March 18, 2017 Page 13 of 102 fi !li t members Develop ber s o lifelong fth a the public l e rn e a r n s , dc private ivic leaders, d e workforce r s, andvaluable in Carlsbad through education partnerships and skills development. Team Lead Debbie Fountain, Community & Economic Development Strategy #1 Support partnerships for career and work force talent development both in Carlsbad and within the 78 Corridor Higher Education • The city continues to work with local businesses and regional economic development organizations to develop a graduate-level engineering program that would best fit their talent needs. A survey was sent to Carlsbad and 78 Corridor employees and Human Resources representatives to assess the long-term market for master's students for a program in Carlsbad. • The results of the survey are being tabulated and analyzed. If a determination is made that there is little or no demand for the graduate- level engineering program, this strategy will be abandoned. A final decision is pending, but will most likely be made by June, 2017. Strategy #2 Develop high potential emerging leaders through self- discovery and equipping high school age residents with the right tools to make meaningful contributions to Carlsbad Emerging Leader Program • Graduation held (January, 2017) for the 28 high school age residents who participated in the inaugural session of the Carlsbad Student Leader Academy. • Applications were again accepted, reviewed and 26 new high school age residents were selected to participate in the Winter Session of the Carlsbad Student Leader Academy, which started January 10th. • A strategy is under development to allow for the continued engagement of the alumni classes of the Academy. Item #1 March 18, 2017 Page 14 of 102 Strategy #3 Ensure the city's life-long learner programs continue to meet the needs of the community for life enrichment and personal success • Life-long learner programs are continuing at newly renovated library facilities, and various Parks & Recreation facilities. • A strategic framework for offering life-long learning programs in the future has been developed and adopted by the Library Staff. • Efforts to develop an effective tool to evaluate existing programs and measure impacts and outcomes remains underway; the timeframe for completion of this evaluation has been extended to the end of 2017 due to the specialized nature of this evaluation. Staff has experienced difficulty in identifying a qualified evaluator, and determined that the effort might require a partnership with a higher education institution to be successful and will require an investment of more time for strategy development and implementation. Enhance Carlsbad's coastline to ensure an excepti experience in all the ways people want to enjoy it Team Lead Gary T. Barberio, City Manager's Office Strategy #1 Improve beach access and amenities Ocean Street Beach Access Project • Conceptual plans for the refurbishment and improvement of the beach access points have been developed and refined based on input from the public and city staff, and environmental review and permitting has been completed. • The City Council awarded a contract for a professional design firm to prepare construction documents on November 8, 2016. Project scheduled to commence in October 2017, and be completed by April 2018. Item #1 March 18, 2017 Page 15 of 102 Strategy #2 Improve the safety and usability for all along Carlsbad Boulevard Terramar Area Coastal Improvement Project • Conceptual design alternatives have been developed with the benefit of several environmental and engineering technical studies, including geotechnical, traffic, biological and cultural studies, as well as public input. • To date, feedback has been received from 1,750 online survey and/or public meeting participants. • The design alternatives have been advanced to a greater level of detail, and an additional public outreach meeting will occur in the second quarter of 2017, prior to environmental review and permitting. • The project is scheduled for completion in 2019. Tamarack Area Coastal Improvement Project • The city was awarded a SANDAG Active Transportation Grant in the amount of $1.32 million for this project. • Staff developed three options to address the project goals, created conceptual drawings and gathered input from nearly 2,000 individuals through public meetings, an online survey and discussions with users at the project site. This process has narrowed the project options to two. • Staff has been working on preliminary technical reports in parallel with ongoing public outreach efforts and efforts to advance the two design options based on public input. • A consultant has been selected to prepare contract plans following selection of the preferred alternative. • Property boundary issues have hampered progress in the past quarter, but the project remains on schedule to be complete by July 2018. Strategy #3 Initiate creating a vision for coastal enhancements from Terramar to the southern Carlsbad border Coastal Corridor Vision • The first public outreach effort entitled "Highway 101 Past, Present, and Future" is scheduled for February 16, 2017. • Further elements of the overall project schedule and timeline are still to be determined. Item #1 March 18, 2017 Page 16 of 102 Strategy #4 Expand city-state partnership for the management of state- owned beaches to enhance facilities and services Pilot Project and Agreement with State Parks • Ongoing discussions with the State of California Department of Parks & Recreation, which owns approximately five miles of beaches within the City of Carlsbad are occurring. • After the City Manager's team met with the CA State Parks Director in Sacramento in October 2016, staff has had fruitful discussions with local State Parks staff regarding the potential development of an operating agreement. • New energies and new perspectives on the side of CA State Parks are contributing to positive dialogues and relationship development, and building a culture of trust and mutual respect. • Year three of the city's Right of Entry Permit to improve and maintain the upper picnic facilities at Tamarack State Beach and the coastal bluff at Tamarack/Frazee State Beach is set to expire in May 2017. Staff continues to work with local State Parks staff to extend the agreement for another year. Lower the railroad tracks in a trench throughi the Village to improve safety, community connectivity, quality of life and economic value Jason Haber, City Manager's Office • SANDAG has completed the Carlsbad Village Double Track - Railroad Trench Alternative Economic Analysis and Feasibility Study. The Feasibility Study analyzed technical feasibility, design considerations, environmental constraints, schedule, and cost, and generally determined that both the long- and short-trench alternatives (in addition to the at-grade alternative) are feasible. The Economic Analysis assessed the fiscal and economic impacts expected to occur over 99 years with the trenched and at-grade alternatives, including: the value of lives saved and injuries avoided, the value of time saved by motorists and pedestrians, property values, property taxes, retail and restaurant sales, sales taxes, construction impacts, transient occupancy taxes, vacancy and lease rates, job creation, emergency response delays, and displacement. Item #1 March 18, 2017 Page 17 of 102 • The At-grade alternative has the lowest estimated construction cost of the three alternatives at $62 million. For this alternative, the findings indicate negative value of lives saved and negative economic and fiscal impacts (estimated as ranging from -$228.9 million to -$567.9 million, at -$143.4 million, and at -$1.7 million, respectively), primarily due to loss of life and time, as well as changes in property values. • The Short Trench has an estimated total project cost between $215 million and $235 million, but has estimated fiscal and economic benefits in the billions of dollars, the most prominent of which are the expected additional retail sales, higher property values, and the value of lives saved. Other significant benefits include the economic output resulting from construction, additional sales tax revenues, and greater property tax revenues. In total, the value of lives saved plus economic benefits of the Short Trench are estimated between $5.87 billion and $20.27 billion, while fiscal impacts are estimated from $56.1 million to $194.8 million. • The Long Trench has the highest estimated total project cost, estimated at between $320 million and $350 million, as well as the highest fiscal and economic benefits. Overall, the value of lives saved plus economic benefits range from $6.10 billion to $21.86 billion. Fiscal benefits are estimated between $56.5 million and $207.0 million. • Staff has initiated conversations with SAN DAG and other potential partners to inform a funding strategy for completing project-level environmental review, which would be the next step in advancing this Council Goal. trategv #2 Collaborate with Local, Regional, State and Federal Stakeholder, to Advance Project and Develop Fnnding Strateuv • Staff is finalizing contracts to engage local, state and federal government affairs and legislative consultants to support this project. • Staff has initiated outreach to inform community stakeholders, including the Carlsbad Chamber of Commerce, Carlsbad Village Association, the Sierra Club and other local interest groups, as well as rail owners and operators about the project. • Since the city is not the final decision maker concerning the selection of a preferred alignment alternative, there will be a significant need for Council Members to engage with multiple partner agencies to advance city interests Item #1 March 18, 2017 Page 18 of 102 over the coming year. These will include opportunities to influence decisions at the San Diego Association of Governments (SANDAG), North County Transit District (NCTD), the California Public Utilities Commission (CPUC), and Federal Rail Administration (FRA), among others. (07 OPEN Enhance the health and vitality of the Village and Barrio, two neighborhoods that represent the historic heart of Carlsbad. Team Lead Christie Marcella, Community & Economic Development Strategy #1 Improve the public space in the Village and Barrio to enhance quality of life and economic vitality Improve Roadways in the Village and Barrio for public use by all • Design underway for additional ADA improvements in the Village. Construction to begin second quarter of 2017. • Paving of Grand Ave. east of Madison Ave. to be completed by end of first quarter of 2017. Address current and future parking needs in the Village and Barrio • Field and survey work for the preparation of the Village, Barrio and beach area parking study has been completed. Analysis and outreach will be conducted this quarter with recommendations going forward with the Village and Barrio Master Plan. Increase safety, security and quality of life in the Village and Barrio • Barrio Strong meetings continue to identify initiatives for safety and community improvement in the neighborhood. • Multi-department Homelessness Response Team (HRT) formed to proactively find solutions to address homelessness in the community. • A team is working to enhance decorative lighting in the downtown core. Strategy #2 Optimize Public Properties in the Village and Barrio Optimize City-Owned Properties and Activate the Public Right-of-Way • "Village Grill" property lease to Council Feb. 2017 with an expected opening third quarter of 2017. Item #1 March 18, 2017 Page 19 of 102 • Pine Avenue Park Community Center & Gardens contract awarded in Jan. with project starting Mar. 2017. • Staff is coordinating the long term use of city owned property with the strategic property efforts related to City Hall goal. Strategy #3 Enhance the Village and Barrio for current and future residents, businesses and visitors Implement Village and Barrio Enhancements • Based on public input, the city is conducting additional outreach on the draft Village and Barrio Master Plan and will update the plan as needed to address this input, as well as results from the parking study. The updated plan is expected to be ready to present to the City Council by end of 2017. • Recruitment for the Village Manager position to begin Feb. 2017, providing additional resources to Village and Barrio efforts. • Staff are aligning capital improvement projects with the larger Village and Barrio Master Plan effort. • Carlsbad Village Association events and marketing have increased visibility, attendance and merchant engagement in the Village. Item #1 March 18, 2017 Page 20 of 102 To the members of the: CITY COUNCIL ACM V CA VCC vr/ Date jucbi City Manager 17 (City of Carlsbad Memorandum February 16, 2017 To: Mayor and City Council Members From: ary T. Barberio, Assistant City Manager and Curtis M. Jackson, Real Estate Manager Via: Kevin Crawford, City ManageIti, Re: City Hall Funding Analysis The City Council has an established goal to develop a plan for a new city hall that will be a point of pride for residents while greatly improving efficiency and effectiveness by centralizing an employee base that is currently spread throughout many city facilities. One of the strategies in the City Council adopted work plan for achieving this goal includes the completion of a City Hall Funding Analysis. Over the past six months, with the assistance of outside legal counsel, real estate advisors, and city finance staff, a draft funding source, allowed use, and expected availability of funds analysis for a new city hall has been conducted. City Hall Funding Analysis Community Facility District No. 1 (CFD No. 1) — Background: Funding for a new city hall would come primarily, although not exclusively, through CFD No. 1 funds. CFD No. 1 was established in 1991 to finance certain specifically identified public capital facilities located throughout the City, among these was a City Hall complex. To date, most all of the public facilities identified in CFD No. 1 have been constructed except for the City Hall complex, a Public Works office and warehouse facility, the expansion of the Cole library, and the construction of Veterans Park. CFD No. 1 funds cannot be used to pay for civic facilities or services outside those mentioned above. CFD No. 1 funds are not considered "general fund" dollars and are not subject to Prop H spending limitation restrictions. There is no sunset or deadline by which CFD No. 1 funds must be used; however, if they are not spent on the identified public facilities, the city is required to return these funds back to the parties who paid them. Current and Expected CFD No. 1 Fund Balance: The City currently has approximately $30,000,000 in CFD No. 1 funds specifically allocated for the development of a new city hall, and anticipates collecting up to $20,000,000 in additional funds that could be added to the current budget for a new city hall through the city's build-out, for a total of $50,000,000. Additionally, in 2002 the citY acquired the Farmers Property as a possible location for a new city hall utilizing $15,730,000 in CFD No. 1 funds. If the city determines that the Farmers Property will not be the location for a new city hall, the city is required to sell the property and deposit the realized funds back into the CFD No. 1 fund. Our current (December 2016) real estate evaluation estimate is that the city could realize ,between $25,206,000 and $35,473,000 through the sale of the Farmers Property. The sale of the Farmers Property would bring the total amount of CFD No. 1 funds available for the construction of a new city hall to between $75,206,000 and $85,474,000. Item #1 March 18, 2017 Page 21 of 102 Exhibit 2 Public Facility Fee - Background: In 1979, the City Council established a Public Facilities Fee (PFF) which requires developers to pay the PFF prior to issuance of a building permit. All PFF funds collected must be used only for acquiring, building, improving, expanding or equipping public property and public improvements and facilities. PFF funds are not considered "general fund" dollars and are not subject to Prop H spending limitation restrictions and use of these funds is generally more flexible than the use of CFD No. 1 funds. Current city Real Estate assets purchased utilizing PFF funds include the Faraday Center and Las Palmas properties. The Faraday Center was acquired in 2001 for $9,100,000. Our current (August 2016) real estate evaluation estimate is that the Faraday Center property is valued at between $9,800,050 and $17,798,950. The Las Palmas property was acquired in 1987 for $1,602,160, and is currently leased to Mira Costa Community College through 2020. Our current (April 2016) real estate evaluation estimate is that the Las Palmas property is valued at between $2,899,142 and $7,772,391. Unlike the Farmers Property, if the city selects a new city hall location that does not involve the Faraday Center or Las Palmas properties, the city would not be required to sell these properties as they were purchased with PFF funds which are less restrictive than CFD No. 1 funds. However, if the city were to sell the Faraday Center and the Las Palmas properties, the city could realize between $12,699,192 and $25,571,341, and, given the flexibility allowed with PFF funds, these funds could be made available towards the construction of a new city hall. Alternatively, the city could elect to lease the Faraday Center and the Las Palmas properties and the lease revenue generated could also be made available for the construction of a new city hall or utilized for general fund purposes. If the city elected to combine the funds realized through the sale of the Faraday Center and the Las Palmas properties together with the total estimated CFD No. 1 funds available for a new city hall project, the resulting total funds available would be between $62,699,192 and $75,571,341, and, when combined with potential funds from the sale of the Farmers Property, between $87,905,192 and $111,044,341. Estimated City Hall Building Square Footage and Acreage Needed Currently the majority of the city's administrative staff is located at the current City Hall (16,500 SF building) and Faraday Center (68,000 SF building) properties. Ideally, the city would develop a city hall to house all administrative staff, a new Council Chamber and community meeting spaces, and potentially some additional commercially leasable space that would also be available for future municipal expansion. It is estimated that the aforementioned new city hall would require approximately 120,000 square feet of office and meeting space. Based on staff research of numerous recently constructed southern California city halls, the current market estimates indicate the cost to develop a new city hall is between $320 and $570 per square foot (range is directly influenced by design) including building and site construction. As such, a 120,000 square foot city hall would cost between $38,400,000 and $68,400,000, plus an additional 40% for soft and contingency costs, for a total project cost of $53,760,000 to $95,760,000 Given the 120,000 square foot size estimate of a new city hall building, it is estimated that a new city hall of that size would need to be located on 3 to 5 acres if the project included a structured parking garage, and 5 to 8 acres if parking requirements were met by surface parking only. Total required parking spaces for a new 120,000 square foot city hall are estimated to be 480 parking spaces. If a parking structure is required for a new 120,000 square foot city hall, each structured parking space is estimated to cost $37,000, or $17,760,000 for 480 parking spaces. The parking structure cost would be in addition to the Item #1 March 18, 2017 Page 22 of 102 above mentioned total project cost, for a revised estimated development budget between $71,520,000 to 113,520,000. Potential City-owned New City Hall Locations Existing City Hall Location: The current City Hall property is 11.09 acres in size and includes the Cole Library building and the existing 16,500 square foot city hall buildings. If the existing City Hall property was selected as the site for a new city hall, the 11.09 acres would be more than sufficient to accommodate both a new 120,000 square foot city hall and the expansion and rebuild of the Cole Library utilizing either surface or structured parking, or a combination thereof. If the current City Hall property was chosen, the City would have the opportunity to create a more cohesive and unique "civic center" campus around the existing and future Cole Library, and adjacency to the Village and freeway. If the city elects to not use this location, the current City Hall portion of the property is valued conservatively at $20,465,000. Additionally, the city could potentially lease the prope-riy for an estimated $1,637,200 per year and utilize the revenue stream as determined by the City Council. Farmers Property: The Farmers Property is 13.51 acres in size and consists of three separate parcels, one of which is a 5.1 acre vacant parcel. The Farmers Property is currently developed with a 128,846 square foot, three-story office building on a 6.95 acre parcel and a 6,100 square foot single story office building (Bio, Tech & Beyond incubator) on a 1.46 acre parcel. If the Farmers Property was selected as the site for a new city hall, the 13.51 acres would be more than sufficient to accommodate a new 120,000 square foot city hall utilizing either surface or structured parking. Estimated costs (February 2016) to remodel the existing 128,846 square foot building to a basic but functional city hall is $23,910,178, and the cost to demolish the existing buildings is $1,000,000 (should the city decide to build a new building at this location). Given the current city hall size estimate, it is very likely that the 5.1 acre vacant parcel would not be needed to accommodate a new city hall. If the land is not needed for a new city hall or for future city hall expansion, the city is required to sell this "excess" parcel and deposit the realized funds back into the CFD No. 1 fund. The current (December, 2016) real estate evaluation estimate is that the city could realize between $2,665,872 and $6,804,638 through the sale of the "excess" parcel at the Farmers Property. Pine Avenue Park Site (western parking lot): The Pine Avenue Park Site is 11.56 acres in size, and is developed with 46,300 square feet of buildings for the Senior Center and soon-to-be constructed community recreation center, along with a multi-purpose field, park and picnic areas, and parking lots. It is feasible to construct a new multi-story 120,000 square foot city hall utilizing below-ground structured parking on the existing 2.16 acre parking lot located just west of the Senior Center. If the Pine Avenue Park Site was selected as the location for a new city hall, the city would have the opportunity to realize a unique "civic center" campus around the existing Senior Center and new community recreation center within the heart of the Village and Barrio neighborhoods. Faraday Center Property — 1635 Faraday Avenue: The Faraday Center property is 7.25 gross acres, but only approximately 3.5 acres in net size. It is developed with a 68,000 square foot office building. The net acreage of the Faraday Center Property is not large enough to easily accommodate additional building square footage and parking. In order to construct 52,000 square feet of additional administrative office, Council Chamber and community meeting space and the parking needed to support the additional square footage at the Faraday Center location, approximately 7.8 gross acres of the undeveloped portion of the adjacent private property to the south would need to be acquired. Combined, the two properties comprise an estimated 8.12 net buildable acres. It is estimated that the acquisition of the needed 7.8 acres to the south would cost between $4,000,000 and $6,700,000. Item #1 March 18, 2017 Page 23 of 102 Memorandum All Receive - Agenda item # 1 For the Information of the: CITY COUNCIL ACM v CA CC Date rCity Mangigef City of Carlsbad February 17, 2017 To: Mayor and City Council Members From: Jason Haber, Assistant to the City Manager Via: Kevin Crawford, City Manager AY Re: SANDAG Trench Studies Attached for your reference is the Executive Summary of the Carlsbad Village Double Track Railroad Trench Alternative Economic Analysis and Feasibility Study, and the Executive Summary of the Economic Study Assessing LOSSAN Corridor Improvement Options. These items are intended to serve as supplemental information in support of the February 21, 2017 City Council Goal Setting staff report. Both reports are on file and available for public review in the City Clerk's Office. Please contact me if you have any questions. JH:mf Attachments City Manager's Office City Hall 1200 Carlsbad Village Drive I Carlsbad, CA 92008 I 760-434-2820 t Item #1 March 18, 2017 Page 24 of 102 CARLSBAD VILLAGE DOUBLE TRACK - RAILROAD TRENCH ALTERNATIVE ECONOMIC ANALYSIS AND FEASIBILITY STUDY January 2017 OA S''T Prepared for: ''SANDAG San Diego Association of Governments 401 B Street, Suite 800 San Diego, CA 92101 City of Carlsbad California 1200 Carlsbad Village Drive Carlsbad, CA 92008 Prepared by: HINTERNATIONAL 404 Camino Del Rio South, Suite 700 San Diego, CA 92108 (619) 692-1920 Item #1 March 18, 2017 Page 25 of 102 Carlsbad Village Double Track Railroad Trench Alternative Economic Analysis and Feasibility Study SANDAG / City of Carlsbad / NCTD January 2017 1. EXECUTIVE SUMMARY This report documents the study of two additional alternatives for the Carlsbad Village Double Track project. The Carlsbad Village Double Track project constructs a second railroad track from Cassidy Street in Oceanside south to Tamarack Avenue in Carlsbad. The At-Grade Alternative would construct a second track at the existing ground level, modify the at-grade street crossings, and construct a double-track bridge over Buena Vista Lagoon. The two new alternatives would include grade separation of the railroad tracks by constructing them in a trench, beneath the existing street elevations. The first alternative, known as the Short Trench Alternative, would construct the double track railroad lowered in a trench passing under vehicular overpasses at Grand Avenue, Carlsbad Village Drive, and Oak Avenue, with pedestrian overpasses at Beech Ave/Carlsbad Village Station and Chestnut Avenue. The second alternative is the Long Trench AlternatiVe, which would construct a railroad trench passing under vehicular overpasses at Grand Avenue, Carlsbad Village Drive, Oak Avenue, Chestnut Avenue, and Tamarack Avenue, with a pedestrian overpass at Beech Ave/Carlsbad Village Station. Both trench alternatives would require replacement of the Carlsbad Boulevard Overcrossing with a new bridge spanning the tracks. Current conditions include only four locations for pedestrians and vehicles to cross the railroad tracks in the 1.8 miles between Buena Vista Lagoon and Agua Hedionda Lagoon, one grade separated and three at-grade. By grade separating the tracks in a trench, additional crossings can be added at Oak Avenue and Chestnut Avenue, and potentially others along the railroad Right-of-Way. The Long Trench Alternative would construct a vehicular crossing at Chestnut Avenue, while the Short Trench Alternative would construct a pedestrian crossing at Chestnut Avenue. The grade separated crossings will eliminate delays to traffic and emergency responders caused by at-grade crossing gate arms that remain down as trains approach and pass by. Construction of either trench alternative would first require a temporary shoofly track be constructed to allow railroad operations to continue throughout construction. An impact of the temporary shoofly track is a temporary loss of parking at the station and in the area east of the tracks between Grand Avenue and Oak Avenue. The historic Carlsbad Santa Fe Depot located between Grand Avenue and Carlsbad Village Drive would need to be relocated prior to construction. 1 Item #1 March 18, 2017 Page 26 of 102 Carlsbad Village Double Track Railroad Trench Alternative Economic Analysis and Feasibility Study SANDAG / City of Carlsbad / NCTD January 2017 Based on geotechnical borings taken in the project area from 2013 and 2016, the trench would be located below the water table and require specialized design and construction techniques for trench retaining walls and waterproofing of the trench in groundwater. Several options were studied for the trench structure. The most viable retaining wall structure type is a secant pile wall system with horizontal struts for bracing in the deepest portion. This type of wall creates an effective seal from groundwater and can be constructed prior to excavation which reduces the volume of dewatering needed. A sealed trench floor is required which will result in a buoyant force trying to lift the trench structure. A mass concrete base is proposed to withstand the buoyant force due to the groundwater. Additional options presented in the report are deep soil mixing walls or slurry diaphragm walls, and the use of tie-down anchors in the trench floor to reduce the weight of concrete needed. Future phases of the project would require an extensive groundwater monitoring program and analysis to confirm the proper design groundwater depth. The Long Trench Alternative would require the acquisition of three single family residential parcels located east of existing railroad Right-of-Way, just south of Tamarack Avenue. The existing Right-of-Way is narrow in this location and there are utilities (a 48-inch sewer and 84-inch storm drain) located on the east side of the tracks which must be relocated to construct this alternative. A feasible place to relocate them is to shift them east into the subject parcels. The Short Trench Alternative does not require any Right-of-Way acquisitions. The Short Trench Alternative would have a total project investment between $215 million and $235 million (2016), while the Long Trench Alternative would have a total project investment between $320 million and $350 million (2016). These costs include a 30% contingency on the estimated construction cost to account for the preliminary nature of the design. Future maintenance costs due to the trench alternatives would include maintenance of storm drain pump stations required to drain the trench, maintenance of bridges and retaining walls, and elevator maintenance at the train station. The preferred minimum vertical clearance on the Los Angeles-San Diego-San Luis Obispo (LOSSAN) corridor is 26 ft. North County Transit District (NCTD) has indicated that, with concurrence from Burlington Northern and Santa Fe (BNSF) Railway, the minimum vertical clearance may be reduced to 24 ft. If the minimum clearance used for design were 24 ft., the construction cost of the project would be reduced by an estimated $14 million for the Long Trench Alternative, and $8 million for the Short Trench Alternative. 2 Item #1 March 18, 2017 Page 27 of 102 Prepared for: CSANDAG (City of Carlsbad California EC c STUDY 1/17/2017 • , , Prepared by RSG, Inc., Kimley-Horn and Associates, Inc., and dBF Associates Item #1 March 18, 2017 Page 28 of 102 Economic Study Economic Study Economic Study Assessing LOSSAN Corridor Improvement Options — City of Carlsbad EXECUTIVE SUMMARY Three different alternatives have been proposed in connection with the double tracking of the Los Angeles-San Diego-San Luis Obispo ("LOSSAN") rail corridor through the City of Carlsbad ("City" or "Carlsbad"), primarily through downtown Carlsbad (commonly called "Carlsbad Village"). This Economic Study ("Study") has been prepared to project the economic and fiscal impacts throughout San Diego County ("County") of the following three alternatives: 1. Double tracking entirely at-grade ("At-grade") 2. Double tracking with a railroad trench from the Carlsbad Boulevard/Highway 101 overpass to north of Tamarack Avenue ("Short Trench") 3. Double tracking with a railroad trench from the Carlsbad Boulevard/Highway 101 overpass to north of the Agua Hedionda Lagoon railroad bridge ("Long Trench") This Study has been prepared for inclusion in the Carlsbad Village Double Track - Railroad Trench Alternative Feasibility Study ("Feasibility Study") for the San Diego Association of Governments ("SANDAG") and Carlsbad, prepared by T.Y. Lin International. The Feasibility Study analyzes the technical feasibility, design considerations, environmental constraints, schedule, and cost of the three alternatives. An important distinction must be made between fiscal and economic impacts. Fiscal impacts, such as property and sales taxes, represent a direct revenue benefit to local public agencies. Per industry standards, this Study focuses on fiscal impacts expected to result directly from the three alternatives. Additional fiscal impacts can be expected to accrue to public agencies indirectly. Economic impacts—such as the values of lives and time saved, as well as economic output—are distributed more broadly and may not be reflected directly in public agencies' finances. This Study considers both categories of impacts, specifically the following: • The value of lives saved and injuries avoided • The value of time saved by motorists and pedestrians • Property values • Property taxes • Retail and restaurant sales • Sales taxes • Construction impacts • Transient occupancy taxes • Vacancy and lease rates • Job creation • Emergency response delays • Displacement Where possible, the projected values have been calculated as a range with "Low," "Middle," and/or "High" points due to the uncertainty associated with projecting economic and fiscal impacts. It is important to note that Page Item #1 March 18, 2017 Page 29 of 102 Economic Study the actual impacts of the three rail improvement alternatives will depend on, and occur within the context of, many factors and trends. This Study focuses on the impacts expected to occur solely due to the three alternatives. Figure A below summarizes the results of this analysis and provides a side-by-side comparison of these impacts under each alternative during a 99-year period. Figures B and C portray these results graphically. Economic Study- Summary LOSSAN Corridor Carlsbad Improvement Options of Economic and Fiscal Impacts - 3 Scenarios Figure A . All Numbers Expressed in 2016 Million Dollars _ At-grade Short Trench Lang Trench Low I Middle High Low Middle I High Low r Middle High Construction Cost Total Cost $62.0 $224.1 $335.1 Value of Lives Saved and Injuries Avoided Total Value ($228.9) ($406.9) ($567.9) $363.2 $645.6 $901.2 $484.7 $861.6 $1,202.7 Economic Impacts Value of Time Saved ($71) $10.9 $12.7 Secondary Economic Output of Construction $35.4 $139.2 $208.1 Property Value ($171.6) $3,432.0 $3,432.0 ' Retail and Restaurant Sales $0.0 $1,922.1 $6,890.2 $15,785.5 $1,958.4 $7,642.8 $17,003.2 Total Economic Impacts ($143.4) $5,504.2 $10,472.3 $19,367.6 $5,611.2 $11,295.6 $20,656.0 Fiscal Impacts Additional Sales Tax $0.0 $19.2 $68.9 $157.9 $19.6 $76.4 $1713.0 Property Tax due to Reduced Noise, Traffic Congestion ($1.7) $34.3 $34.3 Property Tax due to Reduced Noise ($1.7) $1.6 $2.0 $2.3 $2.9 $3.3 $3,7 Property Tax due to Improved Beach Access $0.0 $2.6 $2.6 Transient Occupancy Tax $0.0 $0.0 $0.0 Total Fiscal Impacts ($13) $56.1 I $105.8 I $194.8 $56.5 $113.4 I $207.0 The At-grade alternative has the lowest construction cost of the three alternatives at $62.0 million. The results of the data analysis indicate negative value of lives saved and negative economic and fiscal impacts (estimated as ranging from -$228.9 million to -$567.9 million, at -$143.4 million, and at -$1.7 million, respectively), primarily due to loss of life and time, as well as changes in property values. Trespasser incidents resulting in motorist and pedestrian death could potentially be reduced with crossing improvements and fencing of the railroad corridor made in the At-grade alternative. The current construction cost estimate for the At- grade alternative includes new quadrant gates and crossing modifications. However, there is a lack of data showing the statistical effect these improvements have in preventing incidents. Furthermore, the At-grade alternative includes a pedestrian underpass at Beech Avenue, which would likely help to reduce trespasser incidents and boost property values by improving beach access. As with crossing modifications, there is a lack of data showing the exact statistical effect of the underpass. The primary cause of the At-grade's negative economic and fiscal impacts is the expectation of an increase in lives lost as train traffic and the opportunity for accidents increases (see Figure D). Other causes include a decline in property values due to higher noise and traffic congestion levels, and greater delays due to traffic congestion. The Short Trench has a significantly higher construction cost of $224.1 million, but has estimated fiscal and economic benefits in the billions of dollars, the most prominent of which are the expected additional retail sales, higher property values, and the value of lives saved. Other significant benefits include the economic output resulting from construction, additional sales fax revenues, and greater property tax revenues. In total, the value Page 5 Item #1 March 18, 2017 Page 30 of 102 Total Economic Impacts - 2016 Million Dollars ($5,000) 1 LOW MIDDLE HIGH AT-GRADE LOW MIDDLE HIGH SHORT-TRENCH 1 LOW MIDDLE HIGH LONG TRENCH is Retail Sales LI Property Value ci Value of Lives Saved and Injuries Avoided Value of Time Saved El Secondary Economic Output of Construction $25,000 $20,000 $15,000 $10,000 $5,000 $o 1 17=01 Economic Study of lives saved plus economic benefits of the Short Trench are estimated between $5.87 billion and $20.27 billion, while fiscal impacts are estimated from $56.1 million to $194.8 million. The Long Trench has the highest construction cost, estimated at $335.1 million, as well as the highest fiscal and economic benefits. Overall, the value of lives saved plus economic benefits range from $6.10 billion to $21.86 billion. Fiscal benefits are estimated between $56.5 million and $207.0 million. It should be noted that after the analysis for the Study was completed, the required vertical clearance for the project was changed from 26 feet to 24 feet. Since the analysis was already complete, it was not changed. However, RSG notes that a lower required vertical clearance would allow for lower construction costs in the Short Trench and Long Trench alternatives, which would correspond to a reduced construction duration as well as lower economic impacts of construction. As described in the Feasibility Study, the reduction equals 5-6% of the construction cost estimates identified in this Study. Figure B — Total Projected Economic Impacts Page 6 Item #1 March 18, 2017 Page 31 of 102 TotaA Hscall Impacts - 2016 MMion D !laws $250 $200 $150 LOW MIDDLE HIGH LOW MIDDLE HIGH LOW MIDDLE HIGH la Property Tax - I m proved Beach Access Pro perty Tax - Reduced Noise and Traffic Congestion • Addition al Sales Tax $100 $50 $0 ($50) AT-GRADE SHORTTRENCH I LONG TRENCH Train Inddents in Carlsbad & Solana Beach Injuries and Fatalities CARLSBAD SOLANA BEACH CARLSBAD SOLANA BEACH BEFORE 1998 AFTER 1998 L; Fatalities • Injuries to Unspecified Incidents 25 20 15 10 0 No Incidents Economic Study Figure C — Total Projected Fiscal Impacts Figure D 4 Page 7 Item #1 March 18, 2017 Page 32 of 102 To the members of the: CITY COUNCIL ACM v CA cc Date211/0 City Manager V (.:27, !rt.:CC 171" (City of Carlsbad Memorandum February 15, 2017 To: Mayor and City Council Members From: Gary T. Barb erio, Assistant City Manage Via: Kevin Crawford, City Manageli Re: Hub Park Lease This memorandum, including all attachments, is intended to serve as supplemental information in support of the February 21, 2017 City Council Goal Setting staff report. As indicated in the February 21, 2017 Staff Report, at its June 21, 2016 meeting, the City Council received a report regarding the Hub Park Lease. Council direction at that meeting was to reconsider the discussion and priority of the Hub Park Lease area at the City Council's 2017 Goal Setting Workshop. Attached for your reference, please find the staff report, PowerPoint presentations and the minutes from the June 2016 meeting. One point of discussion and concern at the June 2016 City Council meeting was the expected completion date of the Carlsbad Trails Master Plan. The anticipated completion date for the Trails Master Plan is end of summer 2017. GTB:mf Attachments CC: Parks & Recreation Director Chris Hazeltine City Manager's office City Hall 1200 Carlsbad Village Drive I Carlsbad, CA 92008 I 760-434-2820 t Item #1 March 18, 2017 Page 33 of 102 Staff Report Item #1 March 18, 2017 Page 34 of 102 CITY OF CARLSBAD AGENDA BILL ABU 22,321 REPORT AND PRESENTATION REGARDING THE HUB PARK LEASE DEPT. DIRECTOR MTG. 06/21/2016 CITY ATTORNEY DEPT. CM CITY MANAGER RECOMMENDED ACTION: To receive a report and presentation regarding the Hub Park Lease and provide direction to city staff as appropriate. ITEM EXPLANATION: Recently, a number of community members have inquired about the possibility of the city developing passive recreational uses such as hiking trails and view-points on the property covered by the Hub Park Lease (Exhibit 1). This Agenda Bill provides background and a summary of the Hub Park Lease provisions and the property in general, offers an overview of the opportunities, constraints and challenges to executing the lease, and outlines an option for a course of action should the City Council wish to pursue further work in this area. Lease and Property Background: As a result of Encina Power Plant-related development activities initiated by San Diego Gas & Electric (SDG&E) and in direct response to significant community concerns that were raised in 1975 regarding the proposed development of an oil refinery on property east of the 1-5 freeway owned by SDG&E, the city entered into what is known as the Hub Park Lease with SDG&E in November of 1975. The lease covers an area of approximately 96 acres on the south shore of the Agua Hedionda Lagoon (Exhibit 2). SDG&E continues to be the owner of the property. A majority of the Hub • Park lease area is subject to the provisions of Proposition D, adopted by the voters of Carlsbad in 2006. A majority of the Hub Park lease area was also proposed for purchase by and was a part of the Agua Hedionda South Shore Specific Plan initiative sponsored by Caruso Affiliated. The Agua Hedionda South Shore Specific Plan was the subject of Measure A, which was defeated by the voters of Carlsbad in February 2016. The initial 60-year Hub Park lease term runs through November 2035, and may be extended for four additional periods for a maximum lease term of 99 years, or until 2074_ The lease provides that the city may use the land for park and recreation purposes. Under the terms of the lease the city must pay rent in an amount not to exceed $14,000 annually, with rent due at the time the city has an adopted plan for development of the land and has obtained all permits necessary to initiate development of the property. The lease acknowledges that a portion of the Hub Park lease area is currently leased to and may continue to be leased to an agricultural user, currently the Carlsbad Strawberry Company. Prior to the city initiating actual development in the lease area, the city is required to provide a one-year advance notice so that SDG&E can arrange termination of the agricultural lease use. DEPARTMENT CONTACT: Gary T. Barberio, Assistant City Manager, 760-434-2821 gary.barberlopcarisbadcagov FOR CITY CLERKS USE ONLY, COUNCIL ACTION: APPROVED DENIED CONTINUED WITHDRAWN AMENDED CONTINUED TO DATE SPECIFIC CONTINUED TO DATE UNKNOWN 0 RETURNED TO STAFF 0 OTHER — SEE MINUTES Item #1 March 18, 2017 Page 35 of 102 Hub Park Lease Area June 21, 2016 Page 2 Analysis: Execution of the Hub Park lease provides an opportunity for expanding passive recreational uses such as hiking trails and view-points on the 96 acre property. However, the property is also highly constrained and development of the property presents many challenges. The opportunities, constraints, and challenges exhibited by the 96 acre Hub Park lease property are summarized as follows: Opportunities 96 acres (gross) of property under city control to 2074 Public access could be provided for first time in over 60 years Lagoon frontage and views Development consistent with the values of the Carlsbad Community Vision Development consistent with Open Space & Conservation Resource Management Plan (OSCRMP) Development consistent with draft Trails Master Plan Proposition C —Open Space and Trail Connections set-aside fund Future trail connections - West to 1-5 and coastline - Cannon Road undercrossing - AHLF Discovery Center - Veteran's Park - Crossings Golf Course trails - Carlsbad Ranch Specific Plan trails Constraints and Challenges Property Deed Restrictions Cal Coastal Commission (CCC) OS Deed Restriction and existing HMP Hardline — 62 acres of lease area Utility Easements/Power line Corridor —41 acres of lease area -Net lease area is 34 acres (net of OS deed restriction) -Net-net lease area is 16 acres (net of 05 deed restriction & utility easement) Land Use/Zoning Policies, Regulations, and Permits Carlsbad General Plan Local Coastal Program (LCP) Agua Heclionda Land Use Plan provisions No LCP Implementation Plan — Coastal Development Permit issued by CCC Proposition D Implementation provisions of the Cannon Road Agricultural/Open Space Zone Carlsbad Habitat Management Plan (HMP) provisions Lease area not included in Growth Management Program -not needed for Park compliance -not included as Park in the Zone 13 Local Facilities Management Plan (LFMP) -not included as Park in the Zone 13 LFMP financing plan Permitting/CEQA issues and costs State and Federal Resource Agencies — US Army Corps, US F&W, CA St F&W, RWQCB Item No. 1 - AB # 22.321 June 21. 20166 Page 2 of 20 Item #1 March 18, 2017 Page 36 of 102 Hub Park Lease Area June 21, 2016 Page 3 Environmental Considerations Pesticide considerations Biological Resource impact avoidance and mitigation considerations Cultural Resource considerations Archeological Resource considerations Storm water/drainage/grading considerations Physical Considerations Steep Topography Lease area is isolated -access to/from Cannon Road is significantly challenging -location of a trail-head is problematic -no direct trail connection to existing trail system Legal and Lease Considerations Property is leased, not owned Historical and existing Agricultural use and tenant provisions Lease rate As can be readily appreciated by the above enumerated opportunities, constraints and challenges, it is evident that any planning, public outreach, environmental review, permitting, and development of passive recreational uses such as hiking trails and view-points on the 96 acre Hub Park Lease property will take a significant amount of effort, time, and resources. Any work effort in this area at this time would compete for resources with the many other initiatives and projects already anticipated by the City Council's adopted goals and in the city's adopted capital improvement program, many of which are planned and needed for compliance with the provisions of the city's growth management program. Options for Consideration: If the City Council wishes to pursue further analysis and work in this area, staff would recommend that the City Council consider the merits of such an effort and the resources necessary to undertake it at their next annual goal setting workshop. If, after consideration as a part of the goal setting workshop process, the City Council determines to move forward, staff will develop a comprehensive work plan for this effort, including a schedule and budget, and present the work plan to the City Council for their consideration. FISCAL IMPACT: There is no fiscal impact associated with this report. ENVIRONMENTAL IMPACT: The activities associated with receiving this report will not involve or result in any disturbance to the environment, and is categorically exempt from the California Environmental Quality Act (CEQA). CEQA Section 15306 describes the following activities as being exempt from environmental review: "...basic data collection, research, experimental management, and resource evaluation activities which do not result in a serious or major disturbance to an environmental resource. These may be strictly for information gathering purposes, or as part of a study leading to an action which a public agency has not yet approved, adopted or funded." Itimm No. 1 - AR # 22.321 June 21. 2016 Page 3 of 20 Item #1 March 18, 2017 Page 37 of 102 Hub Park Lease Area June 21, 2016 Page 4 EXHIBITS: 1, Hub Park Lease 2. Map of Hub Park Lease Area 3. Map of Hub Park Lease Area Constraints 4. "Proposal for Public Access and Trail Project on Hub Park/Proposition D Open Space Lands", submitted to the City Council by Ms. Vicky Syage on June 14, 2016. Item No. 1 - AB #122.321 June 21. 2016 Page 4 of 20 Item #1 March 18, 2017 Page 38 of 102 • EXHIBIT di S E TB 2 '10.v.013ex 4 , S LEASE, made anci entered into as of the. 16th clity. 19 75 , by and between SAN DIEGO GAS & ELECTRIC COMPANY a California corporation, hereinafter called "Lessor' and the CITY OF CARLSBAD CALIFORNIA, a municipal corporation, e hereinafter called "Lessee" tilITNE-SS,ETH: WHEREAS, In 1971 Lessor requested specific. plan approval for certain public utility operations in the City of Carlsbaft and. WHEREAS, In the course of processing said request Lessor offered to make a portion of the property covered by the specific plan. available to the Lessee for park andrecreational -purpose .and WHEREAS, Said offer waS accepted by Lessee and incorpor-: ted in Ordinance No. 9279 which approved the specific plan as a condition thereof and WHEREAS In accordance.with Section 2 Condition No. of Ordinaiöe No.. 9279, Lessor and Lessee have resolved the details regar ing the lease of certain hereinafter described real property; NOW, THEREFORE, in consideration of the performance of. the terms and conditions hereof the parties atg5ee as follows: 1. Leased Premises. Lessor does hereby lease to Lessee , ItPm 1\1-n. 1 - —AR 44 77271 June 21. 2016 Page 5 of 20 Item #1 March 18, 2017 Page 39 of 102 those certain premises located in the City of Carlsbad, St te of California, containing approximately ninety-one (91) acres as generally shown on the map marked Exhibit "A.", attached hpeth. and made a part ,hereof. Less-or' shall survey the premises within ninety (90) days of the execution. of this lease and shall furnish -Lessee with a legal description to. be attached hereto as Exhibit "B" and made a part heredf. 2. Use. The leased premises may be used by Lessee for park and recreation purposes which shall be supervised*to the same extent as other comparable properties owned by Lessee and used for the same purpose. Lessee shall not use the_leased- premises for any commercial or business purpose that does not reasonably relate to the use of theprethiseS.for park and recreation _ purposes. . 3, Term.. The term of this lease shall be fora period of sixty (60) years commencing on the/Othday of November 1975 and ending on the 9th day Of November 2.035 • 4. Renewal. Within nan ty (95) days from the expiration of the initial sixty (60) year term and each succeeding term thereafter, the parties may by written mutual agreement renew this lease for three (3) additional periods, each consisting of a ten (10) year term, plus one (1) additional term of nine (9) years. In no event shall the cumulative terms exceed ninety-nine (99) --11P.Prs 5. Additional Construction. This lease is made upon the express condition that the leased premises will be available for 2. Kern No. 1 - AR if 22.321 June 21. 2016 Page 6 of 20 Item #1 March 18, 2017 Page 40 of 102 . use by LeSsr .at -)y and all times for e IFir or maintenance-.. . of existing and .future facilities, as well as all other d-pera-Eions necessary in.connection with -its public utility operations It is understood that Lessor may _Construct additional electrical trans- F. . • MiSsionlines and/or other utility lines upon :the. leased"TreMises .and reserves th9 right to accomplish said construction. Lessor shall ?make reasonable effortsto coordinate such.activities with Lessee t minimize the interference with he Lessee's use of the Premises. 6. Rent. fessee agrees to pay Lessor rent based on the amount of one half of the taxes asseSsed against the leased premises and paid by Lessor, but in no case shall the amount paid by the City exceed the sumof fouaeen thousand'dolaars (0.4,600) annually. Lessee and Lessor shall take all reasonable steps to relieVe Lessor of the real property tax liability on the leased premises for the term of the lease or any renewal as herein provided. The obligation of Lessee to pay rent shall not commence until five (5) years after execution of this lease or until Lessee has adopted a plan of develop- -ment for the premises and obtained all permits necessary to accomplish the development, whichever occurs later. - 7: 'Improvements. . Lessee shalrhave the right to construct improvements .npon the leased premises-. Lessee agrees to consult with Lessor regarding any proposed improvements prior to the commencement of construction. -No improvements, including' grading or structures of any type, shall interfere with- Lessors public utility facilities or operations on the leased premises. Lessor may ielocate in a mutually • agreable manner any such improvement at Lessor's* expense. Lessor Oirv.taie- every reasonable Means-to avoid:relocation of Lessee's Improvements. Upon termination of thiS.lease, after.receipt of a . - written demMld from Lessor Lessee shall remove all improvements 'tarn- Airs 1 L-7311 "r) q71 r)acb 7 ;if --)n Item #1 March 18, 2017 Page 41 of 102 , within ninety (90). days at LeSsee.'s expense. 84 Protection and Patrols, Lessee agrees to police, regulate, and control the entry and activities in and upon the leased premises to the same extent as other comparable Property owned. by Lessee, -In'addition, Lessee will take reasonable steps *to protect all Lessor-owned property surrounding or adjacent to the leased premises and exterior thereto so as to mipimize any r • and all disturbances and damages, including the possibility of .damage to property and injuries to persons incident to the use of said premises by any person entering thereon. Said protection shall be consistent wrth the protection given to Other private property in the City of Carlsbad. 9. 'Waste. Lessee shall not commit, suffer, nor permit any waste, nuisances or unlawfill'acts on the leased premises.,:and shall at all-times maintain the same in a clean and sanitary con- dition in compliance with all applicable rules laws, regulations, and ordinances respecting .health and safety of the City of Carlsbad • . and County of San Diego, and-the State of California. - 10. Right of Entry. Lessor reTerves the right to enter upon the leased premises at any time for the purpose of viewing patroling and inspecting the same to see if Lessee is faithfully complying with the terms and, conditions of this lease. 11. Rights of Lessee. Lessee shall have no rights liar acquire any interest in or to the leased premis:es other than as upvided in this lease and as a lessee and tenant thereof. 12. Default. Should default be made in the performance of any, of the terms and conditions of this lease and such default shall continue for sixty (60) days after Lessee has been notified Item No. 1 AB # 22.321 A' IiirtrA "1 ',ilia o Item #1 March 18, 2017 Page 42 of 102 3 in writing of such default hen Lessor may re-enter, take Possession of said-preMises, and remove any and all persons.and'pr4erty of • Lessee therefrom. • 13. Assignment. Lessee shall not a sign this -se nor , ublease he leased premises except upon the.. writtenconsent of Lessor which shall not-be unieaSonably.withheid. Subject to the terms and provisions of this lease, Lessee may make anyjoint'use agreement for the use or improvement of the premises and may grant permits"; licenses or priviledges to any agency,-person or varther-_ 'Ship to enter upon and/or use any or all of the lease premises, upon ,terms and conditions as the Lessee deems necessary or desirabIe.. 14: Waiver. Any, waiver by Lessor of any breach of one or more of the terms, covenants, and conditions of this lease shall -not be a Waiver of any subsequent or other breach Of the same', or . of any, other term or condition hereof 15 -Indemnity. Lessee hereby agrees to indemnity, save and 1104 lessor harmless from and against any and all demands.' claims suits, loss, damage, injury, resulting from any act or es. omission-of'Lessee, its employees, agents, permittees, invitees or other persons upon the leased 'premises with or without the consent of Lessee to the person or'persons,Apr property or proper- ties- of any person, including injury to or. death of any person in • any way arising from use and occupancy of the leaied premises by.. •. Lessee its agents, servants, employees, or invitees whether a-ebual-or implied by law. It is the mutual intention and agreement o the parties that the foregoing indemnity provisions shall extend to any and 5- 1 AD 44 "13 3-11 I.-.)1 1111 g' Dnrra Cl'iNf 111 Item #1 March 18, 2017 Page 43 of 102 all damages suffered by Lessor to it property adjacent to the leased premises or injury to or death of any person upon thp adr jacent property in any way arising from the use or. occupancy of the leased premises, -occasioned by the negligent, willful, or .intentional acts or omissions f any personsi using and who may be in or upon the leased premises. 16. Liability Protection. Lessee agrees to include the leased property in the liability 'protection program in use for other property owned bz-Lessee. ' 17. Notices. Notices to be given from or to either party may be addressed as follows: a. Lessor at 101 Ash Street, San,Diego, California 92101. b. Lessee at 1200 Elm Avenue, Carlsbad, California 92008. Notices shall be deemed given hereunder when placed by either party In the United States mail, postage prepaid, certified, and properly addressed to the other. -.18., Ordinance No. 9279, Section 2, 13-B, 1-3. It is agreed that construction of park- improvements, under Paragraph 7 of th16 • lease, are not considered develoPMent of Lessor' property as Specified in Ordinance No:. 9279, Section 2,13-B, 1 .3 ---19. Existing Agricultural Lease. Lessee recognizes that a part of the park lease area is presently being leased by Leisor for agricultural purposes. Lessee agrees that'Lessor May continue .to'lease this area for agricultural purposes and. will not require y the cancellation until Lessee's plans to develop the leased premises for its intended park use are ready to be implemented. Prior, to Item No 1 - AR it 7) 1-71 6. . "el nnoi f•i Item #1 March 18, 2017 Page 44 of 102 Ap R 'TED AS TO FORM: J• A'47 V nâèntP. Blond°, J City Attorney AD 4411 V11 Itir“-%71 1,11,g 1 implementation, Lessee agrees to provide Lessor with one year advance notice so-that Lessor can arrange the termination of the agricultural use. IN WITNESS WHEREOF, 'the parties have indiVidually executed and caused this lease to be executed for. and on behalf cd each by their respective officers or agents as of the day and year first • above. written. SAN DIEGO GAS & ELECTRIC. CO a 'a Cali fornia corporation , 4,4 • Senior Vice President ' -LESSOR • CITY OF CARLSBAD, a Municipal Corporation og,the State of .Californi ROBERT C. FRAZEE, Mayor LESSEE LEWIel. CHASE, Vice Mayor Item #1 March 18, 2017 Page 45 of 102 LEGAL DESCRIPTION OF MUD PARK SITE CITY OF CARLSBAD ' . 'That portion of Lots "F" and. "B" of Rancho Ague. Hedionda, in the City of Carlsbad, bounty of San Diego; . State of California, according to Partition Map thereof' N. , 823, filed in the Office of the County Recorder of said County, November 16:, 1896,:desorihed as follows: Beginning at the corner common to Lots I F", "H" and "I"_of said Rancho Agua Hedionda; thence along the,' 'Northerly line of said Lot "F" South 860 52' 04" East (record South 87° 23' 24" East per Record.of Survey No. 7938),.1456.25 feet; thence leaving said line South 22° 501.04" West, 1273.28 feet-to the beginning of-a 949.00 - foot radius tangent curve concave Northwesterly; thence . . Southwesterly. along the arc of said curve through A 'central angle of 18' 39' 20", a -distance of 309.00 feet; thence non-tangent North 84° 52' 43" West, 2517.07 feet; thence North-27° 23r 43" West, 392.39 feet; thence North 846 52'.43" West, 453.19 feet; thence-North 07° 51'- 4.3"- West; 259.19 feet; thence North 89° 26' 05" West, 404.67 feet; : thence North 16° 24' 38" West, 440 feet more or less to the mean.high,tide line af'Agua Hedionda uper Lagoon; thence Southeasterly, Northeasterly and Northwesterly along said mean -high tide line to the Northeasterly line of said Lot "II"; thence along said line South 64° 01' 41" East; 275 feet more or less to the-POINT OF BEGINNING._ DESCRIPTION EP ED ElY . . PF 1fer6 NO7 22,321 June 21, 2016 Page 17 nf 71) Item #1 March 18, 2017 Page 46 of 102 1,000 600 0 Exhibit 2— Hub Park Lease Area Legend =11 Hub Park Lease Area Data PlIntild WSW' &EI Fl'414 """nr="11rT TWO it 22.321 1,000 Feet nna Item #1 March 18, 2017 Page 47 of 102 1,000 500 0 1,000 Feet Legend ; 14 Hub Park Lease Area Exhibit 3 — Hub Park Lease Area Constraints EMI Open Space Deed Restriction 11777;i Utility Easement Powerline Corridor Datto Printout 6115/2016.1ompo Dale: Piora tool JitRniononitrath,t..01.1ttiyikr16:1164.30,,jai, oolzos n _C nfl rt Item #1 March 18, 2017 Page 48 of 102 EXHIBIT 4 ,7 ( 7, 0 ) " rAte111)0 u b C, 941 illt2iftj- )_)iirlillt",_`J \f J PROPOSAL FOR PUBLIC ACCESS AND TRAIL PROJECT ON HUB PARK/PROPOSITION D OPEN SPACE LANDS Item #1 March 18, 2017 Page 49 of 102 PROPOSAL FOR PUBLIC ACCESS AND TRAIL PROJECT ON HUB PARK/PROPOSITION 13 OPEN SPACE LANDS I. INTRODUCTION AND CONTEXT This is a citizen group prepared proposal for the city to construct a public trail project on the Hub Park/Proposition 0 Open Space lands located south of the Agua Hedionda Lagoon. In 1975, the city entered into a lease agreement with San Diego Gas and Electric Company ("Hub Park Lease") that granted the city the legal right to use a portion of the company's land located south of the Ague Hedionda Lagoon for public park and recreational uses. The Hub Park Lease consists of 91 acres and was granted as a condition for the city approving a Specific Plan which allowed the expansion of operations at the Encina Power Plant. The lease would allow public access to and the construction of a trail project. The trail project described in this proposal would be located on the Hub Park Lease area. Proposition 0 was approved by Carlsbad voters in 2006 and placed a permanent open space designation on approximately 155 acres of land south of Agua Hedionda Lagoon and north of Cannon Road, The Hub Park Lease area is part the Proposition 0 open space land. The Proposition stated, in part, that the purpose was "to allow public use, access and community gathering places to occur in the area". The Permitted Use Section of the Proposition specifically lists public trails as a permitted use. Therefore, the public trail project described in this proposal is consistent with Proposition D. Proposition C was approved by Carlsbad voters in 2002 and provided the city with authorization to spend more than $1 million on several projects including open space and trails. In the city's 2012-13 Budget, the City Council transferred $5 million of the Proposition C funds to a line specific item for open space and trails. Therefore, funds are available to construct the trail project described in this proposal and the voters have already given authorization to use the funds for this type of project, The trail project is also consistent with the city's existing Citywide Trail Plan. That plan shows a future trail in the same general location as the trail shown in this proposal. The trail project Is also consistent with the standards and guidelines contained in the "Citywide Trails Report" previously prepared by the city. An important feature of the project is that it has been planned in a manner that allows viable connections/linkage to other existing and future trails as shown in the Citywide Trail Plan and as further described in detail in the Project Description section of this proposal. As such, this project could be viewed as Phase 1 of a larger, future trail project(s) that would provide public access to the entire south shore of Agua Hedionda Lagoon as well as other areas of the city. There was community disagreement recently over a development project located adjacent to the Hub Park/Proposition 0 Open Space lands (Measure A). Citizens on both sides of this issue were in agreement, however, in their desire to have public access and trails on the open space lands. The vision of this proposal for the construction of a trail project on Hub Park is to take a major step in unifying the community. 'tom hIn 1_ H g/1 (to a 1f11 C ok•IP '111. Item #1 March 18, 2017 Page 50 of 102 II. DETAILED DESCRIPTION OF TRAIL PROJECT Except for an entrance off Cannon Road, the proposed trail project would be located entirely on the city's Hub Park Lease area and is shown on Attachment 1 to this proposal (Proposed Trail Plan). It would be approximately one mile in length, 8 feet wide, unpaved and available for both hiking and biking users. The trail would be located outside of and setback from the City's Habitat Management Plan preserve boundaries and split-rail fencing is proposed along the edge of the trail closest to the preserve. Access to the trail project would be provided by an entrance off Cannon Road at the existing, signalized intersection of Cannon Road and Grand Pacific Drive. A small, unpaved parking area could be provided next to the entrance. Some grading of the existing slope located on the north side of Cannon Road would be required, Additional trail amenities being proposed Include three picnic areas with tables, benches and shade structures and two vista points with benches. The location of these trail amenities are also shown on Attachment 1. With these amenities, the trail project will not only provide for recreational use but for community gathering spaces for social interaction. The vista points will provide for spectacular views of the lagoon. The trail project has been planned to allow for connections/linkage to existing and future trails as shown on the Citywide Trail Plan. These trail linkage points are shown on Attachment 2 to this proposal (Trail Linkage Map). These trail linkage points include: 1) a westerly connection to remaining open space on the south shore of Agua Hedionda Lagoon; 2)a southerly connection to the previously constructed under-crossings at Cannon Road and Armada Drive which would provide a continuous trail linkage to the existing trails near LegoLand, on the Municipal Golf Course and on Veterans Memorial Park; 3) a possible easterly connection to the Ague Hedionda Lagoon Foundation Discovery Center; and 4) a potential, northerly connection which could provide public, pedestrian access to the existing, sand beaches located along the south shore of Ague Hedionda lagoon. III. COST ESTIMATES FOR TRAIL PROJECT The cost estimates for the construction of the Hub Park Trail Project utilized the "Citywide TrailsReport" previously prepared by the city (adjusted for rate of inflation), citizen research and input from construction professionals. Because the Hub Park Lease area has been farmed in the past, the estimate also provides for soil testing. The estimates are as follows: Trail Construction (clearing, grubbing, grading)-$207,000 Trail Amenities (3 picnic tables,3 sun shade structures, 4 vista sitting benches, 5 trash receptacles with dog-waste bag dispensers-$57,800 Split-Rail Fencing (adjacent to entire HMP preserve boundaries)-$120,000 Storm Water Runoff Prevention Measures and Erosion Control-$30,000 Soil Testing-$10,000 Total Project Cost E mate-$424,800 IV. REQUESTED CITY COUNCIL ACTION It is requested that the City Council indicate its support for the Hub Park Trail Project as presented in this proposal and refer it to staff to determine the appropriate and applicable procedures for processing the project including environmental review and the opportunity for maximum public input and review. Item #1 March 18, 2017 Page 51 of 102 V. ATTACHMENTS Attachment 1. Hub Park Proposed Trail Plan Attachment 2. Hub Park Trail Linkage Map 14,-...." M. 1 An 44 Item #1 March 18, 2017 Page 52 of 102 RoAD CANNON \\ 3 wei. 0 AGUA HEDIONDA LAGOON , 1 ri, % . . . • . •••% • S .•••••• .... . N, ,.... ......- ..........- 7' ' ---- I'! 1 , 1.. 0 - V A 0 lez _ -% LEGEND.. PROPOSED TRAIL PICNIC AREA • VISTA POINT HMP HARDLINE HUB PARK LEASE , PROP. D LAND 500 1,000 Feet HUB PARK PROPOSED TRAIL PLAN Item #1 March 18, 2017 Page 53 of 102 0 500 1,000 FE* NNW AGUA HEDIONDA LAGOON .11• tk. . k '7 / „......."">7 ../.;;:' ------.......„...„„ .4)." i sc."---._,................ .' ." ( 0 quj ,t1 /1 CANA11711.a . . SP 1— IX . i \ 0 1 Z \ ):. \A •"0 0 . , 1 C 10 1 4 % 0.. °Ii 4C LEGEND: PROPOSED TRAIL PICNIC AREA • VISTA POINT HIVIP HARDLINE FUTURE TRAIL LINK HUB PARK TRAIL LINKAGE MAP Item No. 1 - AB # 22.321 t..— — 014 n..r n r Item #1 March 18, 2017 Page 54 of 102 City Presentation Item #1 March 18, 2017 Page 55 of 102 Hub Park Lease Gary T. Barberio, Assistant City Manager June 21,2016 Item #1 March 18, 2017 Page 56 of 102 Today's Agenda • Purpose • Lease history • Lease provisions • Opportunities 9 Constraints & challenges • Staff recommendation Item #1 March 18, 2017 Page 57 of 102 Purpose * Community member inquiries City Council member request Item #1 March 18, 2017 Page 58 of 102 Lease History • Result of activities initiated by SDG&E • Encina Power Plant • Macario Refinery proposal * Entered into in 1975 • ±96 acres on Agua Hedionda Lagoon south shore Item #1 March 18, 2017 Page 59 of 102 The outlined itatkiete morel or land propmed for Ma elm 0/11w Muuwio Indapeneeni Refinery 4 approximately three miler tali oi Xhe Engine Power Plant (bailout center), The Malty limit mould be apnea on 320 ocrer wan iaiihin the parcel boundorier. • Nevvsc Notes from Macario Independent Refinery PUl3LISHED NOW In THEN "FUEL FOR TROUCHIT" NO. Two Firms Study Feasibility of Macario Refinery Near Carlsbad Pacific Resources, Inc. of Hawaii curd San Diego Cot &Metric Com-pany aro conducting airing iLy atudy for din nun thou of no refinery emu Car ('be facility would produce low- Sulfur fuel oils for pont plonla and rnitlio sn (synthetic natured SW. or gasolinic, lcut not both HNC and gasoline. James F. Onry, PRI Punkleak and Walter k Zuiiau SD= meal. dont, mid that the MG configura- tion would require an investment of $1.52 =Tien, while the gasoline con- cept would require a 8114 million invostnical. Neigh of Airpert The proptued situ is north of tho Palomar airport, aboot throe lac* fial4t oh SIDE&R's marina borminel at the Midair Power Plant, 'Thu Filo is owned by 4 wholly-owned SDC&Iil subsidiary. aryanld out PRI, headquar- tered In Honolulu, would be the operator and majority corner. PRI owns CASCO, Hawaii's gas public mad oporolco Um Hawaiian ludeponden I liolluory, inn, near Honolulu. A delegation seleated by the Carls-bad Chamber of Commerce recently Monied from An inerpoefien trip of the Honolulu facility: SDC&Z now rocelves approxi- mately nue-third of Its lomaistfor fuel ea supply from tlia Ihmaiinn mfinerY. SEGER of this Cm in teen no the principal customer of the ma- imed Ladlity, which has limo named the Maude Independent Many. Early Disclosure blade "Because of to community impor- tance)' Zillea Enid, 'the two cow- ponies made on early dischmoro, ho- npiio the Ind that mush planar's% remained to ho done. °During the newt year, we will be - conducting environmental mid other ouches, on well no uppoming befonr tho various Marne &Conant+ run-corned wilh air and viola qualit), land-uee planning, construction standards, and other community im tamale to-Prove-out Um Pr:Total-1" Clean Plant Promised Both Zitlau and Gary combatted that whatever istdticantelYPtcPucall Hem on engineering otandneint would permit plant operations to meat or exceed dm Appropriate local, alai o, or fa dorol environment.' standards. 'We built out! 11* operate a clean ploul In envimumentally.conceicrut Hawaii, and with that'experieneo we bollesn we bare the modentiola Inn plan mid operate in faddy that MR moot the needs nod desires of the people hem, Cory said. Item #1 March 18, 2017 Page 60 of 102 , '1)- Exhibit 2 — Hub Park Lease Area Lmaint Hub IlarK LeAuAilab 1.000 Feet 1,000 000 0 Item #1 March 18, 2017 Page 61 of 102 Lease Provisions 60-year lease through 2035 — Four extensions for 99 years or through 2074 • $14,000 annual rent — Adopted plan and permits in place • One-year notice to SDG&E to allow agricultural lease termination Item #1 March 18, 2017 Page 62 of 102 Opportunities 471 • 96 acres • South shore lagoon location and views • Carlsbad Community Vision 9 Consistent with OSCRMP and draft Trails MP • Prop C — Open Space and trails fund • Future trail connections Item #1 March 18, 2017 Page 63 of 102 owirost14110Mx! qnki pinSal 000'L 0 005i 00041. eaAttaseal ved qniq —,z Hcilqx3 Item #1 March 18, 2017 Page 64 of 102 Constraints & Challenges * Property deed restrictions • Land Use/ Zoning Policies, Regulations And Permits • Environmental • Physical • Legal and Lease considerations Item #1 March 18, 2017 Page 65 of 102 Legend ktub Pork Leese/Ana Ethibit 3 — Hub Park Lease Area Constraints sp.,. Deodlier,Inclion 1,00D 51:10. 0 1,004.a A Easerneni I Powedne Could°. Item #1 March 18, 2017 Page 66 of 102 Summary .1. • Opportunities exist • Constraints and challenges are numerous • Will require significant effort, time and fa; resources Item #1 March 18, 2017 Page 67 of 102 Recommendation • Consider merits at the next City Council Goal Setting Workshop • If, after goal setting workshop, City Council decides to move forward: — Staff will develop comprehensive work plan process, schedule, budget Present work plan to City Council Item #1 March 18, 2017 Page 68 of 102 Questions? Item #1 March 18, 2017 Page 69 of 102 ;09A 20001 0 •1700 coryonral linrd WIN c3 puagal ealtr'eseel Wed cin1-1 —Z,Vtfitlx3 Item #1 March 18, 2017 Page 70 of 102 1,000 500 0 1.000. feet A Legend r=1 Hun Perk Lena AM1 Open Spate Deed Reel:keen 1=11 gaeanon41PowereaseCnnidur Exhibit 3— Hub Park Lease Area Constraints Item #1 March 18, 2017 Page 71 of 102 Community Presentation Item #1 March 18, 2017 Page 72 of 102 JUNE 21 2016 IC ACCESS AND TRAIL 1;)ROJECT •PEN SPACE LANDS Item #1 March 18, 2017 Page 73 of 102 - - • •, r . , - • ,-, • ••• • • , • '11(111 vi ' 1 71„ti..;7. 1,9 ,i i'..f,i lii' tb7 ()till 4" .111 L I 4 (Air , rr(-11) 41'1'0 Item #1 March 18, 2017 Page 74 of 102 Access to Recreation and Active, Healthy Lifestyles Enhance Carlsbad's defining attributes small town feel and beach community But.id on the city's culture of chflc eriga volunteerism, and phila rithropy. Prioritize protection and enhancernem space and the natural environment. SU and protect Carlsbad's unique open sp agricultural heritage. Promote active lifestyles and cortimuni by furthering access to trails, parks, be and other reCreatiorl opportuniti_ Strengthen the city's strong and diverse and its position as an employment hub in San Diego County, Promote business dive increased specialty retail and dining oppr, and Carishad's tourism, increase travel options through enhani walking bicycling, and public transpor systems.. Enhance mobility' through connectivity and in transporta Small Town Feel, Beach Community Character, and Connectedness Open Space and the Natural Environment The Local Economy, Business Diversity, and Tourism Walking, Biking, Public Transportation, and Connectivity Item #1 March 18, 2017 Page 75 of 102 11.7.1 FACILITY/AMENITY PRIORITY RAKINGS The top five facility and amenity priorities as determined by the community were family picnic areas, outdoor swimming pools, botanical or ornamental gardens, community gardens, and off leash dog parks. Carlsbad Facility/Amenity Priority Rankings _ Overall Ranking Family picnic areas -covered and uncoverec , _ , _ _ , . -,, Outdoor swimming pools Botanical or ornamental gardens Community gardens Off leash dog parks 2013: What do Carlsbad residents want? Parks Needs Assessment concludes: P CN1C AREAS, I FA POINTS LiNkE TRA CARLSBAD City of Canis Item #1 March 18, 2017 Page 76 of 102 Item #1 March 18, 2017 Page 77 of 102 Allunwumo 0141 Apun 01 diaq ffiNk up!slA palom ueldII 40 q1MTualsisuo0 o uppi!sodaid W0J4 apepeAv spund a UOMSOdaid LMAA, SOHCIWOO •asn pue ssaooe ouqnd J04 SMOII eseei mied cinH lesodad paiedead dnoi6 uezmo .1X21.N00 CINV 1VSOdaHd 3E11 Item #1 March 18, 2017 Page 78 of 102 DESCRIPTION OF TRAIL PROJECT Located on Hub Park Lease area mile in length 8 feet wide — unpaved Hiking and bike use Access off Cannon Road Trail Amenities — Public gathering places, picnic areas, and vista points Potential connections and linkage to existing and future trails Item #1 March 18, 2017 Page 79 of 102 500 1,000 Feet LEGEND: - • .gaseleopkte r - PROPOSED TRAIL PICNIC AREA VISTA POINT HMP HARDLINE HUB PARK LEASE PROP, 0 LAND HUB PARK PROPOSED TRAIL PLAN AGUA HEDIONDA LAGOON HUB PARK PROPOSED TRAIL PLAN Item #1 March 18, 2017 Page 80 of 102 AGUA HEDIONDA LAGOON LEGEND: PROPOSED TRAIL PICNIC AREA • VISTA POINT lansti0.111"111k HIMP HARDLINE > FUTURE TRAIL UNK HUB PARK TRAIL LINKAGE MAP .500 1,000 HUB PARK TRAIL LINKAGE MAP Item #1 March 18, 2017 Page 81 of 102 III. COST ESTIMATES FOR ITO ZitstRinGLI E C T $207,000 Trail Amenities: $57,800 Split Rail Fencing: $120,000 Storm Water Runoff: $30,000 Soil Testing: $10,000 Item #1 March 18, 2017 Page 82 of 102 REQUESTED CITY COUNCIL ACTION Demonstrate support for the Agua Hedionda South Shores Trail Project today! Say Yes! Direct Staff to concurrently: I Begin Public Outreach. Initiate trail design/technical studies for CEQA process. Immediately Consult with the California Coastal Commission. 4 Publish project timeline. • Allocate project funding at upcoming budget workshop Item #1 March 18, 2017 Page 83 of 102 Item #1 March 18, 2017 Page 84 of 102 Arnie Cohen Presentation Item #1 March 18, 2017 Page 85 of 102 gpser Look at th S uth shore Trc.iii - -.Proposal Item #1 March 18, 2017 Page 86 of 102 Evaluating the prQ Qsal Read Et understand the plan Tour the property • Review the cost estimates 44.* Key considerations before moving forward + Does the City currently have all the necessary rights to provide public access to the property? + Do the cost estimates reflect the total cost of completing this project? Does the plan fully provide for public safety? Item #1 March 18, 2017 Page 87 of 102 • Trai LEGEND: • • 46121604664.1444 1111111imumagiM PROPOSED TRAIL PICNIC AREA VISTA POINT MAP HAPDUNE HUB PARK LEASE PROP. 0 LAND 0 SOO 1.000 Feet HUB PARK PROPOSED TRAIL PLAN Item #1 March 18, 2017 Page 88 of 102 * Ompps0 TroiI5 Qn a Q.99gle M,ap Item #1 March 18, 2017 Page 89 of 102 Proposed location for entry driveway Et srna, unpaved parking area The City does not currently have rights to the land for the entry driveway and parking lot. (SDGEtE owned Parcel 11) The City would have to negotiate with SDGEtE for that NEW access. There is a dramatic grade change from the road to the proposed parking area. • Does the City currently have alt the necessary rights to the property? Item #1 March 18, 2017 Page 90 of 102 New entry driveway location Grade difference from street to parking area of 20+ feet will require significant engineering Et grading. • "Some grading of the existing slope located on the north side of Cannon Road will be required." • CARsteco Evaluating the Cost Estimates Item #1 March 18, 2017 Page 91 of 102 Evaluating the Cost Estimates ne intQ. pads for eastbound traffic to engineer and construct the necessary median modifications and new turn lane? Item #1 March 18, 2017 Page 92 of 102 Evaluating the Cost Estimates * Potential. displacement of animals Et vegetation in driveway area 1. CAR 'Ra Item #1 March 18, 2017 Page 93 of 102 • •44'.. Evaluating the Cost Estimates Exten5ive non'. p4iyp vegetation throughout • Is this the type of vegetation you want to hike through? Will the Coastal Commission require the removal of invasive plants and the restoration of native vegetation as they have for other projects? Item #1 March 18, 2017 Page 94 of 102 Does the plan fully provide for public safety? * Trail toppgra.phy Proposed trail alignment goes straight up this steep incline instead of incorporating switchbacks as were previously proposed. The trail is proposed as mixed-use for biking Et hiking. The potential for bikers coming down this hill at high speeds creates a dangerous condition for hikers Et families. Item #1 March 18, 2017 Page 95 of 102 4:- Does the plan fully provide for public safety? * Significant portions of proposed trail including 2 of the 3 picnic areas lie directly beneath the power lines. Item #1 March 18, 2017 Page 96 of 102 Does the plan fully provide for public safety? * Soils S andards During the recent election campaign there was considerable concern raised about the "post-agricultural land" and its condition. The following standards were put forth for the previous plan and should also apply to the current proposal: • What level of toxaphene exposure would you say is acceptable for you, your friends and family, for the hiking and biking trails, picnic areas and other passive recreational activities promised.....? • Fails to call for detailed sampling and analysis of those parts of other passive recreational activities (P-OS areas) that contain elevated post-agricultural land slated for hiking and biking trails, picnic areas and levels of toxaphene. ..+ Fails to discuss the potential release of hazardous materials in the P-OS areas, and fails to discuss potential soil remediation efforts. Faits to discuss the potential impact on hazards if contaminated soil would be removed from the project site. Source: www.citizensfornorthcounty.org Item #1 March 18, 2017 Page 97 of 102 nciw§igns * Hub Park was rejected as a viable park during the city's extensive Growth Management planning process. Why is it a better idea now than it was then? \‘, * This plan is much more complicated and costly than what has been suggested in the proposal. Costs not accounted for include: New entry driveway Et parking lot area New left-turn lane and median modifications Environmental review conforming to CEQA Potential extensive habitat restoration Potential soil remediation Et removal * Adding such a complex project, with in the last days before next year's budget adoption does not seem to make good civic or business sense. Item #1 March 18, 2017 Page 98 of 102 Minutes Item #1 March 18, 2017 Page 99 of 102 CITY COUNCIL Minutes Council Chamber 1200 Carlsbad Village Drive Carlsbad, CA 92008 June 21, 2016, 9 a.m. CALL TO ORDER: 9:00 a.m. ROLL CALL: Hall, Wood, Schumacher, Blackburn, Packard INVOCATION: None. PLEDGE OF ALLEGIANCE: Council Member Packard led the Pledge of Allegiance. APPROVAL OF MINUTES: None. CONSENT CALENDAR: None. ORDINANCE FOR INTRODUCTION: None. ORDINANCE FOR ADOPTION: None. PUBLIC COMMENT: Larry Posner expressed his appreciation for the Council's efforts in prohibiting the retail sale of puppies. In addition, he expressed concerns relating to the placement of concrete blocks in front of parking spaces due to potential damage to vehicles and personal injury. Diane Nygaard, representing Preserve Calavera, expressed concerns relating to the City's future removal of palm trees in the Lake Calavera Preserve. Melanie Burkholder voiced her support for the Council and their vision that has resulted in the City of Carlsbad being considered one of the top 10 cities in the state. PUBLIC HEARING: None. DEPARTMENTAL AND CITY MANAGER REPORT: 1. AB #22,321 — Report and Presentation Regarding the Hub Park Lease. Assistant City Manager Gary Barberio reviewed the report and presented a PowerPoint presentation (on file in the Office of the City Clerk). He explained that should the Council wish to move forward with adding trail development within the Hub Park area to the City's current work plan, staff would recommend the following steps: o Consider the work at the next Council Goal Setting Workshop (early 2017) • If after the Workshop, Council decides to move forward, staff would return with a comprehensive work plan which would include process, schedule and budget • As part of the process, staff would likely recommend that a Citizens Advisory Committee be appointed by the Council Item #1 March 18, 2017 Page 100 of 102 June 21, 2016 Carlsbad City Council Regular Meeting Page 2 In response to an inquiry from Council Member Blackburn, Assistant Manager Barberio explained that although facilitating the construction of trails in the Hub Park area would increase access to open space, there are other considerations such as preserving agricultural and environmental resources in that area. He further explained that the City already has a Habitat Management Plan in place that has been approved by the California Coastal Cornmission. Council Member Blackburn confirmed with Administrative Services Director Chuck McBride that the City has set aside approximately $5 million for open space improvements. Of the $5 million, approximately $3.7 million is available at this time. Mayor Pro Tern Wood confirmed with staff that there are archeological artifacts in the Hub Park area, In response to an inquiry from Council Member Schumacher, Manager Barberio explained that the City's lease on the Hub Park property runs through the year 2035. Carlsbad residents Vicky Syage and De'Ann Weimer presented a PowerPoint presentation (on file in the Office of the City Clerk) encouraging the Council to move forward with developing public access trails on the Hub Park property. Carlsbad resident Arnie Cohen presented a PowerPoint presentation (on file in the Office of the City Clerk) encouraging Council to consider all the costs and complications with implementing a trail system within Hub Park property area. Speakers in favor of moving forward with a trail system within the Hub Park area: Elizabeth Banks; Hope Nelson; Carl Pope; Larry Posner; Laurie Boone; Diane Nygaard. Speakers with a neutral position regarding staffs recommendation: Fred Briggs; Kerry Siekmann. Mayor Hall declared a recess at 10:37 a.m. Council returned to the dais at 10:44 a.m. In response to an inquiry from Council Member Blackburn, City Manager Kevin Crawford explained that if the Council were to move forward with developing the trail plan at Hub Park at this time, staff would need to remove some work from the current work plan due to capacity issues. Mayor Pro Tern Wood asked staff if there are specific ADA requirements that must be followed when constructing trails, Park Planning Manager Liz Ketabian explained that there are requirements that staff follows; however, variances are permitted at times. In response to Council Member Blackburn, City Manager Crawford explained that it would be possible to go ahead and assemble a Citizens Advisory Committee if that is what the Council desires. Item #1 March 18, 2017 Page 101 of 102 June 21, 2016 Carlsbad City Council Regular Meeting Page 3 = Mayor Pro Tern Wood expressed support for moving forward with the formation of a Citizens Advisory Committee in advance of the Council Goal Setting Workshop. Council Member Schumacher expressed concerns with moving forward with a segment of trails prior to completion of the Trails Master Plan. Council Member Blackburn also expressed support for the formation of a Citizens Advisory Committee prior to the Council Goal Setting Workshop. Council Member Packard spoke in favor of staff continuing with their current work plan and revisiting the possibility of trails in the Hub Park area at a later date. Mayor Hall suggested that once the Trails Master Plan is complete, the Council should consider the appointment of a Citizens Advisory Committee. On a minute motion by Council Member Blackburn, seconded by Council Member Packard, Council accepted staffs recommendations and requested that staff determine the appropriate time to assemble the Citizens Advisory Committee. Motion carried 4/1 (Wood — No) Mayor Pro Tern Wood explained that she would prefer to assemble the Committee prior to the Goal Setting Workshop and review of the Trails Master Plan; therefore, she voted "no" vote on the motion. COUNCIL REPORTS AND COMMENTS: Mayor Hall and Council Members reported on activities and meetings of some committees and sub-committees of which they are members. CITY MANAGER COMMENTS: None. CITY ATTORNEY COMMENTS: None. ANNOUNCEMENTS: None, ADJOURNMENT: Meeting was adjourned at 11:16 a.m. Sheila R. Cobian, CMC City Clerk Services Manager Item #1 March 18, 2017 Page 102 of 102 ~-. tv\\c.h~ Sc~TL.-Q_V ~'7~~n ~~\~~ \Otl"0"'L~ ~\J of'\\\~ {be;~~) @tho ~llb ~oo.-\ Coui'd \ . CH.Z\PTER 23.08 DESIGN REVIEW yV\e_eh_j 23.08.010 Purpose. A. It is the purpose of this Chapter to achieve and protect a residential, seaside co~nunity which is both beautiful and pleasant in character, by fostering and encourag1ng good design which encompasses the use of harmonious materials and colors, compc.tible proportional relationships and appropriate use of landscaping, and to protect the citizens of the City of del Mar by providing a design review process as hereinafter described. As a means to implement the Del Mar Community Plan intended to preserve and improve the City of del Mar as a beautiful, pleasant, residential community in which to live, work, shop, and pursue leisure time activities, and in order to protect the property values, natural environment, primary scenic views and the aesthetic quality of the community, this Chapter is to be applied in furtherance of the health, safety, and general welfare of the City. [Ord. 4 65, 8 4 9] B. The Design Review Board shall fully consider the beneficial design impacts of a proposed project before analyzing the project for impacts that may violate the regulations of this Chapter. 23.08.020 Prohibitions. A. It shall he unlawful for any person to construct, relocate, alter, remodel or otherwise modify the exterior of any structure, without first having obtained a Design Review Permit, when such activity is required by this Chapter to have a Design Review Penni t. B. No building pennit or pennits shall be issued relating which a Design Review Penni t is Design Review Permit is obtained. other development to a structure for required until the Ji.mended Ncvenber 2C12 23.08.030 General Scope of Requirement. A Design Review Permit shall be required for the construction, relocation, alteration, remodeling or other modification of the exterior of all structures, whether public or private, except as follows: (1) Except as provided in Subsection B or C below, no Design Review Permit is required for the repair, restoration or reconstruction of a structure where such work maintains the outer dimensions and surface relationships of the existing structure. [Ord. 784] B. For projects located within the CC, NC, BC, VC, PC, or RC zones, or within the BSC, Open Space, and Historical Preservation Overlay zones, no Design Review Permit shall be required for the repair, restoration or reconstruction of a structure where such work maintains the outer dimensions and surface relationships of the existing structure, unless such work will involve a modification of the exterior design features of the existing structure or involve a change in the exterior materials or colors in existence on such structure. "Modifications of the exterior design features" as but lS not limited to, the modification of windows, chimneys. [Ord. 565] used herein, includes, addition, deletion or doors, overhangs and C. For projects involving the installation of doors, windows or other transparent surfaces on portions of the outer surface of an existing structure where such doors, windows or other transparent surfaces do not currently exist, a Design Review Permit shall be obtained. ~ The requirement for receipt of a Design Review P~t shall not apply for the replacement of doors, windows or other transparent surfaces that currently exist, provided the surface area of the replacement door window or other transparent surface does not exceed the size of the door window or other transparent surface to be replaced by a factor of more than 10% and/or the replacement door window or other transparent surface ls located on the same building plane and within three (3) feet of the l'.mended l\cvember 2C12 location of the door, surface to be replaced. window or other transparent [Ord. 784] 23.08.031 [Ord. 789 expired August 10, 2008] 23.08.035 Adrninistrative Design Review. A. An applicant for a project involving the construction, alteration, or remodeling of the exterior of a structure which requires a Design Review Permit may apply for an Administrative Design Review Permit in accordance with this section, so long as: [Ord. 716] 1. The proposed project involves only a pool, spa or fence; or 2. The proposed project involves the modification of an existing structure and the outer vertical dimensions of such structure will not be extended or retracted by more than three feet in any lateral direction or involve an increase in height; or 3. The proposed project involves the installation of a skylight which measures not more than four feet in width or length and for which all proposed mechanized operating equipment is located on the interior of the structure on which the skylight is to be installed; or 4. The proposed project involves solely the installation of solar water-heating or solar air- heating equipment, with such equipment installed either on and extending no more than 30 inches above grade; or on an existing roof so as to be generally flush to, but in no event more than five inches above, the level of the roof to which it is mounted; or [Ord. 740] 5. The proposed project involves the construction or installation of an accessory structure which measures not more than 48 square feet in area and not more than s1x feet in height and which meets all required setbacks pursuant to the provisions of Title 30, the Zoning Code. Amended November 2012 B. Notice of the filing of an application for an Administrative Design Review Permit shall be mailed to persons owning property within 300 feet of the project site and posted on the property. The mailed notice of application shall advise persons that plans are available for public review at City Hall and that the application will be administratively approved unless a written objection is received by the Planning Department on or before a date specified in the notice which shall be ten (10) working days after the date of mailing. C. If no timely written objection is filed, the application shall be administratively approved by the Planning Director if it is deemed to be consistent with the provisions of the Del Mar Municipal Code. D. If application processed accordance [Ord. 565] a timely written objection is filed, the shall no longer be administratively and shall instead be processed in with the other sections of this Chapter. 23.08.040 Definitions. A. For purposes of this Chapter, a conclusion that a proposed design element is "unreasonable," must be supported by findings of fact regarding: 1. The extent to which design element adversely impacts upon for which this Chapter is adopted. the the contested purposes 2. Whether the project requires the inclusion of the contested design element in order for the project to be useable by the applicant. 3. Whether the project requires the inclusion of the contested design element in order to produce a project that is similar in quality to development in the neighborhood. 4. The availability of one or more alternatives to the contested design element that will produce a project that is useable by the applicant and similar ln quality to development in the neighborhood. ~~ended November 2012 B. For purposes of this Chapter, "primary scenic view" means a v1ew of the ocean, the cornrnunity, lagoons, canyons or other scenic vistas from the primary living area of a residence. C. For purposes of this Chapter, primary living area shall mean that portion of a residence determined by the Design Review Board, or City Council on appeal, to be the main gathering and entertainment room used by residents and guests at the residence. [Ord. 784] 1. Each residence shall be limited to the designation of only one (1) primary living area. 2. Unless otherwise determined by the DRB, or City Council on appeal, the primary living area of a residence is that portion of the residence that is most often used by the occupants and their guests for gatherings and entertainment, consisting of the residence' s I i vi ng r oorn di ni ng room or great room. 3. Under rare and extraordinary circumstances, the DRB, or City Council on appeal, may determine that another area of a residence is the primary living area when it has been demonstrated that due to extenuating circumstances, the occupants of the residence must use another portion of the residence, rather than its living room, dining room or great r oorn as the r esi dence' s rmi n gat her i ng and entertainment area. 4. In no case shall a bathroom, storage room, stairwell or hallway be designated as a primary living area. D. For pur poses of t hi s Olapt er, "bul k" and "rmss" shal I rrean the appearance of vol urre given by the outer, visible envelope of a structure as viewed from surrounding public or private properties, this appearance generally attributable to the size of the structure and/or its architectural features. [Ord. 647 1 Sec.1) 23.08.050 [Repealed, Ord. 518) ?.mended November 2C:.2